Task Assignment DC048A Summary
This Task Assignment (TA) is a contract amendment entered into between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S. Inc., dated October 1, 2024, pursuant to underlying Contract Number HW680. The task assignment authorizes Arcadis to conduct a site assessment at the Prestige Cleaners facility located at 7509 West Hillsborough Avenue, Tampa, Hillsborough County, Florida (ERIC_4723). The Department Project Manager is Theresa Pepe (850-245-8966), and the Contractor's Project Manager is Gus Suarez (813-205-4703). The task assignment is effective through December 12, 2025.
Arcadis will complete a site assessment according to the approved work plan, with a total task assignment value of $63,827.36 on a fixed unit rate basis. The contract includes two invoicing milestones: $50,202.83 upon FDEP approval of fieldwork activities (due 06/06/2025), and $13,624.53 upon FDEP approval of the Site Assessment Report, investigative derived waste (IDW) manifests, and project management deliverables (due 10/10/2025). Specific work tasks include project management (automatically calculated as a percentage of total labor), site assessment activities including soil and groundwater screening and monitoring well installation, and preparation of a comprehensive Site Assessment Report with supporting documentation. Subcontractors include Preferred Drilling Solutions for drilling services ($15,895.00), Site Lines for ground-penetrating radar utility survey ($1,200.00), Landmark for professional surveying ($1,000.00), and Erwin for IDW transportation and disposal ($1,100.00). The scope of work is governed by FDEP's Standard Operating Procedures and the approved Initial Site Assessment Work Plan dated May 2024.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC048A Completion December 12, 2025
Arcadis will complete a Site Assessment according to the approved Work Plan.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_4723
7509 West Hillsborough Ave, Tampa, Hillsborough County
Prestige Cleaners
✔ $ 63,827.36
$ 63,827.36
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2024.10.01 14:05:59 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.10.01 10:16:07 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Completion of Fieldwork Activities 06/06/2025
Site Assessment Report/IDW manifests/Project Management 10/10/2025
FDEP approval of Fieldwork Activities $ 50,202.83
FDEP approval of Site Assessment Report/IDW manifests/Project Management $ 13,624.53
$ 63,827.36
HW680
DC048A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Prestige Cleaners
FACID NO. 29-9501220; ERIC_4723
Tampa, Hillsborough County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC048A (HW680) DATE: September 30, 2024
This Task Assignment authorizes Arcadis to complete a Site Assessment at the Prestige Cleaners site. The initial fieldwork will be completed in approximately seven days and a Site Assessment Report (SAR) will be submitted as the final deliverable. The assessment may be expanded or reduced via change order depending on the complexity of the site. All work will be performed in accordance with the approved work plan.
The final task assignment total is $63,827.36. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Site Assessment This subtask provides funds for soil, vapor and groundwater screening and monitor well installation at the facility. Arcadis will present the data in an interim deliverable after which a change order may be authorized for additional work, if needed. The Project Manager approved sampling locations and the overall approach to the assessment presented in the May 2024 Work Plan.
Site Lines will provide a GPR survey to check for underground utilities, based on their low bid of three bids solicited.
Prestige Cleaners
(ERIC_4723)
Preferred Drilling Solutions was selected as the drilling subcontractor based on their low bid of three bids solicited.
Landmark will conduct a professional survey of piezometers and monitoring wells.
Erwin will transport and dispose of IDW. Note: IDW is presumed to be non-hazardous but will be characterized before disposal.
Subtask 3: Site Assessment Report (SAR) All activities and analytical results obtained during site assessment work will be submitted to FDEP as a written report. This report will include appropriate figures, graphs, data tables, etc. IDW manifests will also be provided to FDEP as part of the final deliverable.
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 6/25/24
Task #: SubTask 1 Project Management Site: Prestige Cleaners SubTask 2 Field Activities
Activity/Phase: Site Assessment SubTask 3 Site Assessment Report Project Manager: Gus Suarez SubTask 4
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$87.59 Project Manager Suarez, Gus (GS) 14 14.3 $70.45 Principal Scientist Perella, John (JP) 7 3 4 0 0 $69.76 Principal Scientist Burke, Brian (BRB) 15 7 8 0 0 $50.00 Senior Engineer Hanna, Chad (CH) 57 17 40 0 0 $40.09 Project Scientist Brooks, Eric (EAB) 89 89 0 0 0 $34.89 Technician Welch, David (DJW) 18 18 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 12 0 12 0 0 $38.28 Project Assistant Cruz, Michele (MC) 15 6 9 0 0
Total Hours 227 14 140 73 0 0
Direct Labor $10,888.48 $1,252.66 $5,975.38 $3,660.44 $0.00 $0.00
Overhead 79.00% $8,601.90 $989.60 $4,720.55 $2,891.75 $0.00 $0.00 Gen & Admin 36.00% $3,919.86 $450.96 $2,151.14 $1,317.76 $0.00 $0.00 Fringe 37.10% $4,039.63 $464.74 $2,216.87 $1,358.02 $0.00 $0.00 Total Labor $27,449.87 $3,157.96 $15,063.94 $9,227.97 $0.00 $0.00
Travel Vehicle Rental $840.00 $840.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $840.00 $840.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) PDS Drilling (Conventional) $15,895.00 $15,895.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 SiteLines GPR $1,200.00 $1,200.00 $0.00 $0.00 $0.00 Landmark Surveying $1,000.00 $1,000.00 $0.00 $0.00 $0.00 Erwin IDW $1,100.00 $1,100.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $19,195.00 $19,195.00 $0.00 $0.00 $0.00 Handling Fee $1,919.50 $1,919.50 $0.00 $0.00 $0.00 Total Subcontractor Cost $21,114.50 $21,114.50 $0.00 $0.00 $0.00
