PDF 176 KB Posted

Attached to
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153. 0436
Solicitation number
Not on record
Issued by
Monroe County, Pennsylvania

About this file

This is an Input/Output (I/O) List document for the SCADA Operating System supporting the Skytop Lodge Sewage Treatment Plant Upgrade Project in Pennsylvania. The document provides detailed technical specifications for control panels and monitoring systems across multiple treatment process areas, including the Influent Screen Control Panel (10-CP-101), Equalization Tank Control Panel (10-CP-102), and Recirculation Wet Well & Secondary Clarifier Control Panel (40-CP-400). The I/O list identifies 67 distinct inputs and outputs encompassing level sensors, float switches, pump and blower controls, flow meters, and alarm systems distributed across influent screening, equalization, recirculation, clarification, post-aeration, and backup power management functions. Each line item specifies equipment tags, signal types (analog or digital), operational ranges, source and destination control panels, and implementation remarks indicating whether data connections are contiguous registers, hardwired, VFD Ethernet parameters, spare holding registers, or Modbus communications.

The document serves as the technical blueprint for systems integration and configuration, with all marked items designated for implementation by the systems integrator or through specified communication protocols. The Autodialer (40-AD-400) and Automatic Transfer Switch (40-ATS-400) inputs provide facility-wide alarm notification and generator backup power monitoring capabilities. The I/O list was prepared as of April 27, 2026, corresponding to the bid opening scheduled for September 18, 2026, with a pre-bid conference held on August 25, 2026 at the Skytop Lodge STP location in Canadensis, Pennsylvania. Bid security of 10 percent is required from contractors responding to Contract 2026-01, Project Number 005153.0436.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
33 14 16 - Site Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I/O List for SCADA Operating System Skytop WWTP Upgrade

Location Letter Number Ind

INFLUENT SCREEN CONTROL PANEL (10-CP-101)

10 LE 101 A INFLUENT CHANNEL UPSTREAM LEVEL LEVEL AI FEET LE-101 10-CP-101 2

10 LE 102 A INFLUENT CHANNEL DOWNSTREAM LEVEL LEVEL AI FEET LE-102 10-CP-101 2

10 SV 101 A AUGER SPRAY SOLENOID VALVE ON DO OFF ON 10-CP-101 10-SV-101 2

10 SV 102 A PRESS ZONE SOLENOID VALVE ON DO OFF ON 10-CP-101 10-SV-102 2

EQUALIZATION TANK CONTROL PANEL (10-CP-102)

