This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S. Inc. for environmental consulting services at the Former Imperial Laundry & Dry Cleaners site located at 901 W. Fairbanks Avenue, Winter Park, Orange County, Florida. The task assignment is designated DC041C under Contract Number HW680, with a completion date of May 8, 2026. The FDEP Project Manager is Theresa Pepe (850-245-8966), and the contractor's Project Manager is Gus Suarez (813-205-4703).
Arcadis will conduct two quarters of groundwater monitoring from select wells at the site, with all activities performed in accordance with the October 8, 2025 Work Plan submitted by Arcadis. The scope includes four subtasks: Project Management (calculated as a percentage of total labor), Quarterly Groundwater Monitoring Event 1 (sampling two recently reinstalled wells for drycleaning solvents), Quarterly Groundwater Monitoring Event 2 (same scope as Event 1), and Reporting (submission of a written report with recommendations for additional actions). The total Task Assignment value is $10,822.52, established on a fixed unit rate basis. The invoicing schedule is tied to FDEP approval of the Groundwater Monitoring Report, IDW manifest, and Project Management deliverables with a due date of March 31, 2026. The cost estimate includes direct labor ($8,364.56), travel ($240.00), laboratory costs ($512.00), field expenses ($732.00), subcontractor services for IDW disposal ($137.50), and a completion fee ($836.46).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW680
DC041C Completion May 8, 2026
Arcadis will conduct two quarters of groundwater monitoring from select wells at the site. All activities will be performed according to the October 8, 2025, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Arcadis U.S. Inc. Contractor
Contractor Gus Suarez Contractor 813-205-4703
ERIC_5039
901 W. Fairbanks Ave, Winter Park, Orange County
Imperial Laundry & Dry Cleaners
Contractor Contractor
✔ $ 10,822.52
$ 10,822.52
Scope of Work
Arcadis U.S. Inc.
Contractor Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2025.10.14 13:56:14 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.10.14 11:04:00 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report/IDW manifest/Project Management 03/31/2026
FDEP approval of Groundwater Monitoring Report/IDW manifest/Project Management $ 10,822.52
$ 10,822.52
HW680
DC041C
FFLORIDA DEPARTMENT OF
EEnvironmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jay Collins
Lt. Governor
AAlexis A. Lambert Secretary
Memorandum
TO: Negotiation File Imperial Laundry & Dry Cleaners
FACID NO. 48-9503059; ERIC_5039
Winter Park, Orange County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC041C (HW680) DATE: October 10, 2025
Arcadis U.S. Inc. will perform two quarters of groundwater monitoring from select wells at the site. Groundwater monitoring will ensure that natural attenuation of contaminants continues to occur. All activities will be conducted in accordance with the October 8, 2025, Work Plan submitted by Chad Hanna of Arcadis.
The final task assignment total is $10,822.52. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtasks 2 and 3: Quarterly Groundwater Monitoring FDEP obtained an access agreement in December 2021 with the City of Winter Park, who remains the real property owner of the former Imperial site.
Arcadis will sample two recently reinstalled wells for drycleaning solvents per the recommendation of the Waste Site Cleanup Section’s Geologist. IDW will be disposed by a licensed waste hauler.
Subtask 4: Reporting Arcadis will submit a written report as the final deliverable including recommendations for additional actions as needed.
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 10/8/2025
Task #: DC041C SubTask 1 Project Management
Site: SubTask 2 Groundwater Monitoring Event 1 - VOHs
Activity/Phase: NAM SubTask 3 Groundwater Monitoring Event 2 - VOHs
Project Manager: Theresa Pepe SubTask 4 Reporting
SubTask 5
TTotals 1 2 3 4 5 Labor Rate Category
$89.78 Principal Engineer Suarez, Gus (GS) 4.3 $89.78 Principal Engineer Suarez, Gus (GS) 4 1 1 2 0 $50.00 Senior Engineer Hanna, Chad (CH) 18 5 5 8 0 $41.50 Project Scientist Brooks, Eric (EAB) 8 0 0 8 0 $34.89 Technician Welch, David (DJW) 26 13 13 0 0 $39.67 Drafter/Design Oliva, Brian (BO) 5 0 0 5 0 $39.94 Project Assistant Cruz, Michele (MC) 6 2 2 2 0
Total Hours 71 4.3 21.0 21.0 25.0 0.0
Direct Labor $3,317.96 $381.71 $873.23 $873.23 $1,189.79 $0.00
Overhead 79.00% $2,621.18 $301.55 $689.85 $689.85 $939.93 $0.00 Gen & Admin 36.00% $1,194.46 $137.42 $314.36 $314.36 $428.32 $0.00 Fringe 37.10% $1,230.96 $141.61 $323.97 $323.97 $441.41 $0.00 Total Labor $8,364.56 $962.29 $2,201.41 $2,201.41 $2,999.45 $0.00
Travel Vehicle $240.00 $120.00 $120.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Meals $0.00 $0.00 $0.00 $0.00 $0.00 Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $120.00 $120.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
Erwin IDW $125.00 $0.00 $125.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $125.00 $0.00 $125.00 $0.00 $0.00 Handling Fee $12.50 $0.00 $12.50 $0.00 $0.00 Total Subcontractor Cost $137.50 $0.00 $137.50 $0.00 $0.00