Laboratory Analytical Costs $7,709.00 $7,709.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $450.00 $450.00 $0.00 $0.00 $0.00 Total Laboratory $8,159.00 $8,159.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $280.00 $280.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $989.00 $989.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
EwE - MAGS Equipment (Other) $2,250.00 $2,250.00 $0.00 $0.00 $0.00 Total Field Expenses $3,519.00 $3,519.00 $0.00 $0.00 $0.00
Subtotal $61,082.37 $3,157.96 $48,696.44 $9,227.97 $0.00 $0.00 Completion Fee $2,744.99 $315.80 $1,506.39 $922.80 $0.00 $0.00
Total Estimated Cost $63,827.36 $3,473.76 $50,202.83 $10,150.77 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Prestige Cleaners SUBTASK 2: Field Activities
DATE: 6/25/24
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Soil Sampling, Vertical Profile GW Sampling, PZ/MW Install Principal Sci (BB) PG field support and daily updates (4 hrs) 4 Senior Eng (CH) HASP (4 hrs), Property owner updates and field event preparation (2 hrs), data analysis (2 hrs) 8 Project Sci (EB) Prep (4 hrs), Mob/demob (1 hr), GPR oversight (8 hrs), Soil sampling and VP GW sampling (5 x 12 hrs = 60), logs/paperwork (4 hrs) 77 Project Assistant (MC) HASP (3 hrs) 3
MAGS Testing and Monitor Well Sampling Principal Eng (JP) PE field support and MAGS data evaluation (3 hrs) 3 Senior Eng (CH) Field event paperwork preparation and field readiness (2 hrs), IDW characterization and waste profiling for disposal (2 hrs) 4 Project Sci (EB) Field prep/field readiness (1 hr), Mob/demob (1 hr), MAGS Field Testing, restoration, and logs (10 hrs) 12 Technician (DW) Field prep/field readiness (1 hr), Mob/demob (1 hr), MAGS Field Testing, restoration, and logs (10 hrs), Survey oversight, Guage WLs, Sample one well (6 hrs) 18
Initial Site Assessment Report Deliverable Principal Sci (BB) Teleconference call with FDEP, next assessment or remediation discussion planning (3 hrs) 3 Senior Eng (CH) Sketch GW gradient and data figures. Field deliverable package submit to FDEP (5 hrs) 5 Project Assistant (MC) Field support, database management, assemble field deliverable package, lab reports (3 hrs) 3
TOTAL LABOR 140
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 7 $840.00 $840.00
TOTAL VEHICLE $840.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
Project Sci (EB) $36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
Project Sci (EB) $150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals PDS Direct-push services $15,895.00 Lump Sum 1 $15,895.00 Erwin IDW $110.00 Drum 10 $1,100.00 SiteLines Utility Locate / GPR Survey $1,200.00 Lump Sum 1 $1,200.00 Landmark Survey $1,000.00 Lump Sum 1 $1,000.00
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $19,195.00
TOTAL SUBCONTRACTOR $19,195.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $73.00 1.00 37 $2,701.00 VOC 8260 Soil $73.00 1.00 32 $2,336.00 Encore Samplers 8260 SPLP Soils $16.00 1.00 32 $512.00 SPLP Extraction 1311/1312 Soil/Sediment $50.00 1.00 5 $250.00 VOC analysis on SPLP extracted sample 8260 Soil/Sediment $73.00 1.00 5 $365.00 VOC TO-15 Vapor $200.00 1.00 6 $1,200.00 TCLP Benzene for IDW 1311/8260 Soil $210.00 1.00 1 $210.00 TCLP metals for IDW 1311/6010 Soil $135.00 1.00 1 $135.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $7,709.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 3 $450.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $450.00
TOTAL LAB $8,159.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 7 $280.00
Total Expendables: $280.00 Equipment Items Survey Station transit/rod/level/tape $50.00 Per Day 0 $0.00 Tubing, Poly/HDPE $0.30 Per Foot 30 $9.00 Tubing, Silicon 3/16x3/8 $3.00 Per Foot 5 $15.00 EWE SVE Trailer for MAGS $2,250.00 Per Day 1 $2,250.00
Total Equipment Items: $2,274.00 Equipment Kits Monitor Well Installation Kit $325.00 Day 1 $325.00 Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00 Soil Assessment Kit $175.00 Day 2 $350.00
Total Equipment Kits: $965.00
TOTAL EQUIPMENT $3,519.00
SITE : Prestige Cleaners SUBTASK 3: Site Assessment Report
DATE: 6/25/24
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title) Principal Sci (BB) PG write/certification of final SAR (4 hrs); results/risk-based mngt options with FDEP (4 hrs) 8 Project Engineer (JP) PE analysis of SAR (2 hrs); remedial characterization data/preliminary remedial options evaluation (2 hrs) 4 Senior Eng (CH) SAR writing (24 hrs); SAR figures/graphs generation (8 hrs); SAR tables (8 hrs) 40 Drafter/Designer (BO) SAR figures/graphs generation (8 hrs); data mgmt, import to CAD (4 hrs) 12 Project Asst (MC) Process field notes (2 hrs), sample tracking (2 hrs), database entry (2 hrs), report assembly (3 hrs) 9
TOTAL LABOR 73
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection Item Rate Unit Usage Totals
Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items
Total Equipment Items: $0.00 Total Equipment Kits: $0.00
Total Equipment Kits: $0.00
INITIAL SITE ASSESSMENT WORK PLAN
www.arcadis.com 2024.05.31_Prestige Cleaners_ISA Work Plan 4
INITIAL SITE VISIT
On May 8, 2024, Arcadis performed an initial site visit to observe the current layout and use of the site and surrounding properties, establish the immediate future use, verify the presence of utilities, potential drill locations/access, and complete applicable portions of the Site Visit Checklist. No on-site monitor wells were found during the visit. Arcadis spoke to the current property owner representative, Ms. Erin Feather (Tenant Relations Manager), prior to the visit to coordinate access. It was confirmed that municipal drinking water and sanitary sewer service is provided to the site; no septic systems currently exist. Natural gas is also supplied to the site.
