Summary

This is a technical specification document for thrust restraint systems for utility piping, prepared by Herbert, Rowland & Grubic, Inc., for the Skytop Lodge Sewage Treatment Plant Improvements Project in Pennsylvania (Project Number 005153.0436). The specification outlines requirements for tied joint restraint systems to be installed at bends, tees, and directional changes in pressure pipelines as part of a sewage treatment plant upgrade. The project encompasses installation of multiple treatment systems including an influent screening system, equalization tank, chemical feed system, two clarifier tanks, a post-aeration tank, and UV disinfection system. Bids for Contract 2026-01 are due September 18, 2026, at 10:00 AM through PennBid, with a pre-bid conference scheduled for August 25, 2026, at 10:30 AM at the Skytop Lodge STP facility in Canadensis, Pennsylvania. Bid security of not less than 10% in the form of a certified check or bid bond is required.

The specification requires mechanical restrained joints, push-on restrained joints, and restraint harnesses manufactured by approved vendors including US Pipe, American Cast Iron Pipe Co., Griffin Pipe Products, and EBAA Iron, Inc., or approved equals. All restraint devices must meet minimum working pressure requirements with a 2:1 safety factor and comply with AWWA, ASME, and ASTM standards. Installation must follow AWWA C600 standards and manufacturer instructions, with shop drawings, design calculations, and certifications required for submission. The manufacturer and fabricator must have a minimum of three years' documented experience, and design work must be performed by a professional engineer licensed in Pennsylvania. Field measurements must be verified prior to fabrication, and all materials must be inspected upon delivery and stored according to manufacturer requirements.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

33 05 09.33 - THRUST RESTRAINT FOR UTILITY PIPING

Herbert, Rowland & Grubic, Inc. 33 05 09.33 - 1 005153.0436

SECTION 33 05 09.33 - THRUST RESTRAINT FOR UTILITY PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Tied joint restraint system.

B. Related Requirements:

1. Section 31 23 16.13 - Trenching: Trenching and backfilling requirements for Site utilities.

2. Section 33 14 16 - Site Water Utility Distribution Piping: Requirements for piping Work as required by this Section.

3. Section 33 31 11 - Sanitary Sewerage Gravity Piping: Requirements for piping Work as required by this Section.

1.2 REFERENCE STANDARDS

A. American Water Works Association:

1. AWWA C600 - Installation of Ductile-Iron Water Mains and Their Appurtenances.

B. ASME International:

1. ASME B1.1 - Unified Inch Screw Threads, UN and UNR Thread Form.

C. ASTM International:

1. ASTM A36/A36M - Standard Specification for Carbon Structural Steel.

2. ASTM A123/A123M - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products.

3. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware.

4. ASTM A307 - Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength.

5. ASTM A325 - Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength.

6. ASTM A563 - Standard Specification for Carbon and Alloy Steel Nuts.

7. ASTM A588/A588M - Standard Specification for High-Strength Low-Alloy Structural Steel, up to 50 ksi Minimum Yield Point, with Atmospheric Corrosion Resistance.

8. ASTM B633 - Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel.

9. ASTM F436 - Standard Specification for Hardened Steel Washers.

1.3 COORDINATION

A. Section 01 31 13 – Project Coordination: Requirements for coordination.

Herbert, Rowland & Grubic, Inc. 33 05 09.33 - 2 005153.0436

B. Coordinate Work of this Section with installation of fittings and joints that require restraint.

1.4 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer catalog information for restrained joint details and installation instructions.

C. Shop Drawings:

1. Indicate restrained joint details and materials being used.

2. Submit layout drawings showing piece numbers and locations.

3. Indicate restrained joint locations.

D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

E. Delegated Design Submittals:

1. Submit signed and sealed Shop Drawings with design calculations and assumptions for restrained lengths.

2. Submit joint restraint details.

3. Use joint restraint devices specifically designed for applications described in manufacturer information.

F. Manufacturer Instructions: Submit detailed instructions on installation requirements, including storage and handling procedures.

G. Qualifications Statement:

1. Submit qualifications for manufacturer, fabricator, and licensed professional.

1.5 CLOSEOUT SUBMITTALS

A. Section 01 73 00 - Execution Requirements: Requirements for submittals.

B. Project Record Documents: Record actual locations of joint restraints.

1.6 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.

