ATTACHMENT 4 AF Form 66 MBMV222322.pdf
Air Force Form PDF 64 KB Posted
- Attached to
- MBMV222322 Repair Floors Basewide East
- Solicitation number
- W50S84-22-B-0009
- Issued by
-
Department of the Army National Guard
About this file
This document includes a federal contract solicitation and related attachments. The solicitation is to repair floors basewide at various locations in Battle Creek, Michigan with a period of performance of 180 calendar days. The small business set-aside has a NAICS code of 238330 for flooring contractors and an estimated value between $500,000 to $1 million. A pre-bid conference will be held on August 16, 2022 and bids are due by the response date listed in the solicitation. The attachments include submittal requirements and specifications for flooring products and installation services including carpet, tile, grout, adhesives and more. The solicitation also provides information on availability of funds and priority list status for award.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
MBMV222322
APPROVED DISAPPROVED
1 Submittal Schedule - AF Form 66 1 x
2 Transfer and Acceptance of DOD Real Property - DD Form 1354 1 x
3 Contractor Hazardous Material Identification 1 x
4 Solid Waste Recycling and Disposal Reporting Form 1 x
5 Affirmative Procurement Reporting Form 1 x
6 Construction Schedule 1 x
7 Construction Photos 1
8 Safety Documentation as stated 1 x
9 Permits, Licenses and Certificates 1 x
10 Quality Control Plan 1 x
11 Carpet 1 1 1 1 12 Porcelain Tile 1 1 1 13 Thinset 1 14 Carpet Adhesive 1 15 Grout 1 1 16 Transition 1 1 17 Rubber Tile 1 1 1 18 Vinyl Cove Base 1 1 19 Tile Cove Base 1 1 20 Recesessed Aluminum Entry Mats 1 1 1 21 Rubber Tile Adhesive 1
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L
O R
D
AT
A
SH
O
P D
R
AW
IN
G
S
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D
AT
IO
N
S
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair Floors Basewide - East
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
File details come from the government source that posted it. Updated .