26 05 13 - Medium Voltage Cable.pdf
PDF 266 KB Posted
- Attached to
- Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153.0436
- Solicitation number
- US.247986
- Issued by
- Monroe County, Pennsylvania
About this file
This is a Technical Specification document for Section 26 05 13 – Medium Voltage Cable, prepared by Herbert, Rowland & Grubic, Inc. for the Skytop Lodge Sewage Treatment Plant Improvements Project (Project Number 005153.0436) in Pennsylvania. The specification establishes comprehensive requirements for the procurement and installation of medium voltage cables rated 601 volts and above, including cable terminations and splices. The project scope requires three-conductor triplex medium voltage cables with integral grounding conductors, meeting specified voltage class ratings per project drawings. Cables must comply with standards established by AEIC, IEEE, NEMA/ICEA, NETA, NFPA, OSHA, and UL. Acceptable manufacturers include The Okonite Company and Southwire Company for wire and cable, with Raychem, Elastimold, and Joslyn approved for lugs, connectors, and terminations. Cable technicians must have a minimum of three years' experience in handling, terminating, and splicing medium voltage cables and must be factory-trained on the specific products used. Independent testing organizations must maintain NIST-traceable calibration programs and employ certified engineering technicians with minimum five-year experience. The pre-bid conference is scheduled for August 25, 2026 at 10:30 AM at Skytop Lodge STP in Canadensis, Pennsylvania, with bid submissions due September 18, 2026 at 10:00 AM via PennBid.
The specification requires cables to feature cross-linked thermosetting polyethylene (XLP) insulation rated at 100 percent insulation level with Type MV-105 temperature rating per NFPA 70, shielding consisting of semiconductor conductor and insulation screens with copper tape, and PVC jackets suitable for direct burial applications. All cable accessories, including compression-type lugs, molded rubber termination kits, and splice connectors, must meet specified voltage and current ratings with continuous operation capability matching cable ratings up to 35 kilovolts. Installation requirements prohibit cable installation during wet conditions, mandate immediate end cap installation on cut cable ends, and require arc-proofing of all cables in manholes. Splices must be avoided whenever possible, with a maximum of one splice permitted between termination points and no splices allowed in runs shorter than 100 feet. Field quality control requires shield continuity testing and DC high-potential testing on all terminations and splices prior to equipment connections, with acceptance testing performed per NETA's Acceptance Testing Specifications for Electrical Power Distribution Equipment and Systems. Bid security of not less than 10 percent in the form of a Certified Check or Bid Bond is required, with all bidder questions submitted through PennBid in accordance with the Instructions to Bidders.
View the file
Other files
Show 40 more
Latest 50 of 157 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
26 05 13 - MEDIUM VOLTAGE CABLE
Herbert, Rowland & Grubic, Inc. 26 05 13-1 005153.0436
SECTION 26 05 13 - MEDIUM VOLTAGE CABLE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Material and installation requirements for:
a. Medium voltage cable (601 V and above).
b. Cable terminations and splices.
B. Related Sections include but are not necessarily limited to:
1. Division 00 - Bidding Requirements, Contract Forms, and Conditions of the Contract.
2. Division 01 - General Requirements.
3. Section 26 05 00 – Electrical - General: Basic Requirements.
1.2 QUALITY ASSURANCE
A. Referenced Standards:
1. Association of Edison Illuminating Companies (AEIC).
a. CS8, Extruded Dielectric, Shielded Power Cables Rated 5 Through 46kV.
2. Institute of Electrical and Electronics Engineers, Inc. (IEEE):
a. 48, Alternating-Current Cable Terminations 2.5kV Through
756kV.
b. 386, Separable Insulated Connector Systems for Power
Distribution Systems Above 600V.
c. 404, Cable Joints for use with Extruded Dielectric Cable Rated
5000 - 138,000V and Cable Joints for use with Laminated Dielectric Cable Rated 2500 - 500,000V.
d. 510, High-Voltage and High-Power Testing.
3. National Electrical Manufacturers Association/Insulated Cable Engineers
Association (NEMA/ICEA):
a. WC 74/S-93-639, Shielded Power Cable 5-46kV.
4. National Electrical Testing Association (NETA):
a. Acceptance Testing Specifications For Electrical Power
Distribution Equipment and Systems.
5. National Fire Protection Association (NFPA):
a. 70, National Electrical Code (NEC).
b. 70E, Electrical Safety Requirements for Employee Workplaces.
