Attachment 6) AF Form 66.pdf
PDF 230 KB Posted
- Attached to
- Install Wi-Q Locksets Federal contract opportunity
- Solicitation number
- FA303022Q0027
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA303022Q00270001 SF 30.pdf | ||
| Attachment 3) - DOD Contractor Guide.pdf | ||
| Attachment 1) Statement of Work for Wi-Q Locksets .docx | DOCX document | |
| Attachment 4) - Materials List.pdf | ||
| Attachment 2) Drawings.pdf | ||
| Solicitation - FA303022Q0027.pdf | ||
| Attachment 5) Base Access letter.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORM66.xls
SCHEDULE OF MATERIAL SUBMITTALS
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
Part 1, 1.5.1 Work Schedule AF Form 3064 4 (e) GA
Part 1, 1.7.1 Accident Prevention Plan 4 (e) FIO
Part 1, 1.9.4 Dumpster Location 4 (c) GA
4 Part 1, 1.12 Warranties 4 (b) GA
Part 1, 1.13.1 Parking and Storage Area 4 (c) GA
Part 1, 1.14.1.1 Work Clearance Request, AF Form
4 (e) GA
Part 1, 1.14.2 Planned Outages
4 14 Days Prior
(d) GA
Part 1, 1.15, Disposition of Waste Materials 4 (b) GA
Part 2, 2.2, Environmental Hazardous Waste Record 4 (a) GA
Part 2, 2.4.1, Certificate certifing no asbestos was used in construction
4 (b) GA
Part 2, 2.5, Hazardous Materials, SDS 4 (c) GA
Part 2, 2.8, Air Emissions Report 4 Monthly
(d) FIO
PROJECT NUMBER: 1045828
SA
MP
LE
S
PROJECT TITLE: New Wi-Q Server and Locking System
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION DATE REMARKS
DATE
RECEIVED IN
CON-
TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
FORM66.xls
SCHEDULE OF MATERIAL SUBMITTALS
SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT NUMBER: 1045828
SA
MP
LE
S
PROJECT TITLE: New Wi-Q Server and Locking System
FINAL
APPROVAL
MA
NU
FA
CT
UR
ER
'S
RE
CO
MM
EN
DA
TI
ON
S
CO
LO
R
SE
LE
CT
IO
N
SE
E
P
AR
A
ON
C
OP
IE
S
OT
HE
RS
A
S
SP
EC
IF
IE
D
REQUIRED
SUBMISSION DATE REMARKS
DATE
RECEIVED IN
CON-
TRACTING
DATE TO CIVIL
ENGINEER-ING
RETURN
SUSPENSE
DATE
FOLLOW UP CONTRACT-TOR
RE-SUBMITTAL
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
CE
RT
IF
IC
AT
IO
N
OF
C
OM
PL
IA
NC
E
OP
ER
AT
IN
G
IN
ST
RU
CT
IO
NS
SH
OP
D
RA
W
IN
GS
MA
NU
FA
CT
UR
ER
'S W
AR
RA
NT
Y
Part 2, 2.9, Construction Waste Management Form Submittal 4 (d) GA
Part 2, 2.11.2.2 Construction Product minimums 4 (d) GA
Part 3, 3.4, Parts and Materials
4 (e) GA
16 Part 4, 4.3 Daily Reports 4 (d) GA
17 Part 4, 4.4 Final Inspection 4 (b) GA
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP
(b) Prior to Final Inspection
(c) Prior to Use.
(d) As Required.
(e) Prior to Start of Construction
AF Form 66