This document is an Amendment of Solicitation (Standard Form 30) for the Watervliet Arsenal 3 CO HQ Fire Station project (Solicitation W912DS25RA009). Amendment 0004 provides clarifications and updates to various drawings, specifications, and technical details based on bidder inquiries. Key changes include revisions to drawings such as ET-601, I-601, I-602, A-602, and A-604, as well as specification sections 08 71 00, 09 51 00, and 12 24 13.
The amendment addresses multiple technical questions from potential bidders, including specifications for door hardware, window treatments, electrical systems, structural steel details, and LEED certification requirements. Notable clarifications include confirming that all window treatments will be manual, the electrical contractor is responsible only for pathways for access control and CCTV systems, and the project aims to achieve formal LEED Silver certification. The government will provide a geotechnical report, and all exterior window glazing must be tempered glass meeting blast requirements. The bid date remains unchanged, and bidders must acknowledge receipt of this amendment prior to the specified date.
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 30 00 - Available Information
Miscellaneous text in this section has been modified to:
Watervliet Arsenal
3 CO HQ Fire Station
W912DS25RA009
Amendment 0004
AMENDMENT 0004 to DRAWINGS and SPECIFICATIONS for Watervliet Arsenal 3 CO HQ Fire Station.
TO OFFERORS
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
None
2. The following DRAWINGS have been REVISED and REISSUED:
ET-601
I-601, I-602
M1703
A-602, A-604
ES103
3. The following DRAWINGS have been ADDED:
None
4. The following DRAWINGS have been DELETED:
None
SPECIFICATIONS
W912DS25RA0090004
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
None
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
08 71 00
09 51 00
12 24 13
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
None
PROPOSER'S QUESTIONS AND GOVERNMENT REPLY
Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors "for information only" and do not revise the solicitation, plans or specifications.
BIDDER INQUIRY: ET001 drawing for the (FL) Floor box states to provide 4- 8 position cat 6 jacks - ET601 note # 9 calls out to provide 2 cat 6 cables. Please clarify the correct quantities of data jacks to be provided in floor boxes.
RESPONSE: See amendment attachments, update to ET-601.
BIDDER INQUIRY: Drawing ET601 - Keyed Note #1 states to use 4 post racks. Drawing ET401 keyed note #2 states to use 2 post racks. Please clarify preference
RESPONSE: See amendment attachments, update to ET-601.
BIDDER INQUIRY: On Drawings EP601 & ES103 show the MV cables coming out of Existing manhole #52. Please clarify what you would like done once the duct bank is terminated and wires pulled into the existing manhole? i.e: Terminate to existing wiring.
RESPONSE: See amendment attachments, update to ET-601.
BIDDER INQUIRY: Drawing S108 along 7 line from K to F shows tube steel for brick relief support;
nothing is called out above at the roof level. Should relief support also be provided there per detail 1 /S505?
RESPONSE: BRICK RELIEF SUPPORT IS TO BE PROVIDED WITH THE SAME SECTIONS AND
DETAILS AS THE SECOND FLOOR. SECTIONS 2/S-503 AND 5/S-503 APPLY.
BIDDER INQUIRY: Drawing S111 calls out 66 tube steel infill along line1. Please confirm:
- Final TS size
- Required weld pattern
- Whether a bent plate should be added on top to match roof slope
RESPONSE: "PROVIDE HSS6x6x1/4.
PROVIDE STAGGERED 1/4"" FLARE BEVEL GROOVE WELD 2-12 BOTH SIDES OF TUBE TO
WIDE FLANGE.
PROVIDE BENT PLATE."
BIDDER INQUIRY: Detail 3/S504 calls out "see plan" for perimeter channel, but none is shown. Should this be a C68.2 channel to match adjacent details?
RESPONSE: PERIMETER CHANNEL IS TO BE C6X8.2 TO MATCH ADJACENT DETAILS.
BIDDER INQUIRY: In sections such as 3 & 4/S502, galvanized steel is called out. Please confirm if all exterior steel is to be galvanized, or only items specifically noted.
RESPONSE: GALVANIZE ALL EXTERIOR STEEL.
BIDDER INQUIRY: Detail 1/S503 shows LH joists bearing on a cap plate and also 843/4 galvanized Ls under the cap plate. Please confirm both are required.