10 LE 103 A EQ TANK LEVEL LEVEL AI FEET LE-103 10-CP-102 2

10 LSH 101 A EQ TANK HIGH LEVEL FLOAT SWITCH HIGH LEVEL DI NORMAL HIGH LEVEL LSH-101 10-CP-102 2

10 LSL 102 A EQ TANK LOW LEVEL FLOAT SWITCH LOW LEVEL DI NORMAL LOW LEVEL LSL-101 10-CP-102 2

10 P 101 A EQ TANK PUMP #1 VFD START DO STOP START 10-CP-102 VFD-P-101 2

10 P 101 B EQ TANK PUMP #1 VFD RUNNING DI STOPPED RUNNING VFD-P-101 10-CP-102 2

10 P 101 C EQ TANK PUMP #1 VFD VFD FAIL DI NORMAL FAIL VFD-P-101 10-CP-102 2

10 P 102 A EQ TANK PUMP #2 VFD START DO STOP START 10-CP-102 VFD-P-102 2

10 P 102 B EQ TANK PUMP #2 VFD RUNNING DI STOPPED RUNNING VFD-P-102 10-CP-102 2

10 P 102 C EQ TANK PUMP #2 VFD VFD FAIL DI NORMAL FAIL VFD-P-102 10-CP-102 2

10 B 101 A EQ TANK BLOWER #1 START DO STOP START 10-CP-102 10-B-101 (STARTER) 2

10 B 101 B EQ TANK BLOWER #1 OVERLOAD DI NORMAL OVERLOAD 10-B-101 (STARTER) 10-CP-102 2

10 B 101 C EQ TANK BLOWER #1 MOTOR OVERTEMP DI NORMAL OVERTEMP 10-B-101 10-CP-102 2

10 B 102 A EQ TANK BLOWER #2 START DO STOP START 10-CP-102 10-B-102 (STARTER) 2

10 B 102 B EQ TANK BLOWER #2 OVERLOAD DI NORMAL OVERLOAD 10-B-102 (STARTER) 10-CP-102 2

10 B 102 C EQ TANK BLOWER #2 MOTOR OVERTEMP DI NORMAL OVERTEMP 10-B-102 10-CP-102 2

RECIRCULATION WET WELL & SECONDARY CLARIFIER CONTROL PANEL (40-CP-400)

20 LE 200 A RECIRULATION WET WELL LEVEL LEVEL AI FEET LE-200 40-CP-400 2

20 LSH 200 A RECIRULATION WET WELL HIGH LEVEL FLOAT SWITCH HIGH LEVEL DI NORMAL HIGH LEVEL LSH-200 40-CP-400 2

20 LSL 200 A RECIRULATION WET WELL LOW LEVEL FLOAT SWITCH LOW LEVEL DI NORMAL LOW LEVEL LSL-200 40-CP-400 2

Remarks Equipment Tag

Description Analog/Digital (True)

