About this file

This is a technical specification document for metal railings prepared by Herbert, Rowland & Grubic, Inc. in support of the Skytop Lodge Sewage Treatment Plant Improvements Project (Contract 2026-01, Project Number 005153.0436) in Pennsylvania. The specification establishes requirements for the fabrication and installation of stainless steel pipe and tube railings, balusters, handrails, and associated fittings. The work must comply with ASTM standards (A167, A312, A554, and E985) and guidelines from the National Association of Architectural Metal Manufacturers and the National Ornamental & Miscellaneous Metals Association. The railing system shall utilize Grade MT 304 or MT 316 stainless steel tubing with 1-1/2 inch diameter posts (minimum Schedule 40) and 1-1/2 to 1-1/4 inch diameter rails, welded and finished to a uniform directional textured polished surface. Installation must achieve strict tolerances with maximum variations of 1/4 inch from plumb and alignment. The project bid opening is scheduled for Friday, September 18, 2026, at 10:00 AM, with a pre-bid conference held on August 25, 2026, at 10:30 AM at Skytop Lodge STP, Falls Road, Canadensis, Pennsylvania.

The specification requires that fabricators and erectors possess a minimum of three years of documented experience in their respective disciplines. Contractors must submit shop drawings with design calculations signed and sealed by a licensed professional engineer, welders' certificates verifying AWS qualification within the previous twelve months, and qualifications statements with manufacturer approval. Field quality-control submittals documenting all testing and inspections are mandatory. The railings must be designed to resist specified loads per IBC/ASCE 7 code requirements, including a 200-pound concentrated load on handrails and guard top rails, 50 pounds per linear foot uniform loads, and a maximum deflection limit of 5/8 inch. All exposed fasteners must be stainless steel flush countersunk screws or bolts, and exterior components require continuous welds with condensate drainage provisions. Bid security of not less than 10% is required in the form of a certified check or bid bond, with all bidder inquiries to be submitted through PennBid.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

05 52 00 - METAL RAILINGS

Herbert, Rowland & Grubic, Inc. 05 52 00 - 1 005153.0436

SECTION 05 52 00 - METAL RAILINGS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Stainless steel pipe/tube railings, balusters, and fittings.

2. Handrails.

B. Related Requirements:

1. Section 03 30 00 - Cast-In-Place Concrete: Execution requirements for placement of anchors, as specified in this Section, in concrete.

2. Section 05 50 00 – Metal fabrications.

1.2 REFERENCE STANDARDS

A. ASTM International:

1. ASTM A167 - Standard Specification for Stainless and Heat-Resisting Chromium-

Nickel Steel Plate, Sheet, and Strip.

2. ASTM A312 - Standard Specification for Seamless, Welded, and Heavily Cold

Worked Austenitic Stainless Steel Pipes.

3. ASTM A554 - Standard Specification for Welded Stainless Steel Mechanical

Tubing.

4. ASTM E985 - Standard Specification for Permanent Metal Railing Systems and

Rails for Buildings.

B. National Association of Architectural Metal Manufacturers:

1. NAAMM Metal Finishes Manual.

C. National Ornamental & Miscellaneous Metals Association:

1. NOMMA Guideline 1 - Joint Finishes.

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Shop Drawings: Indicate profiles, sizes, connection attachments, anchorage, size and type of fasteners, and accessories.

C. Welders' Certificates: Certify welders and welding procedures employed on the Work, verifying AWS qualification within previous 12 months.

D. Delegated Design Submittals: Submit Shop Drawings with design calculations, assumptions, and full load path for all elements signed and sealed by a Licensed Professional in the projects Jurisdiction.

E. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

Herbert, Rowland & Grubic, Inc. 05 52 00 - 2 005153.0436

F. Qualifications Statements:

1. Submit qualifications for fabricator and erector.

2. Submit manufacturer's approval of fabricator and erector.

1.4 QUALITY ASSURANCE

A. Perform Work of this Section according to ASTM E985.

B. Finish joints according to NOMMA Guideline 1.

1.5 QUALIFICATIONS

A. Fabricator: Company specializing in fabricating products specified in this Section with minimum three years' documented experience.

