4. AF Form66_Install TW Lights.docx
DOCX document 26 KB Posted
- Attached to
- Install Troopwalk Lighting Federal contract opportunity
- Solicitation number
- FA303023Q0032
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA303023Q00320004 SF 30.pdf | ||
| Install Troopwalk Lights Answers .pdf | ||
| Solicitation Amendment - FA303023Q00320004.pdf | ||
| Solicitation Amendment FA303023Q00320003 SF 30.pdf | ||
| Solicitation Amendment - FA303023Q00320003.pdf | ||
| Solicitation Amendment - FA303023Q00320001.pdf | ||
| 6. Davis-Bacon Act WagesDetermination - Building.pdf | ||
| 5. BAL Template 21 SEP 2022.docx | DOCX document | |
| 3b. TE-2 Existing Utilities Map.pdf | ||
| 1. Abbreviated SOW_Install Troopwalk Lights.pdf | ||
| 2. Environmental Req_ Division 1.docx | DOCX document | |
| 3a. TE-1 Site Map.pdf | ||
| Solicitation - FA303023Q0032.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
1130564
PROJECT TITLE
Install Troopwalk Lights
SOLICITATION/CONTRACT NO.
| TO BE COMPLETED BY THE PROJECT ENGINEER |
| TO BE COMPLETED BY CONTRACT ADMINISTRATOR |
NO. OF COPIES REQUIRED
DATE RECEIVED IN CONTRACTING
DATE TO CIVIL ENGINEERING
RETURN SUSPENSE DATE
FOLLOW UP
DATE CONTRACTOR NOTIFIED
CONTRACTOR RE-SUBMITTAL
| FINAL APPROVAL |
| REMARKS |
| LINE NUMBER |
| ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para) |
| CERTIFICATE OF COMPLIANCE |
| SHOP DRAWINGS |
| SAMPLES |
| COLOR SELECTION |
| MANUFACTURER'S RECCOMENDATIONS |
| MANUFACTURER'S WARRANTY |
| OPERATING INSTRUCTIONS |
| SEE PARA |
| OTHERS AS SPECIFIED |
| REQUIRED SUBMISSION DATE |
| APPROVED |
| DIS-APPROVED |
| 1 |
| Part 1, 1.11d, As-Built Drawings |
x
(b)
GA
| 2 |
| Part 1,1.10, DD 1354 Transfer of Real Property |
(b)
GA
| 3 |
| Part 1, 1.16, AF Form 592 Welding, Cutting, Brazing Permit |
(c)
GA
| 4 |
| Part 1,1.19, AF 3064 Progress Schedule |
(a)
GA
| 5 |
| Part 2, 2.2, Concrete Mix Design |
(c)
GA
| 6 |
| Part 2, 2.4, PVC Conduit and Fittings |
(c)
GA
| 7 |
| Part 2, 2.6, Electrical Wiring and Connectors |
(c)
GA
| 8 |
| Part 2, 2.7, Electrical Handhole |
(c)
GA
| 9 |
| Part 2, 2.8, L.E.D. Troopwalk Lights and Mounting Hardware |
x x
(c)
GA
| 10 |
| Part 2, 2.9, Light Poles, Anchor Bolts, Mounting Hardware |
| x |
| x |
| x |
| x |
(c)
GA
| 11 |
| Part 2, 2.10, Light Pole Pedestal Detail |
x x
(c)
GA
| 12 |
| Part 4, 4.1, AF Form 103 Work Clearance Request |
(a)
GA
| 13 |
| Part 1, 1.14.2, Utility Outages |
14 Days Prior (c)
GA
| 14 |
| Part 1, 1.11 Manufacturer Catalogue Data |
(c)
GA
| 15 |
| Part 1, 1.11b, Manufacturer’s Warranty |
(b)
GA
| 17 |
| Section 01400, 4.2, Hazardous Materials |
(c)
GA
| 18 |
| Section 01400, 14.1, Air Emission Source Report |
(b)
GA
| 19 |
| Section 01400, 15.1, Construction and Debris Report |
(b)
GA
(a) Prior to Start of Work but no more than 14 calendar days after NTP. AF Form 66, SEP 86 Page 2 of 2
(b) Prior to Final Inspection.
(c) Prior to Use
(d) As Required.
(a) Prior to Start of Work but no later than 14 calendar days after NTP. AF Form 66, SEP 86 Page 2 of 3
(b) Prior to Final Inspection.
(c) Prior to Use
(d) As Required.