Condition Signal Range/Off Status Units/On Status Source Destination

4/27/2026 HRG 1

20 P 201 A RECIRCULATION PUMP #1 VFD START DO STOP START 40-CP-400 VFP-P-201 2

20 P 201 B RECIRCULATION PUMP #1 VFD RUNNING DI STOPPED RUNNING VFP-P-201 40-CP-400 2

20 P 201 C RECIRCULATION PUMP #1 VFD VFD FAIL DI NORMAL FAIL VFP-P-201 40-CP-400 2

20 P 202 A RECIRCULATION PUMP #2 VFD START DO STOP START 40-CP-400 VFP-P-202 2

20 P 202 B RECIRCULATION PUMP #2 VFD RUNNING DI STOPPED RUNNING VFP-P-202 40-CP-400 2

20 P 202 C RECIRCULATION PUMP #2 VFD VFD FAIL DI NORMAL FAIL VFP-P-202 40-CP-400 2

30 P 301 A SECONDARY CLARIFIER PUMP #1 VFD START DO STOP START 40-CP-400 VFP-P-301 2

30 P 301 B SECONDARY CLARIFIER PUMP #1 VFD RUNNING DI STOPPED RUNNING VFP-P-301 40-CP-400 2

30 P 301 C SECONDARY CLARIFIER PUMP #1 VFD VFD FAIL DI NORMAL FAIL VFP-P-301 40-CP-400 2

30 P 302 A SECONDARY CLARIFIER PUMP #2 VFD START DO STOP START 40-CP-400 VFP-P-302 2

30 P 302 B SECONDARY CLARIFIER PUMP #2 VFD RUNNING DI STOPPED RUNNING VFP-P-302 40-CP-400 2

30 P 302 C SECONDARY CLARIFIER PUMP #2 VFD VFD FAIL DI NORMAL FAIL VFP-P-302 40-CP-400 2

30 P 303 A SECONDARY CLARIFIER PUMP #3 VFD START DO STOP START 40-CP-400 VFP-P-303 2

30 P 303 B SECONDARY CLARIFIER PUMP #3 VFD RUNNING DI STOPPED RUNNING VFP-P-303 40-CP-400 2

30 P 303 C SECONDARY CLARIFIER PUMP #3 VFD VFD FAIL DI NORMAL FAIL VFP-P-303 40-CP-400 2

30 P 304 A SECONDARY CLARIFIER PUMP #4 VFD START DO STOP START 40-CP-400 VFP-P-304 2

30 P 304 B SECONDARY CLARIFIER PUMP #4 VFD RUNNING DI STOPPED RUNNING VFP-P-304 40-CP-400 2

30 P 304 C SECONDARY CLARIFIER PUMP #4 VFD VFD FAIL DI NORMAL FAIL VFP-P-304 40-CP-400 2

30 LSH 301 A EQ TANK #1 LOW LEVEL FLOAT SWITCH LOW LEVEL DI NORMAL LOW LEVEL LSH-301 40-CP-400 2

30 LSH 302 A EQ TANK #2 LOW LEVEL FLOAT SWITCH LOW LEVEL DI NORMAL LOW LEVEL LSH-302 40-CP-400 2

40 B 301 A POST AERATION BLOWER #1 START DO STOP START 40-CP-400 40-B-301 (STARTER) 2

40 B 301 B POST AERATION BLOWER #1 OVERLOAD DI NORMAL OVERLOAD 40-B-301 (STARTER) 40-CP-400 2

40 B 301 C POST AERATION BLOWER #1 MOTOR OVERTEMP DI NORMAL OVERTEMP 40-B-301 40-CP-400 2

40 B 302 A POST AERATION BLOWER #2 START DO STOP START 40-CP-400 40-B-302 (STARTER) 2

40 B 302 B POST AERATION BLOWER #2 OVERLOAD DI NORMAL OVERLOAD 40-B-302 (STARTER) 40-CP-400 2

40 B 302 C POST AERATION BLOWER #2 MOTOR OVERTEMP DI NORMAL OVERTEMP 40-B-302 40-CP-400 2

AUTODIALER '40-AD-400'

40 CP 400 A 10-CP-101: SYSTEM FAIL FAIL DI NORMAL FAIL 10-CP-101 40-AD-400 2

40 CP 400 B 10-CP-102: EQ TANK HIGH LEVEL HIGH LEVEL DI NORMAL HIGH LEVEL 10-CP-102 40-AD-400 2

40 CP 400 C 40-CP-400: RECIRCULATION WET WELL HIGH LEVEL HIGH LEVEL DI NORMAL HIGH LEVEL 40-CP-400 40-AD-400 2

40 CP 400 D 40-CP-400: SECONDARY CLARIFIER GENERAL ALARM GENERAL ALARM DI NORMAL ALARM 40-CP-400 40-AD-400 2

40 CP 400 E 40-CP-400: INFLUENT FLOW METER FLOW AI GPM 40-CP-400 40-AD-400 2

40 CP 400 F 40-CP-400: EFLUENT FLOW METER FLOW AI GPM 40-CP-400 40-AD-400 2

40 CP 400 G 40-CP-400: EQ TANK LEVEL LEVEL AI FEET 40-CP-400 40-AD-400 2

4/27/2026 HRG 2

40 ATS 400 A 40-ATS-400: UTILITY POWER FAILURE UTILITY OUTAGE DI NORMAL UTILITY OUTAGE 40-ATS-400 40-AD-400 2

40 ATS 400 B 40-ATS-400: ATS TRANSFER FAIL ATS TRANSFER FAIL DI NORMAL FAIL 40-ATS-400 40-AD-400 2

40 ATS 400 C 40-ATS-400: GENERATOR POWER GENERATOR POWER DI NORMAL ON GENERATOR 40-ATS-400 40-AD-400 2

40 GEN 400 A 40-GEN-400: GENERATOR FAULT GENERATOR FAULT DI NORMAL FAIL 40-GEN-400 40-AD-400 2

REMARKS:

1. ITEMS MARKED WITH A '1' IN THE REMARKS COLUMN, DATA TO BE PLACED IN CONTIGUOUS REGISTERS FOR IMPLEMENTATION ONTO THE SCADA SYSTEM BY THE SYSTEMS INTEGRATOR

2. ITEMS MARKED WITH A '2' IN THE REMARKS COLUMN, HARDWIRED

3. ITEMS MARKED WITH A '3' IN THE REMARKS COLUMN, VFD ETHERNET PARAMETERS

4. ITEMS MARKED WITH A '4' IN THE REMARKS COLUMN, SPARE IO HOLDING REGISTERS

5. ITEMS MARKED WITH A '5' IN THE REMARKS COLUMN, MODBUS COMMUNICATION