This is a technical specification document for pressure and differential pressure gauges required for the Skytop Lodge Sewage Treatment Plant Improvements Project (Project Number 005153.0436) in Pennsylvania. The project encompasses sewage treatment plant upgrades including installation of an influent screening system, equalization tank, chemical feed system, two clarifier tanks, a post aeration tank, a UV disinfection system, and associated work. The specification establishes requirements for pressure gauges with 2.5-inch photo-luminescent dials, weatherproof liquid-filled cases constructed from phenolic or Pocan thermoplastic materials, and Bourdon tube measuring elements made of stainless steel. Approved manufacturers include Ametek US Gauge, Ashcroft Inc., and Omega Engineering, Inc., with substitutions permitted under Section 01 61 00. The pre-bid conference is scheduled for August 25, 2026 at 10:30 AM at Skytop Lodge STP in Canadensis, Pennsylvania, with bid opening on Friday, September 18, 2026 at 10:00 AM through PennBid. Bid security in the form of a certified check or bid bond is required in an amount not less than 10%, with all questions and notifications to be submitted via the PennBid platform.

The specification requires gauges to comply with ASME B40.100 standards and materials in contact with potable water must be certified to NSF 61 and NSF 372 standards. Measuring elements must achieve accuracy within plus or minus 0.5 percent of full-scale range. Connections shall be located at the bottom with 1/2-inch NPT male threads and brass forging sockets extending minimum 1.25 inches below the gauge cases. Gauges must include pressure snubbers constructed of Type 316 stainless steel with isolation valves, removable rear plates, and clear shatterproof glass windows with gaskets. Manufacturers must demonstrate minimum three years of documented experience in producing specified products. Shop inspection and testing of completed assemblies, along with demonstration of equipment startup, shutdown, routine maintenance, and emergency repair procedures to Owner's personnel, are required prior to project completion.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

40 73 13 - PRESSURE AND DIFFERENTIAL PRESSURE GAUGES

Herbert, Rowland & Grubic, Inc. 40 73 13 - 1 005153.0436

SECTION 40 73 13 - PRESSURE AND DIFFERENTIAL PRESSURE GAUGES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes: Pressure gages.

B. Related Requirements:

1. Section 43 05 20 - Common Work Results for Liquid Handling Equipment:

Pressure measurement and control requirements as specified in this Section.

1.2 REFERENCE STANDARDS

A. ASME International:

1. ASME B40.100 - Pressure Gauges and Gauge Attachments.

B. NSF International:

1. NSF 61 - Drinking Water System Components - Health Effects.

2. NSF 372 - Drinking Water System Components - Lead Content.

1.3 COORDINATION

A. Section 01 31 13 – Project Coordination: Requirements for coordination.

B. Coordinate Work of this Section with piping Work pump installation.

1.4 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer information for system materials and component equipment, including connection requirements.

C. Shop Drawings:

1. Indicate system materials and component equipment.

2. Submit installation requirements and other details.

D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

E. Source Quality-Control Submittals: Indicate results of factory tests and inspections.

F. Qualifications Statement:

1. Submit qualifications for manufacturer.

1.5 CLOSEOUT SUBMITTALS

A. Section 01 77 00 - Closeout Procedures: Requirements for submittals.

Herbert, Rowland & Grubic, Inc. 40 73 13 - 2 005153.0436

B. Project Record Documents: Record actual locations of equipment and accessories.

1.6 MAINTENANCE MATERIAL SUBMITTALS

A. Section 01 78 23 – Operations & Maintenance Data: Requirements for maintenance materials.

1.7 QUALITY ASSURANCE

A. Ensure that materials of construction of wetted parts are compatible with process liquid.

B. Materials in Contact with Potable Water: Certified to NSF 61 and NSF 372.

1.8 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

C. Store materials according to manufacturer instructions.

D. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

2. Provide additional protection according to manufacturer instructions.

PART 2 - PRODUCTS

2.1 PRESSURE GAGES

A. Manufacturers:

1. Ametek US Gauge

2. Ashcroft Inc.

3. Omega Engineering, Inc.

4. Or Equal.

5. Substitutions: As specified in Section 01 61 00 - Product Requirements.

B. Type: Pressure.

C. Dials:

1. Nominal Diameter: 2-1/2 inches.

2. Face: Photo-luminescent with black graduations.

3. Scale: Extend over arc not less than 270 degrees.

Herbert, Rowland & Grubic, Inc. 40 73 13 - 3 005153.0436

4. Ranges and Graduation Units: As required.

D. Cases:

1. Weatherproof, Liquid filled.

2. Material: Phenolic or Pocan Thermoplastic.

3. Type: Blowout protected.

4. Blowout Disc Encasement Material: Phenolic or Pocan Thermoplastic.

5. Provide removable rear plate.

6. Windows:

a. Material: Clear, shatterproof glass.

b. Thickness: 1/8 inch.

c. Provide gasket.

E. Connection:

1. Location: Bottom.

2. Socket:

a. 1/2-inch NPT male thread.

b. Material: Brass forging.

c. Extend minimum 1-1/4 inches below gage cases.

d. Provide wrench flats.

3. Mounting: As indicated on Drawings.

F. Measuring Element:

1. Bourdon Tubes:

a. Material: Stainless steel.

b. Provide welded, stress-relieved joints.

2. Accuracy:

a. Comply with ASME B40.100.

b. Plus and minus 0.5 percent of full-scale range.

G. Adjustment:

1. Provide for zero-reading adjustment.

2. Adjusting Screws: Accessible from rear of case without need for disassembly.

H. Accessories:

1. Pressure Snubber:

a. Material: Type 316 stainless steel.

b. Provide isolation valve.

2. Shutoff Cocks: Furnished by gage manufacturer.

2.2 SOURCE QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for testing, inspection, and analysis.

B. Provide shop inspection and testing of completed assembly.

Herbert, Rowland & Grubic, Inc. 40 73 13 - 4 005153.0436

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.

B. Verify that items provided by other Sections of Work are ready to receive Work of this Section.

3.2 INSTALLATION

A. According to manufacturer instructions.

B. Coordinate location and orientation of gages and seal assemblies with final piping and equipment installations.

C. Ensure that gages are located to be easily read during operation and easily accessible for maintenance.

3.3 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.

B. Equipment Acceptance:

1. Adjust, repair, modify, or replace components failing to perform as specified and rerun tests.

2. Make final adjustments to equipment under direction of manufacturer's representative.

3.4 DEMONSTRATION

A. Section 01 73 00 - Execution Requirements: Requirements for demonstration and training.

B. Demonstrate equipment startup, shutdown, routine maintenance, and emergency repair procedures to Owner's personnel.

END OF SECTION