BPM005628 Revised Price Sheet Southwest Siteworks 12.4.23.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
On-Call Pipelining and Drainage Repair Services
Solicitation number
BPM005628
Issued by
Arizona

About this file

This is a revised price sheet for On-Call Pipelining and Drainage Repair Services provided by Southwest Siteworks for the State of Arizona Department of Transportation. The document outlines comprehensive statewide pricing for HDPE piping materials in various configurations and drainage work services. HDPE pipe products are listed in circular and oval formats ranging from 12 inches to 78 inches in diameter, with annual estimated quantities varying from 20 to 2,240 linear feet depending on the specific size and configuration. Additional line items include drainage work such as bank protection using dumped rip rap, wire-tied rip rap, and soil-cement; rail bank protection for drainage ways and abutments; jetting and drilling services; drainage excavation; and ditch regrading work with and without surplus material. Specialized services encompassed in the price sheet include hydrovac services, robotic inspection crawler CCTV camera inspection, and emergency call-out labor.

The price sheet includes traffic management and safety equipment rental items such as traffic cones, flashing arrow panels, signs, barricades, warning lights, and certified civilian flaggers, along with provisions for DPS law enforcement officers and off-duty local law enforcement personnel. Mobilization costs are specified by district, with rates ranging from $70 to $300 per mile depending on the geographic district served, including Central, Northcentral, Northeast, Northwest, Southwest, Southcentral, and Southeast districts. The current not-to-exceed unit prices and revised not-to-exceed unit prices are identical across all 71 line items, indicating no price adjustments were made in this revision dated December 4, 2023. All pricing remains fixed at the stated rates, with units of measure specified as linear feet, cubic yards, hours, days, each-day, or miles as applicable to each service category.

View the file

Other files

File Type Posted
BPM005628_Solicitation_Amendment_Summary_Three__3_.pdf PDF
6-Project Team.pdf PDF
Equipment Write up - Combined 11.20.23.pdf PDF
6-Method of Approach - Remote Areas.pdf PDF
BPM005628 Summary of Negotiations - GCC 12.1.23.pdf PDF
BPM005628 Revised Price Sheet GCC 12.1.23.xlsx XLSX spreadsheet
6-5_BPM005628_References.pdf PDF
BPM005628 Request for BAFO - GCC 12.11.23.pdf PDF
6-3_BPM005628_SPO_Form_205_-_Forced_Labor_of_Ethnic_Uyghurs_Ban.pdf PDF
6-6_BPM005628_Confidentiality_and_Trade_Secrets.pdf PDF
6-8_BPM005628_Price_Increase_Percentages.pdf PDF
BPM005628 Revised Price Sheet Southwest Siteworks 12.12.23.xlsx XLSX spreadsheet
Mobilization Narrative 12.4.23.pdf PDF
BPM005628 Summary of Negotiations - SWSW.pdf PDF
BPM005628 Summary of Negotiations - SWSW 11.20.23.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 2 BPM005628 Boycott of Israel Disclosure.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 4 BPM005628 Subcontractors and Suppliers.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 6 BPM005628 Confidentiality and Trade Secrets.pdf PDF
BPM005628_Evaluation_Documents.pdf PDF
6-Method of Approach - Drainage Excavation.pdf PDF
6-Equipment - Combined.pdf PDF
Response to Invitation to Negotiation - BPM005628 On-Call Pipelining 11.20.23.pdf PDF
Method of Approach - Pipe 11.20.23.pdf PDF
Response BPM005628 Request for BAFO - GCC 12.11.23.pdf PDF
6-Proposal # 1-prop_items.xls XLS spreadsheet
6-Financial Envelope-Proposal # 1-prop_answer.xls XLS spreadsheet
6-[On-Call Pipelining and Drainage Repair Services] 1 BPM005628 Offer and Acceptance.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 8 BPM005628 Price Increase Percentages.pdf PDF
BPM005628 Request for BAFO - SWSW.pdf PDF
BPM005628 Summary of Negotiations - Southwest Siteworks.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 7 BPM005628 Equipment List.pdf PDF
6-Odering and Maintaing Materials.pdf PDF
6-SWSW History.pdf PDF
6-On-Call Pipelining and Drainage Repair Services 9 BPM005628 Price Sheet.pdf PDF
BPM005628_Pre-Solicitation_Documents.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Five__5_.pdf PDF
BPM005628_Solicitation_Amendment_Summary_One__1_.pdf PDF
6-Operations Capacity.pdf PDF
6-Company History.pdf PDF
6-Method of Approach - Pipe.pdf PDF
6-2_BPM005628_Boycott_of_Israel_Disclosure.pdf PDF
6-9_BPM005628_Price_Sheet_Amendment_Three__3_Granite.xlsx XLSX spreadsheet
6-1_BPM005628_Offer_and_Acceptance.pdf PDF
6-Project Team .pdf PDF
SWSW Mob Cost Breakdown 12.4.23.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 5 BPM005628 References.pdf PDF
Equipment List 11.20.23.pdf PDF
Method of Approach Pipe 11.20.23.pdf PDF
BPM005628 Revised Price Sheet 11.20.23.xlsx XLSX spreadsheet
6-[On-Call Pipelining and Drainage Repair Services] 3 BPM005628 SPO Form 205 - Forced Labor of Ethnic Uyghurs Ban.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statewide

