Attachment 2 - B530 Flooring AF Form 66.xls
XLS spreadsheet 49 KB Posted
- Attached to
- Building 530 Carpet replacement - Goodfellow AFB Federal contract opportunity
- Solicitation number
- FA303021R0012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 4 - Technical Exhibit B530 Replace Carpet TE-1 -Drawings 13July.pdf | ||
| Solicitation Amendment FA303021R00120001 SF 30.pdf | ||
| Attachment 1 - B530 1st 2nd Floor Flooring-SOW_NMP 13July.pdf | ||
| Attachment 5 - Base Access Request Template.docx | DOCX document | |
| Solicitation Amendment - FA303021R00120001.pdf | ||
| Solicitation - FA303021R0012.pdf | ||
| Attachment 3 - Davis-Bacon Act Wage Determination TX20200282.pdf | ||
| Attachment 5 - BAL Initial Request.docx | DOCX document | |
| Attachment 6 - COVID Policy Letters.pdf | ||
| Attachment 1 - B530 1st 2nd Floor Flooring-SOW_NMP.pdf | ||
| Attachment 4 - Technical Exhibit B530 Replace Carpet TE-1 -Drawings.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | WORK TASK: 8338997 | Replace Carpet Bldg 530 | SOLICITATION/CONTRACT NO. | |||||||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.) | CERTIFICATION | OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S | RECOMMENDATIONS | MANUFACTURER'S | WARRANTY | OPERATING | INSTRUCTIONS | SEE PARA | OTHERS AS SPECIFIED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CON-TRACTING | DATE TO CIVIL ENGINEER-ING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACT-TOR RE- SUBMIT- TAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | |||||||||||||||||||||||
| 1 | Para. 1.5.1 - Work Schedule | 4 | 14 Days Prior (e) | GA | ||||||||||||||||||||
| 2 | Para 1.7.1 Company Safety Policy and Accident Prevention Plan | 4 | x | (c) | FIO | |||||||||||||||||||
| 3 | Para 1.12, List of Warranties and Certificates | 4 | Upon Final Acceptance by Gov | GA | ||||||||||||||||||||
| 4 | Para 1.14.2 AF Form 103, Work Clearance Report | 4 | (e) | GA | ||||||||||||||||||||
| 5 | Para 2.2, 2.2.1, 2.3, 2.3.1, Hazardous Waste Records | 4 | x | (b) | GA | |||||||||||||||||||
| 6 | Para 2.4 Haz. Material List with worksheet for each SDS | 4 | x | (c) | GA | |||||||||||||||||||
| 7 | Para 2.6 Air Emissions Reports | 4 | x | (b) | FIO | |||||||||||||||||||
| 8 | Para 2.8 EMS Awareness Training | 4 | x | (e) | GA | |||||||||||||||||||
| 9 | Para 3.1.2, Flooring Material Selection | 4 | x | (e) | GA | |||||||||||||||||||
| 10 | Para 4.2.1, Contractor Quality Control Daily Reports | 4 | (e) | GA | ||||||||||||||||||||
| AF Form 66, SEP 86 | ||||||||||||||||||||||||
| (a) As soon as possible but in no case later than 45 calendar days after NTP. | ||||||||||||||||||||||||
| (b) Prior to Final Inspection. | ||||||||||||||||||||||||
| (c) Prior to Use. | ||||||||||||||||||||||||
| (d) As Required. | ||||||||||||||||||||||||
| (e) Prior to start of construction. |
&CPAGE &P OF &N
&CFORM66.xls
Sheet2
&A Page &P