Atch 9- AF Form 66.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Well 1 Pump Repair
Solicitation number
FA480325B0013
Issued by

About this file

The document is an Air Force Form 66 (AF Form 66) Schedule of Material Submittals for a window replacement project (VLSB 26-0011 B1130). The project requires several key document and drawing submissions at specific milestones, including a Construction/Design Schedule due within 1 week of Notice to Proceed (NTP), Operations & Maintenance (O&M) Manuals, and technical drawings at 65% and 95% completion stages.

The submission timeline includes 65% drawings due 16 weeks after award, 95% drawings due 133 calendar days after award, and As-Built Drawings to be submitted at project completion. The form tracks various submission requirements such as certification of compliance, shop drawings, samples, color selections, manufacturer's recommendations, warranties, and catalog data. The solicitation number is F38604-99-1480, and the project appears to be associated with the Department of the Air Force Air Combat Command, specifically linked to a related solicitation number FA480325B0013 for Well 1 Pump Repair.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NCOC-A

PROJECT NUMBER :PROJECT TITLE:SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALSVLSB 26-0011B1130 Window Replacement
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSOTHERREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1Construction / Design SchedulexWithin 1 week of NTP
2
3O&M ManualsxxxxManufacture warranty Info at end of project
465% Drawingsxxxx16 Weeks days after award.
595% Drawingsxx133 Calander days after award
6As-Built DrawingsxAt the end of the project
7
8
9
10
11
12
13
14
15
16
17
18
19

Solicitation No. F38604-99-1480 Attachment 6

AF FORM 66

(Computer Generated) PAGE &P of &N