This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S. Inc. for environmental assessment services at the Scott's Custom Cleaners site located at 755 N Indian Rocks Road, Belleair, Pinellas County, Florida. The task assignment is executed under Contract Number HW680 and assigned TA Number DC023B, with an effective completion date of April 21, 2023. Arcadis serves as the primary contractor with Gus Suarez as the project manager, while Theresa Pepe represents FDEP as the department project manager.
Arcadis will complete a comprehensive Site Assessment at the property on a fixed unit rate basis for a total task assignment value of $61,406.92. The contract encompasses three primary subtasks: Project Management (automatically calculated as a percentage of total labor), Site Assessment (including soil, vapor, and groundwater screening, monitor well installation, and subsurface utility location via GPR survey), and Site Assessment Report preparation. Invoicing is structured in two phases: $48,213.53 upon FDEP approval of fieldwork activities (due 12/23/2022) and $13,193.39 upon FDEP approval of the Site Assessment Report and investigation-derived waste manifests (due 03/24/2023). Subcontractors include PDS Drilling ($15,900.00), EnviroServe for IDW disposal ($583.00), and SiteLines for GPR utility survey ($1,100.00). The scope involves up to 18 soil borings, 8 Modified Active Soil Gas Survey (MAGS) wells, 10 vertical profiling locations, piezometer installation, and laboratory analysis of soil and groundwater samples for volatile organic compounds using EPA Method 8260.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC023B Completion April 21, 2023
Arcadis will complete a Site Assessment according to the approved Work Plan.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_5297
755 N Indian Rocks Rd, Belleair, Pinellas County
Scott's Custom Cleaners
✔ $ 61,406.92
$ 61,406.92
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2022.10.24 14:06:41 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2022.10.24 13:42:55 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Completion of Fieldwork Activities 12/23/2022
Site Assessment Report/IDW manifests/Project Management 03/24/2023
FDEP approval of Fieldwork Activities $ 48,213.53
FDEP approval of Site Assessment Report/IDW manifests/Project Management $ 13,193.39
$ 61,406.92
HW680
DC023B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Scott’s Custom Cleaners
FACID NO. 52-9501285; ERIC_5297
Belleair, Pinellas County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC023B (HW680) DATE: October 21, 2022
This Task Assignment authorizes Arcadis to complete a Site Assessment at the Scott’s Custom Cleaners site. The initial fieldwork will be completed in approximately eight to ten days and a Site Assessment Report (SAR) will be submitted as the final deliverable.
The assessment may be expanded or reduced via change order depending on the complexity of the site. All work will be performed in accordance with the approved work plan.
The final task assignment total is $61,406.92. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Site Assessment This subtask provides funds for soil, vapor and groundwater screening and monitor well installation at the facility. Arcadis will present the data in an interim deliverable after which a change order may be authorized for additional work, if needed. The Waste Site Cleanup Section’s geologist approved sampling locations and the overall approach to the assessment presented in the September 2022 Work Plan.
SiteLines will provide a GPR survey to check for underground utilities, based on their low bid of three bids solicited.
Scott’s Custom Cleaners
(ERIC_5297)
PDS was selected as the drilling subcontractor. They are the second lowest bidder of three bids solicited; however, the lowest bidder is not available to do the work until 2023. PDS is available in a few weeks.
EnviroServe (formerly Clark) will transport and dispose of IDW. Note: IDW is presumed to be non-hazardous but will be characterized before disposal.
Subtask 3: Site Assessment Report (SAR) All activities and analytical results obtained during site assessment work will be submitted to FDEP as a written report. This report will include appropriate figures, graphs, data tables, etc. IDW manifests will also be provided to FDEP as part of the final deliverable.
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 10/17/2022
Task #: DC023B SubTask 1 Project Management Site: Scott's Custom Cleaners SubTask 2 Field Activities
Activity/Phase: Site Assessment SubTask 3 Site Assessment Report Project Manager: Gus Suarez SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$84.18 Project Manager Suarez, Gus (GS) 13 13.3 $100.00 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0 $86.94 Principal Engineer Burtnett, Susan (SB) 0 0 0 0 0 $84.18 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0 $65.43 Principal Scientist Burke, Brian (BRB) 16 8 8 0 0 $65.28 Principal Engineer Perella, John (JP) 7 3 4 0 0$50.00 Senior Engineer Cardoso, Antonio (AC) 0 0 0 0 0 $48.63 Senior Engineer Hanna, Chad (CH) 58 18 40 0 0 $28.94 Scientist Brooks, Eric (EAB) 86 86 0 0 0 $34.89 Technician Welch, David (DJW) 20 20 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 12 0 12 0 0 $28.43 Document Technician Embras, Susan (SRE) 0 0 0 0 0 $35.81 Project Assistant Cruz, Michele (MC) 18 6 12 0 0
Total Hours 230 13 141 76 0 0
Direct Labor $9,753.75 $1,122.11 $4,996.12 $3,635.52 $0.00 $0.00
Overhead 79.00% $7,705.46 $886.47 $3,946.93 $2,872.06 $0.00 $0.00 Gen & Admin 36.00% $3,511.35 $403.96 $1,798.60 $1,308.79 $0.00 $0.00 Fringe 37.10% $3,618.64 $416.30 $1,853.56 $1,348.78 $0.00 $0.00 Total Labor $24,589.20 $2,828.84 $12,595.21 $9,165.15 $0.00 $0.00
