01 57 28 - Temporary Flow Control.pdf

PDF 226 KB Posted

Attached to
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153. 0436
Solicitation number
Not on record
Issued by
Monroe County, Pennsylvania

About this file

This is a technical specification document for temporary flow control work as part of the Skytop Lodge Sewage Treatment Plant Improvements Project in Pennsylvania. The specification outlines the contractor's responsibilities for managing water flow during construction of sewage treatment plant upgrades, including installation of an influent screening system, equalization tank, chemical feed system, two clarifier tanks, a post aeration tank, and UV disinfection system. The project is located at Skytop Lodge STP, Falls Road, Canadensis, PA, with a pre-bid conference scheduled for August 25, 2026 at 10:30 AM and bid opening on September 18, 2026 at 10:00 AM via PennBid. The contractor must submit a Temporary Flow Control Plan at least ten days before starting work requiring temporary flow control, along with an Emergency Cleanup Plan, both requiring approval before construction commences.

The specification requires the contractor to design and implement temporary flow control systems that intercept, convey, and discharge flow while protecting water resources and preventing public nuisance. The system designer must be a professional engineer registered in Pennsylvania with at least five years' experience in such systems. Equipment requirements include fully automatic, self-priming pumps capable of handling three-inch diameter solids, mechanical or pneumatic plugs for pipes 24 inches or smaller, and inflatable bag stoppers for larger pipes from manufacturers such as Lansas or Cherne Industries. Contractors must provide standby equipment including one standby pump of each size and a minimum of one backup electric generator onsite at all times. All temporary equipment and materials must be removed before substantial completion, with the site graded and all damage repaired to restore existing and permanent facilities to their original condition.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
33 14 16 - Site Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 57 28 - TEMPORARY FLOW CONTROL

Herbert, Rowland & Grubic, Inc. 01 57 28 - 1 005153.0436

SECTION 01 57 28 - TEMPORARY FLOW CONTROL

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Responsibilities for temporary facilities and controls.

B. Temporary Controls:

1. Water control.

2. Pollution control.

C. Removal of utilities, facilities, and controls.

1.2 DEFINITIONS

A. Bypass Pumping: Temporary flow control accomplished by diverting flow away from the Work area using one or more pumps.

B. Temporary Flow Control: Reducing, limiting, or excluding flow in or to a sanitary sewer, storm sewer, pump station, force main, or other facility as required for performing the Work under the Contract. Draining, handling, and disposal of sanitary sewage and stormwater from pipelines and other facilities as required for performing the Work under the Contract is also part of temporary flow control.

C. Temporary Flow Control Plan: Plan prepared by Contractor containing complete information on how Contractor proposes to perform temporary flow control in accordance with specified requirements.

1.3 SYSTEM DESCRIPTION

A. Provide facilities and controls required to intercept, convey, and discharge flow to be controlled; include redundant standby and emergency equipment.

B. Conform to regulatory requirements.

C. Protect water resources and other natural resources.

D. Temporary flow control shall be done in a manner that will not interfere or disrupt facility operations, property, or create a nuisance or public menace. Flow shall be conveyed in enclosed pipes that are adequately protected from traffic or other hazards.

E. Sanitary Discharge:

1. To downstream sanitary sewer manhole. See Drawings for manholes.

2. Dumping or free flow on property, gutters, streets, or sidewalks is strictly prohibited.

3. Discharge of sanitary sewage to storm sewers or onto the ground, is strictly prohibited.

Herbert, Rowland & Grubic, Inc. 01 57 28 - 2 005153.0436

1.4 SUBMITTALS

A. Informational Submittals:

1. Temporary Flow Control Plan.

2. Emergency Cleanup Plan.

B. Products: Pump information with curves.

1.5 QUALITY ASSURANCE

A. Qualifications: Temporary Flow Control System Designer: Professional engineer who has at least 5 years’ experience in design of such systems and who is registered in the State of Pennsylvania.

B. Regulatory Requirements: Comply with Pennsylvania Department of Environmental Protection temporary sanitary flow bypass requirements.

