This is a Task Assignment (TA) document for Contract Number HW680 entered into between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S. Inc. The task assignment is identified as DC011D and pertains to annual groundwater monitoring activities at the Concord Custom Cleaners #50 facility located at 1245 East Lafayette Street, Tallahassee, Leon County, Florida (FDEP Facility ID ERIC_4869). The Department's Project Manager is Theresa Pepe, and the Contractor's Project Manager is Gus Suarez. The document is effective as of March 13, 2026, with a completion date of July 17, 2026.
The task assignment requires Arcadis to conduct annual groundwater monitoring from select wells at the site in accordance with the February 2, 2026 Work Plan, with all activities performed on a fixed unit rate basis. The total Task Assignment Value is $12,239.82. The work is organized into three subtasks: Subtask 1 (Project Management), Subtask 2 (Annual Groundwater Monitoring including sampling of ten monitoring wells for volatile organic compounds, inspection of eight recovery wells, and disposal of purge water), and Subtask 3 (preparation of an Annual Monitoring Report). The invoice schedule requires payment upon FDEP approval of the Annual Monitoring Report, IDW manifest, and Project Management deliverables, with a due date of June 12, 2026. The cost estimate includes direct labor ($3,477.08), overhead and administrative charges, fringe benefits, travel ($240.00 for vehicle use), laboratory analytical costs ($730.00), sample shipping ($300.00), subcontractor services for industrial waste disposal ($137.50), and field equipment and expendables ($1,190.00), plus a completion fee of $876.58.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW680
DC011D Completion July 17, 2026
Arcadis will conduct annual groundwater monitoring from select wells at the site. All activities will be performed according to the February 2, 2026, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Arcadis U.S. Inc. Contractor
Contractor Gus Suarez Contractor 813-205-4703
ERIC_4869
1245 East Lafayette Street, Tallahassee, Leon County
Concord Custom Cleaners #50
Contractor Contractor
✔ $ 12,239.82
$ 12,239.82
Scope of Work
Arcadis U.S. Inc.
Contractor Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2026.03.13 13:30:23 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.03.13 11:52:15 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual Monitoring Report/IDW manifest/Project Management 06/12/2026
FDEP approval of Annual Monitoring Report/IDW manifest/Project Management $ 12,239.82
$ 12,239.82
HW680
DC011D
FFLORIDA DEPARTMENT OF
EEnvironmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jay Collins
Lt. Governor
AAlexis A. Lambert Secretary
Memorandum
TO: Negotiation File Concord Custom Cleaners #50
FACID NO. 37-9502141; ERIC_4869
Tallahassee, Leon County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC011D (HW680) DATE: February 3, 2026
Arcadis U.S. Inc. will perform annual groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur. All activities will be conducted in accordance with the February 2, 2026, revised Work Plan submitted by Mike O’Sullivan of Arcadis.
The final task assignment total is $12,239.82. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Annual Groundwater Monitoring An access agreement with the current real property owner was signed in February 2005.
Arcadis will sample ten wells for drycleaning solvents based on recommendations from the previous monitoring report. In the revised proposal, additional hours were added to inspect (and potentially sample) recovery wells (RWs) per the Waste Site Cleanup Geologist. IDW will be disposed by a licensed waste hauler.
Subtask 3: Reporting An Annual Monitoring Report including recommendations for additional actions will be provided under this subtask.
Hours and costs are comparable to past task assignments of similar scope.
FDEP COST ESTIMATE
Contractor: Arcadis, U.S., Inc.