Travel Vehicle Rental $960.00 $960.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $960.00 $960.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) PDS Drilling (Conventional) $15,900.00 $15,900.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
EnviroServe IDW $583.00 $583.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00
GPR - SiteLines $1,100.00 $1,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $17,583.00 $17,583.00 $0.00 $0.00 $0.00 Handling Fee $1,758.30 $1,758.30 $0.00 $0.00 $0.00 Total Subcontractor Cost $19,341.30 $19,341.30 $0.00 $0.00 $0.00
Laboratory Analytical Costs $10,225.00 $10,225.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $450.00 $450.00 $0.00 $0.00 $0.00 Total Laboratory $10,675.00 $10,675.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $320.00 $320.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $3,062.50 $3,062.50 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $3,382.50 $3,382.50 $0.00 $0.00 $0.00
Subtotal $58,948.00 $2,828.84 $46,954.01 $9,165.15 $0.00 $0.00 Completion Fee $2,458.92 $282.88 $1,259.52 $916.52 $0.00 $0.00
Total Estimated Cost $61,406.92 $3,111.72 $48,213.53 $10,081.67 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Scott's Custom Cleaners SUBTASK 2: Field Activities
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Soil Sampling, Vertical Profile GW Sampling, PZ/MW Install Principal Sci (BB) 5
Senior Eng (CH) 9
Staff Sci (EB) 74
Project Assistant (MC)
PG field support and daily updates (5 hrs)
HASP (5 hrs), Property owner updates and field event preparation, data evaluation (4 hrs)
GPR oversight (8 hrs), Prep (3 hrs), Soil sampling and VP GW sampling (5 x 12 hrs = 60), logs/paperwork (3 hrs) HASP (3 hrs) 3
MAGS Testing and Monitor Well Sampling Principal Eng (JP) PE field support and MAGS data evaluation (3 hrs) 3
Senior Eng (CH) Field event preparation (2 hrs), IDW characterization and waste profiling for disposal (2 hrs) 4
Staff Sci (EB) MAGS Field Testing, restoration, and logs (12 hrs) 12
Technician (DW) MAGS Field Testing, restoration, and logs (12 hrs) 12
Technician (DW) Survey PZs, Guage WLs, Sample three wells: MW-A, MW-B, MW001 (8 hrs) 8
Initial Site Assessment Report Deliverable Principal Sci (BB) Teleconference call with FDEP, next assessment or remediation discussion planning 3
Senior Eng (CH) Sketch GW gradient and data figures. Field deliverable package submit to FDEP 5
Project Assistant (MC) Field Support, database management, assemble field deliverable package, lab reports 3
TOTAL LABOR 141
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 8 $960.00 $960.00
TOTAL VEHICLE $960.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals PDS Direct-push services $15,900.00 Lump Sum 1 $15,900.00 EnviroServe IDW 4 drums $583.00 Lump Sum 1 $583.00 SiteLines LLC Utility Locate / GPR Survey $1,100.00 Lump Sum 1 $1,100.00
Total Services: $17,583.00
TOTAL $17,583.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $73.00 1.00 33 $2,409.00
VOC 8260 Soil $73.00 1.00 72 $5,256.00
SPLP Extraction 1311/1312 Soil/Sediment $50.00 1.00 5 $250.00
VOC analysis on SPLP extracted sample 8260 Soil/Sediment $73.00 1.00 5 $365.00
VOC TO-15 Vapor $200.00 1.00 8 $1,600.00
TCLP Benzene for IDW 1311/8260 Soil $210.00 1.00 1 $210.00
TCLP metals for IDW 1311/6010 Soil $135.00 1.00 1 $135.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $10,225.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 3 $450.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $450.00
TOTAL LAB $10,675.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage TotalsPPE Level D $35.00 Per Man Day 0 $0.00
Total PPE: $0.00 Expendables
Miscellaneous Expendables $40.00 Per Day 8 $320.00 Total Expendables: $320.00
Equipment Items
Survey Station transit/rod/level/tape $50.00 Per Day 1 $50.00
Tubing, Poly/HDPE $0.30 Per Foot 45 $13.50
Tubing, Silicon 3/16x3/8 $3.00 Per Foot 3 $9.00
EWE SVE Trailer for MAGS $1,850.00 Per Day 1 $1,850.00 Total Equipment Items: $1,922.50
Equipment Kits
Monitor Well Installation Kit $325.00 Day 1 $325.00
Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00
Soil Assessment Kit $175.00 Day 3 $525.00 Total Equipment Kits: $1,140.00
TOTAL EQUIPMENT $3,382.50
SITE : Scott's Custom Cleaners SUBTASK 3: Site Assessment Report
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
SAR
Principal Sci / BB PG write/certification of final SAR; results/risk-based mngt options with FDEP 8
Principal Engineer / JP PE analysis of SAR; remedial characterization data/preliminary remedial options evaluation 4
Senior / CH SAR writing (24 hrs); SAR figures/graphs generation (8 hrs); SAR tables (8 hrs) 40
Designer - Database Mgr / BO SAR figures/graphs generation (8 hrs); data mgmt, import to CAD (4 hrs) 12
Project Assistant / MMc Process field notes, sample tracking, database entry, report assembly, report submittal 12
TOTAL LABOR 76
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage TotalsPPE Level D $35.00 Per Man Day 0 $0.00
Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items
Total Equipment Items: $0.00 Equipment Kits
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
INITIAL SITE ASSESSMENT WORK PLAN
www.arcadis.com
Former Scotts Cleaners ISA Work Plan 09092022_ 3
Table 1. Summary of Historical Soil Analytical Data
Soil Sample Date Depth (ft bg) PCE (mg/kg)
SB-01 10/28/96 1.5 14.6
SB-03 10/28/96 unknown 2.7
SB-05 10/28/96 unknown 0.307
A Dry Cleaning Solvent Cleanup Program (DCSCP) Application was submitted to the FDEP on December 23, 1996 and the site was entered into the DCSP on March 3, 1997. A Rapid Risk Screening Form was completed and submitted to FDEP in January 2012. According to the Site Screening Report Form, no large (>100,000 gallons per day) Public Water Supply Wells were identified within one mile of the site and no small potable wells were located within one-quarter mile of the site. Additionally, no daycare facilities or schools were reported within
150 feet of the facility.