The previous site layout from Site Screening Report is provided on Figure 2. There is currently no drycleaning equipment at the site and the unit is operated as a hair salon (Star Hair Salon). Current site photographs are presented in Appendix A and a copy of the completed Site Visit Checklist is presented in Appendix B.
INITIAL SITE ASSESSMENT WORK PLAN
A flexible assessment approach will be used to create a site-specific unsaturated soil and groundwater database capable of determining the absence/presence and extent of chlorinated drycleaning solvents above soil and groundwater CTLs. In addition, potential risks and exposure pathways will be identified and preliminary recommendations and design provided for remedial action, if justified. The proposed assessment activities will be completed in accordance with FDEP’s Standard Operating Procedures (SOP) (001/01), the site-specific HASP, Chapter 62-780 Florida Administrative Code (F.A.C.), and recent guidance provided in the July 13, 2022, Waste Cleanup Program Pollution Response Action Contract (WCP PRAC) meeting in Tallahassee, Florida.
Based on the reported historical contamination in the shallow groundwater, the reported depth-to-water (~5 ft bg) and site layout, multiple assessment methodologies are proposed. Unsaturated soil assessment will be completed by the installation of soil borings above the water table, with collection of soil samples for fixed-based laboratory analysis of VOCs and completion of a Modified Active Soil Gas Survey (MAGS).
The first phase of groundwater assessment will be completed as follows:
Installing a source area monitor well (MW001) near the former drycleaner machine location (currently unknown for the former Prestige facility) and a monitor well (MW002) near the historical temporary monitor well (TMW2) for fixed-based laboratory analysis of VOCs, Completing vertical profiling using direct-push technology (DPT) for fixed-based laboratory analysis of VOCs;
and, Installing piezometers to assess groundwater gradient conditions.
Following receipt and evaluation of the first phase of assessment, the scope of the next phase of investigation activities, such as additional monitor wells, will be developed in consultation with FDEP. The site assessment methods and techniques are described in detail below.
Site Preparation and Utility Locate Arcadis will contact the current site operator and current property owner to share proposed sampling locations and advise schedule/notification requirements prior to completing field work. Arcadis will oversee a subsurface private utility locate using ground penetrating radar (GPR) on the site and surrounding areas. The purpose of the
2024.05.31_Prestige Cleaners_ISA Work Plan 5 utility locate will be to establish/confirm the suspected locations of underground utilities (Sunshine State One Call will initially locate utilities on and surrounding the site). The initial site visit indicated the presence of underground water, sewer, electric, communications, and gas lines.
Soil Assessment and Sub-Slab Soil-Gas Sampling
Unsaturated Soil Assessment One continuous soil boring (SB001) will be installed in the rear of the facility to a depth of approximately 50 ft bls or into the basal confining clay at the bottom of the SAS to characterize site lithology. A lithologic log of the general geology at the site will be developed from the soil samples collected from this soil boring. Soil samples from each boring will be described by an onsite Arcadis geologist.
To confirm if past drycleaning operations at the site had an adverse impact to unsaturated soil quality conditions, up to 8 soil borings (SB001-SB008) for collection of soil samples are proposed for installation at the locations shown on Figure 3. The initial sample location will be placed in vicinity of the former temporary monitoring well (TMW2); additional boring/sample locations will be placed within and surrounding the building. Soil boring locations may be adjusted based on the GPR results and location of buried utilities/infrastructure.
The soil borings will be installed using a hand auger and DPT. A concrete coring machine will be used to bore through the concrete floor inside the building to access the underlying soils. Soil samples at all soil borings will be collected at 0.5 ft bls, 2 ft bls, and then at two-foot depth intervals to the water table (estimated to be at 4-7 ft bls).
All soil samples (up to 4 samples/boring x 8 initial boring locations or a total of up to 32 soil samples) will be submitted to a fixed-based laboratory for confirmatory analysis of VOCs by EPA Method 8260. Each soil sample will also be collected in encore samplers in anticipation of SPLP analysis. Five SPLP analyses are included in the initial costs. Following the sampling, the boreholes will be converted to a MAGS well, or sealed with cement grout.
Modified Active Gas Sampling MAGS is proposed for completion inside and outside the building. MAGS will be completed in general agreement with the Modified Active Gas Sampling Manual, dated October 12, 2004. Six MAGS wells (MAG01 – MAG06), constructed of 2-inch diameter PVC with 0.010-inch slotted screen set approximately one foot below ground surface to approximately one foot above the water table, estimated to be 4-7 ft bls, resulting in an assumed screen interval of 1 to 4 ft bg. Final MAGS well construction will be field determined. One vapor sample will be collected from each MAGS well for analysis of VOCs by EPA Test Method TO-15. Proposed MAGS well layout locations are depicted on Figure 3.
