About this file

This is a technical specification document for aggregates and earthwork materials required for the Skytop Lodge Sewage Treatment Plant Improvements Project (Project Number 005153.0436) in Canadensis, Pennsylvania. The project involves the construction and installation of sewage treatment plant upgrades, including an influent screening system, equalization tank, chemical feed system, two clarifier tanks, a post aeration tank, and a UV disinfection system. Bids for Contract 2026-01 will be received and publicly opened on Friday, September 18, 2026, at 10:00 AM through PennBid. A pre-bid conference is scheduled for August 25, 2026, at 10:30 AM at the Skytop Lodge STP facility located at Falls Road, Canadensis, PA 18325; attendance is encouraged but not required. Bidding documents are available for download from the designated PennBid website, which will be updated periodically with addenda and other relevant information.

The specification document details requirements for coarse and fine aggregate materials that must meet Pennsylvania Department of Transportation (PennDOT) standards and relevant AASHTO and ASTM International standards. Coarse aggregate options include PennDOT 2A, AASHTO No. 57, AASHTO No. 8, AASHTO No. 3, and select granular material conforming to PennDOT Publication 408. Fine aggregates must meet PennDOT standards for bituminous concrete sand types, mortar sand, and filler materials with specified sieve size gradations. All aggregate materials must originate from PennDOT-approved sources and be furnished from a single source throughout the project. Contractors must submit material samples, supplier information, and manufacturer's certificates demonstrating compliance with specifications. Bid security in the form of a certified check or bid bond is required in an amount not less than 10%.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
33 14 16 - Site Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 05 16 – AGGREGATES FOR EARTHWORK

Herbert, Rowland & Grubic, Inc. 31 05 16 - 1 005153.0436

SECTION 31 05 16 - AGGREGATES FOR EARTHWORK

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Coarse aggregate materials.

2. Fine aggregate materials.

B. Related Sections:

1. Section 31 05 13 - Soils for Earthwork: Fill and grading materials.

2. Section 31 22 13 - Rough Grading.

3. Section 33 14 16- Site Water Utility Distribution Piping.

4. Document 00 31 32 – Geotechnical Report: Geotechnical report; bore hole locations and findings of subsurface materials.

1.2 REFERENCES

A. Pennsylvania Department of Transportation (PennDOT):

1. American Association Publication 19 - Field and Laboratory Test Methods, latest edition.

2. Publication 408 - Specifications, latest edition, as amended.

B. American Association of State Highway and Transportation Officials:

1. AASHTO M147 - Standard Specification for Materials for Aggregate and Soil-

Aggregate Subbase, Base and Surface Courses.

2. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils

Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.

C. ASTM International:

1. ASTM C136 - Standard Test Method for Sieve Analysis of Fine and Coarse

Aggregates.

2. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3).

3. ASTM D2487 - Standard Classification of Soils for Engineering Purposes (Unified

Soil Classification System).

4. ASTM D4318 - Standard Test Method for Liquid Limit, Plastic Limit, and Plasticity

Index of Soils.

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Samples: Submit, in air-tight containers, 10 lb. sample of each type of fill to testing laboratory.

C. Materials Source: Submit name of imported materials suppliers.

Herbert, Rowland & Grubic, Inc. 31 05 16 - 2 005153.0436

D. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.

1.4 QUALITY ASSURANCE

A. Furnish each aggregate material from single source throughout the Work.

B. All aggregate must originate from a source approved by PennDOT meeting according to PennDOT standards.

PART 2 - PRODUCTS

2.1 COARSE AGGREGATE MATERIALS

A. PennDOT 2A: consisting of naturally or artificially graded mixture of natural or crushed gravel, crushed stone, or crushed slag meeting the requirements of PennDOT Publication 408, Section 703.2 for No. 2A, type C.

B. AASHTO No. 57: Open-graded, free-draining coarse aggregate meeting the requirements of PennDOT Publication 408, Section 703.2 for AASHTO No. 57.

C. AASHTO No. 8: Open-graded, free-draining coarse aggregate meeting the requirements of PennDOT Publication 408, Section 703.2 for AASHTO No. 8.

D. AASHTO No. 3: Open-graded, free-draining coarse aggregate meeting the requirements of PennDOT Publication 408, Section 703.2 for AASHTO No. 3.

E. Select Granular Material: Select Granular Material conforming to PennDOT Publication 408 Section 703.3 for 2RC.

2.2 FINE AGGREGATE MATERIALS

A. Fine Aggregates: Conforming to PennDOT's standards as follows:

Bituminous Concrete Sand Type B

Mortar Sand

Sieve Size #1 #3 Filler Type C

3/8 inch 100 100 -- --

No. 4 95-100 80-100 -- 100

No. 8 70-100 65-100 -- 95-100

No. 16 40-80 40-80 -- --

No. 30 20-65 20-65 100 --

No. 50 7-40 7-40 95-100 --

No. 100 2-20 2-20 90-100 0-25

No. 200 0-10 0-10 70-100 0-10

Herbert, Rowland & Grubic, Inc. 31 05 16 - 3 005153.0436

PART 3 - EXECUTION

3.1 STOCKPILING

A. Stockpile materials on site at locations designated by Engineer.

B. Stockpile in sufficient quantities to meet Project schedule and requirements.

C. Separate different aggregate materials with dividers or stockpile individually to prevent mixing.

D. Direct surface water away from stockpile site to prevent erosion or deterioration of materials.

3.2 STOCKPILE CLEANUP

A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent free standing surface water.

END OF SECTION