4 INITIAL SITE VISIT
On September 7, 2022, Arcadis performed an initial site visit to meet/discuss current and prior uses of the facility with the current operator, observe the current layout and use of the site and surrounding properties, establish the immediate future use, verify the presence of utilities, potential drill locations/access, and complete applicable portions of the Site Visit Checklist. Two existing monitor wells (2-inch diameter) of unknown origin were found in front of the facility to the west. For the purposes of this Work Plan, they are denoted as “MW-A” and “MW-B”.
Arcadis met with the current property owner representative, Mr. Ed Hacker. It was confirmed that municipal drinking water and sanitary sewer service is provided to the site; no septic systems currently exist. Natural gas is also supplied to the site. The current site layout and historical locations of previous equipment are provided on
Figure 3. There are no stormwater drains on the site property and it appears stormwater drains to the west to
Indian Rocks Road.
Current site photographs are presented in Appendix A and copy of the completed Site Visit Checklist is presented in Appendix B. Arcadis requested copies of facility as-built drawings from the current owner and was informed that the current owner does not have drawings to provide. Arcadis will forward information provided by the current owner should it become available in the future.
5 INITIAL SITE ASSESSMENT WORK PLAN
A flexible assessment approach will be used to create a site-specific unsaturated soil and groundwater database capable of determining the absence/presence and extent of chlorinated drycleaning solvents above soil and groundwater CTLs. In addition, potential risks and exposure pathways will be identified and preliminary recommendations and design provided for remedial action, if justified. The proposed assessment activities will be completed in accordance with FDEP’s Standard Operating Procedures (SOP) (001/01), the site-specific HASP, Chapter 62-780 Florida Administrative Code (F.A.C.), and recent guidance provided in the July 13, 2022, Waste
Cleanup Program Pollution Response Action Contract (WCP PRAC) meeting in Tallahassee, Florida.
Former Scotts Cleaners ISA Work Plan 09092022_ 4
Based on the reported historical PCE contamination in the shallow soil (southeast side of the building), the reported depth-to-water (3 to 4 ft bg) and site layout, multiple assessment methodologies are proposed.
Unsaturated soil assessment will be completed by the installation of soil borings to two feet into the water table, soil field screening using a PID capable of detecting to parts per billion (ppb), commonly referred to as a ppbRAE®, soil sampling for fixed-based laboratory analysis of volatile organic compounds (VOCs) and completing a Modified Active Soil Gas Survey (MAGS).
The first phase of groundwater assessment will be completed as follows:
installing a source area monitor well (MW001) inside the facility for fixed-based laboratory analysis of VOCs, completing vertical profiling using direct-push technology (DPT) for fixed-based laboratory analysis of VOCs;
and, installing piezometers to assess groundwater gradient conditions.
Following receipt and evaluation of the first phase of assessment, the scope of the next phase of investigation activities, such as additional monitor wells and a professional survey, will be developed in consultation with FDEP.
The site assessment methods and techniques are described in detail below.
5.1 Site Preparation and Utility Locate
Due to on-site access constraints along the south portion of the property, Arcadis will acquire access agreements with up to three properties (Figure 2) located south of the Scott’s Custom Cleaners property on behalf of the
FDEP. These properties include:
715 Indian Rocks Road N (Parcel ID: 33-29-15-47448-003-0010)
2329 Belmar Drive (Parcel ID: 33-29-15-47448-003-0030)
2325 Belmar Drive (Parcel ID: 33-29-15-47448-003-0040)
Prior to commencement of field work, Arcadis will contact the off-site property owners and current site operator/ property owner (Hacker Properties Inc. representative, Mr. Ed Hacker) to share proposed sampling locations and advise schedule/notification requirements prior to completing field work. Arcadis will oversee a subsurface private utility locate using ground penetrating radar (GPR) on the site and surrounding properties. The purpose of the utility locate will be to establish/confirm the suspected locations of underground utilities (Sunshine State One Call will initially locate utilities on and surrounding the site). The initial site visit indicated the presence of underground water, sewer and gas lines as shown on Figure 3.
5.2 Soil Assessment and Sub-Slab Soil-Gas Sampling
5.2.1 Unsaturated Soil Assessment
One continuous soil boring (SB001) will be installed in the rear of the facility (east side of building) to a depth of approximately 50 ft bg or into the basal confining clay at the bottom of the surficial aquifer to characterize site lithology and for field screening of the unsaturated zone for synthetic organic vapors. The lithologic log of the general geology at the site will be developed from the soil samples collected from this soil boring. Soil samples from each boring will be described by an onsite Arcadis geologist.
Former Scotts Cleaners ISA Work Plan 09092022_ 5
To confirm if past drycleaning operations at the site had an adverse impact to unsaturated soil quality conditions, up to 18 soil borings (SB001-SB018) for collection of soil samples are proposed for installation at the locations shown in Figure 3. The initial sample locations will be placed in vicinity of the confirmed PCE release areas
(historical samples: SB-01, SB-03, and SB-05). Additional boring/sample locations will be placed inside the facility at potential source areas, adjacent to the sewer lateral identified during the GPR scan, and outside the building and parking lot areas.
The soil borings will be installed using a hand auger and/or DPT. A concrete coring machine will be used to bore through the concrete floor inside the building to access the underlying soils. Soil samples at all soil borings will be collected at 0.5 ft bg, 2 ft bg, and then at two-foot depth intervals to a depth of two feet into the water table
(estimated to be at 4 ft bg). All soil samples (up to 4 samples/boring x 18 initial boring locations or a total of up to
72 soil samples) will be submitted to a fixed-based laboratory for confirmatory analysis of VOCs by EPA Method
8260. Each soil sample will also be collected in encore samplers in anticipation of SPLP analysis. Five SPLP analysis are included in initial costs. Following the sampling, the boreholes will be sealed with cement grout.
Soil samples will also be transferred to mason jars, covered with aluminum foil and screened with a ppbRAE equipped with a photo-ionization detector to determine if the soils contain the presence of synthetic organic vapors.
