31 10 00 - Site Clearing.pdf

PDF 208 KB Posted

Attached to
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153.0436
Solicitation number
US.247986
Issued by
Monroe County, Pennsylvania

About this file

This is a Scope of Work document prepared by Herbert, Rowland & Grubic, Inc. for the Skytop Lodge Sewage Treatment Plant Improvements Project (Contract 2026-01, Project Number 005153.0436) in Canadensis, Pennsylvania. The document details site clearing requirements as the initial phase of construction. Work includes removal of surface debris, designated paving and curbs, trees, shrubs, and plant life, abandoned utilities, and topsoil excavation. The scope specifies clearing and grubbing to a minimum depth of 12 inches for site access, application of herbicide to remaining stumps, removal of all debris from the site with continuous cleanup, and stockpiling of excavated topsoil to a maximum depth of 35 feet in a designated area. A pre-bid conference is scheduled for August 25, 2026 at 10:30 AM at the Skytop Lodge STP facility located at Falls Road, Canadensis, PA 18325. Bids are due by September 18, 2026 at 10:00 AM and will be publicly opened on that date through PennBid.

The document requires contractors to comply with Pennsylvania Department of Environmental Protection Regulations and mandates that all debris be disposed of at locations outside the Owner's property, permanent easement, or right of way in accordance with applicable laws. Contractors must contact the Local Utility Line Information service at least three working days before performing work to locate and mark underground utilities. All submittals, including herbicide product data and disposal agreements with property owners releasing the Owner from liability, must be provided per submittal procedures. Bid security in the form of a Certified Check or Bid Bond is required in an amount not less than 10 percent. Topsoil excavation is restricted to dry conditions and must be kept separate from foreign materials for use in finish grading.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 10 00 - SITE CLEARING

Herbert, Rowland & Grubic, Inc. 31 10 00 - 1 005153.0436

SECTION 31 10 00 - SITE CLEARING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Removing surface debris.

2. Removing designated paving and curbs.

3. Removing designated trees, shrubs, and other plant life.

4. Removing abandoned utilities.

5. Excavating topsoil.

B. Related Sections:

1. Section 31 22 13 - Rough Grading.

2. Section 31 23 16.26 – Rock Removal.

1.2 DEFINITIONS

A. Clearing is defined as the removal of trees, brush, down timber, rotten wood, rubbish, any other vegetation, and other material at or above original ground elevation not designated to be saved. Clearing also includes removal and replacement of fences, walls, guideposts, guide rail, signs, and other obstructions interfering with the proposed work.

B Grubbing is defined as the removal from below the surface of the natural ground of stumps, roots and stubs, brush, topsoil, organic materials and debris.

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit data for herbicide. Indicate compliance with applicable codes for environmental protection.

C. Permits for Disposal of Debris:

1. Arrange for disposal of debris to locations outside the Owner's property, permanent easement, or right of way. Comply with all applicable laws.

2. Submit two copies of any agreement with each property owner releasing the

Owner from responsibility in connection with the disposal of the debris.

1.4 QUALITY ASSURANCE

A. Conform to applicable Pennsylvania Department of Environmental Protection Regulations.

Herbert, Rowland & Grubic, Inc. 31 10 00 - 2 005153.0436

PART 2 - PRODUCTS - NOT USED.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Verification of existing conditions before starting work.

B. Verify existing plant life designated to remain is tagged or identified.

3.2 PREPARATION

A. Call Local Utility Line Information service not less than three (3) working days before performing Work:

1. Request underground utilities to be located and marked within and surrounding construction areas.

3.3 PROTECTION

A. Locate, identify, and protect utilities indicated to remain, from damage.

B. Protect bench marks, survey control points, and existing structures from damage or displacement.

3.4 CLEARING

A. Clear and grub areas required for access to site and execution of Work to minimum depth of 12 inches.

B. Remove trees and shrubs.

C. Clear undergrowth and deadwood, without disturbing subsoil.

D. Apply herbicide to remaining stumps to inhibit growth.

3.5 REMOVAL

A. Remove debris, rock, and extracted plant life from site.

B. Remove paving and curbs.

C. Continuously clean-up and remove waste materials from site. Do not allow materials to accumulate on site.

E. Do not burn or bury materials on site. Leave site in clean condition.

3.6 TOPSOIL EXCAVATION

A. Excavate topsoil from areas to be further excavated, relandscaped, or regraded without

Herbert, Rowland & Grubic, Inc. 31 10 00 - 3 005153.0436 mixing with foreign materials for use in finish grading.

B. Do not excavate wet topsoil.

C. Stockpile in area designated on site to depth not exceeding 35 feet and protect from erosion.

END OF SECTION