25-08-11_I-601 and I-602.pdf

PDF 95 KB Posted

Attached to
WVA Fire Station Construction Acquisition Federal contract opportunity
Solicitation number
W912DS25RA009
Issued by
Department of the Army Corps of Engineers Engineering District New York

About this file

This document is a Legend of Colors and Finishes for a US Army Corps of Engineers project for a 3 Company HQ Fire Station in Watervliet, New York. The detailed specification sheet provides comprehensive material and finish selections for various building components, including flooring (carpet tiles, luxury vinyl tile, porcelain tile), wall treatments (paint, wall tiles, fiberglass reinforced panels), base materials (rubber base, quarry tile base), ceiling types (acoustical tiles), and window treatments. The document specifies exact manufacturers, colors, styles, and sizes for each material, such as Sherwin Williams paint colors, Crossville tile selections, and Mannington carpet tiles, with specific applications for different rooms like the apparatus bay, offices, training rooms, and dormitory spaces. The document is dated April 29, 2025, and appears to be part of a solicitation for construction materials and interior finishes for a fire station facility.

View the file

Other files for this federal contract opportunity

Other files attached to WVA Fire Station Construction Acquisition, newest first.
File Type Posted
ET601 - TELECOMM RISER DIAGRAM.pdf PDF
Solicitation Amendment W912DS25RA009_0009(final).pdf PDF
01 45 00.15 10.pdf PDF
Solicitation Amendment W912DS25RA009_0008 (final).pdf PDF
Amendment W912DS25RA0090007.pdf PDF
Solicitation Amendment W912DS25RA009 0006.pdf PDF
01 50 00.pdf PDF
Solicitation Amendment W912DS25RA0090005.pdf PDF
FINAL_GeotechnicalReport_WatervlietArsenal_Rev1 8-7-23.pdf PDF
WVA Fire Station A-604 20250814.pdf PDF
09 51 00.pdf PDF
Solicitation Amendment W912DS25RA0090004 SF 30.pdf PDF
MI703.pdf PDF
ET-601 - TELECOMM RISER DIAGRAM.pdf PDF
ES103 - ELECTRICAL - SITE PLAN - POWER -TELECOMMUNICATIONS.pdf PDF
12 24 13.pdf PDF
WVA Fire Station A-602 20250814.pdf PDF
FINAL_GeotechnicalReport_WatervlietArsenal_Rev1 8-7-23.pdf PDF
08 71 00.pdf PDF
WVA Fire Station A-603 20250801.pdf PDF
WVA Fire Station A-511 20250730.pdf PDF
WVA Fire Station A-510 20250730.pdf PDF
WVA Fire Station A-310 20250730.pdf PDF
WVA Fire Station A-123 20250730.pdf PDF
AHJ Interpretation - FP Quals.pdf PDF
07 21 16.pdf PDF
07 21 13.pdf PDF
WVA Fire Station A-503 20250730.pdf PDF
WVA Fire Station A-122 20250730.pdf PDF
06 41 16.00 10.pdf PDF
01 45 00.pdf PDF
WVA Fire Station A-121 20250730.pdf PDF
WVA Fire Station A-602 20250801.pdf PDF
WVA Fire Station A-507 20250730.pdf PDF
WVA Fire Station A-501 20250730.pdf PDF
Solicitation Amendment W912DS25RA009 0003.pdf PDF
WVA Fire Station JA Plymovent Vehicle Exhaust System_sOAS.pdf PDF
Solicitation Amendment W912DS25RA009 0002.pdf PDF
WVA Fire Station JA Simplex Fire Alarm System_sOAS.pdf PDF
Attendance List 21 July 2025.pdf PDF
W912DS25RA009 Amendment 0001.pdf PDF
Site Visit Photos.pdf PDF
WVA-FIRESTATION_RTA_SPEC_07-11-2025.pdf PDF
WVA Fire Station - Drawings - RTA 20250624.pdf PDF
CID PACKAGE.pdf PDF
Solicitation - W912DS25RA009(4).pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. MATERIALS REFRENCED ARE NOT

INTENDED TO ESTABLISH QUALITY,

COLOR AND FINISH ONLY AND ARE NOT

INTENDED TO LIMIT SELECTIONS FROM

OTHER MANUFACTURERS.