5.2.2 Modified Active Gas Sampling
MAGS is proposed for completion inside and outside the building. MAGS will be completed in general agreement with the Modified Active Gas Sampling Manual, dated October 12, 2004. Eight MAGS wells (MAG01 – MAG08), will be constructed of 2-inch diameter PVC with 0.010-inch slotted screen set approximately 0.5-ft bg to approximately 0.5-ft above the water table, resulting in an assumed screen interval of 0.5 to 3.5 ft bg. Final MAGS well construction will be field determined. One vapor sample will be collected from each MAGS well for analysis of
VOCs by EPA Test Method TO-15 at the end of each MAGS test. Because the site is an active drycleaner, the
MAGS testing will be performed with the drycleaner is not active or after operating hours. The proposed MAGS layout locations are depicted on Figure 3.
5.3 Groundwater Assessment
5.3.1 Groundwater Vertical Profiling
Groundwater assessment will be conducted utilizing vertical profiling by a direct-push drill rig and fixed-based laboratory analysis of groundwater samples for VOCs. Eight vertical profile (VP) locations (VP001 – VP008) (at or near reported and suspected source areas and downgradient) are initially proposed as shown on Figure 3.
Assuming the water table will be encountered at approximately 4 ft bg, samples starting at the water table and at
10-ft depth intervals to a total depth of 28 ft bg (4-8, 14-18, and 24-28 ft bg) will be collected. The screen intervals may extend deeper if the underlying confining clay is found to be deeper based on lithologic information from Soil
Boring SB001. Each VP water sample will be submitted to a fixed-based laboratory for confirmatory analysis of
VOCs by EPA Method 8260. Following sampling, each vertical profile borehole will be sealed with cement grout.
5.3.2 Piezometer Installation
Arcadis will install two piezometers and utilize the interior monitor well MW001 (described below) and the two existing two monitor wells (“MW-A” and “MW-B”) to provide groundwater gradient information. For purposes of
Former Scotts Cleaners ISA Work Plan 09092022_ 6 this Work Plan, it is assumed that two shallow piezometers (PZ001 and PZ002) will be installed with 10-ft of
0.010-inch slot pre-pack screen, between 2 to 12 ft bg using DPT (Figure 3). Final locations, dimensions, including depth, and screen interval will be determined based upon groundwater elevations encountered during the initial assessment activities. The piezometers will be developed and completed in a method to allow them to be converted to monitor wells in the future, if necessary. Arcadis will also field survey the top of casing elevations of the wells and piezometers relative to common point so that the groundwater gradient can be determined.
5.3.3 Monitor Well Installation and Sampling
Arcadis will hand-install a source area well inside the facility (MW001) into the water table to maximum depth possible near the former soil boring SB-1 as presented on Figure 3. The well will be constructed with 0.010-inch slot pre-pack screen, developed, and completed within a manhole. Arcadis will sample MW001 and the two existing monitor wells (“MW-A” and “MW-B”) per SOP 001/01 for laboratory analysis of VOCs using EPA Method
8260.
Based on the results of the initial assessment activities and vertical profiling results, the installation of additional monitor wells and sampling analyses in a subsequent phase will be provided to FDEP accordingly. Also, sampling for per- and polyfluoroalkyl substances (PFAS) will be screened per FDEP guidance and tasked separately.
6 REPORTING
An Initial Site Assessment Report (ISAR) including field logs, photographs, laboratory reports will be submitted to
FDEP within 30 days of receipt of laboratory data as an interim deliverable to document the fieldwork. The ISAR will provide a basis for the next phase of work which may include additional soil sampling, the installation of permanent monitor wells, a professional survey, etc. to be completed under a Task Assignment Change Order
(TACO).
A final Site Assessment Report (SAR) will serve as the final deliverable and will describe the results of the proposed site assessment tasks described herein will be delivered to FDEP within 60 days of completion of the field work. The SAR will contain field logs, laboratory reports, tables, and figures summarizing the results of assessment activities and include conclusions and recommendations based upon findings.
7 INVESTIGATIVE DERIVED WASTE
Investigative derived wastes (IDW - drill cuttings and purge water) generated during site assessment activities will be drummed, labeled, and temporarily staged on-site in Department of Transportation (DOT)-approved, 55-gallon steel drums. Arcadis will coordinate with a waste disposal contractor for non-hazardous disposal of the IDW and provide copies of final disposal manifests to FDEP.
8 QUALITY ASSURANCE & QUALITY CONTROL
All fieldwork will be performed in accordance with FDEP’s SOP (001/01), and the site-specific HASP included under separate cover. Additionally, sample analyses will be performed by NELAP-certified laboratories to method practical quantitation limits. Appropriate QA/QC samples will be collected during the assessment.
SITE ASSESSMENT WORKPLAN
SUMMARY CHECKLIST
Task No.: FDEP Contractor/Contract No.: HW680
Subtask 1: Fieldwork Logistics
1.1 Offsite Property Access – Generally not applicable unless site is so small that this is required to complete initial site assessment phase
1.2 Utility Clearances
State-wide Utility Locating Service 1-800-432-4770 Private utility locate?
1.3 Other (specify)
Subtask 2:
2.2 Professional Survey of site features and soil/DPT/MW sample locations and TOC elevations (NAD 83 Florida North State Plane coordinate system and NAVD 1988)
2.3 MAGS
No. MAGS Points: Eight (Hand-augered) No. Vacuum Monitoring Points:
Air Sample Analysis: TO-15 (Suma cannisters) Screen Interval for MAGS:
Notes: 1) Soil samples must be collected from standard depth intervals from each MAGS point,
2) One, 3-vacuum level (low to high) step test must be conducted as the initial MAGS test, 3) bottom of screen must be set ~0.5’ to 1’ above water table as determined by concurrent measurement
2.4 Perform Soil Sampling and DPT Groundwater Profiling (See Figure 3 for sample locations) No. Sampling Locations: 1 DPT Lithology Boring(s) to max depth of penetration 18 DPT Soil Borings (DPSB) for soils below five feet: 6' 18 Hand Augered Soil Borings (HASB) to five feet: 0.5', 2', 4' 10 DPT water sampling (DPWS) vertical profiling to 28’
# Fixed/
Samples ID Matrix Samples Depth Mobile Methods SB001(0.5) Soil 0.5 and 2’to WT SB001(6) Soil below 5' VP001(48) GW Every 10’ to 50’
DC023A
Site Name: Scott's Custom Cleaners Site Address: 755 N Indian Rocks Rd, Belleair, Pinellas County, FL
Site ID No.: ERIC_5297
Comments: Access to three adjacent properties to the south will allow access for DPT rig.