RESPONSE: BOTH CAP PLATE AND ANGLES ARE REQUIRED.
BIDDER INQUIRY: Section 3/S601 references a "loose steel lintel - see schedule," but no schedule is provided. Please provide or confirm lintel sizes.
RESPONSE: "FOR OPENINGS UP TO 4', PROVIDE L4 X 3 1/2 X 5/16.
FOR OPENINGS FROM 4' - 6', PROVIDE L5 X 3 1/2 X 5/16.
FOR OPENINGS FROM 6' UP TO 8', PROVIDE L6 X 3 1/2 X 5/16.
NOTES:
1. RE: ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR OPENING SIZE
AND LOCATION.
2. CONNECT ALL ANGLES TO ALL 2 AND 3 ANGLE LINTELS BACK TO BACK AT 2' OC MAX.
3. ALL ANGLES LONG LEG VERTICAL, UNLESS OTHERWISE NOTED.
4. BEARING END OF STEEL LINTEL AT CONTROL JOINT SHALL BE WRAPPED WITH
BUILDING PAPER.
5. PROVIDE MINIMUM 6"" BEARING ON BRICK OR SOLID CONCRETE BLOCK.
6. PROVIDE MINIMUM 8"" x WALL THICKNESS x 8"" HIGH GROUTED CMU OR BRICK
BEARING PAD UNDER ALL LINTELS, UNO. GROUT JAMBS OF MASONRY OPENINGS 6' AND
LARGER FULL HEIGHT FOR 8"".
7. MINIMUM WIDTH.
8. CONNECT LINTEL TO COLUMN IF MASONRY OPENING IS ADJACENT TO COLUMN AND
LINTEL HAS LESS THAN 200MM BEARING ON CMU BEYOND COLUMN FLANGES.
9. STEEL LINTELS IN EXTERIOR WALLS ARE TO BE GALVANIZED."
BIDDER INQUIRY: Several architectural sections (e.g., 1 & 2/A508, 1 & 2/A505) call out steel framing with "see structural drawings," but corresponding members are not shown on structural. Please clarify what steel is required.
RESPONSE: "FOR CONNECTIONS TO HSS COLUMNS, THROUGHBOLT ALL BOLTS.
FOR DETAIL 1/A-505, PROVIDE L6x6x3/4"", BOLTED TO L8x6x.75"", w/ 3/4"" DIAMETER A325
BOLT @ 2' OC FOR BOTH LOCATIONS.
FOR DETAIL 2/A-505, PROVIDE L6x4x.75"", w/ 3/4"" DIAMETER A325 BOLT @ 2' OC FOR THE
STOREFRONT WINDOW CONNECTION. AT THE CLERESTORY WINDOW CONNECTION
PROVIDE L6x4x1/2"" w/3/4"" DIAMETER A325 BOLT @ 3' OC. STAGGER THESE
CONNECTIONS 6"" SO AS NOT TO COLLIDE.
FOR DETAIL 1/A-508, PROVIDE L8x8x3/4"" w/ 5/8"" DIAMETER A325 BOLT @ EACH STUD.
FOR DETAIL 2/A508 PROVIDE L8x8x3/4"" w/ 3/4"" EXPANSION BOLT WITH 4/5"" EMBED @ 2'
OC."
BIDDER INQUIRY: Note on 6/S501 says "see plan" for bracing size; plan does not show. Based on other sections (e.g., 3/S501), should all bracing be 661/2 TS?
RESPONSE: ALL BRACING IN PERIMETER BRACED FRAMES IN THE APPARATUS BAY TO
BE HSS6x6x1/2.
BIDDER INQUIRY: Drawing S109 does not show a deck perimeter support detail. Please clarify required member or detail.
RESPONSE: PROVIDE L6x6x5/8 w/ 3/4" EXPANSION BOLT @ 36" OC
BIDDER INQUIRY: Drawing S-105 is missing key notes 6 and 7 that are indicated on the plan view but not listed under key notes?
RESPONSE: KEY NOTE 6 INDICATES A 10" METAL STUD WALL, KEY NOTE 7 INDICATES A
6" METAL STUD WALL.