Groundwater Assessment
Groundwater Vertical Profiling Groundwater assessment will be conducted utilizing vertical profiling by a direct-push drill rig to collect water samples for VOCs analysis. Seven vertical profile (VP) locations (VP001 – VP007) are proposed as shown on Figure 3. Assuming the water table will be encountered at approximately 5 ft bls and the base of the surficial aquifer is approximately 50 ft bls, samples starting at the water table and at 10-ft depth intervals to a total depth of
2024.05.31_Prestige Cleaners_ISA Work Plan 6
49 ft-bls (5-9, 15-19, 25-29, 35-39, and 45-49 ft bls) will be collected. Lithologic information from Soil Boring SB001 will be used to determine exact sample intervals. Each VP water sample will be submitted to a fixed-based laboratory for confirmatory analysis of VOCs by EPA Method 8260. Following sampling, each vertical profile borehole will be sealed with cement grout.
Piezometer Installation Arcadis will install three piezometers at select locations to provide groundwater gradient information. For purposes of this Work Plan, it is assumed that three shallow piezometers (PZ001 through PZ003) will be installed with 10-ft of 0.010-inch slot pre-pack screen, between 2 to 12 ft bls using DPT (Figure 3). Final locations, dimensions, including depth, and screen interval will be determined based upon groundwater elevations encountered during the initial assessment activities. The piezometers will be developed and completed in a method to allow them to be converted to monitor wells in the future, if necessary. Monitor wells and piezometers will be professionally surveyed so that the groundwater gradient can be determined.
Monitor Well Installation and Sampling Arcadis will hand-install a source area well (MW001) into the water table, as deep as possible, at the location presented on Figure 3. The well will be constructed with 0.010-inch slot pre-pack screen, developed, and completed within a manhole. A second monitor well (MW002) will be installed adjacent to the historical temporary monitoring well (TMW2) that was referenced in the DSCP documentation. MW002 will be installed with 10-ft of 0.010-inch slot pre-pack screen, between 2 to 12 ft bls using DPT (Figure 3). Arcadis will sample MW001 and MW002 per SOP 001/01 for laboratory analysis of VOCs using EPA Method 8260.
Based on the results of the initial assessment activities and vertical profiling results, the installation of additional monitor wells and sampling/analyses in a subsequent phase will be provided to FDEP as required. Also, sampling for per- and polyfluoroalkyl substances (PFAS) will be screened per FDEP guidance and tasked separately.
REPORTING
An Initial Site Assessment Report (ISAR) including field logs, photographs, laboratory reports, and results summary will be submitted to FDEP within 30 days of receipt of laboratory data as an interim deliverable to document the fieldwork. The ISAR will provide a basis for the next phase of work which may include additional soil sampling, the installation of additional monitor wells, etc. to be completed under a Task Assignment Change Order (TACO).
A final Site Assessment Report (SAR) will serve as the final deliverable and will describe the results of the proposed site assessment tasks described herein. The SAR will be submitted to FDEP within 60 days of completion of the field work. The SAR will contain field logs, laboratory reports, tables, and figures summarizing the results of assessment activities and include conclusions and recommendations based upon findings.
INVESTIGATIVE DERIVED WASTE
Investigative derived wastes (IDW - drill cuttings and purge water) generated during site assessment activities will be drummed, labeled and temporarily staged on-site in Department of Transportation (DOT)-approved, 55-gallon
2024.05.31_Prestige Cleaners_ISA Work Plan 7 steel drums. Arcadis will coordinate with a waste disposal contractor for non-hazardous disposal of the IDW and provide copies of final disposal manifests to FDEP.
QUALITY ASSURANCE & QUALITY CONTROL
All fieldwork will be performed in accordance with FDEP’s SOP (001/01), and the site-specific HASP included under separate cover. Additionally, sample analyses will be performed by NELAP-certified laboratories to method practical quantitation limits.
PROJECT SCHEDULE AND COST
Cost estimate form/level of effort (CEF-LOE) worksheets and subcontractor bid copies for the implementation of this ISAWP will be provided separately upon approval of this Work Plan. Arcadis will proceed with scheduling field activities upon receipt of the task assignment from the FDEP.
REFERENCES
HSW Environmental Consultants, Inc. 1992. Contamination Assessment Report, Allied Discount Tires Store #22
FDEP. 2017. Standard Operating Procedures for Field Activities.
FDEP. 2022. Waste Cleanup Program Pollution Response Action Contract (WCP PRAC) Summary Slides.
Ryder, Paul D., USGS. 1985. The Hydrology of The Floridan Aquifer System in West-Central Florida.
REAR
ENTRANCE
FRONT
ENTRANCE
COUNTER
AREA
ASPHALT PARKING
COVERED WALKWAY
ASPHALT
DRIVE/PARKING
FORMER
PRESTIGE CLEANERS
TMW2
FIRE
HYDRANT
CONC.