Laboratory Analytical Costs $292.00 $146.00 $146.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $220.00 $110.00 $110.00 $0.00 $0.00 Total Laboratory $512.00 $256.00 $256.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $40.00 $40.00 $0.00 $0.00 Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $652.00 $326.00 $326.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $732.00 $366.00 $366.00 $0.00 $0.00
Subtotal $9,986.06 $962.29 $2,943.41 $3,080.91 $2,999.45 $0.00 Completion Fee $836.46 $96.23 $220.14 $220.14 $299.95 $0.00
Total Estimated Cost $10,822.52 $1,058.52 $3,163.55 $3,301.05 $3,299.40 $0.00
Former Imperial Cleaners
REV: 09/25 CEF ARCADIS Page 1
SITE : Former Imperial Cleaners 0 SUBTASK 2: Groundwater Monitoring Event 1 - VOHs
DATE: 10/8/25
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Activities and Email Updates Principal Engineer - GS Field readiness with project team, PE oversight (1hr) 1
Senior Enginner - CMH 5
Field Technician - DJW 13
Project Assistant - MC Process and file field notes (2hrs) 2
TOTAL LABOR 21
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 1 $120.00 $120.00
TOTAL VEHICLE $120.00
STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals $36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals EESI AWS $2,000.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals Erwin IDW $125.00 per drum 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOCs 8260 Aqueous $73.00 1.00 2 $146.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $146.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 1 $110.00
Total Shipping: $110.00
TOTAL LAB $256.00
EQUIPMENT
Personal Protection Item Rate Unit Usage Totals
Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 1 $40.00
Total Expendables: $40.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 100 $30.00 Tubing, Silicon 3/16x3/8 $3.00 Per Foot 2 $6.00 55-gallon Drum $100.00 Each 0 $0.00
Total Equipment Items: $36.00 Equipment Kits Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00
Total Equipment Kits: $290.00
Total Equipment Kits: $366.00
Prep equipment/calibrations (2hrs); Mob/Demob (5hrs); measure water levels in 9 MWs (1hr); sample 2 wells (2hrs); IDW management/sampling (1hr); package/ship samples (1hr); paperwork (1hr)
Notifications, field scheduling / support (1hr); prep paperwk/figures, order bottles (1hr), Field readiness with field crew (1hr), review field logs/notes (1hr), FDEP email update (1hr)
SUBTASK 3: Groundwater Monitoring Event 2 - VOHs
DATE: 10/8/25
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Field Activities and Email Updates Principal Engineer - GS Field readiness with project team, PE oversight (1hr) 1
Senior Enginner - CMH 5
Field Technician - DJW 13
Project Assistant - MC Process and file field notes (2hrs) 2
TOTAL LABOR 21
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 1 $120.00 $120.00
TOTAL VEHICLE $120.00
STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals $36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals EESI AWS $2,000.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals Erwin IDW $125.00 per drum 1 $125.00
Total Services: $125.00
TOTAL $125.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOCs 8260 Aqueous $73.00 1.00 2 $146.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $146.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 1 $110.00
Total Shipping: $110.00
TOTAL LAB $256.00
EQUIPMENT
Personal Protection Item Rate Unit Usage Totals
Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 1 $40.00
Total Expendables: $40.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 100 $30.00 Tubing, Silicon 3/16x3/8 $3.00 Per Foot 2 $6.00 55-gallon Drum $100.00 Each 0 $0.00
Total Equipment Items: $36.00 Equipment Kits Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00
Total Equipment Kits: $290.00
Total Equipment Kits: $366.00
Notifications, field scheduling / support (1hr); prep paperwk/figures, order bottles (1hr), Field readiness with field crew (1hr), review field logs/notes (1hr), FDEP email update (1hr)
Prep equipment/calibrations (2hrs); Mob/Demob (5hrs); measure water levels in 9 MWs (1hr); sample 2 wells (2hrs); IDW management/sampling (1hr); package/ship samples (1hr); paperwork (1hr)
SUBTASK 4: Reporting
DATE: 10/8/25
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring Report Principal Engineer - GS PE finalization/certification 2 Senior Enginner - CMH Report text, table, figure generation, report table validation, IDW T&D coordination 8 Project Scientist - EAB Report text, table, figure generation 8 CAD Designer - BO Develop figures for GW results 5 Project Assistant - MC Data entry, report assembly, formatting 2
TOTAL LABOR 25
VEHICLE TYPE RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection Item Rate Unit Usage Totalsy
Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items y
Total Equipment Items: $0.00 Equipment Kits
Total Equipment Kits: $0.00
Total Equipment Kits: $0.00
Arcadis U.S., Inc.
