This is a technical specification document for aggregate base courses prepared by Herbert, Rowland & Grubic, Inc., for the Skytop Lodge Sewage Treatment Plant Improvements Project (005153.0436) in Pennsylvania. The specification details the installation of aggregate subbase and aggregate base course materials as part of the sewage treatment plant upgrades project. The work includes placement of PennDOT No. 2A Type C and AASHTO No. 57 aggregate materials in compacted layers with a maximum thickness of 6 inches and minimum of 3 inches per layer, along with geotextile fabric installation where required. Field quality control testing is specified at a frequency of one test per 1,000 square yards of each layer, with compaction requirements set at 100 percent maximum density according to ASTM D6938. The pre-bid conference is scheduled for August 25, 2026, at 10:30 AM at the Skytop Lodge STP location in Canadensis, Pennsylvania, with bids due and publicly opened on Friday, September 18, 2026, at 10:00 AM through PennBid.

Bid security in the form of a certified check or bid bond is required at a minimum of 10 percent of the bid amount. All aggregate materials must originate from PennDOT-approved sources, with materials sourced from a single supplier throughout the work. Submittals required include product data for geotextile fabric and herbicide, materials source documentation, manufacturer's certificates, and material slips certifying the amount of materials utilized from the producer in accordance with PennDOT specifications. Laboratory compaction testing will be performed according to ASTM D1557, with field compaction testing conducted per ASTM D2922 and ASTM D3017. Surface tolerances are specified at 1/4 inch variation from flatness measured with a 10-foot straightedge, 1/4 inch variation from thickness, and 1/2 inch variation from elevation. The specification references PennDOT Publications 19 and 408, Pennsylvania Code Chapter 213 for work zone traffic control, and various ASTM and AASHTO standards for materials and testing procedures.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

32 11 23 – AGGREGATE BASE COURSES

Herbert, Rowland & Grubic, Inc. 32 11 23 - 1 005153.0436

SECTION 32 11 23 - AGGREGATE BASE COURSES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Aggregate subbase.

2. Aggregate base course.

B. Related Sections:

1. Section 31 05 16 - Aggregates for Earthwork.

2. Section 31 22 13 - Rough Grading.

3. Section 31 23 16 – Excavation.

4. Section 32 91 13 – Soil Preparations.

1.2 REFERENCES

A. Pennsylvania Department of Transportation (PennDOT):

1. Publication 19 - Field and Laboratory Test Methods, latest edition.

2. Publication 408 - Specifications, latest edition, as amended.

B. Commonwealth of Pennsylvania, Pennsylvania Code, Title 67, Transportation, Department of Transportation:

1. Chapter 459, Occupancy of Highways by Utilities, as supplemented or revised.

2. Chapter 213, Work Zone Traffic Control (PennDOT Chapter 213).

C. American Association of State Highway and Transportation Officials:

1. AASHTO M288 - Standard Specification for Geotextile Specification for Highway

Applications.

D. ASTM International:

1. ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in

Place by Nuclear Methods (Shallow Depth).

2. ASTM D2940 - Standard Specification for Graded Aggregate Material For Bases or

Subbases for Highways or Airports.

3. ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth).

4. ASTM D6938 – Density and Moisture Content of In-Place Soil and Soil Aggregates

Using Nuclear Density Methods (Shallow Depth)

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data:

1. Submit data for geotextile fabric and herbicide.

Herbert, Rowland & Grubic, Inc. 32 11 23 - 2 005153.0436

C. Materials Source: Submit name of aggregate materials suppliers.

D. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.

E. Material Slips: Furnish certification of the amount of materials utilized from the producer in accordance with PennDOT specifications.

1.4 QUALITY ASSURANCE

A. Furnish each aggregate material from single source throughout the Work.

B. All aggregate must originate from a source approved by PennDOT meeting according to PennDOT standards.

PART 2 - PRODUCTS

2.1 AGGREGATE MATERIALS

A. Base and Subbase Aggregate:

1. PennDOT No. 2A, type C per Section 31 05 16.

2. AASHTO No. 57 per Section 31 05 16.

2.2 ACCESSORIES

A. Geotextile Fabric: AASHTO M288; non-woven, polypropylene.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Verification of existing conditions before starting work.

B. Verify compacted substrate is dry and ready to support paving and imposed loads:

1. Proof roll substrate with loaded triaxle (GVW 75,000 pounds) in minimum two perpendicular passes to identify soft spots.

2. Remove soft substrate and replace with compacted fill as specified in Section

31 23 23.33.

C. Verify substrate has been inspected, gradients and elevations are correct.

3.2 PREPARATION

A. Correct irregularities in substrate gradient and elevation by scarifying, reshaping, and re-compacting.

B. Do not place fill on soft, muddy, or frozen surfaces.

Herbert, Rowland & Grubic, Inc. 32 11 23 - 3 005153.0436

3.3 AGGREGATE PLACEMENT

A. Where shown on Drawings, install geotextile fabric over subgrade according to manufacturer's instructions:

1. Lap ends and edges minimum 6 inches.

2. Anchor fabric to subgrade when required to prevent displacement until aggregate is installed.

B. Place aggregate equal thickness layers to total compacted thickness indicated on Drawings:

1. Maximum Layer Compacted Thickness: 6 inches.

2. Minimum Layer Compacted Thickness: 3 inches.

C. Roller compact aggregate to 100 percent maximum density.

D. Level and contour surfaces to elevations, profiles, and gradients indicated.

E. Maintain optimum moisture content of fill materials to attain specified compaction density.

F. Use mechanical tamping equipment in areas inaccessible to compaction equipment.

3.4 TOLERANCES

A. Section 01 40 00 - Quality Requirements: Tolerances.

B. Maximum Variation From Flat Surface: 1/4 inch measured with 10-foot straight edge.

C. Maximum Variation From Thickness: 1/4 inch.

D. Maximum Variation From Elevation: 1/2 inch.

3.5 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Field inspecting, testing, adjusting, and balancing.

B. Laboratory compaction testing will be performed according to ASTM D1557.

C. Field compaction testing will be performed according to ASTM D2922 and ASTM D3017.

D. When tests indicate Work does not meet specified requirements, remove Work, replace and retest.

E. Frequency of Tests: One test for every 1000 square yards of each layer compacted aggregate.

Herbert, Rowland & Grubic, Inc. 32 11 23 - 4 005153.0436

3.6 COMPACTION

A. Compact materials to 100 percent of maximum density as determined from test strip, according to ASTM D6938.

END OF SECTION