33 05 97 - Identification And Signage For Utilities.pdf

PDF 217 KB Posted

Attached to
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153. 0436
Solicitation number
Not on record
Issued by
Monroe County, Pennsylvania

About this file

This is a technical specification document for identification and signage for utilities prepared by Herbert, Rowland & Grubic, Inc., in support of the Skytop Lodge Sewage Treatment Plant Improvements Project (Project Number 005153.0436) in Pennsylvania. The specification outlines requirements for pipeline marker posts, metal and plastic utility markers, marking flags, plastic ribbon tape, and trace wire to be installed as part of sewage treatment plant upgrades. The project includes installation of an influent screening system, equalization tank, chemical feed system, two clarifier tanks, post aeration tank, UV disinfection system, and related infrastructure. A pre-bid conference is scheduled for August 25, 2026, at 10:30 AM at Skytop Lodge STP in Canadensis, Pennsylvania, with bid opening on September 18, 2026, at 10:00 AM through PennBid. Bid security of not less than 10% in the form of a certified check or bid bond is required.

The specification details product requirements including stencils with semigloss enamel paint, flexible plastic pipe markers from manufacturers such as Seton Identification Products or Craftmark Pipe Markers, polyethylene ribbon tape minimum 6 inches wide by 4 mils thick with caution imprints for sanitary sewer, water, gas, and storm sewer applications, and 10-AWG Type THWN insulated copper tracer wire. Manufacturers must have minimum three years of documented experience. Installation requirements include placement of ribbon tape continuously over pipe, coordination with trenching operations per specification Section 31 23 16.13, and recording of actual valve locations in project record documents. Bidding documents are available exclusively through the PennBid website at https://pennbid.bonfirehub.com/, with periodic updates to addenda and other project information provided through this designated platform.

View the file

Other files

File Type Posted
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
33 14 16 - Site Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

33 05 97 - IDENTIFICATION AND SIGNAGE FOR UTILITIES

Herbert, Rowland & Grubic, Inc. 33 05 97 - 1 005153.0436

SECTION 33 05 97 - IDENTIFICATION AND SIGNAGE FOR UTILITIES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Pipeline marker posts.

2. Metal utility markers.

3. Plastic utility markers.

4. Marking flags.

5. Plastic ribbon tape for placement above direct-buried utility.

6. Trace wire for placement above direct-buried utility.

B. Related Requirements:

1. Section 31 23 16.13 - Trenching: Backfilling considerations for installation of underground pipe markers.

2. Section 33 14 16 - Site Water Utility Distribution Piping: Piping, valves, and appurtenances requiring identification marking.

3. Section 33 31 11 - Sanitary Sewerage Gravity Piping: Piping, valves, and appurtenances requiring identification marking.

1.2 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer catalog information for each specified product.

C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

D. Qualifications Statement:

1. Submit qualifications for manufacturer.

1.3 CLOSEOUT SUBMITTALS

A. Section 01 77 00 - Closeout Procedures: Requirements for submittals.

B. Project Record Documents: Record actual locations of tagged valves.

1.4 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.

Herbert, Rowland & Grubic, Inc. 33 05 97 - 2 005153.0436

PART 2 - PRODUCTS

2.1 STENCILS

A. Description:

1. Quality: Clean-cut symbols.

2. Letters:

a. Up to 2-Inch OD of Insulation or Pipe: 1/2-inch-high letters.

b. b. 2-1/2- to 6-Inch OD of Insulation or Pipe: 1-inch-high letters.

c. c. More Than 6-Inch OD of Insulation or Pipe: 1-3/4-inch high letters.

B. Stencil Paint:

1. Description: Semigloss enamel.

2. As specified in Section 09 90 00 – Painting and Coating.

2.2 PIPE MARKERS

A. Plastic Pipe Markers:

1. Manufacturers:

a. Seton Identification Products.

b. Craftmark Pipe Markers.

c. Or equal.

2. Description:

a. Factory-fabricated, flexible, and semi-rigid plastic.

b. Preformed to fit around pipe or pipe covering.

c. Larger sizes may be of maximum sheet size, with spring fastener.

B. Plastic Tape Pipe Markers:

1. Description: Flexible, vinyl film tape with pressure-sensitive adhesive backing and printed markings.

2.3 RIBBON TAPE

A. Description:

1. Material: PE.

2. Brightly colored, continuously printed.

3. Minimum Size: 6 inches wide by 4 mils thick.

4. Manufactured for direct burial service.

5. Imprint:

a. CAUTION - SANITARY SEWER BELOW” in large letters.

b. “CAUTION – WATER BELOW” in large letters.

c. “CAUTION – GAS BELOW” in large letters.

d. “CAUTION – STORM SEWER BELOW” in large letters.

Herbert, Rowland & Grubic, Inc. 33 05 97 - 3 005153.0436

2.4 TRACER WIRE

A. Description:

1. Wire: Unshielded 10-AWG Type THWN insulated copper.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Pipeline Marker Posts, Utility Markers, and Marking Flags: According to manufacturer instructions.

B. Ribbon Tape:

1. Continuous over top of pipe.

2. If multiple pipes occur in common trench, locate tape above centerline of trench.

3. Coordinate with trench Work as specified in Section 31 23 16.13 – Trenching.

END OF SECTION