Date: 1/14/2026
Task #: SubTask 1 Project Management
Site: SubTask 2 Groundwater Monitoring (VOHs)
Activity/Phase: Monitoring SubTask 3 Reporting (VOHs)
Project Manager: Mike O'Sullivan SubTask 4
SubTask 5
TTotals 1 2 3 4 5 Labor Rate Category
$64.44 Project Manager O'Sullivan, Mike (MOS) 6 6.2 $64.44 Principal Scientist O'Sullivan, Mike (MOS) 23 8 15 0 0 $28.94 Scientist Cassidy, Brandon (BC) 35 33 2 0 0 $39.67 Drafter/Design Oliva, Brian (BO) 6 0 6 0 0 $32.22 Document Technician Embras, Susan (SRE) 2 0 2 0 0 $39.94 Project Assistant Cruz, Michele (MC) 7 5 2 0 0
Total Hours 79 6 46 27 0 0
Direct Labor $3,477.08 $400.02 $1,670.24 $1,406.82 $0.00 $0.00
Overhead 79.00% $2,746.90 $316.02 $1,319.49 $1,111.39 $0.00 $0.00 Gen & Admin 36.00% $1,251.76 $144.01 $601.29 $506.46 $0.00 $0.00 Fringe 37.10% $1,290.00 $148.41 $619.66 $521.93 $0.00 $0.00 Total Labor $8,765.74 $1,008.46 $4,210.68 $3,546.60 $0.00 $0.00
Travel Vehicle $240.00 $240.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Meals $0.00 $0.00 $0.00 $0.00 $0.00 Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Connelly & Associates Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Landmark Surveying $0.00 $0.00 $0.00 $0.00 $0.00 Erwin IDW $125.00 $125.00 $0.00 $0.00 $0.00 GeoView Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $125.00 $125.00 $0.00 $0.00 $0.00 Handling Fee $12.50 $12.50 $0.00 $0.00 $0.00 Total Subcontractor Cost $137.50 $137.50 $0.00 $0.00 $0.00
Laboratory Analytical Costs $730.00 $730.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $300.00 $300.00 $0.00 $0.00 $0.00 Total Laboratory $1,030.00 $1,030.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $180.00 $180.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 Equipment (Other) $830.00 $830.00 $0.00 $0.00 $0.00 Total Field Expenses $1,190.00 $1,190.00 $0.00 $0.00 $0.00
Subtotal $11,363.24 $1,008.46 $6,808.18 $3,546.60 $0.00 $0.00 Completion Fee $876.58 $100.85 $421.07 $354.66 $0.00 $0.00
Total Estimated Cost $12,239.82 $1,109.31 $7,229.25 $3,901.26 $0.00 $0.00
Concord Custom Cleaners #50
REV: 09/25 CEF ARCADIS Page 1
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Concord Custom Cleaners #50 SUBTASK 2: Groundwater Monitoring (VOHs)
DATE: 1/14/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Groundwater Monitoring Principal Scientist (MOS) Property owners verification, notification and site access agreement updates. Lab coordination. Field personnel ovesight. Staffing. 8
Scientist (BC) Mob/demob (6), prepare sampling kits/equipment (4), DTW/field measurements (8), purge and sample 11 MWs (11), Inspect RWs (2), Pack and ship samples (2) 33 Project Asst (MC) Sample container ordering, preparation, electronic transcriptions of field data 5
TOTAL LABOR 46
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 2 $240.00 $240.00 Van/Truck $480.00 Per Week 0 $0.00 $0.00
TOTAL VEHICLE $240.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equipment: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals Erwin IDW - Liquid $125.00 Drum 1 $125.00
Total Services: $125.00
TOTAL SUBCONTRACTOR $125.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $73.00 1.00 10 $730.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) -week=20% (1.20) Total Lab: $730.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 2 $300.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $300.00
TOTAL LAB $1,030.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Personal Protection
Item Rate Unit Usage Totals Expendables Miscellaneous Expendables $40.00 Per Day 2 $80.00
Total Expendables: $80.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 600 $180.00 55-gallon Drum $100.00 Each 1 $100.00
Total Equipment Items: $280.00 Equipment Kits Deep Groundwater Sampling Kit $415.00 Day 2 $830.00
Total Equipment Kits: $830.00
TOTAL EQUIPMENT $1,190.00
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Concord Custom Cleaners #50 SUBTASK 3: Reporting (VOHs)
DATE: 1/14/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Site Assessment Reporting Principal Scientist (MOS) Data evaluation. Preparation of an Annual GW Monitoring Report, sign and seal report 15 Scientist (BC) Data evaluation 2 Drafter/Designer (BO) Figures preparation 6 Document Technician (SRE Editing; Report preparation 2 Project Asst (MC) Report editing/formatting, and report production/submittal/delivery 2
TOTAL LABOR 27
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
SUBCONTRACTOR COSTS
Equipment Procurement Name Equipment Rate Units Usage Totals
$0.00 Per Day 0 $0.00
Total Equipment: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals $0.00 Per Day
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65)-week=20% (1.20) Total Lab: $0.00 Rate Units Usage
Shipping - Large (25 to 50 lb --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Personal Protection
Item Rate Unit Usage Totals Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items
Total Equipment Items: $0.00 Equipment Kits
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
FINAL --7/24/96
Arcadis U.S., Inc.
