00 45 36 EEO Certificate.pdf

PDF 199 KB Posted

Attached to
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153. 0436
Solicitation number
Not on record
Issued by
Monroe County, Pennsylvania

About this file

This is an Equal Employment Opportunity Certification form completed by Herbert, Rowland & Grubic, Inc. for the Skytop Lodge Sewage Treatment Plant Improvements Project in Pennsylvania. The project, numbered 005153.0436 and designated as Contract 2026-01, involves construction of sewage treatment plant upgrades at Skytop Lodge in Canadensis, Pennsylvania. The scope of work includes installation of an Influent Screening System, Equalization Tank, Chemical Feed System, two Clarifier Tanks, a Post Aeration Tank, a UV Disinfection System, and associated work. Bids were publicly opened on Friday, September 18, 2026, at 10:00 AM through PennBid. A pre-bid conference was held on August 25, 2026, at 10:30 AM at the project site (Falls Road, Canadensis, PA 18325), with attendance encouraged but not required. Bid security in the form of a Certified Check or Bid Bond was required in an amount not less than 10%.

The EEO certification document requires the bidder to disclose whether it has participated in previous contracts or subcontracts subject to the Equal Opportunity clause under Executive Order 11246, whether compliance reports were required, and whether all required compliance reports, including SF-100 forms, have been filed. Bidders unable to certify compliance must submit a compliance report within seven calendar days after bid opening, with no contract award issued until such report is received. The form also inquires whether the bidder has been or is being considered for sanction due to violations of Executive Order 11246, as amended. All bidding documents and official notifications were made available exclusively through the designated PennBid website at https://pennbid.bonfirehub.com/.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
33 14 16 - Site Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Herbert, Rowland & Grubic, Inc. 00 45 36 - 1 005153.0436

CERTIFICATION OF BIDDER REGARDING EQUAL EMPLOYMENT OPPORTUNITY

INSTRUCTIONS

This certification is required pursuant to Executive Order 11246 (30 CFR 12319-25). The implementing rules and regulations provide that any Bidder or prospective Contractor, or any of their proposed subcontractors, shall state as an initial part of the Bid or negotiations of the Contract whether it has participated in any previous contract or subcontract subject to the Equal Opportunity clause, and, if so, whether it has filed all compliance reports due under applicable instructions.

Where the certification indicates that the Bidder has not filed a compliance report due under applicable instructions, such a Bidder shall be required to submit a compliance report within seven calendar days after Bid opening. No Contract shall be awarded unless such report is submitted.

CERTIFICATION BY BIDDER

(Name of Bidder)

(Address) (City) (State) (Zip Code)

1. Bidder has participated in a previous contract or subcontract subject to the Equal Opportunity clause.

Yes No

2. Compliance reports were required to be filed in connection with such contract or subcontract.

3. Bidder has filed all compliance reports due under applicable instructions, including SF-100.

Yes No None Required (If No, please explain in detail.)

4. Have you ever been or are you being considered for sanction due to violation of Executive

Order 11246, as amended?

Certification: The information above is true and complete to the best of my knowledge and belief.

(Name of Signer) (Title)

(Signature) (Date)