Yes- GPR
Site Assessment (See Figure 3 for proposed sampling locations)
2.1 Number of Mobilizations: Two (1st: Soil borings, vertical profiling, MW/PZ install; 2nd: MW sampling and MAGS testing)
Professional survey anticipated for second phase of work after MWs are installed.
0.5 3.5 ft bg vacuum will be measured at MAGS points-
Fixed Fixed Fixed
EPA Method 8260 -VOCs EPA Method 8260 -VOCs EPA Method 8260 -VOCs
Expected DTW: 4 feet Expected Lithology: sand to 27 ft underlain by sandy clay and clay Notes:
1) If DTW is >10’, collect soil to 10’ at 2’ intervals, then at 5’ intervals to water table
2) Include no QC samples unless for PFAS or other justifiable reason
3) If petroleum solvent DC machine is suspected/eligible, add 8260 full list, 8270 partial list
(e.g. no carcinogenic PAHs/BaP), and TRPH in primary source areas
4) Site Screening Report soil/GW sample(s) must be replicated, if feasible and concentrations exceeded CTLs
8260 VOHs
SPLP
Mobile Lab
2.5 Monitor Well Installation/Sampling (See Figure 3 for well locations)
Installed/ Well ID Existing Diameter Completion Depth Screened Interval
2.6 Groundwater Sampling/Analysis
Sample ID Well ID Analytical Method
Total Well Samples:
2.7 Other (e.g. NAM
parameters, Dhc, etc.)
Subtask 3: Investigation-Derived Waste (IDW) Management/Disposal
3.1 Soil Estimated # Drums:
3.2 Water Estimated # Drums:
3.3 Other (specify)
Subtask 4: Initial Site Assessment Report
Total Numbers: Soil GW SW Sed Other
72 30
MWA unknown Existing
MW001 to be installed
MWA
MW001
MWA
MW001
EPA Method 8260 -VOCs EPA Method 8260 -VOCs
NAM parameters will be collected after initial phase of assessment, if warranted
MWB
Existing
1-inch 12' 2-12' unknown unknown unknown
2inch
MW-B MW-B
EPA Method 8260 -VOCs
2inch bburke Text Box (Pending parent sample results)
Sonic Auger DPT Injection Well Abandonment
DATE: 10/3/2022
ESTIMATE #: 922044
PFAS Protocals
ID QTY Unit Rate TOTAL
1 1 each 700.00$ 700.00$
2 Per Diem 4 night 250.00$ 1,000.00$
3 DPT Rig and Crew 5 day 1,650.00$ 8,250.00$
4 Materials: Water Sampling Expendables 30 each 12.00$ 360.00$
5 Materials: Macrocore Liners 9 each 3.00$ 27.00$
6 Materials: Borehole Grouting w/Concrete Cap 11 each 25.00$ 275.00$
7 Materials:1" Sch 40 PVC Well Installation (Indoor/PZ Wells) 34 foot 4.00$ 136.00$
8 Materials: 1" x 5' PVC .010 Prepack Screen (Indoor) 1 each 75.00$ 75.00$
8 Materials:(2) 1" x 5' PVC .010 Prepack Screen, 3" Exp Point 2 each 175.00$ 350.00$
9 Materials: 2" Sch 40 PVC Well Installation (MAGS) 48 foot 14.00$ 672.00$
10 Materials: 3" Brass Manhole w/Donut Pad (Indoor Well) 1 each 125.00$ 125.00$
11 2' x 2' Concrete Pad w/8" BD Completion 10 each 125.00$ 1,250.00$
12 Well Development (Up to 1/2 hour with pump) 3 each 75.00$ Included
13 Refurbished Drums (Soil) As Needed 0 each 65.00$ -$
14 Refurbished Drums (Water) Client Estimated 4 each 65.00$ 260.00$
15 Concrete Coring Machine/Generator (Indoor Work) 1 day 250.00$ 250.00$
16 Decon Pit 1 each 250.00$ 250.00$
17 Permits (N/A for FDEP Projetcs) -$
Subtotal 13,980.00$
Todd Hodgson
Todd Hodgson TOTAL 13,980.00$ Partner
Drum Purge and Decon Water (Client Estimate 4)
Mobilization
Locations must be accessible with track mounted Sonic Rig
Damage to utilities on private property are the responsibility of the client
Utility Locates on Private Property are the responsibility of the client
Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and costs.
THANK YOU FOR YOUR BUSINESS!
DESCRIPTION
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com.
"Actual quantities used and days onsite will be invoiced"
Completion: 4 to 5 days
PROJECT
Scotts Custom Cleaners 755 N. Indian Rocks Road N
Brian R. Burke, P.G.
