03 39 00 - Concrete Curing.pdf

PDF 214 KB Posted

Attached to
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153. 0436
Solicitation number
Not on record
Issued by
Monroe County, Pennsylvania

About this file

This is a technical specification document for concrete curing work as part of the Skytop Lodge Sewage Treatment Plant Improvements Project (Contract 2026-01, Project Number 005153.0436) in Pennsylvania. The specification covers initial and final curing of horizontal and vertical concrete surfaces using either membrane-curing compounds complying with ASTM C309 Type 1 or 2, Class A, or polyethylene film meeting ASTM C171 and D2103 standards at 4 mils thickness in white opaque. For horizontal surfaces, contractors must apply membrane-curing compound in two coats at right angles or spread PE film with lapped edges, sealed with pressure-sensitive tape and covered with plywood for seven days. Vertical surfaces require two coats of membrane-curing compound applied at right angles. The pre-bid conference is scheduled for August 25, 2026 at 10:30 AM at Skytop Lodge STP in Canadensis, Pennsylvania, with bid opening on Friday, September 18, 2026 at 10:00 AM through PennBid. All work must comply with ACI 308.1 standards, and materials must be inspected upon delivery in original manufacturer packaging and stored in clean, dry locations per manufacturer instructions.

The specification requires that manufacturers have a minimum of three years' documented experience and provide product data, manufacturer's certificates, detailed installation instructions, and qualifications statements as part of submittals. Bid security must be furnished in the form of a certified check or bid bond in an amount not less than 10%. All questions regarding the bidding documents must be submitted through PennBid in accordance with the Instructions to Bidders. Bidding documents, including any addenda, are available exclusively through the designated PennBid website at https://pennbid.bonfirehub.com/, and neither the owner nor engineer will be responsible for documents obtained from other sources.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
33 14 16 - Site Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

03 39 00 - CONCRETE CURING

Herbert, Rowland & Grubic, Inc. 03 39 00 - 1 005153.0436

SECTION 03 39 00 - CONCRETE CURING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes: Initial and final curing of horizontal and vertical concrete surfaces.

B. Related Requirements:

1. Section 03 35 00 - Concrete Finishing: Surface finishing of concrete floor slabs and toppings.

1.2 REFERENCE STANDARDS

A. American Concrete Institute:

1. ACI 301 - Specifications for Structural Concrete.

2. ACI 302.1 - Guide to Concrete Floor and Slab Construction.

3. ACI 308.1 - Specification for Curing Concrete.

4. ACI 318 - Building Code Requirements for Structural Concrete and Commentary.

B. ASTM International:

1. ASTM C171 - Standard Specification for Sheet Materials for Curing Concrete.

2. ASTM C309 - Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete.

3. ASTM C1315 - Standard Specification for Liquid Membrane-Forming Compounds

Having Special Properties for Curing and Sealing Concrete.

4. ASTM D2103 - Standard Specification for Polyethylene Film and Sheeting.

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer's information on curing compounds, mats, paper, and film, including compatibilities and limitations.

C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

D. Manufacturer Instructions: Submit detailed instructions on installation requirements, including storage and handling procedures.

E. Qualifications Statement:

1. Submit qualifications for manufacturer.

1.4 QUALITY ASSURANCE

A. Perform Work according to ACI 308.1.

Herbert, Rowland & Grubic, Inc. 03 39 00 - 2 005153.0436

1.5 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

C. Store materials according to manufacturer instructions.

D. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

2. Provide additional protection according to manufacturer instructions.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Membrane-Curing Compound Type 1 or 2, Class A:

1. Comply with ASTM C309, Type 1 or 2, Class A.

B. PE Film, Type E:

1. Comply with ASTM C171 and D2103.

2. Thickness: 4 mils.

3. Color: White opaque.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Requirements for application examination.

B. Verify that substrate surfaces are ready to be cured.

3.2 APPLICATION

A. Horizontal Surfaces:

1. Comply with ACI 308.1, using Membrane-Curing Compound method or PE Film method.

2. Membrane-Curing Compound: Apply curing compound in two coats with second coat applied at right angles to first.

3. PE Film:

a. Spread over floor slab areas.

Herbert, Rowland & Grubic, Inc. 03 39 00 - 3 005153.0436

b. Lap edges and sides.

c. Seal with pressure-sensitive tape and cover with plywood.

d. Maintain in place for seven days.

B. Vertical Surfaces:

1. Comply with ACI 308.1, using Membrane-Curing Compound method.

2. Membrane-Curing Compound: Apply compound in two coats with second coat applied at right angles to first.

3.3 PROTECTION

A. Section 01 73 00 – Execution Requirements: Requirements for protecting finished Work.

B. Do not permit traffic over unprotected floor surfaces.

END OF SECTION

File details come from the government source that posted it. Updated .