1.6 TEMPORARY FLOW CONTROL PLAN

A. Prepare and submit Temporary Flow Control Plan at least ten (10) days before starting the Work requiring temporary flow control; include following information:

1. Drawings indicating location of temporary sewer plugs and bypass discharge lines.

2. Traffic Control Plan specifically applicable to temporary flow control adhering to requirements of applicable agencies and as may be specified in Contract Documents.

3. Locations where flow will be intercepted and discharged.

4. Complete descriptions and performance characteristics of pumps, electric power generators, and standby equipment.

1.7 EMERGENCY CLEANUP PLAN

A. Prepare and submit an emergency cleanup plan. As a minimum plan shall include the following:

1. Procedures for removal of water.

2. Procedures for determining nature and extent of damage and required restoration where restoration is possible.

1.8 WATER CONTROL

A. Grade Site to drain. Maintain excavations free of water. Provide, operate, and maintain necessary pumping equipment.

1.9 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS

A. Remove temporary equipment and materials before Substantial Completion inspection.

B. Remove underground installations to minimum depth of 2 feet. Grade Site as indicated on Drawings.

Herbert, Rowland & Grubic, Inc. 01 57 28 - 3 005153.0436

C. Clean and repair damage caused by installation or use of temporary Work.

D. Restore existing and permanent facilities used during construction to original condition.

Restore permanent facilities used during construction to specified condition.

PART 2 - PRODUCTS

2.1 EQUIPMENT AND MATERIALS

A. General:

1. Provide materials and equipment that will ensure continuous and successful operation of temporary flow control systems.

2. Repair or modify systems as necessary.

3. Unless otherwise shown or specified, materials and equipment may be new or used at Contractor’s option.

B. Plugs:

1. Provide with taps for connection of pressure gauges and air hoses, and flow-through capability.

2. Pipe Diameters 24 Inches and Smaller: Use mechanical plugs with rubber gaskets or pneumatic plugs with rubber boots.

3. Pipe Diameters Larger than 24 Inches.

4. Use inflatable bag stoppers made in two (2) or more pieces.

5. Manufacturers:

a. Lansas.

b. Cherne Industries.

C. Pumps:

1. Fully automatic, self-priming units that do not require use of foot valves or vacuum pumps in priming system.

2. Solids handling design with ability to pump minimum three (3)-inch diameter sphere.

3. Able to run dry for long periods of time to accommodate cyclical nature of flows.

4. Engine: Equipped to minimize noise. Noise levels shall not exceed 86 dBA at a distance of fifty (50) feet from source.

D. Electric Power Generators:

1. Be able to simultaneously start and run electric powered pumps required for flow to be controlled.

2. Equipped to minimize noise. Noise levels shall not exceed 86 dBA at a distance of fifty (50) feet from source.

3. Include automatic transfer switch if flow control system is to operate unattended.

E. Standby Equipment:

1. Standby Pump: One (1) of each size to be available onsite at all times.

2. Electric Power Generators: Minimum of 1 if temporary flow control system contains electric powered pump. Able to simultaneously start and run electric powered pumps required for flow to be controlled.

Herbert, Rowland & Grubic, Inc. 01 57 28 - 4 005153.0436

PART 3 - EXECUTION

3.1 GENERAL

A. Install temporary flow control facilities in a location acceptable to Owner’s Operations and Facility Maintenance.

B. Operate and maintain temporary flow control while area of Work is out of service.

3.2 BLOCKING FLOW

A. Flow control may consist of blocking flow with mechanical or pneumatic plugs if adequate storage is available.

B. When blocking flow is no longer needed for performance and acceptance of the Work, remove plugs in a manner that permits sewage flow to slowly return to normal without surcharging or causing other major disturbances downstream.

C. Remove temporary plugs at end of each working day and restore normal flow. If downstream work is not or cannot be completed during workday provide, operate, and maintain bypass pumping system or other method of flow control to accommodate flows.

END OF SECTION