This is a Project Team document for SWSW submitted in response to the State of Arizona Department of Transportation's On-Call Pipelining and Drainage Repair Services contract opportunity. The document outlines the qualifications and experience of three key personnel who will lead the project: Jake Buckley as Project Manager (100% dedicated, 15 years experience), Robert Ruegg as Project Superintendent (100% dedicated, 17 years experience), and Delson Ahumada as Foreman (100% dedicated, 12 years experience). All three team members hold construction management or heavy civil industry credentials and have extensive backgrounds in underground utilities, drainage, and pipeline work specific to ADOT projects. SWSW indicates capability to deploy up to five independent crews with over 40 team members plus two additional supervisors to the project.
The project team has demonstrated relevant experience through multiple prior ADOT pipelining contracts spanning 2018 through 2023, with contract values ranging from $1.3 million to $2.3 million. Jake Buckley's project management background includes heavy civil projects valued between $25,000 and $60 million across highway construction, road rehabilitation, and drainage repair. Delson Ahumada and Robert Ruegg have each participated in multiple ADOT Procure AZ Pipelining contracts where they managed installation, grouting, hydrovacing, and drainage work across Arizona. The document emphasizes SWSW's track record of completing projects on time and under budget, with specific reference to successful completion of the 2020 ADOT pipelining contract involving over 60 CMP installations and 40 drainage repair locations.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Team:
SWSW crews have been handpicked due to their expertise, safety mindset, and ability to construct top tier quality projects. SWSW has built a culture that all team members have bought into that has created a top tier team. Below is the team that has been handpicked based on their experience for this project:
Jake Buckley: Jake will oversee all project management and administration for the project.
Robert Ruegg: Rob will act as the project superintendent and will oversee all crews and operations as well as subcontractors.
Delson Ahumada: Delson will oversee the day-to-day operations.
SWSW has four additional crews with crew members that have years of ADOT drainage and civil work experience as well as pipelining. SWSW has the capability of running a total of 5 independent crews at any given time with the ability to staff over 40 team members to this project as well as two additional supervisors.
Name: Jake Buckley Project Title: Project Manager Percent dedicated to Project: 100%
Years’ Experience: 15 years
Qualifications: B.S., Construction Management, Northern Arizona University, 12 years of experience managing heavy civil projects
Projected Related Experience: Jake has successfully completed numerous ADOT projects across the state, including numerous pipelining and drainage repair contracts. Jake has managed projects ranging from $25,000-$60,000,000 overseeing the construction of various work ranging from highway construction, road rehabilitation, aviation, light rail transit, and industrial.
Jake can utilize his vast experience and attention to detail to ensure projects are completed under budget and on schedule.
Same or Similar Projects:
• Procure AZ Pipelining 2023:
Managed the construction and administration on the 2023 ADOT pipelining contract.
The project consisted of hydrovacing, relining, grouting and railbank for the state of
Arizona.
• SR 202 Drainage Repair and Pipeline 2021-Ongoing:
Managed the hrdrovac/pipeling of 42” Culvert and numerous drainage and rip rap repair and installation on 17 miles of State Highway
• Procure AZ Pipelining 2021:
Managed the construction and administration on the 2021 ADOT pipelining contract.
The project consisted of hydrovacing, relining, grouting and erosion control repairs for the state of Arizona.
• Procure AZ Pipelining 2020:
Managed the construction and administration on the 2020 ADOT pipelining contract.
The project consisted of hydrovacing, relining, and grouting over 60 CMPS and over 40 drainage repair locations. This project was completed on time and under budget.
• Procure AZ Pipelining 2019:
Managed the construction and administration for 2019 ADOT pipelining contract. The project consisted of hydrovacing, relining, and grouting over 60 CMPS and over 12 drainage repair locations. This project was completed on time and under budget.
Name: Delson Achumada Project Title: Foreman Percent dedicated to Project: 100%
Years’ Experience: 12 years
Qualifications: 10 years working in the heavy civil industry with a focus in underground utilities and grading
Projected Related Experience: Delson is SWSW key underground foreman. He has completed numerous projects in his tenure and has the experience and knowledge to succeed on any project he works on.
Same or Similar Projects:
• Procure AZ Pipelining 2023:
Foreman on the 2023 ADOT pipelining contract. The project consisted of hydrovacing, relining, grouting and erosion control for the state of Arizona. The contract value was just over $1.3 million dollars. Delson installed and grouted all cmp across the state as well as oversaw the railbank installation.
Leadman on the 2019 ADOT pipelining contract. The project consisted of hydrovacing, relining, grouting and erosion control for the state of Arizona. The contract value was just over $2.3 million dollars. Delson installed and grouted all cmp across the state.
• Procure AZ Pipelining 2018:
Leadman on the 2018 ADOT pipelining contract. The project consisted of hydrovacing, relining, and grouting over 90 cmp runs across the state of Arizona. The contract value was just over $2.2 million dollars. Delson installed and grouted all CMP across the state.
• San Pedro River Bridge ADOT 2017:
The project consisted of reconstructing the SR 92 San Pedro River Bridge as well as grading and drainage installation. Delson was the project lead and managed the grading and drainage installation.
Name: Robert Ruegg Project Title: Project Superintendent Percent dedicated to Project: 100%
Years’ Experience: 17 years
Qualifications: 15 plus years working in the heavy civil industry with a focus in underground works and Grading
Projected Related Experience: Robert is our lead Superintendent. His main objective will be to ensure safety, while delivering a project of superior quality, on time and within budget. Robert will be directly supervising all grading work.
Same or Similar Projects:
• Procure AZ Pipelining 2023:
Superintendent on the 2023 ADOT pipelining contract. The project consisted of hydrovacing, relining, grouting and erosion control for the state of Arizona. The contract value was just over $1.3 million dollars. Rob supervised all subcontractors and suppliers.
• Connect 202 Maintenance Pipe installation, rip rap installation, drainage grading on the Connect 202 project for
ADOT.
• Douglas AZ Border Fence 2020:
Sitework Grading and border fence installation along Arizona Mexico Border. Rob supervised drainage installation and repair crews.
The project consisted of hydrovacing, relining, grouting and erosion control for the state of Arizona. The contract value was just over $2.3 million dollars. Rob was a leadman on all drainage repairs.