BIDDER INQUIRY: Can you confirm that the new trench drains are formed in place as per detail 4 /S301?
RESPONSE: TRENCH DRAINS ARE FORMED IN PLACE PER DETAIL 4/S301.
BIDDER INQUIRY: Door Hardware Clarifications (Sets H03, H04, H05, H06, H09, H13):
H03 & H04: Drawings show both cylindrical lock (F07) and CVR panic device; only one can be provided.
If CVR panic device is required, should it be installed on each leaf?
If cylindrical lock is acceptable, do you want manual flush bolts on the inactive leaf, or automatic flush bolts with coordinator?
Should the inactive leaf also receive a closer?
H05: Should these doors receive push/pull hardware or an F20 lock?
H06: Should this door receive push/pull hardware or an F21 lock?
H09: Drawings show an exit device with a mag/shear lock, which creates conflicting egress/ingress control.
Will there be a motion sensor on the push side to release the magnet for egress?
Should the panic device include request to exit, delayed egress, electronic latch retraction, or electronic trim control instead?
H13: Shows a mag/shear lock but no lever, pull, or exit device; how is the door intended to be operated?
Should this have push/pull hardware or an exit device?
If an exit device, do the same questions from H09 apply?
RESPONSE: See attached updated Spec 08 71 00.
H03 and H04:, cylindrical lock with Manual Flushbolts on inactive leaf, (See attached Spec)
Inactive Leaf should receive a closer
H05: F20 Lock, push pull hardware deleted from section (see attached Spec)
H06: F21 Lock, push pull Hardware deleted from section (see attached spec)
H09 and H13: Electromagnetic lock has been eliminated from section, Replaced with RIM MOUNTED ELECTRIC STRIKE E09361 to be used with CAC reader and allow for free egress.
BIDDER INQUIRY: For spec 23 52 00, sect 2.10.1, who will be responsible for providing the Continuous Emissions Monitoring CEMS?
RESPONSE: This would be up to the GC to coordinate his subs, but typically the mechanical contractor would supply this.
BIDDER INQUIRY: I-601 calls for WB-1 and WB-2 however these are not taged in plan or a window treatment schedule provided. Please provided a floor plan with window treatment tags.
RESPONSE: Per "LEGEND OF COLORS AND FINISHES" All DORM ROOM windows and all DAY TRAINGING ROOM windows will receive WB-1 (103A, 105A, 124, and 17 rooms on the second floor).
all OFFICE windows and all CONFERENCE ROOM windows will recive WB-2 (117, 110, 101, 103, and 105). Update to I-601.
BIDDER INQUIRY: Rooms 112 and 225 are not identified on the finish schedule.
RESPONSE: Updated schedule shows rooms 112 and 225. Update to I-602.
BIDDER INQUIRY: Specification section 12 24 13 section 2.1.1 and 2.1.2 are contradictory. Please confirm what window treatments are to be motorized and/or manual.
RESPONSE: All window treatments are to be manual. Update Spec 12 24 13.
BIDDER INQUIRY: Could we please get a fire alert & reporting riser for this project along with a cable list?
RESPONSE: Fire alarm riser diagram provided in contract drawings indicates design intent. Contractor to provide fire alarm riser diagram with shop drawing submittal for approval.
BIDDER INQUIRY: Spec 013329 1.6.14.1.1 states:
"Project is already registered with TPC organization to achieve LEED v4 BD+C Silver..."
However, the project does not appear to be registered with USGBC, and the Energy & Sustainability Record Card provided is for a different project.
Please clarify:
Is the project currently registered with USGBC under LEED v4 BD+C Silver?
If not, is it the GC's responsibility to register and pay associated fees?
Does the Government intend to pursue and pay for formal USGBC certification (including consultant, review fees, documentation, and plaque)?
Or is the requirement only to design and build in alignment with the Federal Guiding Principles, without formal certification?
RESPONSE:
The project is registered through the LEED Online portal (LEED V4) and the initial registration fee has been paid. It cannot be registered under Silver, though Silver is the goal.
While the project is registered and the initial registration fee has been paid, all review fees (Split review:
one design review, and one construction review) will fall to the contractor.
