This document is a Schedule of Material Submittals (AF Form 66) for the project "VGLZ 232004 Repair Building Envelope B-507" at Selfridge Air National Guard Base. It lists the various products, materials, and documentation required to be submitted for approval as part of this construction contract.
The key details include the required submittals such as structural survey reports, construction photographs, work schedule, safety plans, permits, concrete and masonry materials, roofing, flashing, insulation, sealants, doors and hardware, glazing, electrical components, and landscaping materials. The document specifies the submission requirements, review timelines, and approval statuses for each submittal item. This contract has a 240-day period of performance and is set aside for 100% small business participation under NAICS code 237110 for water and sewer line construction. The solicitation number is W50S8524B0006 and the contract opportunity is posted on SAM.gov.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
VGLZ 232004
APPROVED DISAPPROVED
1 Selfridge Air National Guard Base (ANGB) Form 23 X
2 Structural Survey Report X
3 Construction Photographs X
4 Work Schedule X
5 Schedule of Values X
6 Site Safety and Health Plan X
7 Certificates of completion for AT Level I awareness training X
8 Soil Erosion Control Plan X X X X
9 Soil Erosion Control Permit X
10 Burn Permit X
11 Radioactive Source Permit X
12 Concrete Patch X X X
13 Concrete mix design X X
14 Reinforcement X X
15 Concrete Masonry Units X X X
16 Brick X X X
17 Repoint Mortar X X X X
18 Patching Compound X X X X
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
DATE
TO
CIVIL
ENGINEERING
PR
O
D U
C T
D
AT
A
DATE CONTRACTOR NOTIFIED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
O &M
M
AN
U
AL
AP
PR
O
VE
D P
LA
N FOLLOW-UP
TE
ST
R
EP
O R
TS
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D
AT
IO
N
S
SCHEDULE OF MATERIAL SUBMITTALS (AF Form 66 Modified)
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
PR
EP
IN
ST
R U
C
TI
O N
S
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair Building Envelope B-507
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
19 Replacement Brick X X X
20 Masonry Mockup X X
21 Masonry cleaners X X X
22 Membrane Roofing X X X X X X X X X
23 Membrane Flashing Flashing X X X X X X X
24 Metal Flashing X X X X X X
25 Tapered insulation X X X X X X X X
26 Sealants X X X X
27 Metal Scupper X X
28 Doors and Frames X X X X
29 Door Hardware X X X X X
30 Glazing X X X X X
31 Door Louvers X X X X X
32 Paint X X X X X
33 Drain Pipe and fittings X
34 Roof Drains X X X X X
35 Dehumidification System X X X X X
36 Electrical Wiring X
37 Electrical Raceways and Boxes X
38 Light Fixtures X X X X X
39 Electrical devices X
40 Filter cloth X X
41 Drainage Stone X X X
42 Seed Mix X X X
43 Soil mix X X
45 Completed Punch List. X
46 Substantial Completion letter X
47 DD Form 1354 X
48 Record Documents X
49 Warranties X
50 Warranty of Construction X
File details come from the government source that posted it. Updated .