A

J

O

I

N

T

V

E

U

R

GENERAL NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

I-601

L E

G E

N D

O F

C O

L O

R S

A N

D F

IN

IS

H E

S

W A

T E

R V

L

IE

T N

E W

Y O

R K

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N E

W Y

O R

K N

Y

K C

A L H

O U

N

J W

E R

N E

R

D V

O N

T E

R S

C H

A P

R

IL

C

O M

P A

N Y

H Q

F

IR

E S

T A

T

IO

N

P N

LEGEND OF COLORS AND FINISHES

MARK MATERIAL MANUFACTURER STYLE COLOR SIZE COMMENTS

BASE

PTB-1 PORCELAIN TILE COVE BASE CROSSVILLE COLOR BLOX 2.0 SEA OTTER 6" X 12" ---

QTB-1 QUARRY COVE BASE TILE METROPOLITAN CERAMICS QUARRY BASICS 507 PURITAN GRAY 5.5" X 6" ---

RB-1 RUBBER BASE JOHNSONITE RUBBER WALL BASE TYPE TS 63 BURNT UMBER 4" HEIGHT COILS

CASEWORK AND PARTITIONS

PLAM-1 PLASTIC LAMINATE WILSONART STANDARD LAMINATE FLORENCE WALNUT 993-38 --- CABINETS

SS-1 SOLID SURFACE WILSONART SOLID SURFACE D354SL DESIGNER WHITE --- WINDOW SILLS

SS-2 SOLID SURFACE WILSONART SOLID SURFACE 9223SS ANGEL FALLS --- COUNTERTOPS

TPTN-1 TOILET PARTITION INPRO CORP PARTITIONS SHORELINE P9083 --- ---

CEILING

ACT-1 ACOUSTICAL CEILING TILE USG CEILING SOLUTIONS MARS ACOUSTICAL PANELS SLT, SHADOWLINE TAPERED, WHITE 2'-0" X 2'-0" USE WITH USG DX GRID - WHITE

ACT-2 ACOUSTICAL CEILING TILE USG CEILING SOLUTIONS CLEAN ROOM ACOUSTICAL PANELS SQ, SQUARE EDGE, WHITE 2'-0" X 2'-0" USE WITH USG DXL GRID - WHITE

OPEN EXPOSED STRUCTURE --- --- PT-5 --- SEE CEILING FINISH NOTE 4

PT-6 CEILING PAINT SHERWIN WILLIAMS FLAT SW 7551 GREEK VILLA --- ---

DOORS AND FRAMES

ST-1 STAIN MASONITE NATURAL BIRCH ROTARY CUT ESPRESSO --- FACTORY STAINED DOORS

TP-1 TRIM PAINT SHERWIN WILLIAMS SEMI GLOSS SW7048 URBANE BRONZE --- HOLLOW METAL FRAMES AND DOORS, HANDRAILS, STAIR STRINGERS AND RISERS, AND EXPOSED STEEL COLUMNS

