00 65 19.19 - Consent of Surety to Final Payment.pdf

PDF 228 KB Posted

Attached to
Skytop Lodge Sewage Treatment Plant Improvements Project – Contract : 2026-01- Project Number 005153.0436
Solicitation number
US.247986
Issued by
Monroe County, Pennsylvania

About this file

This is a Consent of Surety to Final Payment form executed by a surety company on behalf of a contractor working on the Skytop Lodge Sewage Treatment Plant Improvements Project for the owner, Skytop Lodge, Inc., located in Skytop, Pennsylvania. The project involves the installation of an Influent Screening System, an Equalization Tank, Chemical Feed System, two Clarifier Tanks, a Post Aeration Tank, a UV Disinfection System, and related work as detailed in the contract documents. The form confirms that the surety, after examining the contractor's books and records or receiving an affidavit, has verified that all claims for labor, materials, and equipment have been satisfactorily settled. The pre-bid conference was held on August 25, 2026, at 10:30 AM at the Skytop Lodge STP facility in Canadensis, Pennsylvania, with bids due on Friday, September 18, 2026, at 10:00 AM through PennBid. Contract number 2026-01 (Project Number 005153.0436) was the subject of public bid opening.

The surety's approval of final payment authorizes the release of final construction cost invoices to the contractor while explicitly preserving the surety's bonding obligations to the owner under the terms of the surety bonds. Bid security was required in the form of a Certified Check or Bid Bond in an amount not less than 10% of the bid price. All bidding documents, addenda, and notifications were made available exclusively through the PennBid platform at https://pennbid.bonfirehub.com/. This consent form serves as a critical document in the project closeout process, ensuring that all contractual obligations regarding payment have been met and that the surety maintains its liability for any unresolved claims or defects.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Herbert, Rowland & Grubic, Inc. 00 65 19.19 - 1 005153.0436

CONSENT OF SURETY TO FINAL PAYMENT

To Owner: Skytop Lodge, Inc. Contractor:

Address: 1 Skytop Lodge Road Contract No.:

Skytop, PA 18357 Contract Name:

Project: Skytop Lodge Sewage Treatment Plant Improvements Project Contract Date:

In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the

SURETY:

Address:

, Surety, as surety on the bond of

CONTRACTOR:

Address:

, Contractor, after a careful examination of the books and records of said Contractor or after receipt of an affidavit from the said of said Contractor or after receipt of an affidavit from the said Contractor, which examination or affidavit satisfied this

Surety Company that all claims for labor, materials, and equipment have been satisfactorily settled, hereby approves of the final payment to the said Contractor and by these presents witnesseth that the payment to the Contractor of the final construction cost invoices shall not relieve the Surety of any of its obligations to the Owner set forth in said Surety’s

Bonds.

IN WITNESS WHEREOF the said Surety Company has hereunto set its hand and seal this day of

Attested: (Surety)

(SEAL) (Signature of Authorized Representative)

(Printed Name and Title)

NOTE: This statement, if executed by any person other than the President or Vice President of the Surety Company, must be accompanied by a certificate of same date showing authority conferred upon the person so signing to execute such instruments on behalf of the Surety Company represented.

File details come from the government source that posted it. Updated .