About this file

This is a Table of Contents document for the Skytop Lodge Sewage Treatment Plant Improvements Project (Project Number 005153.0436) prepared by Herbert, Rowland & Grubic, Inc. for Skytop Lodge, Inc. in Pennsylvania. The project involves construction of sewage treatment plant upgrades including installation of an influent screening system, equalization tank, chemical feed system, two clarifier tanks, a post aeration tank, a UV disinfection system, and associated work. Bids for Contract 2026-01 will be received and publicly opened on Friday, September 18, 2026, at 10:00 AM local time through PennBid. A pre-bid conference is scheduled for August 25, 2026, at 10:30 AM at the Skytop Lodge STP facility located at Falls Road, Canadensis, Pennsylvania (coordinates 41°13'17.3"N 75°14'19.0"W). Attendance at the pre-bid conference is encouraged but not required. Bidding documents are available for download at https://pennbid.bonfirehub.com/, which will be periodically updated with addenda, registered plan holder lists, reports, and other relevant information.

Bid security must be submitted in the form of a Certified Check or Bid Bond in an amount not less than 10% of the bid. The contract documents include comprehensive specifications across multiple divisions covering general requirements, existing conditions, concrete, metals, carpentry, finishes, electrical systems, communications, security, earthwork, exterior improvements, utilities, process integration, material handling, and wastewater treatment equipment. All questions regarding the meaning or intent of the bidding documents must be submitted through PennBid in accordance with the Instructions to Bidders. The project requires performance bonds, payment bonds, warranty bonds, and various certifications including non-collusion affidavits, equal employment opportunity certifications, and public works employment verification forms.

View the file

Other files

File Type Posted
33 05 97 - Identification And Signage For Utilities.pdf PDF
26 29 13 - Contactors and Motor Starting Equipment.pdf PDF
26 05 10 - Basic Electrical Materials & Methods.pdf PDF
01 78 36 - Warranties.pdf PDF
26 12 19.01 - Liquid Filled Medium Voltage Pad Mounted Transformers.pdf PDF
01 61 00 - Product Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
00 01 07 - Seal Page.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
43 26 13 - Submersible Sewage Pumps.pdf PDF
33 05 77 Packaged Metering Manhole.pdf PDF
01 10 00 - Project Summary.pdf PDF
26 05 73 - Power System Study and Testing.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
02 41 19.13 - SELECTIVE BUILDING DEMOLITION.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
40 05 51 - Common Requirements For Process Valves.pdf PDF
01 26 13 - Requests for Interpretation.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
40 05 62 - Plug Valves.pdf PDF
26 24 16 - Panelboards.pdf PDF
00 45 36 EEO Certificate.pdf PDF
46 66 16 - Trojan Open Channel UV Disinfection System.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
40 23 23 - Potable Water Process Piping.pdf PDF
31 23 19 - Dewatering.pdf PDF
40 95 34 a- IOList Table.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 31 32 - Geotechnical Data.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
31 05 16 - Aggregate for Earthwork.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
00 60 00 - Project Forms.pdf PDF
01 22 00 - Unit Prices.pdf PDF
06 10 00 - Rough Carpentry.pdf PDF
40 05 53 - Identification For Process Piping.pdf PDF
06 17 53 - Shop-Fabricated Wood Trusses.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
40 05 23 - Stainless Steel Process Pipe And Tubing.pdf PDF
26 05 33.16 - Boxes.pdf PDF
26 05 29 - Electrical Supports, Anchors and Fasteners.pdf PDF
41 22 23.16 - Portable Hoists.pdf PDF
26 32 13 - Packaged Engine Generator Systems.pdf PDF
31 23 16.13 - Trenching.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
46 43 21 Packaged Wastewater Treatment Plant Equipment.pdf PDF
13 34 00 - Pre-engineered Post Frame Structures.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
Show 40 more

Latest 50 of 157 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Herbert, Rowland & Grubic, Inc. 00 01 10 - 1 005153.0436

SKYTOP LODGE SEWAGE TREATMENT PLANT IMPROVEMENTS PROJECT

SKYTOP LODGE, INC.

