00 60 00 - Project Forms.pdf

PDF 246 KB Posted

Attached to
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153. 0436
Solicitation number
Not on record
Issued by
Monroe County, Pennsylvania

About this file

This is a project forms document for the Skytop Lodge Sewage Treatment Plant Improvements Project (005153.0436), a construction contract in Canadensis, Pennsylvania. The project involves the installation of sewage treatment plant upgrades, including an influent screening system, equalization tank, chemical feed system, two clarifier tanks, a post-aeration tank, a UV disinfection system, and associated work. Bids for Contract 2026-01 will be received and publicly opened on Friday, September 18, 2026, at 10:00 AM through PennBid. A pre-bid conference is scheduled for August 25, 2026, at 10:30 AM at the Skytop Lodge STP facility in Falls Road, Canadensis, Pennsylvania (coordinates: 41°13'17.3"N 75°14'19.0"W). Attendance at the pre-bid conference is encouraged but not required. Bidding documents are available for download from the PennBid website at https://pennbid.bonfirehub.com/, with periodic updates including addenda and registered plan holder lists.

The document specifies that bid security must be provided in the form of a certified check or bid bond in an amount not less than 10% of the bid. The project will utilize modified EJCDC (Engineers Joint Contract Documents Committee) forms and conditions, including a modified C-520 Agreement, modified C-700 General Conditions, and supplementary conditions detailed in the project manual. Administrative forms to be used include Performance Bonds (EJCDC C-610), Payment Bonds (EJCDC C-615), Requests for Information, Substitution Request Forms, Field Orders, Work Change Directives, Change Orders, Applications for Payment (EJCDC C-620), and closeout forms including Certificates of Substantial Completion and Affidavits of Release of Liens. All forms will be available in their native format through the Project Documentation Website or upon request. All questions regarding the bidding documents must be submitted via PennBid in accordance with the Instructions to Bidders.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
33 14 16 - Site Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 60 00 – PROJECT FORMS

Herbert, Rowland & Grubic, Inc. 00 60 00 - 1 005153.0436

SECTION 00 60 00 – PROJECT FORMS

PART 1 - GENERAL

1.1 FORM OF AGREEMENT AND GENERAL CONDITIONS

A. The following form of Owner/Contractor Agreement and form of the General Conditions shall be used for Project:

1. The Agreement between the Owner and Contractor is included in the Project

Manual, modified EJCDC C-520.

2. The General Conditions are included in the Project Manual, modified EJCDC C-

700.

3. The Supplementary Conditions for Project are incorporated into a modified copy of the General Conditions included in the Project Manual.

1.2 ADMINISTRATIVE FORMS

A. Preconstruction Forms:

1. Performance Bond: Section 00 61 13.13 of Project Manual, EJCDC C-610.

2. Payment Bond: Section 00 61 13.16 of the Project Manual, EJCDC C-615.

B. Information and Modification Forms: The following forms contained in the Project

Manual will be utilized:

1. Requests for Information (RFIs): Section 00 63 13, modified CSI 13.2A.

2. Substitution Request Form (During Construction): Section 00 63 25.

3. Field Order: Section 00 63 36, modified EJCDC C-942.

4. Work Change Directive: Section 00 63 49, modified EJCDC C-940.

5. Change Order Form: Section 00 63 63, modified EJCDC C-941.

6. Forms identified above will be available in their native format will be made available on the Project Documentation Website or upon request.

C. Application for Payment: The following forms contained in the Project Manual will be utilized:

1. Application for Payment Form: Section 00 62 76, EJCDC C-620.

2. Forms identified above will be available in their native format will be made available on the Project Documentation Website or upon request.

D. Closeout Forms: The following forms contained in the Project Manual will be utilized:

1. Certificate of Substantial Completion: Section 00 65 16, modified EJCDC C-625.

2. Affidavit of Release of Liens: Section 00 65 19.16.

3. Consent of Surety to Final Payment: Section 00 65 19.19.

4. Notice of Acceptability of Work: Section 00 65 19.23, modified EJCDC C-626.

END OF SECTION