B. Erector: Company specializing in performing Work of this Section with minimum three years' documented experience.

1.6 EXISTING CONDITIONS

A. Field Measurements: Verify field measurements prior to fabrication. Indicate field measurements on Shop Drawings.

PART 2 - PRODUCTS

2.1 PERFORMANCE AND DESIGN CRITERIA

A. Design handrail, guardrail, and attachments to resist forces as required by applicable IBC/ASCE 7 code. Apply loads non-simultaneously to produce maximum stresses:

1. Guard Top Rail and Handrail Concentrated Load: 200 lb. applied at any point in any direction.

2. Guard Top Rail and Handrail Uniform Load: 50 plf = applied in any direction.

3. Intermediate Rails, Panels, and Baluster Concentrated Load: 50 lb. applied to 1

sq. ft. area.

4. Deflection: Limit deflection of railings to 5/8” maximum at top of railing system.

2.2 HANDRAILS AND RAILINGS

A. Stainless Steel Railings:

1. Materials:

a. Tubing: ASTM A554, Grade MT 304 / MT 316.

2. Railing System:

a. Rails 1-1/2 / 1-1/4 -inch-diameter stainless-steel tubing / hollow structural sections / pipe; welded joints.

b. Posts: 1-1/2 Minimum Schedule 40 -inch diameter stainless-steel tubing / hollow structural sections / pipe; welded joints.

c. Fittings: Elbows, T-shapes, wall brackets, escutcheons; machined stainless steel.

d. Mounting: Per contract documents; or adjustable brackets and flanges, with stainless-steel inserts for casting in concrete.

Herbert, Rowland & Grubic, Inc. 05 52 00 - 3 005153.0436

e. Exposed Fasteners: Flush countersunk screws or bolts; consistent with design of railing. Fasteners to be stainless steel.

f. Splice Connectors: Stainless-steel concealed spigots / welding collars.

3. Finish railings to conform to NAAMM Metal Finishes Manual for recommendations relative to application and designations of finishes:

a. Remove or blend tool and die marks, and stretch lines into finish.

b. Grind and polish surfaces to produce uniform, directional textured polished finish indicated, free of cross scratches. Run grain with long dimension of each piece.

c. When polishing is completed, passivate and rinse surfaces. Remove embedded foreign matter and leave surfaces chemically clean.

2.3 FABRICATION

A. Fit and shop-assemble components in largest practical sizes for delivery to Site.

B. Fabricate components with joints tightly fitted and secured. Furnish spigots and sleeves to accommodate Site assembly and installation.

C. Form simple and compound curves by bending pipe in jigs to produce uniform curvature for each repetitive configuration required; maintain cylindrical cross section of pipe throughout entire bend without buckling, twisting, cracking, or otherwise deforming exposed surfaces of pipe.

D. Exposed Mechanical Fastenings: Flush countersunk screws or bolts; unobtrusively located; consistent with design of component, except where specifically noted otherwise.

E. Supply components required for anchorage of fabrications. Fabricate anchors and related components of same material and finish as fabrication, except where specifically noted otherwise.

F. Exterior Components: Continuously seal joined pieces by continuous welds. Drill condensate drainage holes at bottom of members at locations not encouraging water intrusion.

G. Interior Components: Continuously seal joined pieces by continuous welds.

H. Grind exposed joints flush and smooth with adjacent finish surface. Make exposed joints butt tight, flush, and hairline. Ease exposed edges to small uniform radius.

I. Accurately form components to each other and to building structure.

J. Accommodate expansion and contraction of members and building movement without damage to connections or members.

Herbert, Rowland & Grubic, Inc. 05 52 00 - 4 005153.0436

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.

B. Verify that field conditions are acceptable and are ready to receive Work.

C. Verify that concealed blocking and reinforcement are installed and correctly located to receive wall-mounted handrails.

3.2 PREPARATION

A. Section 01 73 00 - Execution Requirements: Requirements for installation preparation.

3.3 INSTALLATION

A. Install components plumb and level, accurately fitted, free from distortion or defects.

B. Anchor railings to structure with anchors, plates / angles.

C. Conceal bolts and screws whenever possible. Where not concealed, use flush countersunk fastenings.

D. Assemble with spigots and sleeves to accommodate tight joints and secure installation.

3.4 TOLERANCES

A. Section 01 40 00 - Quality Requirements: Requirements for tolerances.

B. Maximum Variation from Plumb: 1/4inch.

C. Maximum Offset from Alignment: 1/4 inch.

D. Maximum Out-of-Position: 1/4 inch.

END OF SECTION