32 91 13 Soil Preparation.pdf

PDF 218 KB Posted

Attached to
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153. 0436
Solicitation number
Not on record
Issued by
Monroe County, Pennsylvania

About this file

This is a Scope of Work specification document for soil preparation work under the Skytop Lodge Sewage Treatment Plant Improvements Project (Contract 2026-01, Project Number 005153.0436) in Canadensis, Pennsylvania. The work includes preparation of subsoil, soil testing, and placement of topsoil. Key requirements specify that contractors must prepare subsoil by eliminating uneven areas, removing foreign materials and contaminated soil, and scarifying surfaces to depths of 3-5 inches (6-12 inches on compacted soils). Topsoil must be spread to a minimum depth of 6 inches over seeded areas, graded to eliminate rough or low spots, and installed with edging at peripheries. Prior to commencing work, contractors must submit certified soil sample analyses from a qualified soil-testing laboratory at least 10 days before work begins, including laboratory recommendations for soil supplement formulations. A pre-bid conference is scheduled for August 25, 2026 at 10:30 AM at Skytop Lodge STP in Canadensis, Pennsylvania. Bids are due by Friday, September 18, 2026 at 10:00 AM and will be publicly opened through PennBid.

The specification requires that soil testing be performed by an independent laboratory recognized by the State Department of Agriculture and approved by the Engineer. All topsoil, both on-site and newly imported, must receive proper amendments based on soil analysis results indicating percentages of organic matter, sand/silt/clay content, cation exchange capacity, pH, and mineral and plant-nutrient content. The contractor has the option to use soil testing results to justify decreasing lime and fertilizer rates. All work must maintain lines, levels, profiles, and contours during preparation, with topsoil placement limited to areas scheduled for immediate planting. Topsoil placement must occur during dry weather on dry, unfrozen subgrade, with removal of vegetable matter and foreign non-organic materials during spreading operations.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

32 91 13 – SOIL PREPARATION

Herbert, Rowland & Grubic, Inc. 32 91 13 - 1 005153.0436

SECTION 32 91 13 – SOIL PREPARATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Preparation of subsoil.

2. Soil testing.

3. Placing topsoil.

1.2 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Certificates:

1. Prior to use or placement of material, submit certifications of material composition of the following for approval:

a. Fertilizer.

b. Lime.

2. Submit certified soil sample analyses, including laboratory's recommended soil supplement formulation.

C. Topsoil Analysis Report: Contractor is responsible to have on-site topsoil and imported topsoil tested by qualified agronomist. Furnish soil analysis by a qualified soil-testing laboratory stating percentages of organic matter; gradation of sand, silt, and clay content;

cation exchange capacity; deleterious material; pH; and mineral and plant-nutrient content of topsoil:

1. Report suitability of topsoil for lawn growth. State recommended quantities of nitrogen, phosphorus, and potash nutrients and soil amendments to be added to produce satisfactory topsoil.

2. Copies of test results and recommended soil amendments are to be submitted to the Engineer for review and written response a minimum of 10 days prior to commencing work.

3. Ideal Topsoil Nutrients: All topsoil for lawns (both on-site and new) to receive proper amendments.

1.3 QUALITY ASSURANCE

A. Testing Agency:

1. An independent laboratory, recognized by the State Department of Agriculture, with the experience and capability to conduct the testing indicated and that specializes in types of tests to be performed.

2. The Contractor has the option to use soil testing to justify decreasing lime and fertilizer rates. When soil testing is selected by the Contractor, the soil and soil supplement testing shall be performed by a Soils Testing Laboratory engaged and paid for by the Contractor and approved by the Engineer. Collect soil samples under the direction of the Engineer.

32 91 13 – SOIL PREPARATION

Herbert, Rowland & Grubic, Inc. 32 91 13 - 2 005153.0436

B. Analysis and Standards: Package standard products with manufacturer have certified analysis. For other materials, provide analysis by recognized laboratory made in accordance with methods established by the Association of Official Agriculture Chemists, wherever applicable.

1.4 PROJECT CONDITIONS

A. Restore unpaved surfaces to a condition similar to that prior to excavation.

B. Refer to Drawings and Special Conditions for sodding or seeding requirements at each specific location of Work.

PART 2 – PRODUCTS – NOT USED.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify prepared soil base is ready to receive the Work of this section.

3.2 PREPARATION OF SUBSOIL

A. Prepare sub-soil to eliminate uneven areas and low spots. Maintain lines, levels, profiles and contours. Make changes in grade gradual. Blend slopes into level areas.

B. Remove foreign materials, weeds and undesirable plants and their roots. Remove contaminated sub-soil.

C. Scarify surface to depth of 3-5 inches (6 to 12 inches on compacted soils) where topsoil is scheduled. Repeat scarify in areas where equipment used for hauling and spreading topsoil has compacted subsoil.

3.3 PLACING TOPSOIL

A. Limit preparation to areas that will be planted in immediate future. Any prepared areas not immediately planted must be re-prepared.

B. Spread topsoil to minimum depth of 6 inches over area to be seeded. Rake until smooth.

C. Place topsoil during dry weather and on dry unfrozen subgrade.

D. Remove vegetable matter and foreign non-organic material from topsoil while spreading.

E. Grade topsoil to eliminate rough, low or soft areas, and to ensure positive drainage.

Install edging at periphery of seeded areas in straight lines to consistent depth.

END OF SECTION