FLOORING

CPT-1 CARPET TILE MANNINGTON CONNECTED COLLECTION SOCIAL SYNERGY 15213 24" X 24" ---

EF-1 ENTRANCE FLOORING CONSTRUCTION

SPECIALTIES GROUP

PEDIMAT AA M2 9327 DRY BROWN 2" TREAD TAPERED ALUMINUM FRAME SYSTEM, EXTEND FROM DOOR TO DOOR

LVT-1 LUXURY VINYL TILE J&J FLOORING LVT LEGEND 5 MM FICTION 1959 18" X 36" ---

PFT-1 PORCELAIN FLOOR TILE CROSSVILLE COLOR BLOX 2.0 SEA OTTER 12" X 24" INSTALLED 1/3 OFFSET

PFT-2 PORCELAIN FLOOR TILE CROSSVILLE COLOR BLOX 2.0 SEA OTTER 3" X 3" MOSAIC SHOWER FLOOR

QT-1 QUARRY FLOOR TILE METROPOLITAN CERAMICS QUARRY BASICS 507 PURITAN GRAY 6" X 6" SEE FLOOR FINISH NOTE 6

SC-1 SEALED CONCRETE --- --- CLEAR --- CLEANED, PREPARED, SEALED

SC-2 CONCRETE PAINT --- FEDERAL STANDARD 23655 YELLOW --- IN APPARATUS BAY, SEE FINISH PLANS. PAINTED ON CONCRETE PRIOR THE SC-1 BEING INSTALLED.

SDT-1 STATIC DISSIPATIVE SOLID VINYL TILE ARMSTRONG EXCELON IMPERIAL TEXTURE 51804 EARTHSTONE GRIEGE 12" X 12" ---

SRT-1 SOLID RUBBER TILE TARKETT INERTIA KN2 EXPEDITION WG 24" X 24" ---

MISC.

GR-1 WALL TILE GROUT LATICRETE PERMACOLOR LIGHT PEWTER 90 --- USED WITH PWT-1

GR-2 FLOOR TILE GROUT LATICRETE PERMACOLOR NATURAL GREY 24 --- USED WITH PFT-1, PFT-2, QT-1, PTB-1 AND QTB-1

OP-1 OPERABLE PARTITION KWIK WALL ACCORDION PARTION VL-8 ORLEANS FRENCH QUARTER R921-13 --- ---

WALL PROTECTION

CG-1 CORNER GUARD INPRO CORP 150 HIGH IMPACT CORNER GUARD SLATE 0237 4"-0" ALL OUTSIDE CORNERS IN CORRIDORS, INSTALL ABOVE BASE TO 4-4" AFF

CR-1 CHAIR RAIL INPRO CORP 2600 CHAIR RAIL SLATE 0237 3" CONFERENCE ROOM AND TRAINING ROOM, SEE FINISH PLAN

SST-1 STAINLESS STEEL INPRO CORP STAINLESS STEEL WALL CLADDING BRUSHED #4 4'-0"x8'-0" SURFACE MOUNTED ABOVE SPECIFIED BASE TO BELOW RANGE HOOD

WALLS

FRP-1 FIBERGLASS REINFORCED PANELS PANOLAM INDUSTRIES PEBBLE FINISH FRP WHITE --- USE MANUFACUTER'S RECOMMENDED TRIM PIECES TO FINISH SYSTEM

MR-1 MIRROR --- --- MIRROR 36"x76" INSTALL 1'-0" AFF

PT-1 FIELD WALL PAINT SHERWIN WILLIAMS EGGSHELL SW7043 WORLDLY GRAY --- ---

PT-2 FIELD WALL PAINT SHERWIN WILLIAMS EGGSHELL SW7045 INTELLETUAL GRAY --- APPARATUS BAY

PT-3 ACCENT WALL PAINT SHERWIN WILLIAMS EGGSHELL SW7586 STOLEN KISS --- SEE FINISH PLAN FOR ACCENT PAINT LOCATION

PT-4 FIELD WALL PAINT SHERWIN WILLIAMS EGGSHELL SW 7551 GREEK VILLA --- DORM ROOMS

PT-5 FIELD WALL PAINT SHERWIN WILLIAMS EPOXY SW7043 WORLDLY GRAY --- ---

PWT-1 PORCELAIN WALL TILE CROSSVILLE COLOR BY NUMBERS WT18 1812 OVERTURE SATIN 6" X 12" INSTALL IN A BRICK PATTERN

WINDOW TREATMENTS

WB-1 WINDOW SHADES CROSSHATCH R100 1% OPEN C8312 EGGSHELL/FOG FIT WINDOW FIELD VERIFY WINDOW SIZES, DORM ROOM WINDOWS, DAY TRAINING ROOM