Line ItemDescriptionUOM (unit of Measure)Statewide ANNUAL Estimated QuantitiesCurrent Not-to-Exceed Unit PriceRevised Not-to-Exceed Unit Price
1HDPE - Circular, 12"L. Ft.360$300.00$300.00
2HDPE - Oval, 12"L. Ft.120$400.00$400.00
3HDPE - Circular, 15"L. Ft.120$350.00$350.00
4HDPE - Oval, 15"L. Ft.20$500.00$500.00
5HDPE - Circular, 18"L. Ft.1,450$350.00$350.00
6HDPE - Oval, 18"L. Ft.220$450.00$450.00
7HDPE - Circular, 21"L. Ft.360$350.00$350.00
8HDPE - Oval, 21"L. Ft.200$450.00$450.00
9HDPE - Circular, 24"L. Ft.2,240$350.00$350.00
10HDPE – Oval, 24"L. Ft.520$450.00$450.00
11HDPE - Circular, 27"L. Ft.760$400.00$400.00
12HDPE - Oval, 27"L. Ft.200$500.00$500.00
13HDPE - Circular, 30"L. Ft.1,300$400.00$400.00
14HDPE - Oval, 30"L. Ft.330$500.00$500.00
15HDPE - Circular, 33"L. Ft.820$450.00$450.00
16HDPE - Oval, 33"L. Ft.300$550.00$550.00
17HDPE - Circular, 36"L. Ft.1,110$450.00$450.00
18HDPE - Oval, 36"L. Ft.490$550.00$550.00
19HDPE - Circular, 39"L. Ft.820$500.00$500.00
20HDPE - Oval, 39"L. Ft.200$600.00$600.00
21HDPE - Circular, 42"L. Ft.960$650.00$650.00
22HDPE - Oval, 42"L. Ft.120$750.00$750.00
23HDPE - Circular, 48"L. Ft.1,160$700.00$700.00
24HDPE - Oval, 48"L. Ft.200$800.00$800.00
25HDPE - Circular, 54"L. Ft.780$750.00$750.00
26HDPE - Oval, 54"L. Ft.100$850.00$850.00
27HDPE - Circular, 60"L. Ft.760$800.00$800.00
28HDPE - Oval, 60"L. Ft.100$900.00$900.00
29HDPE - Circular, 66"L. Ft.560$1,050.00$1,050.00
30HDPE - Oval, 66"L. Ft.100$1,200.00$1,200.00
31HDPE - Circular, 72"L. Ft.600$1,100.00$1,100.00
32HDPE - Oval, 72"L. Ft.100$1,300.00$1,300.00
33HDPE - Circular, 78"L. Ft.560$1,200.00$1,200.00
34HDPE - Oval, 78"L. Ft.100$1,400.00$1,400.00
35Drainage Work - Bank Protection, Dumped Rip RapCY2,125$1,000.00$1,000.00
36Drainage Work - Bank Protection, Wire Tied Rip RapCY850$1,500.00$1,500.00
37Drainage Work - Bank Protection, Soil-CementCY950$2,000.00$2,000.00
38Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3L. Ft.1,682$1,000.00$1,000.00
39Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6L. Ft.1,682$1,500.00$1,500.00
40Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9L. Ft.1,682$650.00$650.00
41Drainage Work - JettingHr.460$130.00$130.00
42Drainage Work - DrillingFt.1,850$150.00$150.00
43Drainage Work - Drainage ExcavationCY2,050$100.00$100.00
44Drainage Work - Regrading cut ditch, resulting with no surplus materialL. Ft.17,561$10.00$10.00
45Drainage Work - Regrading cut ditch, resulting with surplus material to haulL. Ft.12,531$26.00$26.00
46Hydrovac ServicesHour840$650.00$650.00
47Robotic Inspection Crawler CCTV CameraHour100$150.00$150.00
48Emergency Call Out LaborHour240$150.00$150.00
49Traffic Cones , 28”(height) ReflectorizedEACH-DAY1,062$1.00$1.00
50Flashing Arrow PanelEACH DAY19$50.00$50.00
51Signs over 36” (High Intensity Reflective Sheeting)EACH-DAY96$6.00$6.00
52Sign Stand (Spring Type)EACH-DAY96$2.00$2.00
53Pilot Vehicle with DriverHR280$60.00$60.00
54Variable Message BoardEACH DAY35$50.00$50.00
55Type II BarricadesEACH-DAY142$0.50$0.50
56Warning Lights, Type AEACH-DAY160$0.50$0.50
57Warning Lights, Type BEACH-DAY160$2.00$2.00
58Warning Lights, Type CEACH-DAY160$0.50$0.50
59Vertical PanelsEACH-DAY320$0.50$0.50
60Flag Type High Level Warning DeviceEACH-DAY80$9.00$9.00
61Certified Civilian FlaggersHR520$36.00$36.00
62DPS Law Enforcement Officers and VehiclesHR280$100.00$100.00
63Off-Duty uniformed Local Law Enforcement Officer and vehicleHR280$100.00$100.00
64Light Plant, day is 8 hoursDay22$50.00$50.00
65Mobilization - Central DistrictMile150$150.00$150.00
66Mobilization - Northcentral DistrictMile1,800$70.00$70.00
67Mobilization - Northeast DistrictMile3,000$70.00$70.00
68Mobilization - Northwest DistrictMile260$70.00$70.00
69Mobilization - Southwest DistrictMile280$175.00$175.00
70Mobilization - Southcentral DistrictMile280$300.00$300.00
71Mobilization - Southeast DistrictMile250$175.00$175.00