LOADING DOCK
DUMPSTER
AREA
DUMPSTER
AREA
DUMPSTER
AREA
PAD-MOUNTED
TRANSFORMERS
VP007VP006VP005 PZ003PZ002
VP004
VP003
MW002
MW001
SB001
MAG001
SB003
MAG002
SB004
MAG003
SB005
MAG004
SB006
MAG005
SB008
MAG006
SB007
VP001PZ001
VP002
SB002
SITE LAYOUT AND
PROPOSED SAMPLING LOCATIONS
PRESTIGE CLEANERS - FDEP FACILITY I.D. ERIC_4723
7509 W. HILLSBOROUGH AVENUE
TAMPA, HILLSBOROUGH COUNTY, FLORIDA
INITIAL SITE ASSESSMENT WORK PLAN
20' 40'0
GRAPHIC SCALE
FIGURE
C
IT
Y:
B
B, FL
D
IV
/G
R O
U P:
E N
B:
B
.O
LI
VA
L
P
IC
: G
.S U
AR
EZ
P
M : C
.H
AN
N A
TM
: E .B
R O
O
KS
L
YR
:(O pt )O
N
;O
FF
R
EF
C :\U se rs
\b ol iv a\
D C
\A C
C D oc s\
Ar ca di s
AC
C
U S\
AU
S-
-F D
EP
_P
R
ES
TI
G
E C
LE
AN
ER
S_
TA
M
PA
_F
L\ Pr oj ec t F ile s\
_W
IP
\1 0T
_A R
C _E
N V\
\0 1-
D W
G \F
D
EP
-P re st ig eD C
4-
SM
.d w g L
AY
O
U T:
M
AY
-F
3_
SM
SA
VE
D
: 5 /3
0/
:4
PM
AC
AD
VE
R
: 2 4.
1S (L
M S
TE
C
H
P
AG
ES
ET
U P:
P
LO
TS
TY
LE
TA
BL
E:
AC
S-
C O
LO
R
_A N
AL
YT
IC
AL
.C
TB
PL
O
TT
ED
: 5
/3 1/
:2
PM
BY
: O
LI
VA
, B
R
IA
N
Gulf of Mexico
Atlantic Ocean
Florida
SITE LOCATION
(Hillsborough County)
LEGEND
PARCEL BOUNDARY
SUBJECT SITE PARCEL BOUNDARY
HISTORICAL MONITORING LOCATION (A2L, 1994)
PROPOSED SOIL BORING LOCATION
PROPOSED DIRECT-PUSH LOCATION
PROPOSED PIEZOMETER LOCATION
PROPOSED MONITOR WELL LOCATION
PROPOSED MAGS WELL LOCATION
MAP NOTES:
1. Aerial image from USGS Digital Orthographic Quarter
Quadrangle (DOQQ), 2023.
2. Parcel boundaries from Hillsborough County Property
Appraiser GIS database.
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 6/13/24 FAC ID#: ERIC_4723
Unit Unit Rate Number of Units Extended Price whole day $1,875.00 5 9,375.00$ half day $1,475.00 -$ per foot $25.00 24 600.00$ each $110.00 8 880.00$ each $45.00 -$ each $35.00 4 140.00$ per well $150.00 10 1,500.00$ roundtrip $750.00 1 750.00$ per crew / per night $575.00 -$ each $75.00 10 750.00$ each $125.00 -$ per day $150.00 4 600.00$ each $75.00 1 75.00$ lump sum $350.00 1 350.00$ per day $75.00 5 375.00$ per day $100.00 5 500.00$
TOTAL QUOTE PRICE $15,895.00
Notes: 1. Includes saw cuts, development, standby time, and decon.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator Date: 6/13/24
PDS to supply concrete core drill with 6" bit
7509 W Hillsborough Ave, Tampa, Hillsborough County, FL
Well Completion (includes MH w/ cover, concrete, and locking well cap)
Well Riser (includes all materials) ID 1" 5' Length
Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"
Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"
2" Well Install (includes all materials)
Direct Push Half-Day Rate 1 - on-site half day
(1) 1" x up to 12' MW with up to 10' .010 prepacked screen, installed via hand auger, pad and 6" manhole
(8) Hand auger borings to approx. 7', drum cuttings, grout and restore grade
Decon pad, decon with steam cleaner, drum cuttings, development water, and decon fluids
(6) 2" x 4' VEP's with 3' .010 screen, installed via hand auger, pad and 6" manhole
(3) 1" x 12' PZ's with 10' .010 prepacked screen, soil sampling as needed, drum cuttings, pad and 8" manhole
Site Name and Location: Prestige Cleaners
Consultant Name: Arcadis US, Inc
PROPOSED SCOPE OF WORK:
(1) DPT lithology boring to 50' (or refusal), convert to vertical profile point, grout and restore grade
(7) DPT vertical profile points to 49', up to (5) grab groundwater intervals per boring, grout and restore grade
Days to Complete Scope of Work: 5
Direct Push Daily Rate 1 - on-site day
Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT, Geoprobe 7822DT
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Concrete Core Drill with 6" core bit
Decon Pad
Other (specify)
Refurbished - DOT Approved 55-gal Drum
Per Diem
Mobilization
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)
New - DOT Approved 55-gal Drum
Permits
Steam Cleaner
Pepe_T Highlight
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.974.2423
Date: 6/10/2024
FAC ID#:
PROPOSED SCOPE OF WORK:
Unit Unit Rate Number of Units Extended Price
Equipment Type: DPT Track Rig whole day $1,650.00 5 $8,250.00 half day $0.00 each $225.00 6 $1,350.00 each $0.00 each $100.00 8 $800.00 each $40.00 4 $160.00 per well $225.00 10 $2,250.00 daily roundtrip $1,500.00 1 $1,500.00 per crew / per night $550.00 5 $2,750.00 each $80.00 5 $400.00 each $50.00 1 $50.00 each $75.00 35 $2,625.00 each $500.00 1 $500.00 each $75.00 7 $525.00 day $495.00 0 $0.00
TOTAL QUOTE PRICE $21,160.00
Notes:
Project No.: ___________________________
Date: 6/10/2024
(1) MW 1"x ~12' w/ 10' Pre-Pack Screen & 6" BD Completion - Concrete Core - Installed by hand - Well is inside bldg.
