Atch 9- AF Form 66.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Well 1 Pump Repair
- Solicitation number
- FA480325B0013
About this file
The document is an Air Force Form 66 (AF Form 66) Schedule of Material Submittals for a window replacement project (VLSB 26-0011 B1130). The project requires several key document and drawing submissions at specific milestones, including a Construction/Design Schedule due within 1 week of Notice to Proceed (NTP), Operations & Maintenance (O&M) Manuals, and technical drawings at 65% and 95% completion stages.
The submission timeline includes 65% drawings due 16 weeks after award, 95% drawings due 133 calendar days after award, and As-Built Drawings to be submitted at project completion. The form tracks various submission requirements such as certification of compliance, shop drawings, samples, color selections, manufacturer's recommendations, warranties, and catalog data. The solicitation number is F38604-99-1480, and the project appears to be associated with the Department of the Air Force Air Combat Command, specifically linked to a related solicitation number FA480325B0013 for Well 1 Pump Repair.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NCOC-A
| PROJECT NUMBER : | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | |
| SCHEDULE OF MATERIAL SUBMITTALS | VLSB 26-0011 | B1130 Window Replacement | |
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR |
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | |||||||||||||||||||
| 1 | Construction / Design Schedule | x | Within 1 week of NTP | |||||||||||||||||
| 2 | ||||||||||||||||||||
| 3 | O&M Manuals | x | x | x | x | Manufacture warranty Info at end of project | ||||||||||||||
| 4 | 65% Drawings | x | x | x | x | 16 Weeks days after award. | ||||||||||||||
| 5 | 95% Drawings | x | x | 133 Calander days after award | ||||||||||||||||
| 6 | As-Built Drawings | x | At the end of the project | |||||||||||||||||
| 7 | ||||||||||||||||||||
| 8 | ||||||||||||||||||||
| 9 | ||||||||||||||||||||
| 10 | ||||||||||||||||||||
| 11 | ||||||||||||||||||||
| 12 | ||||||||||||||||||||
| 13 | ||||||||||||||||||||
| 14 | ||||||||||||||||||||
| 15 | ||||||||||||||||||||
| 16 | ||||||||||||||||||||
| 17 | ||||||||||||||||||||
| 18 | ||||||||||||||||||||
| 19 |
Solicitation No. F38604-99-1480 Attachment 6
AF FORM 66
(Computer Generated) PAGE &P of &N
File details come from the government source that posted it. Updated .