07 21 16.pdf
PDF 30 KB Posted
- Attached to
- WVA Fire Station Construction Acquisition Federal contract opportunity
- Solicitation number
- W912DS25RA009
About this file
This document is a technical specification section (07 21 16) for Mineral Fiber Blanket Insulation for the WVA Fire Station project, dated July 31, 2025. The specification provides detailed requirements for mineral fiber insulation, including references to various ASTM, NFPA, and other standards for thermal and acoustic insulation materials.
Key requirements include using ASTM C665 Type II mineral fiber blankets with non-reflecting coverings, containing at least 75% recycled materials from slag, and meeting Energy Star labeling. The insulation must have specific flame spread and smoke developed ratings, and comply with indoor air quality standards such as UL 2818 Greenguard Gold certification. Installation instructions cover proper placement, handling, and sealing techniques, with specific guidance on installing around electrical components, bridging, and heat-producing devices, and ensuring continuous insulation coverage with proper vapor retarder application.
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WVA Fire Station WVAFIRESTATION23 Amendment 003 July 31, 2025
SECTION 07 21 16
MINERAL FIBER BLANKET INSULATION
08/23
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C665 (2023) Standard Specification for Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing
ASTM C930 (2019) Standard Classification of Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM D3833/D3833M (1996; R 2019) Standard Test Method for Water Vapor Transmission of Pressure-Sensitive Tapes
ASTM E84 (2023) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E136 (2022) Standard Test Method for Assessing Combustibility of Materials Using a Vertical Tube Furnace at 750 Degrees C
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2017; Version 1.2) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
GREEN SEAL (GS)
GS-36 (2013) Adhesives for Commercial Use
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 31 (2020) Standard for the Installation of Oil-Burning Equipment
NFPA 54 (2021) National Fuel Gas Code
NFPA 70 (2023; ERTA 4 2023) National Electrical Code
SECTION 07 21 16 Page 1
NFPA 211 (2019) Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
U.S. DEPARTMENT OF ENERGY (DOE)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2022) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Blanket Insulation ; G, DO
Recycled Content for Insulation Materials ; S
Energy Star Label for Insulation Materials ; S
Vapor Retarder
Pressure Sensitive Tape
Accessories
SD-07 Certificates
Indoor Air Quality for Adhesives ; S
SD-08 Manufacturer's Instructions
Insulation
SECTION 07 21 16 Page 2
1.3 CERTIFICATIONS
Submit required indoor air quality certifications and validations in one submittal package.
1.3.1 Insulation Products
Provide product certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs. Provide current product certification from certification body.
1.3.2 Adhesives and Sealants
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
Deliver materials to site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.4.2 Storage
Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.
1.5 SAFETY PRECAUTIONS
1.5.1 Respirators
Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) in accordance with 29 CFR 1910.134 .
1.5.2 Other Safety Concerns
Consider other safety concerns and measures as outlined in ASTM C930.
PART 2 PRODUCTS
2.1 BLANKET INSULATION
ASTM C665, Type II, blankets with non-reflecting coverings; Class A, SECTION 07 21 16 Page 3 membrane-faced surface with a flame spread of 25 or less, except a flame spread rating of 25 or less and a smoke developed rating of 150 or less when tested in accordance with ASTM E84. Provide acousical batt insulation/sound attenuation blankets for interior applications to conform to STC rating of wall and UL number of assembly indicated in the drawings.
Provide insulation with R-Value as indicated on drawings
2.1.1 Recycled Materials
Provide insulation materials containing the following minimum percentage of recycled material content by weight:
a. Mineral wool: 75 percent recovered materials content from slag
Provide data identifying percentage of recycled content for insulation materials .
2.1.2 Energy Star
Provide insulation materials that are Energy Star labeled. Provide data identifying Energy Star label for insulation materials .
2.2 BLOCKING
Wood, metal, unfaced mineral fiber blankets in accordance with ASTM C665, Type I, or other approved materials. Use only non-combustible materials meeting the requirements of ASTM E136 for blocking around chimneys and heat producing devices.
2.3 VAPOR RETARDER
a. Membrane with the following properties:
Vapor retarder to be compliant with vapor retarding and air barrier properties listed in section 07 27 19.01 SELF ADHERED AIR BARRIERS
Maximum Flame Spread: ASTM E84: 50
2.3 PRESSURE SENSITIVE TAPE
As recommended by the vapor retarder manufacturer and having a water vapor permeance rating of one perm or less when tested in accordance with ASTM D3833/D3833M . Tape and sealants must have air leakage less than 0.04 cfm/ft2 under a pressure differential of 1.57 psf when tested in accordance with ASTM E 1677, ASTM E 1680, or ASTM E283.
2.4 ACCESSORIES
2.4.1 Adhesive
As recommended by the insulation manufacturer. Provide non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) that meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . Provide aerosol adhesives used on the interior of the building that meet either emissions requirements of CDPH SECTION 01350 (use the office or classroom requirements, regardless of space type) or VOC content requirements of GS-36. Provide certification or validation of
SECTION 07 21 16 Page 4 indoor air quality for adhesives .
2.4.2 Mechanical Fasteners
Corrosion resistant fasteners as recommended by the insulation manufacturer.
2.4.3 Wire Mesh
Corrosion resistant and as recommended by the insulation manufacturer.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Before installing insulation, ensure that surfaces that will be in contact with the insulation are dry and free of projections which could cause voids, compressed insulation, or punctured vapor retarders. If moisture or other conditions are found that do not allow the workmanlike installation of the insulation, do not proceed but notify Contracting Officer of such conditions.