Contractor Name: Arcadis - Eric Brooks - 813 382-6324
Site Name: Prestige Cleaners - 7509 W Hillsborough Ave - Tampa, FL
(HAND CLEAR ALL LOCATIONS TO 5' or REFUSAL)
(1) DPT Soil Borings to 50' - Grout Abandon
(3) PZ 1"x12' w/ 10' Pre-Pack Screen & 8" BD Completion - DPT Soil Sampling - Installed Using DPT Rods
Permits - Install Well
Water Sample
Signature and Title of Person Submitting Quote: Charles Bucher
Concrete Core
420M Geoprobe Dolly Rig - Upcharge
Days to Complete Scope of Work: 5 Days
Subcontract Company Name: EARTH TECH DRILLING. Inc.
Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069
ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.
Decon Pit w/ Steam Cleaner
MISCELLANEOUS
(6) Vapor Ext. Point 2" x 4' w/ 3' .010" Screen & 6" BD Completion - Concrete Core - Installed by hand
Mobilization
Per Diem
DOT Approved 55-gal Drum
Well Riser (includes all materials) ID ___1"___ 5' Length
Well Completion (includes 30 Min Dev. 6"/8" B-D MH & locking well cap)
Pre-Packed PVC Well Screen (includes all materials) 5' Length Pack OD ___1"____
(7) DPT GW Sample Borings to 49' - Samples collected every 10 feet for a total of 5 Samples per boring (35 Samples Total) - Grout Abandon
Drum Soil, Dev. Water & Decon Water - 30 Minutes of Dev. Per well - Estimated at (5) Drums
Decon Pit & Steamcleaner
Direct Push Daily Rate 1 - on-site day
Direct Push Half-Day Rate 1 - on-site half day
MAG Wells - 2" x 4' w/ 3' .010" Screen
Auger Attachment, 4" Surface Casing
DIRECT PUSH TECHNOLOGY
Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push
Arcadis 6/12/2024 4300 West Cypress Street, Suite 450 191416 Tampa, FL 33607
Project Name Prestige Cleaners
Eric Brooks Project Address 7509 West Hillsborough Ave eric.brooks@arcadis.com Project City Tampa 813-382-6324 Project State Fl
Project Zip 33615
Cascade Rep Contact Information
Scope of Work
Quantity Unit Sales Price Subtotal
1 Lump Sum 1,425.00$ 1,425.00$
1 Lump Sum 1,425.00$ 1,425.00$
5 Day 2,250.00$ 11,250.00$
6 Day 400.00$ 2,400.00$
24 Foot 26.00$ 624.00$
24 Foot 24.00$ 576.00$
36 Foot 24.00$ 864.00$ 10 Each 4.00$ 40.00$ 35 Each 20.00$ 700.00$ 5 Each 85.00$ 425.00$ 11 Each 150.00$ 1,650.00$
Foot 1.00$ -$ Each 15.00$ -$
1 Lump Sum 550.00$ 550.00$ 1 Day 1,600.00$ 1,600.00$
Pre-Tax Total
Tax Percentage
Taxes
Quote Total
Account Name Bid Date Address Quote Number
Quote Revision Date
Bill To Account
Contact Name Email Phone
Number
Prepared By Zachary Fordley, Project Manager Email zfordley@cascade-env.com
Cascade will provide the following 1.VAPOR EXTRACTION POINTS: Core six (6) cores, at least 4-inches in diameter, through concrete slab approximately 6-inches in thickness. Install 2-inch 0.010 slotted PVC screen, 3-feet in length (assumed) in each borehole from 1-4 ft bls. Complete with steel manhole flush to grade.
2.MONITOR WELLS: Core one 6-inch diameter core through concrete and hand install one monitor well inside building (MW001). Complete well with 1-inch prepacked screens, up to 12 feet deep. Bring 5-foot length prepacked screens to provide more flexibility in depths. Complete well within steel manhole flush to grade and develop for 30 minutes. Using direct push, install a second monitor well (MW002) with 10-ft of 0.010-inch slot pre-pack screen, between 2 to 12 ft bls, with 1-inch diameter prepacked screen completed within steel manhole and 2’x2’ concrete pad. Assume 30 minutes for well development
3.LITHOLOGY SOIL BORING: Using direct push, install one boring (SB001) to 50 feet for lithology description using a Macro-Core equipped with a piston-rod assembly for depth-discrete samples.
4.SOIL BORINGS: Assist in coring through concrete and/or asphalt and install up to eight (8) soil borings (SB001 – SB008) for the collection of soil samples. Using a hand auger, advance soil borings to the top of the water table (estimated to be at 4-7 ft bls). Note, most soil borings are co-located with vapor extraction, vertical profile, monitor well, or piezometer locations.
5.VERTICAL PROFILE POINTS: Using direct push at seven (7) vertical profile locations, collect grab water samples at the following depths. One of the vertical profile boring locations will be the same as the soil boring described above.
6.PIEZOMETERS: Install three (3) piezometers screened 2-12 ft below ground, constructed with 1-inch diameter prepacked screen completed within steel manhole and 2’x2’ concrete pad. The piezometers will be installed at the locations shown on the attached figure. Assume 30 minutes for development at each piezometer.
