Attachment 6) AF Form 66.pdf

PDF 230 KB Posted

Attached to
Install Wi-Q Locksets
Solicitation number
FA303022Q0027
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORM66.xls

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

Part 1, 1.5.1 Work Schedule AF Form 3064 4 (e) GA

Part 1, 1.7.1 Accident Prevention Plan 4 (e) FIO

Part 1, 1.9.4 Dumpster Location 4 (c) GA

4 Part 1, 1.12 Warranties 4 (b) GA

Part 1, 1.13.1 Parking and Storage Area 4 (c) GA

Part 1, 1.14.1.1 Work Clearance Request, AF Form

4 (e) GA

Part 1, 1.14.2 Planned Outages

4 14 Days Prior

(d) GA

Part 1, 1.15, Disposition of Waste Materials 4 (b) GA

Part 2, 2.2, Environmental Hazardous Waste Record 4 (a) GA

Part 2, 2.4.1, Certificate certifing no asbestos was used in construction

4 (b) GA

Part 2, 2.5, Hazardous Materials, SDS 4 (c) GA

Part 2, 2.8, Air Emissions Report 4 Monthly

(d) FIO

PROJECT NUMBER: 1045828

SA

MP

LE

S

PROJECT TITLE: New Wi-Q Server and Locking System

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S

RE

CO

MM

EN

DA

TI

ON

S

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION DATE REMARKS

DATE

RECEIVED IN

CON-

TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

FORM66.xls

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRACT NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

PROJECT NUMBER: 1045828

SA

MP

LE

S

PROJECT TITLE: New Wi-Q Server and Locking System

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S

RE

CO

MM

EN

DA

TI

ON

S

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION DATE REMARKS

DATE

RECEIVED IN

CON-

TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S W

AR

RA

NT

Y

Part 2, 2.9, Construction Waste Management Form Submittal 4 (d) GA

Part 2, 2.11.2.2 Construction Product minimums 4 (d) GA

Part 3, 3.4, Parts and Materials

4 (e) GA

16 Part 4, 4.3 Daily Reports 4 (d) GA

17 Part 4, 4.4 Final Inspection 4 (b) GA

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP

(b) Prior to Final Inspection

(c) Prior to Use.

(d) As Required.

(e) Prior to Start of Construction

AF Form 66

File details come from the government source that posted it. Updated .