4. AF Form66_Install TW Lights.docx

DOCX document 26 KB Posted

Attached to
Install Troopwalk Lighting Federal contract opportunity
Solicitation number
FA303023Q0032
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

1130564

PROJECT TITLE

Install Troopwalk Lights

SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY THE PROJECT ENGINEER
TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE RECEIVED IN CONTRACTING

DATE TO CIVIL ENGINEERING

RETURN SUSPENSE DATE

FOLLOW UP

DATE CONTRACTOR NOTIFIED

CONTRACTOR RE-SUBMITTAL

FINAL APPROVAL
REMARKS
LINE NUMBER
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para)
CERTIFICATE OF COMPLIANCE
SHOP DRAWINGS
SAMPLES
COLOR SELECTION
MANUFACTURER'S RECCOMENDATIONS
MANUFACTURER'S WARRANTY
OPERATING INSTRUCTIONS
SEE PARA
OTHERS AS SPECIFIED
REQUIRED SUBMISSION DATE
APPROVED
DIS-APPROVED
1
Part 1, 1.11d, As-Built Drawings

x

(b)

GA

2
Part 1,1.10, DD 1354 Transfer of Real Property

(b)

GA

3
Part 1, 1.16, AF Form 592 Welding, Cutting, Brazing Permit

(c)

GA

4
Part 1,1.19, AF 3064 Progress Schedule

(a)

GA

5
Part 2, 2.2, Concrete Mix Design

(c)

GA

6
Part 2, 2.4, PVC Conduit and Fittings

(c)

GA

7
Part 2, 2.6, Electrical Wiring and Connectors

(c)

GA

8
Part 2, 2.7, Electrical Handhole

(c)

GA

9
Part 2, 2.8, L.E.D. Troopwalk Lights and Mounting Hardware

x x

(c)

GA

10
Part 2, 2.9, Light Poles, Anchor Bolts, Mounting Hardware
x
x
x
x

(c)

GA

11
Part 2, 2.10, Light Pole Pedestal Detail

x x

(c)

GA

12
Part 4, 4.1, AF Form 103 Work Clearance Request

(a)

GA

13
Part 1, 1.14.2, Utility Outages

14 Days Prior (c)

GA

14
Part 1, 1.11 Manufacturer Catalogue Data

(c)

GA

15
Part 1, 1.11b, Manufacturer’s Warranty

(b)

GA

17
Section 01400, 4.2, Hazardous Materials

(c)

GA

18
Section 01400, 14.1, Air Emission Source Report

(b)

GA

19
Section 01400, 15.1, Construction and Debris Report

(b)

GA

(a) Prior to Start of Work but no more than 14 calendar days after NTP. AF Form 66, SEP 86 Page 2 of 2

(b) Prior to Final Inspection.

(c) Prior to Use

(d) As Required.

(a) Prior to Start of Work but no later than 14 calendar days after NTP. AF Form 66, SEP 86 Page 2 of 3

(b) Prior to Final Inspection.

(c) Prior to Use

(d) As Required.

File details come from the government source that posted it. Updated .