Description
$23,529.00
Mobilization
Demobilization
DPT Rig, Crew
Per diem
Vapor Extraction Points
Monitoring wells
Piezometers
MC- 5 Liners
Sp-16 ground water samples
Well Development
Drums
Flush Miounts
Abandonment - Grout
Patch - as needed
Core Equipment
$23,529.00
June 10, 2024
Mr. Eric Brooks
Project Geologic Specialist
Arcadis U.S. Inc.
4300 W. Cypress St., Suite 450
Tampa, FL 33607
RE: Former Prestige Cleaners Site
7509 W Hillsborough Ave.
Tampa, FL
Dear Mr. Brooks:
Landmark Engineering & Surveying Corporation is pleased to present this proposal for surveying services for the above-referenced property. As requested in your email dated June 7, 2024, Landmark will:
• Survey the top of casing elevation and obtain the latitude and longitude of PZ001, PZ002, PZ003, MW001, and MW002, as identified on the exhibit attached to your request.
FEE: $1,000.00
Time Frame: The work will be completed on a mutually agreed upon date, after June 17th, 2024.
Landmark thanks you for the opportunity to present this proposal and looks forward to your favorable response. If you should have any questions or comments, please do not hesitate to let me know.
Sincerely, LANDMARK ENGINEERING
& SURVEYING CORPORATION
Scott R. Fowler, LS
Vice President/Partner
AUTHORIZATION TO PROCEED
Well Locations and elevations – Former Prestige Cleaner site – Tampa, FL
Signature: _____________________________________________________________________
Print Name & Title: _____________________________________________________________
Firm: _________________________________________________________________________
Billing Address: ________________________________________________________________
City, State, Zip: ________________________________________________________________
Preferred Invoice via _____ U.S. Mail _____ E-Mail
SITE LINES PROPOSAL ACCEPTANCE
SIGNATURE PAGE
Site Lines Proposal Number: 01482p Proposal Date: June 7, 2024
Project Site: Prestige Cleaners Site – 7509 W. Hillsborough Ave, Tampa, FL
Project Fee: $1,200.00 includes locate and AutoCAD Figure
Payment Terms: [PAYABLE WITHIN 30-DAYS OF INVOICE]
INVOICE TO:
Client: ARCADIS Address: 3109 West Dr. Martin Luther King Jr. Blvd., Tampa, FL 33607 Attention: Eric Brooks Phone: 813-353-5782 Email: eric.brooks@ARCADIS.com
Special Instructions:
In witness thereof, the parties hereto have made and executed this agreement
FOR [CLIENT] FOR SITE LINES LLC
Signature: Signature:
By: By: William L. Hardy II
Title: Title: President
Date Signed: Date Signed: June 7, 2024
GEOVIEW ASSOCIATES, INC.
PROPOSAL ACCEPTANCE SHEET
Project Name: Prestige Cleaners Site Project Location Tampa, Florida GeoView Proposal #: 11203p Proposal Date: June 13, 2024 Description of Services Provide Utility Designating and Mapping Services Project Cost: $1,300 Payment Terms: Per MSA
CHARGE INVOICE TO THE ACCOUNT OF:
Client: ARCADIS Address: 3109 West Dr. Martin Luther King Jr. Boulevard, Suite 350
Tampa, FL 33607 Attention: Mr. Eric A. Brooks Phone (Office): (813) 353-5782 Phone (Cell): (386) 314-5502 Email: eric.brooks@arcadis.com
FOR APPROVAL OF CHARGES:
Firm:
Address:
Phone No.: Fax No:
Attention:
Special Instructions and/or Mutually Agreed Upon Changes to the Proposal:
In witness thereof, the parties hereto have made and executed this Agreement
Client: GeoView Associates, Inc.
Signature
By: By: Mike Wightman, P.G.
Title: Title: President
Date Signed: Date Signed: June 13, 2024
100495Estimate Number
9/8/2024Expiration Date
6/10/2024Created Date
ESTIMATE
Blood Hound 6500 Technology Center Dr.
Suite 200 Indianapolis, IN 46278
Email: BHI@bhug.com bhug.com Website:
Phone #: 888-858-9830 888-858-9829 Fax #:
Customer has requested an estimate for the following scope of work:
• Client has requested an estimate to horizontally locate detectable underground utilities within a 10' radius of multiple interior and exterior proposed soil bores in areas as shown on the provided exhibit and as directed on site.
Customer has requested approximate depths to be noted on site sketch. Please note that all depths are approximate and can only be verified using vacuum excavation.
· All estimated values are subject to change (+/-) once the technician arrives on site and conducts a proper site assessment. A Not to Exceed amount can be provided upon request, this will increase the estimate.
· Client will only be invoiced for time needed to complete the stated SOW with a two-hour minimum plus trip charge where applicable. Customer is advised if less time onsite is required, invoicing will be reduced to no less than the minimum fee.
Any additional time required on site to complete the task beyond the estimated / minimum time will be invoiced in 15-minute increments of the provided hourly rates, upon customer approval.
· Estimated time onsite does not include time for any site-specific training, escorting or ingress / egress time which if required, shall be an additional billable charge up to and including exceeding the estimate.
· BHUG will attempt to locate public utilities to the best of our ability when requested, with the information provided.
However, not having access to utility records, plans, maps, or utility enclosures may be cause for some utilities to be unaccounted for, therefor it is always the customer responsibility to call 811.
