This is a Warranties specification document for the Skytop Lodge Sewage Treatment Plant Improvements Project in Pennsylvania, prepared by Herbert, Rowland & Grubic, Inc. The project, identified as Contract 2026-01 (Project Number 005153.0436), involves construction of sewage treatment plant upgrades including an Influent Screening System, Equalization Tank, Chemical Feed System, two Clarifier Tanks, a Post Aeration Tank, a UV Disinfection System, and related work. Bids for the project were to be received and opened publicly on September 18, 2026 at 10:00 AM through PennBid. A pre-bid conference was scheduled for August 25, 2026 at 10:30 AM at Skytop Lodge STP in Canadensis, Pennsylvania. Bidding documents were available for download from the designated PennBid website, with all official notifications and addenda provided exclusively through that platform.

The warranties specification establishes comprehensive requirements for product warranties and special warranties to be submitted by the contractor within 10 days following Substantial Completion or Partial Utilization. All warranties must be written in the Owner's name and submitted in bound three-ring binders with two copies provided to the Owner. Warranties become valid upon issuance of the Certificate of Substantial Completion and remain enforceable concurrent with other contract warranties. The contractor bears full responsibility for replacing or rebuilding any defective work covered by warranty, including removal and replacement of damaged adjacent work, regardless of the Owner's prior use of the work. Manufacturer disclaimers and limitations do not relieve the contractor of warranty obligations under the Contract Documents.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
33 14 16 - Site Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 78 36 – WARRANTIES

Herbert, Rowland & Grubic, Inc. 01 78 36 - 1 005153.0436

SECTION 01 78 36 – WARRANTIES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Product warranty manuals.

2. Warranty requirements.

B. Related Sections:

1. Section 01 77 00 – Closeout Procedures: general closeout procedures.

2. Individual Sections for specific requirements for Project Record Documents of the

Work in those Sections.

1.2 PRODUCT WARRANTIES

A. Warranties specified in individual Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents. Warranties shall be written in Owner’s name:

1. Standard Product Warranties are preprinted written warranties published by individual manufacturers for particular products and are specifically endorsed by the manufacturer to Owner.

2. Special Warranties are written warranties required by or incorporated into Contract Documents, either to extend time limits provided by standard warranties or to provide greater rights for Owner.

B. Submission requirements:

1. Submit documents to Owner and Engineer within 10 days following Date of

Substantial Completion or Partial Utilization. For item accepted after Date of Substantial Completion, submit documents within 10 days following each individual acceptance:

a. When special warranty is required to be executed by Contractor, or

Contractor and a subcontractor, supplier or manufacturer, prepare a written document that contains appropriate terms and identification, ready for execution by required parties. Submit a draft to Owner.

2. Submit information on 8½” x 11" pages, bound in three-ring binders with plastic covers. Prepare binder cover with title WARRANTIES AND BONDS, and title of Project and subject matter when multiple binders are needed:

a. Internally subdivide binder contents with permanent page dividers, logically organized with tabs clearly printed.

b. Quantity: Provide two copies of each volume to Owner.

1.3 WARRANTY REQUIREMENTS

A. Written warranties made to Owner are in addition to implied warranties and shall not limit duties, obligations, right and remedies otherwise available under Jaw, nor shall

01 78 36 – WARRANTIES

Herbert, Rowland & Grubic, Inc. 01 78 36 - 2 005153.0436 warranty periods be interpreted as limitations on time in which Owner can enforce such other duties, obligations, rights, or remedies.

B. Manufacturer's disclaimers and limitations on product warranties shall not relieve Contractor of warranty on Work that incorporates products, nor shall it relieve suppliers, manufacturers, and subcontractors required to countersign special warranties with Contractor.

C. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready for execution. Submit a draft for approval before final execution:

1. Manufacturer's Standard Form: Modified to include Project-specific information and properly executed.

2. Specified Form: When specified forms are included with the Specifications, prepare a written document using appropriate form properly executed.

3. Refer to Sections for specific content requirements and particular requirements for submitting special warranties.

D. Warranties shall become valid and operative upon issuance of Certificate of Substantial Completion.

E. For items of Work delayed beyond Date of Substantial Completion, provide an updated schedule within 10 days after acceptance, listing date of acceptance as start of warranty.

F. Related Damages and Losses: When correcting warranted Work that has failed, remove and replace other Work that has been damaged as a result of such failure or that needs to be removed and replaced to provide access for correction of warranted Work.

G. Reinstatement of Warranty: In event of Work covered by warranty has failed, correct by replacement or rebuilding. Reinstate warranty by written endorsement. Reinstated warranty shall be equal to original warranty with an equitable adjustment for depreciation.

H. Replacement Cost:

1. Upon determining that Work covered by a warranty has failed replace or rebuild

Work to an acceptable condition in compliance with requirements of Contract Documents.

2. Contractor shall be responsible for cost of replacing or rebuilding defective Work regardless of whether Owner has benefited from use of Work through a portion of its anticipated useful service life.

PART 2 - PRODUCTS - NOT USED.

PART 3 - EXECUTION - NOT USED.

END OF SECTION