3.2 PREPARATION
3.2.1 Blocking Around Heat Producing Devices
Install non-combustible blocking around heat producing devices to provide the following clearances:
a. Recessed lighting fixtures, including wiring compartments, ballasts, and other heat producing devices, unless these are certified by the manufacturer for installation surrounded by insulation: 3 inches from outside face of fixtures and devices or as required by NFPA 70 and, if insulation is to be placed above fixture or device, 24 inches above fixture.
b. Masonry chimneys or masonry enclosing a flue: 2 inches from outside face of masonry. Masonry chimneys for medium and high heat operating appliances: Minimum clearances required by NFPA 211 .
c. Vents and vent connectors used for venting the products of combustion, flues, and chimneys other than masonry chimneys: Minimum clearances as required by NFPA 211 .
d. Gas Fired Appliances: Clearances as required in NFPA 54 .
e. Oil Fired Appliances: Clearances as required in NFPA 31 .
Blocking around flues and chimneys is not required when insulation blanket, including any attached vapor retarder, passes ASTM E136, in addition to meeting other requirements stipulated in Part 2. Blocking is also not required if the chimneys are certified by the manufacturer for use in contact with insulating materials.
3.3 INSTALLATION
3.3.1 Insulation
Install and handle insulation in accordance with manufacturer's
SECTION 07 21 16 Page 5 instructions. Keep material dry and free of extraneous materials. Any materials that show visual evidence of biological growth due to presence of moisture must not be installed on the building project. Ensure personal protective clothing and respiratory equipment is used as required. Observe safe work practices.
3.3.1.1 Electrical wiring
Do not install insulation in a manner that would sandwich electrical conductors, that are not installed in conduit, between two layers of insulation.
3.3.1.2 Continuity of Insulation
Install blanket insulation to butt tightly against adjoining blankets and to studs, rafters, joists, sill plates, headers and any obstructions.
Provide continuity and integrity of insulation at corners, wall to ceiling joints, roof, and floor. Avoid creating thermal bridges.
3.3.1.3 Installation at Bridging and Cross Bracing
Insulate at bridging and cross bracing by splitting blanket vertically at center and packing one half into each opening. Butt insulation at bridging and cross bracing; fill in bridged area with loose or scrap insulation.
3.3.1.4 Cold Climate Requirement
Place insulation to the outside of pipes.
3.3.1.5 Insulation Blanket with Affixed Vapor Retarder
Locate vapor retarder as indicated. Do not install blankets with affixed vapor retarders unless so specified. Unless the insulation manufacturer's instructions specifically recommend not to staple the flanges of the vapor retarder facing, staple flanges of vapor retarder at 6-inch intervals flush with face or set in the side of truss, joist, or stud. Avoid gaps and bulges in insulation and "fishmouth" in vapor retarders. Overlap both flanges when using face method. Seal joints and edges of vapor retarder with pressure sensitive tape. Stuff pieces of insulation into small cracks between trusses, joists, studs and other framing, such as at attic access doors, door and window heads, jambs, and sills, band joists, and headers. Cover these insulated cracks with vapor retarder material and tape joints with pressure sensitive tape to provide air and vapor tightness.
3.3.1.6 Insulation without Affixed Vapor Retarder
Provide snug friction fit to hold insulation in place. Stuff pieces of insulation into cracks between trusses, joists, studs and other framing, such as at attic access doors, door and window heads, jambs, and sills, band joists, and headers.
3.3.1.7 Sizing of Blankets
Provide only full width blankets when insulating between trusses, joists, or studs. Size width of blankets for a snug fit where trusses, joists or studs are irregularly spaced.
SECTION 07 21 16 Page 6
3.3.1.8 Access Panels and Doors
Affix blanket insulation to access panels greater than one square foot and access doors in insulated floors and ceilings. Use insulation with same R-Value as that for floor or ceiling.
3.3.2 Installation of Separate Vapor Retarder
Apply continuous vapor retarder as indicated. Overlap joints at least 6 inches and seal with pressure sensitive tape. Seal at sill, header, windows, doors and utility penetrations. Repair punctures or tears with pressure sensitive tape.
-- End of Section --
SECTION 07 21 16 Page 7
| 07 21 16 - MINERAL FIBER BLANKET INSULATION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 CERTIFICATIONS |
| 1.3.1 Insulation Products |
| 1.3.2 Adhesives and Sealants |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| 1.4.1 Delivery |
| 1.4.2 Storage |
| 1.5 SAFETY PRECAUTIONS |
| 1.5.1 Respirators |
| 1.5.2 Other Safety Concerns |
| PART 2 PRODUCTS |
| 2.1 BLANKET INSULATION |
| 2.1.1 Recycled Materials |
| 2.1.2 Energy Star |
| 2.2 BLOCKING |
| 2.3 PRESSURE SENSITIVE TAPE |
| 2.4 ACCESSORIES |
| 2.4.1 Adhesive |
| 2.4.2 Mechanical Fasteners |
| 2.4.3 Wire Mesh |
| PART 3 EXECUTION |
| 3.1 EXISTING CONDITIONS |
| 3.2 PREPARATION |
| 3.2.1 Blocking Around Heat Producing Devices |
| 3.3 INSTALLATION |
| 3.3.1 Insulation |
| 3.3.1.1 Electrical wiring |
| 3.3.1.2 Continuity of Insulation |
| 3.3.1.3 Installation at Bridging and Cross Bracing |
| 3.3.1.4 Cold Climate Requirement |
| 3.3.1.5 Insulation Blanket with Affixed Vapor Retarder |
| 3.3.1.6 Insulation without Affixed Vapor Retarder |
| 3.3.1.7 Sizing of Blankets |
| 3.3.1.8 Access Panels and Doors |
3.3.2 Installation of Separate Vapor Retarder
File details come from the government source that posted it. Updated .