31 23 19 - Dewatering.pdf

PDF 225 KB Posted

Attached to
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153. 0436
Solicitation number
Not on record
Issued by
Monroe County, Pennsylvania

About this file

This is a technical specification document for dewatering services as part of the Skytop Lodge Sewage Treatment Plant Improvements Project (Contract 2026-01, Project Number 005153.0436) in Pennsylvania. The specification outlines requirements for a comprehensive dewatering system to manage groundwater and surface water during excavation and construction activities. Key deliverables include installation of dewatering equipment with pumps, standby equipment, surface water control systems, and water disposal mechanisms designed to lower the water table a minimum of 2 feet below excavation bottoms and prevent groundwater infiltration. The contractor must provide 24-hour supervision of dewatering operations, conduct daily maintenance and monitoring, and maintain continuous operation until backfill reaches 2 feet above normal groundwater elevation. Bid submission is scheduled for Friday, September 18, 2026, at 10:00 AM through PennBid, with a pre-bid conference held on August 25, 2026, at 10:30 AM at Skytop Lodge Sewage Treatment Plant in Canadensis, Pennsylvania. Bidding documents are available through https://pennbid.bonfirehub.com/, and bid security of not less than 10% is required in the form of a certified check or bid bond.

The specification requires adherence to ASTM C33 standards for concrete aggregates and compliance with EPA regulations under the National Pollutant Discharge Elimination System (NPDES) for storm water discharge. The contractor must obtain necessary permits before commencing dewatering operations and coordinate with Pennsylvania One Call System at 1-800-242-1776 at least three working days prior to work initiation to locate and mark underground utilities. Water disposal must follow environmental protocols with pollutant and sediment removal prior to discharge to storm drains or receiving waters. All dewatering and surface water control systems must be removed upon project completion, with the contractor responsible for repairing any damage caused by system operation. No specific contract pricing terms, incumbents, or funding sources are detailed in this specification document.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
33 14 16 - Site Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 23 19 - DEWATERING

Herbert, Rowland & Grubic, Inc. 31 23 19 - 1 005153.0436

SECTION 31 23 19 - DEWATERING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Dewatering system.

2. Surface water control system.

3. System operation and maintenance.

4. Water disposal.

B. Related Sections:

1. Section 31 05 16 - Aggregates for Earthwork: Filter sand.

2. Section 31 23 16 - Excavation: Excavation for structures below ground water table.

3. Section 31 23 16.13 - Trenching: Trenching for utilities below ground water table.

4. Section 31 25 00 - Erosion and Sedimentation Controls: Surface water runoff control.

1.2 REFERENCES

A. ASTM International:

1. ASTM C33 - Standard Specification for Concrete Aggregates.

1.3 DEFINITIONS

A. Dewatering includes the following:

1. Lowering of ground water table and intercepting horizontal water seepage to prevent ground water from entering excavations and trenches.

2. Reducing piezometric pressure within strata to prevent failure or heaving of excavations and trenches.

3. Disposing of removed water.

B. Surface Water Control: Removal of surface water within open excavations.

1.4 SYSTEM DESCRIPTION

A. Furnish standby equipment stored at Project site and ready for immediate use upon failure of dewatering equipment. Provide the following standby equipment, but not less than one of each type:

1. Dewatering Pumps

2. Pump Power Units.

3. Portable Electric Generators.

4. Filter bags.

5. Associated hoses and fittings.

Herbert, Rowland & Grubic, Inc. 31 23 19 - 2 005153.0436

1.5 PERFORMANCE REQUIREMENTS

A. Design dewatering systems to:

1. Lower water table within areas of excavation to minimum 2 feet below bottom of excavation to permit Work to be completed on dry and stable subgrade.

2. Relieve hydrostatic pressures in confined water bearing strata below excavation to eliminate risk of uplift or other instability of excavation.

3. Prevent damage to adjacent properties, buildings, structures, utilities, and facilities from construction operations.

4. Prevent loss of fines, quick condition, or softening of foundation subgrade.

5. Maintain stability of sides and bottoms of excavations and trenches.

B. Design surface water control systems to:

1. Collect and remove surface water and seepage entering excavation.

1.6 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit data for each of the following:

1. Dewatering Pumps: Indicate sizes, capacities, priming method, and characteristics.

2. Pumping equipment for control of surface water within excavation.

C. Field Reports: Test and monitoring reports as specified in Field Quality Control article.

1.7 CLOSEOUT SUBMITTALS

A. Section 01 77 00 - Closeout Procedures: Requirements for submittals.

B. Project Record Documents: Record actual locations and depths of capped wells and piping abandoned in place.

1.8 QUALITY ASSURANCE

A. Obtain permit from EPA under National Pollutant Discharge Elimination System (NPDES), for storm water discharge from construction sites.