CUSTOMER
Arcadis
Project Description:
(2) 1" x 12' PVC PZW w/10' of .010 Prepack Screen, 8" BD Completion, No Soil Sampling
(1) DPT Litho Boring to ~50' (or refusal). Grout Borehole/Patch
(10) DPT GW Profiling to 28' BLS at 3 Intervals (4-8', 14-18', 24-28', Grout Borehole/Patch
(8) 2" x 6' PVC MAG Well w/5' of .010 Screen, 8" BD Completion, No Soil Sampling (5 are Indoors and 3 are
Outdoors Installed with Hand Augers. All in Concrete/Asphalt)
(1) 1" x 10' PVC MW w/5' of .010 Prepack Screen, Donut Pad w/3" Completion. (Indoors-Hand Auger)
Tampa, Florida 33607 Bellair Bluffs, Pinellas County, Florida 4300 W Cypress Street, Suite 450
(813) 353-5755 DPT Soil/GW Sampling/MAGS and Well Installation
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
Pepe_T Highlight
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 9/28/22 FAC ID#: ERIC_4786
Unit Unit Rate Number of Units Extended Price whole day $1,875.00 5 9,375.00$ half day $1,350.00 -$ per foot $20.00 48 960.00$ each $110.00 5 550.00$ each $60.00 -$ each $30.00 3 90.00$ per well $125.00 11 1,375.00$ roundtrip $650.00 1 650.00$ per crew / per night $450.00 -$ each $110.00 -$ each $70.00 5 350.00$ each $75.00 1 75.00$ lump sum $350.00 1 350.00$ per day $75.00 5 375.00$ per day $350.00 5 1,750.00$ per day $75.00 5 375.00$
TOTAL QUOTE PRICE $15,900.00
Notes: 1. Includes expendables, tubing, points, liners, caps, plugs, saw cuts, development, standby time, steam cleaning decon, and grouting.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: ___________________________________Kevin Bonacum, Estimator Date: 9/28/22
Follow PFAS Protocol, Decon Pad, Decon between wells/borings
PFAS Free water delivered daily from PDS Lakeland Facility
755 N Indian Rocks, Pinellas County, FL
Well Completion (includes MH w/ cover, concrete pad, and locking well cap)
Well Riser (includes all materials) ID 1" 5' Length
Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"
Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"
2" Well Install via hand auger (included all materials)
Direct Push Half-Day Rate 1 - on-site half day
(1) DPT soil boring to 50', continuous soil sampling, disrete sampling required, drum cuttings, grout and restore grade
(10) Vertical profile points to 28', (3) grab groundwater samples per boring, drum cuttings, grout and restore grade
(2) 1" x 12 Piezometers with 10' .010 prepacked screen, soil sampling as needed, drum cuttings, pad and 8" manhole
Drum cuttings, development water, and decon fluids
Site Name and Location: Scott's Custom Cleaners
Consultant Name: Arcadis U.S., Inc.
PROPOSED SCOPE OF WORK:
(8) 2" x 6' SVP's with 5' .010 screen, soil sampling as needed, drum soil & water, pad and 6" manhole
(1) 1" x 10' MW with 5' .010 prepacked screen, installed via hand auger, soil sampling as needed, drum soil & water, pad and 6" manhole
Days to Complete Scope of Work: 4
Direct Push Daily Rate 1 - on-site day
Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT, Geoprobe 7822DT
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Steam Cleaner
Decon Pad
Poly Tank w/ Approved Water (from Lakeland, FL)
Refurbished - DOT Approved 55-gal Drum
NEW - DOT Approved 55-gal Drum
Per Diem
Mobilization
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
Permits
Concrete Core Drill w/ 6" Bit
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.974.2423
Date: 9/29/2022
FAC ID#:
PROPOSED SCOPE OF WORK:
Drum Soil & Development water - 30 Minutes of Dev. Per well -
Access to PFAS Free Water supplied by client - We can try to bring some water from our shop but may need more.
Unit Unit Rate Number of Units Extended Price
Equipment Type: DPT Track Rig whole day $1,600.00 4 $6,400.00 half day $0.00 each $225.00 8 $1,800.00 each $0.00 each $100.00 5 $500.00 each $35.00 3 $105.00 per well $195.00 11 $2,145.00 roundtrip $1,200.00 1 $1,200.00 per crew / per night $475.00 4 $1,900.00 each $80.00 4 $320.00 each $50.00 0 $0.00 each $65.00 30 $1,950.00 each $95.00 9 $855.00
$0.00
TOTAL QUOTE PRICE $17,175.00
Notes:
Project No.: ___________________________
Date: 9/29/2022
MISCELLANEOUS
(8) Vapor Points 2"x6' w/ 5' .010" Screen & 6" BD Completion - Inside Bldg. Concrete Core - Installed by hand
Mobilization
Per Diem
DOT Approved 55-gal Drum
Well Riser (includes all materials) ID ___1"___ 5' Length
Well Completion (includes 30 Min Dev. 8" B-D MH & locking well cap)
Pre-Packed PVC Well Screen (includes all materials) 5' Length Pack OD ___1"____
Permits - Install Well
Water Sample
Signature and Title of Person Submitting Quote: Charles Bucher
Concrete Core
Days to Complete Scope of Work: 4 Days
Subcontract Company Name: EARTH TECH DRILLING. Inc.
Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069
ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.
Contractor Name: Arcadis / Brian Burke / 813 298-2838
Site Name: Scotts Custom Cleaners - 755 N Indian Rocks Rd. Belleair Bluffs, FL
(HAND CLEAR ALL LOCATIONS TO 5' or REFUSAL)
(1) DPT Soil Borings to 50' - Grout Abandon
(10) DPT Water Sample Borings with Samples at 8', 18' & 28' = 3 Samples per boring (Total of 30 Samples)
(2) PZ 1"x12' w/ 10' Pre-Pack Screen & 8" BD Completion - No DPT Soil Sampling - Installed Using DPT Rods
Direct Push Daily Rate 1 - on-site day
Direct Push Half-Day Rate 1 - on-site half day
Vapor Point - 2" x 6' w/ 5' .010" Screen
Auger Attachment, 4" Surface Casing
(1) MW 1"x10' w/ 5' Pre-Pack Screen & 6" BD Completion - Inside Bldg. - Concrete Core - Installed by hand
DIRECT PUSH TECHNOLOGY
Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push
09/08/2022 12:30 PM PAGE 1 OF 7
Scope of Work
Blanket Quote based on one drum T&D , for service site specific quote - disposal approval required
TCLP Benzene and 4 Metals with Completed Profile required for each site
Drum Pickup /Transportation/Disposal
755 PRARIE INDUSTRIAL PKWY,
MULBERRY, FLORIDA, 33860
QUOTE #: 0030408
DATE: 09/08/2022 PROJECT PROPOSAL
CLIENT
BRIAN BURKE
ARCADIS
4300 W CYPRESS ST, SUITE 450, TAMPA, FLORIDA, 33607
P: (813) 298-2838
PROJECT DESCRIPTION
DRUM PICKUP
VARIOUS SITES CENTRAL FLORIDA
THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE
CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.