· The performance of BHUG’s services is limited to full and unobstructed access to include but not limited to mechanical rooms, manholes, hand holes, vaults, meter rooms, telecom rooms, fixtures (plumbing, electrical, communication), dispensers, fenced compounds, tanks and structures. It may be necessary to have parked vehicles or machinery moved to allow for a full scan and to access structures. Full cooperation from the on-site personnel is necessary to perform a complete survey.
· Any available as-builts, engineered or other record drawings, if available, should be supplied to us prior to providing an estimate and commencement of field work. Any drawings supplied to us after the estimate has been delivered to the customer will require a mandatory review of the estimate and potential revisions to the scope of work and associated pricing.
BHUG SOW
$1,755.00Grand Total eric.brooks@arcadis.comEmail
(813) 903-3100Phone
Eric BrooksName
7509 West Hillsborough Avenue, Tampa, FL, 33615
Job Site Location
630 Plaza Drive, Suite 600 Highlands Ranch, CO 80129
US
Billing Address
Arcadis-Tampa, FLCustomer
Product Invoice Description Quantity Sales Price Total Price
Advantage Locate (hourly) EM / GPR Locating (hourly rate) 7.00 $240.00 $1,680.00
Trip Charge Trip Charge 1.00 $75.00 $75.00
Scope of Work
5315 56th Commerce Park Blvd.
Tampa, FL 33610
Phone (813) 413-7760 eWe – Your Partner in Remediation Fax (813) 413-7761
- 2 - EWE-2410
PROPOSAL
8 Hr Mags Testing
Arcadis U.S., Inc.
Prestige Cleaners
7509 West Hillsborough Avenue Tampa, FL
Please initial and return to the attention of: Thomas Twitmyer – Tomt@ewithe.net
APPROVED ITEM DESCRIPTION RATES UNIT QUANTITY COST
Remedial Equipment SVE mobile unit EN 808 $1,500 /job 1 $1,500
Transportation $250 /job 1 $250
Power Supply 55 KW three phase generator $500 /job 1 $500
TOTAL ESTIMATED COSTS $2,250
NOTES:
Estimate valid for 90 days
DATE SERVICES NEEDED: PROPOSAL PREPARED: 6/9/2024
START TIME: ESTIMATED HOURS ON SITE:
PURCHASE ORDER NO.: EWE JOB NO.: EWE -2410
PAYMENT TERMS: Net 30 Days APPROVED COST
BILLING INFORMATION: Officer* Date *Signature Acts as Notice to Proceed at Contract Price
Payment Remitted to: ATTENTION: Mr. Eric Brooks Equipment with Experience, LLC Arcadis U.S., Inc.
5309 56th Commerce Park Blvd 4300 West Cypress Street, Suite 450 Tampa, FL 33610 Tampa, FL 33607
Email: eric.brooks@arcadis.com
Thomas F. Twitmyer, EWE Arcadis U.S., Inc.
mailto:Tomt@ewithe.net
Invoice
Date
2/6/2024 Invoice #
AUS105
Arcadis U.S., Inc.
Attn: Chad Hanna 1705 Metropolitan Boulevard Tallahassee, FL 32308 invoices_us@arcadis.com
P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511 ErwinRemediation@gmail.com
Site City
Ocoee
Site Name
Towne Cleaners
Total
Quantity Rate AmountDate Item
1 110.00 110.001/30/2024 Drum Disp - Non-Haz Groundwater 1 110.00 110.001/30/2024 Drum Disp - Non-Haz Soil
$220.00
| Peerless Cleaners #3416 Annual Monitoring Proposal 4-18-2022.pdf |
| Annual Groundwater Monitoring |
| Annual Groundwater Monitoring Report |
| Schedule |
| Cost Estimate |
| Closing Remarks |
| HW680_DC048A ns.pdf |
| Subtask 2: Site Assessment |
| Subtask 3: Site Assessment Report (SAR) |
| Prestige Bids Binder.pdf |
| Direct Push |
| SITE: Prestige Cleaners Site – Tampa, Florida |
| Dear Mr. Brooks: |
| If you have any questions, please feel free to contact me. I look forward to working with you. |
| Sincerely, |
| Site Lines LLC |
| William L. Hardy II |
| Enclosure |
| SITE LOCATION |
| PROPOSED SCOPE OF WORK |
| RESULTS OF THE INVESTIGATION |
| PROJECT FEE |
| CLIENT REQUIREMENTS |
| DESCRIPTION OF COMPANY INVESTIGATION AND LIMITATIONS |
| SITE LINES PROPOSAL ACCEPTANCE |
| SIGNATURE PAGE |
| Site Lines Proposal Number: 01482p Proposal Date: June 7, 2024 |
| Project Site: Prestige Cleaners Site – 7509 W. Hillsborough Ave, Tampa, FL |
| Project Fee: $1,200.00 includes locate and AutoCAD Figure |
| Payment Terms: [PAYABLE WITHIN 30-DAYS OF INVOICE] |
| INVOICE TO: |
| Client: ARCADIS |
| Address: 3109 West Dr. Martin Luther King Jr. Blvd., Tampa, FL 33607 |
| Attention: Eric Brooks |
| Phone: 813-353-5782 Email: eric.brooks@ARCADIS.com |
| Special Instructions: |
| In witness thereof, the parties hereto have made and executed this agreement |
| FOR [CLIENT] FOR SITE LINES LLC |
| Arcadis U.S., Inc. |
| 6/9/2024 |
| Thomas F. Twitmyer, EWE Arcadis U.S., Inc. |
File details come from the government source that posted it. Updated .