WB-2 WINDOW SHADES CROSSHATCH R500 5% OPEN C8312 EGGSHELL/FOG FIT WINDOW FIELD VERIFY WINDOW SIZES, OFFICES AND CONFERENCE ROOM

R e v is e d p e r a m e n d m e n t

/0

/2

A

J

O

I

V

U

R

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

I-602

F

IN

IS

H

S C

H E

D U

L E

S

W A

T E

R V

L

IE

T N

E W

Y O

R K

N E

W Y

O R

K D

IS

T

R

IC

T F

E D

E R

A L P

L A

Z A

N E

W Y

O R

K N

Y

K C

A L H

O U

N

J W

E R

N E

R

D V

O N

T E

R S

C H

A P

R

IL

C

O M

P A

N Y

H Q

F

IR

E S

T A

T

IO

N

P N

ROOM NAME ROOM NUMBER FLOOR FINISH BASE FINISH WALL FINISH CEILING FINISH COMMENTS

FIRST FLOOR

APPARATUS BAY 001 SC-1, SC-2 FRP-1 RB-1 FRP-1, PT-2 OPEN FRP-1 ON GYPSUM BOARD WALLS INSTALLED 8'-0" AFF, PT-2 AND RB-1 ON CMU WALLS

CORRIDOR 001E LVT-1 RB-1 PT-1, PT-3 ACT-1 SEE FINISH PLAN FOR ACCENT PAINT LOCATION

VESTIBULE 001EA LVT-1 RB-1 PT-1 ACT-1

LOBBY 001N LVT-1 RB-1 PT-1, PT-3 OPEN SEE FINISH PLAN FOR ACCENT PAINT LOCATION

VESTIBULE 001NA EF-1, LVT-1 RB-1 PT-1 PT-6 SEE FINISH PLAN FOR EF-1 LOCATION

CORRIDOR 001NB LVT-1 RB-1 PT-1, PT-3 ACT-1 SEE FINISH PLAN FOR ACCENT PAINT LOCATION

EQUPMENT WASH AND DISINFECTION 002 SC-1 RB-1 PT-5 ACT-1

WORK ROOM/EQUIPMENT MAINTENANCE 002A SC-1 RB-1 PT-5 ACT-1

CORRIDOR 002E LVT-1 RB-1 PT-1, PT-3 ACT-1 SEE FINISH PLAN FOR ACCENT PAINT LOCATION

VESTIBULE 002E1 LVT-1 RB-1 PT-1 ACT-1

CORRIDOR 002N LVT-1 RB-1 PT-1, PT-3 ACT-1 SEE FINISH PLAN FOR ACCENT PAINT LOCATION

PPE LAUNDRY 003 SC-1 RB-1 PT-5 PT-6

CORRIDOR 003E LVT-1 RB-1 PT-1, PT-3 ACT-1 SEE FINISH PLAN FOR ACCENT PAINT LOCATION

HAZMAT CBRIVE AND SPARE PPE STORAGE 004 SC-1 RB-1 PT-5 ACT-2

VESTIBULE 004E LVT-1 RB-1 PT-1 ACT-1

SCBA MAINTENCE ROOM 005 SC-1 RB-1 PT-5 ACT-2

SCBA COMPRESSOR ROOM 005A SC-1 RB-1 PT-5 ACT-2

HOSE STORAGE 007 SC-1 FRP-1 RB-1 FRP-1, PT-2 OPEN

PPE GEAR STORAGE 008 SC-1 FRP-1 RB-1 FRP-1, PT-2 OPEN

FIRE CHIEF CONFERENCE ROOM 101 CPT-1 RB-1 PT-1 ACT-1

ASSISTANT CHIEF OF FIRE INSPECTION 102 CPT-1 RB-1 PT-1 ACT-1

FIRE CHIEF OFFICE SUITE 103 CPT-1 RB-1 PT-1 ACT-1

ALL GENDER RR/ SHOWER 103B PFT-1, PFT-2 PTB-1 PT-1, PWT-1 PT-6 PFT-2 AT SHOWER FLOOR SLOPE TILE FLOOR TO DRAIN, PWT-1 ON SHOWER WALLS