FEE STRUCTURE
TRANSPORTATION
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
TRANSPORTATION 55 GAL DRUMS
NOTES:SUBJECT TO FUEL SURCHARGE,
1.00 $40.00 DRUM $40.00
STOP FEE 6 DRUMS OR LESS PICKUP 1.00 $50.00 EACH $50.00
TRANSPORTATION SUBTOTAL: $90.00
DISPOSAL
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
55 GALLON NON HAZ DRUM
NOTES: Drum DOT Shippable Drum accessible on hard Surface
80.00 $1.00 EACH $80.00
ENERGY SURCHARGE 10% INVOICE TOTAL 1.00 $17.00 EACH $17.00
DISPOSAL SUBTOTAL: $97.00
TOTAL JOB ESTIMATE: $187.00
bburke Text Box 4 drums bburke Text Box 4 drums bburke Text Box $160 bburke Text Box $320 bburke Text Box 4 drums = $530 x 10% = $583
SITE LINES PROPOSAL ACCEPTANCE
SIGNATURE PAGE
Site Lines Proposal Number: 01155p Proposal Date: September 8, 2022
Project Site: Scotts Custom Cleaners Site – 755 N Indian Rocks, Pinellas County, FL
Project Fee: $1,100.00 includes AutoCAD
Payment Terms: [PAYABLE WITHIN 30-DAYS OF INVOICE]
INVOICE TO:
Client: ARCADIS Address: 4300 W Cypress St., Suite 450, Tampa, FL 33607 Attention: Brian Burke, P.G.
Phone: 813-353-5755 Email: brian.burke@ARCADIS.com
Special Instructions:
In witness thereof, the parties hereto have made and executed this agreement
FOR [CLIENT] FOR SITE LINES LLC
Signature: Signature:
By: By: William L. Hardy II
Title: Title: President
Date Signed: Date Signed: September 8, 2022
GEOVIEW, INC.
PROPOSAL ACCEPTANCE SHEET
Project Name: Scotts Custom Cleaner
Project Location Pinellas County, Florida
GeoView Proposal #: 10209p
Proposal Date: October 14, 2022
Description of Services Provide Utility Designating and Mapping Services
Project Cost: $2,800 – see compensation, page 3
Payment Terms: Per MSA
CHARGE INVOICE TO THE ACCOUNT OF:
Client: ARCADIS
Address: 4300 W Cypress St., Suite 450 Tampa
Tampa, FL 33607
Attention: Brian R. Burke, P.G.
Phone (Office): (813) 903-3151 Phone (Cell): (813) 298-2838
Email: Brian.Burke@arcadis-us.com
FOR APPROVAL OF CHARGES:
Firm:
Address:
Phone No.: Fax No:
Attention:
Special Instructions and/or Mutually Agreed Upon Changes to the Proposal:
In witness thereof, the parties hereto have made and executed this Agreement
Client: GeoView, Inc.
Signature
By: By: Chris Taylor, P.G.
Title: Title: Vice President
Date Signed: Date Signed: October 14, 2022
10220 U.S. Highway 92 East Phone: 813-621-4929 Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com
PROPOSAL 221972
Subsurface Utility Designation
$2,160.00
PM, QA/QC, Clerical, Field Check
$1,425.00
TOTAL $3,585.00
Scope of Services: Subsurface Utility Designation
All SurvTech SUE services abide by the standards set forth by ASCE under (CI/ASCE 38-02)
1. By use of Ground Penetrating Radar (GPR) and Electromagnetic Induction (EM), Attempt to horizontally locate and field mark (paint & flags) all public subsurface utilities found excluding service lines, gravity sewer lines and irrigation within the area on the attached Exhibit “B”
Deliverables shall be surface marking (paint and/or flags) of horizontal location of found subsurface utilities and a utility designation field sketch(s) of the project area reflecting all obtained relevant data for your use.
TERMS AND CONDITIONS
It is understood that the Arcadis U.S., Inc. is responsible to abide by Sunshine 811, Florida State Statutes Chapter 556.106 and all applicable laws, and regulations that pertain to the services provided.
SurvTech expects Arcadis U.S., Inc. to supply any existing information pertaining to the location of underground utilities in the project area. In addition to any information provided by Arcadis U.S., Inc., SurvTech will proceed with retrieving records from regulatory agencies including but not limited to: Sunshine One Call, local and state utility departments, and private utility providers.
SurvTech will ensure that all reasonable efforts are made to identify the location of each underground utility and provide the best available information within the project area but makes no guarantees that all utilities and structures will be found.
Limitations including but not limited to the lack of or inaccuracy of prints, and restrictions with GPR technology exist due to the complexity of site conditions and circumstances beyond the control of SurvTech.
SurvTech expects that the proposed work area to be free and clear of objects or obstacles that might prohibit access in and around the proposed work area. This would include clearing vegetation, machinery, debris, or any other object that would prevent access to the proposed work area. Failure to do so could result in time delay or incomplete coverage of the proposed work area.
Arcadis U.S., Inc. will be responsible for verifying any information provided by SurvTech that is obtained via contact with utility providers as per the Underground Facility Damage Prevention and Safety Act.
The surface designation provided by SurvTech is certified to be within two (2) feet of the true underground position of the utility relative to the mark as shown on the surface.
SurvTech shall not be held liable for any latent or unreasonably discoverable utilities or structures in the project area.