B. Fabricator: Company specializing in fabricating products specified in this Section with minimum three years' documented experience.

C. Licensed Professional: Professional engineer experienced in design of specified Work and licensed in State of Pennsylvania.

Herbert, Rowland & Grubic, Inc. 33 05 09.33 - 3 005153.0436

1.7 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 - Product Requirements: Requirements for transporting, handling, storing, and protecting products.

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

C. Store materials according to manufacturer instructions.

D. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

2. Provide additional protection according to manufacturer instructions.

1.8 EXISTING CONDITIONS

A. Field Measurements:

1. Verify field measurements prior to fabrication.

2. Indicate field measurements on Shop Drawings.

PART 2 - PRODUCTS

2.1 PERFORMANCE AND DESIGN CRITERIA

A. Provide pressure pipeline with restrained joints at each bend, tee, and change in direction.

2.2 RESTRAINED JOINTS

A. Mechanical Restrained Joints: Mechanical joint restraint consisting of follower gland which when actuated imparts multiple wedging action against the pipe, increasing its resistance as the pressure increases. ASTM A 536-80 ductile iron follower gland of dimensions such that it can be used with AWWA C153 mechanical joints. Restraining devices shall be made of ductile iron, heat treated to a minimum hardness of 370 BHN.

Twist-off nuts shall be used to insure proper actuating of the restraint device. Restraint device shall have a 250 psi minimum working pressure with 2:1 minimum safety factor.

Coating for restraint devices shall consist of the following:

1. All wedge assemblies and related parts shall be processed through a phosphate wash, rinse, and drying operation prior to coating application. The coating shall consist of a minimum of two coats of liquid fluoropolymer coating with heat cure to follow each coat.

2. All casting bodies shall be surface pretreated with a phosphate wash, rinse, and sealer before drying. The coating shall be electrostatically applied and heat cured.

The coating shall be a polyester based powder to provide corrosion, impact, and UV resistance.

B. Push-on Restrained Joints: Restrained joint bell joints and/or fittings shall consist of one

Herbert, Rowland & Grubic, Inc. 33 05 09.33 - 4 005153.0436 of the following restraint systems:

1. Bolted retainer rings and welded retainer bars or boltless, push-on type which include ductile iron locking segments and rubber retainers. Bolts for restrained joints (if applicable) shall conform to ANSI B18.2. Restrained pipe and fittings shall be TR Flex as manufactured by US Pipe, Flex-Ring type joints as manufactured by American Cast Iron Pipe Co., Snap-Lok as manufactured by Griffin Pipe Products, Field Lok 350, as manufactured by US Pipe, or equal. For thrust restraint of field cut piping, the manufacturer’s standard assembly shall be used (if applicable).

Assemblies shall be TR Flex Gripper as manufactured by U.S. Pipe, Snap-Lok FC as manufactured by Griffin Pipe Products, Field Flex-Ring as manufactured by American Cast Iron Pipe Co., or equal.

2. Field-Lok Restrained Joint Gaskets as manufactured by US Pipe or equal, conforming to the requirements of ANSI A21.11 (AWWA C111).

C. Restraint Harness (PVC):

1. Restraint for PVC pipe bell (AWWA C900) shall consist of the following: The restraint shall be manufactured of ductile iron conforming to ASTM A536. The restraint devices shall be coated with a thermoset epoxy coating. A split serrated ring shall be used behind the pipe bell. A split serrated ring shall also be used to grip the pipe, and a sufficient number of bolts shall be used to connect the bell ring and the gripping ring. The combination shall have a minimum working pressure rated to the full pressure of the pipe. The restraint shall be manufactured by EBAA Iron, Inc., or approved equal.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.

B. Verify that pipe and fittings are ready to receive Work.

C. Field measure and verify conditions for installation of Work.

3.2 PREPARATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation.

B. Clean surfaces of pipe and fittings that are to receive tied joint restraint systems.

3.3 INSTALLATION

A. According to AWWA C600.

B. Install joint restraint system per manufacturer installation requirements, such that joints are mechanically locked together to prevent joint separation.

END OF SECTION