HAZMAT SAFETY OFFICE 104 CPT-1 RB-1 PT-1 ACT-1

DEPUTY CHIEF OFFICE 105 CPT-1 RB-1 PT-1 ACT-1

ALL GENDER RR/ SHOWER 105B PFT-1, PFT-2 PTB-1 PT-1, PWT-1 PT-6 PFT-2 AT SHOWER FLOOR SLOPE TILE FLOOR TO DRAIN, PWT-1 ON SHOWER WALLS

EMS OFFICE 106 PFT-1 PTB-1 PT-1 ACT-1

FIRE INSPECTORS OFFICE 108 CPT-1 RB-1 PT-1 ACT-1

STAIR 109 SC-1 RB-1 PT-1 OPEN

DISPATCH 110 LVT-1 RB-1 PT-1 ACT-1

UPS 110A SDT-1 RB-1 PT-1 OPEN

ABA ALL GENDER RR 110B PFT-1 PTB-1 PT-1 PT-6

TRAINING OFFICER 111 CPT-1 RB-1 PT-1 ACT-1

NURSING MOTHERS ROOM 112 PFT-1 PTB-1 PT-1 ACT-1

DEPARTMENT TRAINING ROOM 113 CPT-1 RB-1 PT-1 ACT-1

COMPUTER TRAINING AREA 113A CPT-1 RB-1 PT-1 ACT-1

TRAINING STORAGE 113B CPT-1 RB-1 PT-1 ACT-1

ABA ALL GENDER REST ROOM 114 PFT-1 PTB-1 PT-1 PT-6 PFT-2 AT SHOWER FLOOR, PWT-1 ON SHOWER WALLS

AIRLOCK 115A LVT-1 RB-1 PT-1, PT-3

STORAGE 115B LVT-1 RB-1 PT-1 ACT-1, PT-6 PT-6 AT LOCATIONS OF GYPSUM BOARD, SEE RCP

ASSISTANT CHIEF/ SHIFT SUPERVISOR SUITE 116 CPT-1 RB-1 PT-1 ACT-1

STATION CAPTAIN SUITE 117 CPT-1 RB-1 PT-1 ACT-1

ALL GENDER RR/ SHOWER 117B PFT-1, PFT-2 PTB-1 PT-1, PWT-1 PT-6 PFT-2 AT SHOWER FLOOR, PWT-1 ON SHOWER WALLS

CLEAN UP ROOM 118 SC-1 RB-1 PT-5 PT-6

ABA ALL GENDER RR 118A SC-1 RB-1 PT-5 PT-6

ABA SHOWER 118B SC-1, PFT-2 PTB-1, RB-1 PT-1, PWT-1 PT-6 PFT-2 AT SHOWER FLOOR, PWT-1 ON SHOWER WALLS

SHOWER 118C SC-1, PFT-2 PTB-1, RB-1 PT-1, PWT-1 PT-6 PFT-2 AT SHOWER FLOOR, PWT-1 ON SHOWER WALLS

SHOWER 118D SC-1, PFT-2 PTB-1, RB-1 PT-1, PWT-1 PT-6 PFT-2 AT SHOWER FLOOR, PWT-1 ON SHOWER WALLS

FITNESS ROOM 119 SRT-1 RB-1 PT-1, PT-3, MR-1 ACT-1 SEE FINISH PLAN FOR ACCENT PAINT AND MIRROR LOCATION

SAUNA SHOWER ROOM 119 C PFT-1, PFT-2 PTB-1 PT-1, PWT-1 ACT-2 PFT-2 AT SHOWER FLOOR, PWT-1 ON SHOWER WALLS

SAUNA 119A PFT-1 PTB-1 PWT-1 ACT-1

STORAGE 119B SRT-1 RB-1 PT-1 ACT-1