4300 W Cypress Street Suite 450 Tampa Florida 33607 Phone: 813 903 3100 Fax: 813 350 9046 www.arcadis.com
FL Engineering License #7917 FL Geology License #GB564 FL Surveying License #LB7062
1/3
Theresa Pepe Hazardous Waste Cleanup Section Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399
Date: October 8, 2025 Subject: Natural Attenuation Monitoring Proposal
Former Imperial Laundry and Drycleaners 901 West Fairbanks Avenue Winter Park, Florida
Dear Ms. Pepe, Arcadis U.S., Inc. (Arcadis) is pleased to submit to the Florida Department of Environmental Protection (FDEP) the following proposal for Natural Attenuation Monitoring (NAM) activities at the Former Imperial Laundry and Drycleaners (Site), located in Winter Park, Florida. This proposal includes background information, a description of the proposed scope of work (SOW), and an estimated cost and schedule for their completion.
Site Background Arcadis completed Task Assignment (TA) #DC041B, which included the 2025 annual NAM sampling event (July 2025) and associated reporting. The City of Winter Park constructed a turn on the eastern portion of the former dry cleaning parcel in 2024. The Site was used to stage equipment and materials for construction activities. All of the monitor wells except MW005, were damaged and covered by restoration activities following construction of the turn lane. A professional surveyor staked the well locations and Arcadis personnel uncovered the wells on January 8, 2025. Monitor wells MW004, MW005, and MW008 were determined to be the only viable wells.
Based on observed damage to existing monitor wells from construction activities, monitoring wells MW007 and MW013 were destroyed and monitor wells MW001, MW002, MW003, MW009, and MW012 were abandoned by licensed driller Preferred Drilling Solutions Inc. on June 30, 2025. The same day, monitor wells MW001R and MW002R were installed to replace damaged and abandoned monitoring wells MW001 and MW002, and MW004 and MW008 were redeveloped.
The 2025 Annual NAM Report was submitted on August 8, 2025. Tetrachloroethene (PCE) was detected above the FDEP GCTL in the sample collected from monitor well MW002R (7.0 μg/L). Arcadis recommended continued monitoring of MW001R and MW002R. The FDEP reviewed the report and concurred with the recommendations in an email dated September 8, 2025.
Ms. Theresa Pepe Florida Department of Environmental Protection October 8, 2025 www.arcadis.com
2025.10 - Imperial NAM Proposal
2/3
Scope of Work
Task 1: Project Management This task consists of project management activities and health and safety efforts in relation to the completion of Tasks 2 through 4.
Task 2: NAM Field Event Q1
The proposed groundwater NAM program includes depth-to-water measurements and the sampling of two shallow monitoring wells. Depth-to-water measurements will be collected from all accessible site monitor wells and samples will be collected from MW001R and MW002R. The groundwater sampling activities will be performed per the FDEP standard operating procedures (SOP) (DEP-SOP-001/01).
Samples will be shipped to Eurofins located in Altamonte Springs, Florida, and analyzed for CVOCs by United States Environmental Protection Agency (USEPA) Method 8260. In accordance with FDEP guidance, the IDW generated during sampling activities will be containerized on-site and removed for transportation and disposal by a licensed waste hauler (Erwin Remediation Inc.) following receipt of the laboratory analytical report from the second quarterly monitoring event.
Task 3: NAM Field Event Q2
Arcadis will complete an additional monitoring event with the same scope as Task 2.
Task 4: NAM Reporting
A NAM Report will be submitted to the FDEP within 60 days of receipt of the laboratory analytical report from the second quarter of monitoring activities. The Report will contain tables and figures summarizing the results of the two quarterly NAM events and include conclusions and recommendations based upon findings.
Cost Estimate
Arcadis will schedule the field activities following receipt of a TA from the FDEP. The CEF/LOE is included as Attachment 1. The total cost to complete this scope of work is $10,822.52 (Attachment 1). Arcadis proposes the following invoicing schedule:
Completion of NAM field event Q1 $3,163.55 Completion of NAM field event Q2 $3,301.05 NAM Report submittal and PM $4,357.92
Ms. Theresa Pepe Florida Department of Environmental Protection October 8, 2025 www.arcadis.com
2025.10 - Imperial NAM Proposal
3/3
Closing Remarks Arcadis appreciates the opportunity to assist the FDEP at this Site. If you have any questions or wish to discuss this proposal, please do not hesitate to contact us.
Sincerely, Arcadis U.S., Inc.
Chad Hanna Gus Suarez, P.E.
Senior Environmental Specialist Project Manager Email: Chad.hanna@arcadis.com Email: Gus.suarez@arcadis.com Phone: 813.353.5765 Phone: 813.353.5778
File details come from the government source that posted it. Updated .