1705 Metropolitan Boulevard Suite 101 Tallahassee Florida 32308 Phone: 850 422 2555 Fax: 850 668 0080 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
Ms. Theresa Pepe Bureau of Waste Cleanup Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road, M.S. 4520 Tallahassee, Florida 32399-2400
Date: January 14, 2026 Subject: Proposal for 2026 Annual Groundwater Monitoring Concord Custom Cleaners #50 Site, 1245 West Lafayette Street, Tallahassee, Florida, FDEP Facility ID No. ERIC_4869.
Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to submit this level of effort (LOE) and cost proposal for the annual groundwater monitoring activities at the Concord Custom Cleaners #50 facility located at 1245 West Lafayette Street, Tallahassee, Florida (FDEP Facility ID No. ERIC_4869; “the Site”; Figure 1). This proposal includes one groundwater monitoring event, and one letter report summarizing field activities. The FDEP cost estimating spreadsheets (Attachment A) are attached.
SCOPE OF WORK
Subtask 1 - Project Management Subtask 1 is reserved for project management as specified by FDEP and is calculated automatically in the cost estimating form (Attachment A).
Subtask 2 - Groundwater Monitoring (VOHs) Arcadis proposes to collect samples from the following monitoring wells MW005, MW007, MW010, MW013, MW015, MW016, MW017R, PZ002, PZ021, and PZ024. Samples will be submitted to a certified laboratory for analysis by EPA Method 8260C or equivalent (VOHs only). Monitoring well purge water will be contained in 55-gallon drums, sampled for characterization, and disposed of properly.
Arcadis proposes to inspect recovery wells; RW001, RW002, RW003, RW004, RW005, RW006, RW007, and RW008 to determine their status. Monitoring and recovery well locations are shown on Figure 1.
Subtask 3 - Reporting (VOHs) Arcadis will incorporate the data collected during the groundwater sampling event into a letter report summarizing the field activities. The report will include laboratory analytical data, figures presenting groundwater analytical data, a summary of the data, conclusions, and recommendations for future work at the Site.
FDEP – Concord Custom Cleaners #50 Proposal – January 2026 www.arcadis.com Concord 50 AGM Proposal Text - Jan26
SCHEDULE
Arrangements for monitoring well replacement and groundwater sampling activities will be conducted upon receipt of a Task Assignment (TA) from the FDEP.
ESTIMATED COST
A Cost Estimate Form and Level of Effort forms (CEF/LOE) that present estimated project costs are included as Attachment A.
Please contact me if you have any questions regarding this proposal.
Sincerely, Arcadis U.S., Inc.
Mike O’Sullivan, P.G.
Principal Geologist Email: mike.osullivan@arcadis.com Direct Line: 850.895.4739 Mobile: 850.491.2346
Attachment:
Figures Attachment A – Cost Estimating Form and Level of Effort Forms Attachment B – Subcontractor quote
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562 (850) 292-6511
To: Mr. Mike O’Sullivan Arcadis US, Inc.
1705 Metropolitan Boulevard Tallahassee, FL 32308
January 14, 2026
Re: Drum Disposal – 1245 West Lafayette Street – Tallahassee, FL
Mr. O’Sullivan:
The price for transportation and disposal (T&D) of one (1) 55-gallon drums of non-hazardous water located at your site in Tallahassee, FL will be $125.00 per drum/total.
All drums should be staged in a central location. Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.).
A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.
This quote is valid for 90 days.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: Robert@ErwinRemediation.com Phone: (850) 466-2358