W912DS25RA009 Amendment 0001.pdf
PDF 3 MB Posted
- Attached to
- WVA Fire Station Construction Acquisition Federal contract opportunity
- Solicitation number
- W912DS25RA009
About this file
This document is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract for the Watervliet Arsenal 3 CO HQ Fire Station construction project (Solicitation Number W912DS25RA009). Amendment 0001, dated 29 July 2025, provides clarifications for potential bidders, specifically addressing two key inquiries. The first inquiry concerns Quality Control (QC) Manager qualifications, with the government clarifying that a single QC Manager must meet all specified requirements and maintain a full-time physical presence at the work site. The second inquiry relates to drawing ES103, with the government specifying that the contractor is responsible for installing the duct bank from the manhole to identified locations and adding pull string for the EV charger.
No changes were made to drawings or specifications in this amendment. The document serves to provide additional guidance to potential bidders by answering specific technical questions about the project requirements. The solicitation remains open, and bidders are instructed to acknowledge receipt of this amendment through standard submission methods. The project is being managed by the Department of the Army Corps of Engineers Engineering District New York, with the amendment signed by the Contracting Officer on 25 July 2025.
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 30 00 - Available Information
Miscellaneous text in this section has been added to:
Watervliet Arsenal
3 CO HQ Fire Station
W912DS25RA009
Amendment 0001
AMENDMENT 0001 to DRAWINGS and SPECIFICATIONS for Watervliet Arsenal 3 CO HQ Fire Station.
TO OFFERORS
The following changes shall be made to the drawings and specifications.
DRAWINGS
but The following DRAWINGS have been 1. REVISED NOT REISSUED:
- None
The following DRAWINGS have been 2. REVISED and :REISSUED
- None
The following DRAWINGS have been 3. ADDED:
- None
The following DRAWINGS have been 4. DELETED:
- None
W912DS25RA0090001
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been and are provided in their entirety ADDED herein:
- None
2. The following SPECIFICATIONS SECTIONS have been in their entirety:DELETED
- None
3. The following SPECIFICATIONS SECTIONS have been and :REVISED REISSUED
- None
4. The following SPECIFICATIONS have been but REVISED : NOT REISSUED
- None
PROPOSER'S QUESTIONS AND GOVERNMENT REPLY
Questionsthat may be of general interest to all Offerors and/or the Government and thatare not readily answered by the proceeding changes will appear below. These questionsmay have been paraphrased or altered to represent several questions regardingthe same subject and/or simply revised to clarify and simplify the question(s).Questions and answers are issued to the Offerors "for information only" and do not revise the solicitation, plans or specifications.
There are relatively few (if any) QC Managers that meet all of the above BIDDER INQUIRY 01:
requirements in Specification 01 45 00 Quality Control Section 1.6.2.2 Quality Control (QC) Manager Qualifications. In lieu of one QC Manager required to meet all of the requirements, can the above qualifications be satisfied across multiple QC Managers and/or consultants?
RESPONSE: Section says: 01 4500 1.4 general requirements: "The Quality Control Manager must maintain a physical presence at the work site at all times and is the primary individual responsible for all quality control." Contractor's will need a QC manager fulltime that meets the requirements in Section
1.6.2.2 Quality Control (QC)Manager Qualifications.
Drawing ES103: referenced drawing sheet keynotes #12+13. could you BIDDER INQUIRY 02:
please provide more detail for the installation of materials for these notes?
RESPONSE: Per sheet ES103Notes #12 and 13 the contractor shall only be responsible for installing the duct bank from the manhole to the locations identified on the sheet and adding pull string with regards to the EV charger.
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0001 |
| EffDate: 29 JUL 2025 |
| ReqNo: |
| ProjNo: PN81503 |
| IssCode: W912DS |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW YORK |
KO CONTRACTING DIVISION, 26 FEDERAL PLAZA ROOM 16 300
NEW YORK, NY 10278-0004
UNITED STATES
DENISSE SOTO, EMAIL: DENISSE.M.SOTO@USACE.ARMY.MIL TELEPHONE: 000-000-0000
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912DS25RA009 |
| SolDate: 11 JUL 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: THE PURPOSE OF THIS AMENDMENT IS TO (1) PROVIDE SITE VISIT SIGN-IN SHEET FROM 21 JULY 2025, (2) SITE VISIT PHOTOS, AND (3) PROVIDE RESPONSE TO RFIS. |
NOTE: BIDDERS MUST ACKNOWLEDGE RECEIPT OF THIS AMENDMENT BY THE DATE SPECIFIED IN THE SOLICITATION (OR AS AMENDED) BY ONE OF THE FOLLOWING METHODS: IN THE SPACE PROVIDED ON THE SF1442, BY SEPARATE LETTER, OR BY SIGNING THE BLOCK 15 BELOW. FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
| ContNameTitle: |
| CoNameTitle: NICHOLAS EMANUEL |
| ContDate: |
| CODate: 25 JUL 2025 |