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS SECTION: PAGES

SEALS PAGE ................................................................................................................................. 00 01 07: 1

PROCUREMENT REQUIREMENTS

ADVERTISEMENT FOR BIDS ............................................................................................................... 00 11 13: 2 INSTRUCTIONS TO BIDDERS .............................................................................................................. 00 21 13: 12 GEOTECHNICAL DATA ....................................................................................................................... 00 31 32: 31 PERMITS ............................................................................................................................................ 00 31 46: 6 BID BOND .......................................................................................................................................... 00 43 13: 2 NON-COLLUSION AFFIDAVIT ............................................................................................................. 00 45 19: 1

CERTIFICATION OF NON-SEGREGATED FACILITIES AND NON-EMPLOYMENT OF ILLEGAL

ALIEN LABOR ............................................................................................................................... 00 45 33: 1 CERTIFICATION OF BIDDER REGARDING EQUAL EMPLOYMENT OPPORTUNITY .............................. 00 45 36: 1 PUBLIC WORKS EMPLOYMENT VERIFICATION FORM ....................................................................... 00 45 46: 1

CONTRACTING REQUIREMENTS

AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT .................. 00 52 00: 7 PROJECT FORMS ............................................................................................................................... 00 60 00: 1 PERFORMANCE BOND ...................................................................................................................... 00 61 13.13: 4 PAYMENT BOND ............................................................................................................................... 00 61 13.16: 4 WARRANTY BOND ............................................................................................................................. 00 61 19: 2 APPLICATION FOR PAYMENT ............................................................................................................ 00 62 76: 6 REQUEST FOR INFORMATION FORM ................................................................................................ 00 63 13: 1 SUBSTITUTION REQUEST FORM ........................................................................................................ 00 63 25: 2 FIELD ORDER FORM .......................................................................................................................... 00 63 36: 1 WORK CHANGE DIRECTIVE FORM .................................................................................................... 00 63 49: 1 CHANGE ORDER FORM ..................................................................................................................... 00 63 63: 1 CERTIFICATE OF SUBSTANTIAL COMPLETION FORM ........................................................................ 00 65 16: 1 AFFIDAVIT OF RELEASE OF LIENS FORM ........................................................................................... 00 65 19.16: 1 CONSENT OF SURETY FOR FINAL PAYMENT FORM .......................................................................... 00 65 19.19: 1 NOTICE OF ACCEPTABILITY OF WORK ............................................................................................... 00 65 19.23: 1 GENERAL CONDITIONS ...................................................................................................................... 00 72 00: 92 EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.................................................................... 00 73 36: 4 WAGE RATE REQUIREMENTS ............................................................................................................ 00 73 43: 4 WAGE DETERMINATION SCHEDULE ................................................................................................. 00 73 46: 7 ANTI-POLLUTION MEASURES ............................................................................................................ 00 73 53: 1 STATUTORY REQUIREMENTS ............................................................................................................ 00 73 73: 12