6. Occupational Safety and Health Standards (U.S. Department of Labor)
(OSHA).
7. Underwriters Laboratories, Inc. (UL):
a. 486B, Wire Connectors for use with Aluminum Conductors.
b. 1072, Medium Voltage Power Cables.
Herbert, Rowland & Grubic, Inc. 26 05 13-2 005153.0436
B. Qualifications:
1. Cable technician:
a. Three years’ experience in handling, terminating and splicing medium voltage cables.
b. Specifically trained by a factory representative on the terminations and splices to be used on the project. If not trained on the products to be used, on-site training by the factory representative shall be performed before any terminations or splices are made.
2. Cable testing:
a. The independent testing organization shall have been engaged in full practice in the final inspection, testing, calibration, and adjusting of electrical distribution systems, for a minimum of five years.
b. The independent testing organization shall have a calibration program with accuracy traceable every six months in an unbroken chain, to the National Institute of Standards and Technology (NIST).
c. The independent testing organization shall have a designated safety representative on the project. The standards followed shall include OSHA, NFPA 70E and IEEE 510.
d. Inspection, testing, and calibration shall be performed by an engineering technician, certified by a national organization, such as the InterNational Electrical Testing Association or the National Institute for Certification in Engineering Technologies, with a minimum of five years’ experience inspecting, testing, and calibrating electrical equipment, systems and devices.
Information on the certified engineering technician shall be submitted to the Engineer for approval prior to the start of work.
e. The qualifications of the independent testing organization shall be submitted to the Engineer for approval prior to the start of testing. Full membership to the InterNational Electrical Testing Association constitutes proof of meeting all of the above requirements.
1.3 SUBMITTALS
A. Shop Drawings:
1. See Section 26 05 00 – Electrical- General.
2. Product data:
a. All products specified in Part 2.
B. Miscellaneous:
1. Cable Technician qualifications.
2. Independent testing organization qualifications.
3. Engineering Technician qualifications.
4. Cable test reports signed by the engineering technician including the following information:
Herbert, Rowland & Grubic, Inc. 26 05 13-3 005153.0436
a. Summary of Project.
b. Description of equipment/components tested.
c. Visual inspection report.
d. Description of tests.
e. Test results including appropriate test forms.
f. Conclusions and recommendations.
g. Identification of test equipment used.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Ship cable with removable watertight end seals, and store in dry place.
PART 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS
A. Subject to compliance with the Contract Documents, the following manufacturers are acceptable:
1. Wire and cable:
a. The Okonite Company.
b. Southwire Company.
c. Or Equal.
2. Lugs, connectors and terminations:
a. Raychem.
b. Elastimold.
c. Joslyn.
d. Or Equal.
2.2 MEDIUM VOLTAGE CABLES
A. General: Cable shall be three-conductor triplex with integral grounding conductor.
B. Ratings: Voltage class as indicated on the Drawings.
C. Standards:
1. -639.
2. AEIC CS8.
3. UL 1072.
4. Regular or compressed concentric stranded aluminum.
D. Insulation:
1. Temperature rating: Type MV-105 per NFPA 70.
2. Cross-linked thermosetting polyethylene (XLP).
3. 100 percent insulation level.
E. Shielding:
1. Shielding on cables rated above 2 kV consists of:
a. Semiconductor conductor screen.
b. Semiconductor insulation screen.
c. Copper tape.
Herbert, Rowland & Grubic, Inc. 26 05 13-4 005153.0436
F. Neutrals:
1. Neutral conductors of grounded neutral systems shall be of the same insulation materials as the phase conductors, except with a 600 V insulation rating.
2. Cables with a concentric neutral shall have full concentric neutral.
G. Jackets:
1. Direct buried cables shall be rated for direct bury.
2. Jacket: PVC.
3.
2.3 CABLE ACCESSORIES
A. Lugs and Connectors:
1. Lugs:
a. Compression type.
b. Standard: UL 486B for aluminum and copper cables.
c. Voltage rating: Up to 35 kV.
d. Current rating: Continuous operation at the rating of the cable.
e. Material: Aluminum with bronze underplating, tin outerplating and aluminum anti-oxide paste.
f. Number of holes: Two, except one on motor leads.
2. Aerial stem connectors:
a. Same as lug type, except with a 6 IN copper stem.
3. Splice connectors:
a. Standard: UL 486B for aluminum and copper cables.
b. Voltage rating: Up to 35kV.
c. Current rating: Continuous operation at the rating of the cable.
d. Material: Aluminum with bronze underplating, tin outerplating and aluminum anti-oxide paste.