Furthermore, in the event of a claim regarding the services provided in the proposal, SurvTech shall have liability for reasonable and necessary defense costs to the extent caused by SurvTech’s negligence.
SurvTech shall NOT obtain depths while designating utilities. If depths are required, the client must contract for verification (soft dig) services. Soft dig (vacuum excavation) services are NOT included in this proposal.
Notes:
Paint marks will be color coded based upon suspected underground utility, according to the American Public Works Association Uniform Color Code Guide.
Poor conditions for GPR utilization include sites with high water tables (especially saltwater); heavily vegetated areas; heavily rooted soils; ground conditions such as clay and heavily fertilized soil, reinforced concrete; and/or detecting for very small, non-metallic lines, such as PVC (2” and smaller).
http://www.survtechsolutions.com/
5315 56th Commerce Park Blvd.
Tampa, FL 33610
Phone (813) 413-7760 eWe – Your Partner in Remediation Fax (813) 413-7761
- 2 - EWE-Proposal
PROPOSAL
8 Hr Mags Testing
Arcadis U.S., Inc.
Scott’s Custom Cleaners 755 N Indian Rocks Rd
Belleair Bluffs, FL
Please initial and return to the attention of: Thomas Twitmyer – Tomt@ewithe.net
APPROVED ITEM DESCRIPTION RATES UNIT QUANTITY COST
Remedial Equipment SVE mobile unit $1,200 /job 1 $1,200
Transportation $150 /job 1 $150
Power Supply 55 KW three phase generator $500 /job 1 $500
Effluent Treatment Vapor Phase Carbon $900 /job 0 $0
TOTAL ESTIMATED COSTS $1,850
NOTES:
Estimate valid for 90 days
DATE SERVICES NEEDED: PROPOSAL PREPARED: 10/14/2022
START TIME: ESTIMATED HOURS ON SITE:
PURCHASE ORDER NO.: EWE JOB NO.: EWE -2336
PAYMENT TERMS: Net 30 Days APPROVED COST
BILLING INFORMATION: Officer* Date *Signature Acts as Notice to Proceed at Contract Price
Payment Remitted to: ATTENTION: Mr. Chad Hanna Equipment with Experience, LLC Arcadis U.S., Inc.
5315 56th Commerce Park Blvd 3109 Martin Luther King Blvd, Suite 350 Tampa, FL 33610 Tampa, FL 33607
PHONE: (813) 353-5765
FAX: (813) 903-9115
Email: Chad.Hanna@arcadis-us.com
Thomas F. Twitmyer, EWE Arcadis U.S., Inc.
mailto:Tomt@ewithe.net
ID Task Name Duration Start Finish
1 Receipt of TA for Assessment & Notifications 1 day Mon 9/26/22 Mon 9/26/22
2 Commence Site Assessment Activities 1 day Mon 9/26/22 Mon 9/26/22
3 Off-site Access Agreements, Coordinate Field Sampling & Subcontractor
15 days Mon 9/26/22 Fri 10/14/22
4 Field Activities: MW, PZs, VPs, Soil Sampling, and MAGS
10 days Mon 10/17/22 Fri 10/28/22
5 Lab Results Available 11 days Fri 10/28/22 Fri 11/11/22
6 ISAR Deliverable Preparation 16 days Fri 11/4/22 Fri 11/25/22
7 Second Phase of Assessment Planning 10 days Mon 11/28/22 Fri 12/9/22
8 Field Activities: MW Installation, Sampling and Survey
5 days Mon 12/12/22 Fri 12/16/22
9 Lab Results Available 10 days Mon 12/19/22 Fri 12/30/22
10 Prepare SAR and submit 60 days after field activities
44 days Mon 12/19/22 Thu 2/16/23
18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26 5 Oct '22 Nov '22 Dec '22 Jan '23 Feb '23 Mar '23
Former Scott's Custom Cleaners Proposed Schedule 755 North Indian Rocks Road
Belleair Bluffs, Pinellas County, FL
ERIC_5297
| Peerless Cleaners #3416 Annual Monitoring Proposal 4-18-2022.pdf |
| Annual Groundwater Monitoring |
| Annual Groundwater Monitoring Report |
| Schedule |
| Cost Estimate |
| Closing Remarks |
| HW680_DC023B negsum.pdf |
| Subtask 2: Site Assessment |
| Subtask 3: Site Assessment Report (SAR) |
| Driller Bids.pdf |
| Invoice |
| Direct Push |
| Direct Push |
| GPR Bids.pdf |
| SITE: Scotts Custom Cleaner Site – Pinellas County, Florida |
| Dear Mr. Burke: |
| If you have any questions, please feel free to contact me. I look forward to working with you. |
| Sincerely, |
| Site Lines LLC |
| William L. Hardy II |
| Enclosure |
| SITE LOCATION |
| PROPOSED SCOPE OF WORK |
| RESULTS OF THE INVESTIGATION |
| PROJECT FEE |
| CLIENT REQUIREMENTS |
| DESCRIPTION OF COMPANY INVESTIGATION AND LIMITATIONS |
| SITE LINES PROPOSAL ACCEPTANCE |
| SIGNATURE PAGE |
| Site Lines Proposal Number: 01155p Proposal Date: September 8, 2022 |
| Project Site: Scotts Custom Cleaners Site – 755 N Indian Rocks, Pinellas County, FL |
| Project Fee: $1,100.00 includes AutoCAD |
| Payment Terms: [PAYABLE WITHIN 30-DAYS OF INVOICE] |
| INVOICE TO: |
| Client: ARCADIS |
| Address: 4300 W Cypress St., Suite 450, Tampa, FL 33607 |
| Attention: Brian Burke, P.G. |
| Phone: 813-353-5755 Email: brian.burke@ARCADIS.com |
| Special Instructions: |
| In witness thereof, the parties hereto have made and executed this agreement |
| FOR [CLIENT] FOR SITE LINES LLC |