SPECIFICATIONS

DIVISION 01 – GENERAL REQUIREMENTS PAGES

01 10 00 PROJECT SUMMARY

01 12 16 WORK SEQUENCE

01 22 00 UNTI PRICES

01 25 00 SUBSTITUTION PROCEDURES

01 26 00 CONTRACT MODIFICATION PROCEDURES

01 26 13 REQUESTS FOR INTERPRETATION

01 29 00 PAYMENT PROCEDURES

01 31 13 PROJECT COORDINATION

01 31 19 PROJECT MEETINGS

01 32 16 CONSTRUCTION PROGRESS SCHEDULE

01 32 26 CONSTRUCTION PROGRESS REPORTING

01 32 33 PHOTOGRAPHIC DOCUMENTATION

01 32 36 VIDEO MONITORING AND DOCUMENTATION

TABLE OF CONTENTS

Herbert, Rowland & Grubic, Inc. 00 01 10 - 2 005153.0436

01 33 00 SUBMITTAL PROCEDURES

01 40 00 QUALITY REQUIREMENTS

01 41 26 PERMIT REQUIREMENTS

01 42 00 REFERENCES

01 50 00 TEMPORARY FACILITIES AND CONTROLS

01 57 28 TEMPORARY FLOW CONTROL

01 58 00 PROJECT IDENTIFICATION

01 61 00 PRODUCT REQUIREMENTS

01 73 00 EXECUTION REQUIREMENTS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 77 00 CLOSEOUT PROCEDURES

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 36 WARRANTIES

01 78 39 PROJECT RECORD DOCUMENTS

01 78 44 SPARE PARTS AND MAINTENANCE MATERIALS

01 91 00 COMMISSIONING

DIVISION 02 – EXISTING CONDITIONS PAGES

02 41 19.13 SELECTIVE BUILDING DEMOLITION

DIVISION 03 – CONCRETE PAGES

03 10 00 CONCRETE FORMING AND ACCESSORIES

03 20 00 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

03 35 00 CONCRETE FINISHING

03 39 00 CONCRETE CURING

03 41 00 PRECAST CONCRETE CONTROL STRUCTURES

03 60 00 GROUTING

DIVISION 05 – METALS PAGES

05 50 00 METAL FABRICATIONS

05 52 00 METAL RAILINGS

05 53 00 METAL GRATINGS

DIVISION 06 PAGES

06 10 00 ROUGH CARPENTRY

06 16 00 SHEATHING

06 17 53 SHOP-FABRICATED WOOD TRUSSES

DIVISION 09 – FINISHES PAGES

09 90 00 PAINTING AND COATING

DIVISION 13 – SPECIAL CONSTRUCTION PAGES

13 34 00 PRE-ENGINEERED POST FRAME STRUCTURES

DIVISION 26 – ELECTRICAL PAGES

26 05 00 ELECTRICAL-GENERAL

26 05 10 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 13 MEDIUM VOLTAGE CABLE