B. Terminations:
1. End caps:
a. Cold or hot shrink.
b. Used to environmentally seal and mechanically protect exposed cable ends.
2. Molded rubber kit:
a. Standard: IEEE 48.
b. Voltage rating: Same as the cable rating.
c. Current rating: Continuous operation at the rating of the cable.
d. One piece design or modular with stress cone and skirts, where high-dielectric constant stress control is integrated within a skirted insulator made of EPDM rubber.
e. Suitable of contaminated indoor and outdoor locations.
3. Elbow connectors:
a. Standard: IEEE 386.
b. Voltage rating: Same as the cable rating.
c. Current rating: 200A or 600A as required.
d. One piece design, comprised of an insulation shield, insulation layer and an outer shield constructed of EPDM rubber.
Herbert, Rowland & Grubic, Inc. 26 05 13-5 005153.0436
e. Deadfront, loadbreak type with hot stick pulling eye, grounding tab and test point.
f. Accessories to be constructed in a similar manner as the elbow connector:
1) Bushing inserts.
2) Bushing well plugs.
3) Feed thru inserts.
4) Protective caps.
C. Splices:
1. Molded rubber kit:
a. Standard: IEEE 386 or 404.
b. Voltage rating: Same as the cable rating.
c. Current rating: Continuous operation at the rating of the cable.
d. One or multi piece design, comprised of an insulation shield, insulation layer and an outer shield constructed of EPDM rubber.
e. Suitable for indoor, direct burial or submersible applications.
2. Modular separable molded rubber:
a. Standard: IEEE 386.
b. Voltage rating: Same as the cable rating.
c. Current rating: 600A.
d. One piece design, comprised of an insulation shield, insulation layer and an outer shield constructed of EPDM rubber.
e. Deadfront, deadbreak type.
f. Components: T-body, insulating plug with cap, insulating plug with cap and stud, and connecting plug.
g. Suitable for submersible applications.
D. Field Verification:
1. For cable accessories installed within the existing medium-voltage splice box, field verify compatibility with the existing cable lugs and provide all materials necessary to complete the medium-voltage service connections.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Do not install cable during wet conditions:
1. Prior to pulling cables, drain or pump out manholes and other low points if standing water is present.
2. Blow out conduits with dried compressed air if moisture is present in conduits.
3. Install end caps immediately on all cut ends of cable prior to pulling, and maintain end caps while pulling in cable:
a. If end caps are damaged, remove and install new end caps.
b. Do not remove end caps until ready to terminate or splice cable.
Herbert, Rowland & Grubic, Inc. 26 05 13-6 005153.0436
B. Arc-proof all cables in manholes.
1. Apply in spiral, half-overlap fashion to full exposed length of each cable in manhole.
2. Secure in place with glass cloth electrical tape.
a. Apply in reverse spiral to arc-proofing tape, at maximum interval of 9 IN and double wrapped at each end.
C. Do not install conductors when ambient temperature is near minimum as recommended by manufacturer for installation of the type of conductor insulation.
D. Provide voltage rated prefabricated terminations at each shielded cable termination:
1. Select correct termination to match cable diameter and construction.
2. Form and install terminations in strict accordance with instructions of cable manufacturer and termination manufacturer.
E. Splices:
1. Provide components in kit form, complete with instructions, supplied by a single approved manufacturer and suitable for the type of cable being used. Prepare cable ends, provide materials and follow all application steps in accordance with manufacturer's instructions:
a. As a minimum requirement:
1) The cable ends shall be cut squarely.
2) The insulation shall be free from nicks or burrs after removal of jacket.
3) The conductors shall be cleaned, and an oxide inhibitor applied.
4) For splices, connector indents shall be filled with insulating putty to eliminate voids.
5) Attach grounding lead to system ground.
2. Splices shall be avoided whenever possible:
a. No more than one splice is permitted between termination points.
b. No splices are permitted in runs less than 100 FT long.
c. Splices will be made only at manholes or other accessible locations.
d. Do not pull splices into ductbanks or conduits or leave them under tension.
3.2 FIELD QUALITY CONTROL
A. After all terminations and splices have been made, and prior to connections to equipment, provide the following acceptance tests:
1. Shield continuity test.
2. DC high-potential test.
B. The acceptance tests shall be performed per NETA's Acceptance Testing Specifications for Electrical Power Distribution Equipment and Systems.
END OF SECTION
File details come from the government source that posted it. Updated .