1.9 SEQUENCING

A. Section 01 10 00 – Project Summary: Requirements for sequencing.

B. Sequence work to obtain required permits before start of dewatering operations.

1.10 COORDINATION

A. Section 01 31 13 – Project Coordination: Requirements for coordination.

B. Coordinate work to permit the following construction operations to be completed on dry stable substrate.

Herbert, Rowland & Grubic, Inc. 31 23 19 - 3 005153.0436

1. Excavation for structures specified in Section 31 23 16.

2. Trenching for utilities specified in Section 31 23 16.13.

PART 2 - PRODUCTS

2.1 DEWATERING EQUIPMENT

A. Select dewatering equipment to meet specified performance requirements.

2.2 ACCESSORIES

A. Valves and Fittings: Furnish valves and fittings to isolate each well from header pipe and to prevent loss of pump prime.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Verification of existing conditions before starting work.

B. Call Pennsylvania One Call System, Inc. at 1-800-242-1776 not less than three working days before performing Work:

1. Request underground utilities to be located and marked within and surrounding construction areas.

3.2 PREPARATION

A. Protect existing adjacent buildings, structures, and improvements from damage caused by dewatering operations.

3.3 DEWATERING SYSTEM

A. Install dewatering system in accordance with shop drawings.

B. Locate system components to allow continuous dewatering operations without interfering with installation of permanent Work and existing public rights-of-way, sidewalks, and adjacent buildings, structures, and improvements.

3.4 SURFACE WATER CONTROL SYSTEM

A. Provide ditches, berms, and other devices to divert and drain surface water from excavation area as specified in Section 31 25 00.

B. Divert surface water and seepage water within excavation areas into sumps and pump water into settling basins in accordance with requirements of agencies having jurisdiction.

C. Control and remove unanticipated water seepage into excavation.

Herbert, Rowland & Grubic, Inc. 31 23 19 - 4 005153.0436

3.5 SYSTEM OPERATION AND MAINTENANCE

A. Operate dewatering system continuously until backfill is minimum 2 feet above normal ground water table elevation.

B. Provide 24-hour supervision of dewatering system by personnel skilled in operation, maintenance, and replacement of system components.

C. Conduct daily observation of dewatering system and monitoring system. Make required repairs and perform scheduled maintenance.

D. Fill fuel tanks before tanks reach 25 percent capacity.

E. Start emergency generators at least twice each week to check operating condition.

F. When dewatering system cannot control water within excavation, notify Engineer and stop excavation work:

1. Supplement or modify dewatering system and provide other remedial measures to control water within excavation.

2. Demonstrate dewatering system operation complies with performance requirements before resuming excavation operations.

G. Modify dewatering and surface water control systems when operation causes or threatens to cause damage to new construction, existing site improvements, adjacent property, or adjacent water wells.

H. Correct unanticipated pressure conditions affecting dewatering system performance.

I. Do not discontinue dewatering operations without Engineer's approval.

3.6 WATER DISPOSAL

A. Prior to dewatering, evaluate site conditions. Evaluate flow path to minimize erosion and the transport of sediment to storm drains and receiving waters.

B. Discharge water to areas that are well vegetated and stable. Pollutants and sediments must be removed prior to discharging to a storm drain, waterbody, or wetland.

C. Dispose of water removed by dewatering in a manner that does not endanger public health, property, and portions of the work under construction or completed. Dispose of water in a manner that avoids inconvenience to others. Provide sumps, sedimentation tanks, and other flow control devices as required.

3.7 SYSTEM REMOVAL

A. Remove dewatering and surface water control systems after dewatering operations are discontinued.

Herbert, Rowland & Grubic, Inc. 31 23 19 - 5 005153.0436

B. Repair damage caused by dewatering and surface water control systems or resulting from failure of systems to protect property.

END OF SECTION

File details come from the government source that posted it. Updated .