26 05 19 CONDUCTORS

26 05 26 GROUNDING

26 05 29 ELECTRICAL SUPPORTS, ANCHORS AND FASTENERS

26 05 33 RACEWAYS

26 05 33.16 BOXES

26 05 53 ELECTRICAL SYSTEM IDENTIFICATION

Herbert, Rowland & Grubic, Inc. 00 01 10 - 3 005153.0436

26 05 73 POWER SYSTEM STUDY AND TESTING

26 08 00 ELECTRICAL FIELD ACCEPTANCE TESTS

26 09 14 CELLULAR ALARM SYSTEM

26 09 16 AUXILIARY CONTROLS AND RELAYS

26 12 19.01 LIQUID-FILLED MEDIUM-VOLTAGE PAD-MOUNTED TRANSFORMERS

26 24 16 PANELBOARDS

26 27 16 CONTROL PANELS AND ENCLOSURES

26 27 26 WIRING DEVICES

26 28 16.13 OVERCURRENT PROTECTIVE DEVICES

26 28 16.16 DISCONNECTS AND SAFETY SWITCHES

26 29 13 CONTACTORS AND MOTOR STARTING EQUIPMENT

26 29 33 VARIABLE FREQUENCY DRIVES

26 32 13 PACKAGED ENGINE GENERATOR SYSTEMS

26 36 23 TRANSFER SWITCHES

DIVISION 27 – COMMUNICATIONS PAGES

27 13 23 FIBER OPTIC COMMUNICATION SYSTEMS

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY PAGES

28 23 00 CLOSED CIRCUIT VIDEO EQUIPMENT

DIVISION 31 – EARTHWORK PAGES

31 05 13 SOILS FOR EARTHWORK

31 05 16 AGGREGATES FOR EARTHWORK

31 05 19.13 GEOTEXTILES FOR EARTHWORK

31 10 00 SITE CLEARING

31 22 13 ROUGH GRADING

31 23 16 EXCAVATION

31 23 16.13 TRENCHING

31 23 16.26 ROCK REMOVAL

31 23 19 DEWATERING

31 23 23.33 FLOWABLE FILL

31 25 00 EROSION AND SEDIMENTATION CONTROLS

DIVISION 32 – EXTERIOR IMPROVEMENTS PAGES

32 11 23 AGGREGATE BASE COURSES

32 91 13 SOIL PREPARATION

DIVISION 33 – UTILITIES PAGES

33 01 10.58 DISINFECTION OF WATER UTILITY PIPING SYSTEMS

33 01 30.11 TELEVISION INSPECTION OF SEWERS

33 05 05.31 HYDROSTATIC TESTING

33 05 05.36 VACUUM TESTING

33 05 05.41 AIR TESTING

33 05 05.43 MANDREL TESTING

33 05 09.33 THRUST RESTRAINT FOR UTILITY PIPING

33 05 61 CONCRETE MANHOLES

33 05 77 PACKAGED METERING MANHOLE

33 05 97 IDENTIFICATION AND SIGNAGE FOR UTILITIES

33 14 16 SITE WATER UTILITY DISTRIBUTION PIPING

33 31 11 SANITARY SEWERAGE GRAVITY PIPING

33 31 23 SANITARY SEWERAGE FORCE MAIN PIPING

DIVISION 40 – PROCESS INTEGRATION PAGES

40 05 06 COUPLINGS, ADAPTERS, AND SPECIALS FOR PROCESS PIPING

40 05 07 HANGERS AND SUPPORTS FOR PROCESS PIPING

Herbert, Rowland & Grubic, Inc. 00 01 10 - 4 005153.0436

40 05 23 STAINLESS STEEL PROCESS PIPE AND TUBING

40 05 51 COMMON REQUIREMENTS FOR PROCESS VALVES

40 05 53 IDENTIFICATION FOR PROCESS PIPING

40 05 59.21 ALUMINUM WEIR GATES

40 05 59.23 STAINLESS STEEL SLIDE GATES

40 05 61 GATE VALVES

40 05 62 PLUG VALES

40 05 63 BALL VALVES

40 05 65 CHECK VALVES

40 23 23 POTABLE WATER PROCESS PIPING

40 42 13 PROCESS PIPING INSULATION

40 73 13 PRESSURE AND DIFFERENTIAL PRESSURE GAUGES

40 94 43 PROGRAMMABLE LOGIC CONTROL EQUIPMENT

40 95 13 PROCESS CONTROL PANELS & HARDWARE

40 95 33 PROCESS CONTROL NETWORK OVERVIEW

40 95 34 PROCESS CONTROL NETWORK INPUT/OUTPUT LIST

DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT PAGES

41 22 23.16 PORTABLE HOISTS

DIVISION 43 – PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT PAGES

43 05 20 COMMON WORK RESULTS FOR LIQUID HANDLING EQUIPMENT

43 05 53 IDENTIFICATION FOR PROCESS GAS AND LIQUID HANDLING EQUIPMENT

43 26 13 SUBMERSIBLE SEWAGE PUMPS

DIVISION 46 – WATER AND WASTEWATER EQUIPMENT PAGES

46 05 53 IDENTIFICATION FOR WATER AND WASTEWATER EQUIPMENT

46 31 24 SPIRAL SCREEN SCREENING EQUIPMENT

46 33 44 PERISTALTIC METERING PUMPS

46 43 21 PACKAGED WASTEWATER TREATMENT PLANT EQUIPMENT

46 66 16 TROJAN OPEN CHANNEL UV DISINFECTION SYSTEM