AIR LOCK 120 LVT-1 RB-1 PT-1 ACT-1

ABA ALL GENDER RR 121 PFT-1 PTB-1 PT-1 PT-6

J.C. 122 PFT-1 PTB-1 FRP-1 ACT-2 INSTALL FRP-1 ABOVE BASE TO CEILING

RECYCLE ROOM 123 PFT-1 PTB-1 FRP-1 ACT-2 INSTALL FRP-1 ABOVE BASE TO CEILING

DAY/ TRAINING ROOM 124 LVT-1 RB-1 PT-1, PT-3 ACT-1 SEE FINISH PLAN FOR ACCENT PAINT LOCATION

KITCHEN 124A QT-1 QTB-1 PT-1, PWT-1, SST-1 ACT-2 SEE FINISH PLAN FOR SST-1 LOCATION, INSTALL PWT-1 ABOVE AND BELOW CASEWORK

PANTRY 124AA LVT-1 RB-1 PT-1 ACT-1

PANTRY 124AB LVT-1 RB-1 PT-1 ACT-1

VESTIBULE 124C EF-1 RB-1 PT-1 ACT-1

ELECTRIC 125 SC-1 RB-1 PT-1 OPEN

TELECOM 126 SDT-1 RB-1 PT-1 OPEN

STAIR 3 127 SC-1 RB-1 PT-1 OPEN

MECHANICAL 151 SC-1 RB-1 PT-1 OPEN

SECOND FLOOR

CORRIDOR 022N LVT-1 RB-1 PT-1, PT-3 ACT-1 SEE FINISH PLAN FOR ACCENT PAINT LOCATION

J.C. 202 PFT-1 PTB-1 FRP-1 ACT-1

GENERAL ADMIN STORAGE 204 LVT-1 RB-1 PT-1 ACT-2 INSTALL FRP-1 ABOVE BASE TO CEILING

STAIR 1 206 SC-1 RB-1 PT-1 ACT-1

RECREATION ROOM 208 LVT-1 RB-1 PT-1, PT-3 ACT-1

TELECOM 212 SC-1 RB-1 PT-1 ACT-1

ELECTRICAL 214 SC-1 RB-1 PT-1 OPEN

STAIR 2 216 SC-1 RB-1 PT-1 ACT-1

STAIR 3 217 SC-1 RB-1 PT-1 ACT-1

MECHANICAL 218 SC-1 RB-1 PT-1 OPEN

GENERAL ADMIN STORAGE 218A LVT-1 RB-1 PT-1 ACT-1

LAUNDRY ROOM 225 PFT-1 PTB-1 PT-1, PWT-1 PT-6 PWT-1 ON WET WALLS

MENS SHOWER 228A PFT-1, PFT-2 PTB-1 PT-1, PWT-1 PT-6 PFT-2 AT SHOWER FLOOR, PWT-1 ON SHOWER WALLS

WOMENS DORM REST ROOM 230 PFT-1, PFT-2 PTB-1 PT-1, PWT-1 PT-6 PFT-2 AT SHOWER FLOOR, PWT-1 ON SHOWER WALLS

WOMENS SHOWER 230A PFT-1, PFT-2 PTB-1 PT-1, PWT-1 PT-6 PFT-2 AT SHOWER FLOOR, PWT-1 ON SHOWER WALLS

FINISH SCHEDULE - TYPICAL DORM ROOM

ROOM NAME FLOOR FINISH BASE FINISH WALL FINISH CEILING FINISH

DORM CPT-1 RB-1 PT-4 ACT-1

R e v is e d p e r a m e n d m e n t

/0

/2

Sheets
I-601 - LEGEND OF COLORS AND FINISHES
I-602 - FINISH SCHEDULES