Attachment 4 - AF FORM 66 Upgrade Crosswalks.xlsx

Air Force Form XLSX spreadsheet 32 KB Posted

Attached to
Upgrade Crosswalks Base Wide - Goodfellow AFB
Solicitation number
FA303024Q031
Issued by

About this file

This document is an AF Form 66 that provides a schedule of material submittals for a project to Upgrade Crosswalks at Goodfellow AFB. The related federal contract opportunity is a solicitation issued by the 17th Contracting Squadron for the Upgrade Crosswalks Base Wide project.

The solicitation requires the complete removal and/or recommended improvement of six (6) identified crosswalk locations, including pavement markings, curbs, ramps, sidewalks, and signage. The Period of Performance is 60 days after receiving Notice to Proceed. The contract will be awarded as a Firm Fixed-Price to the responsible offeror whose proposal conforms to the requirements and is most advantageous to the Government. This is a 100% Small Business Set-Aside with a NAICS code of 237310 and a size standard of $45.0M. A site visit is scheduled for 31 May 2024, and questions are due by 4 June 2024. The solicitation closes on 12 June 2024.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER: 1139282Upgrade Crosswalk, Basewide Facility 60110SOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.)CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYOPERATING INSTRUCTIONSSEE PARA ON COPIESOTHERS AS SPECIFIEDREQUIRED SUBMISSION DATEDATE RECEIVED IN CON-TRACTINGDATE TO CIVIL ENGINEER-INGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACT-TOR RE-SUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
1Para 1, 1.1 General Scope Work1aFIO
2Para 1, 1.4 Performance Period1bGA
3Para 1, 1.5.1, Traffic Plan1c for eachGA
4Para 2, 2.1 Work and Mechanics - Personnel Qualification1aGA
5Para 2.7, Base Access1aGA
6Para 3, Safety Plan1cFIO
7Para 4, 4.1 Storage Area1aGA
10Para 7, Submittals11a,dGA
11Para 7, 7.3 Warranties11eFIO
12Para 7, 7.5.1 Construction Planning Chart1bGA
AF Form 66
(a) As soon as possible but NLT start of construction(d) Prior to Installation
(b) NLT 7 Calendar Days after Task Order NTP(e) Prior to Final Inspection
(c) Prior to Start of Demo/Construction(f) As soon as possible but NLT 15 days after project completion

PAGE &P OF &N

FORM66.xls