It is the government's intention to secure formal LEED Silver recognition and a plaque be procured and installed. Note that all design credits have been developed, documented, and uploaded. The contractor will be tasked with paying the review fee to start the design credit review process. The design team will support the contractor in the event USGBC replies with inquiries or requests for additional information regarding the design credits. The contractor will be expected to achieve all construction credits necessary to achieve LEED silver, and to document, upload, and pay all associated fees to that end.
Incorrect. The Government expects formal and recognized certification as stated above.
BIDDER INQUIRY: Is there a geotechnical report of the current site or if GC's will be asked to carry this in their pricing.
RESPONSE: Geotechnical Report attached.
The drawings contain borehole logs and a borehole location plan.
The specifications contain depth to groundwater that was encountered during the geotechnical site-exploration program.
It is the contractor's responsibility to study the drawings and specifications during the bidding phase to get an idea about what to expect during excavation and construction phase.
BIDDER INQUIRY: Project manual provides a specification section for sheet applied and fluid applied air barriers. The drawings only call out fluid applied air barriers.
RESPONSE: Fluid applied air barriers to be used on this project unless otherwise indicated, Please disregard section pertaining to Sheet applied air barriers.
BIDDER INQUIRY: The specifications do not include any sections for electronic access control or CCTV systems. Please provide specs for these systems if they are to be contractor-furnished and installed.
RESPONSE: Electrical Contractor Is responsible for pathways only for access control and cctv system.
DRAWINGS FOR THIS WORK ARE DIAGRAMMATIC AND
INTENDED TO CONVEY THE EXTENT, GENERAL ARRANGEMENT AND LOCATION OF THE
WORK.
BIDDER INQUIRY: Details 1 & 2/S506 note 95 support tube steel (see plan) for shelf angles; these are not shown on plan. Please confirm exact locations.
RESPONSE: Details 1 & 2/S506 are for exterior brick walls in the apparatus bay and are suitable for above doors and windows along grid lines B & J. They may be used along grid line 1 for brick support as required.
BIDDER INQUIRY: Is the electrical contractor for supplying the access control / CCTV system? If so, please provide a specification.
RESPONSE: Electrical Contractor Is responsible for pathways only for access control and cctv system.
DRAWINGS FOR THIS WORK ARE DIAGRAMMATIC AND
INTENDED TO CONVEY THE EXTENT, GENERAL ARRANGEMENT AND LOCATION OF THE
WORK.
BIDDER INQUIRY: On drawing MI703, EF-5 control schematic, the control point list has note to interlock the EF to HWDH-2. I do not see HWDH-2 on the drawings or schedule. Is there an HWDH-2 unit?
RESPONSE: Revised HWDH-2 to HWDH-1. There is only one HWDH on the project. Updated drawing
MI703.
BIDDER INQUIRY: Drawing P105 - Compressed Air Drops: Please specify the required size of the compressed air line drops shown on this sheet.
RESPONSE: Contractor shall provide 3/4" compressed air drops and associated appurtenances to 48" A.
F.F.
BIDDER INQUIRY: The legend on drawing ET001 shows symbols for a public address system and an intercom system. However, these systems do not show up on the floor plans. Are these systems part of the project? Please advise.
RESPONSE: Per the Contract drawing ET001 general note 1 "ALL SYMBOLS, ABBREVIATIONS
AND GENERAL NOTES SHOWN ARE NOT NECESSARILY USED ON
THIS PROJECT."
BIDDER INQUIRY: PLEASE PROVIDE HARDWARE SETS FOR DOORS #001N & 001NA AS THE
DOOR SCHEDULE IS BLANK FOR THESE.
RESPONSE: See attached Revised A-602 with Hardware set H11 for 001N and H17 for 001NA.
Updated spec 08 71 00.
BIDDER INQUIRY: PLEASE CONFIRM THAT LAMINATED EXTERIOR GLAZING IS NOT
REQUIRED FOR THIS PROJECT TO MEET BLAST REQUIREMENTS.
RESPONSE: All exterior window glazing to be tempered glass and must meet blast requirements listed in Section 08 51 13.
BIDDER INQUIRY: PLEASE CONFIRM THERE IS NO INTERIOR WINDOW TYPE "F" AS
SHOWN ON A-604 AS THE FIRE RATED VERSION OF TYPE "E".
RESPONSE: See attached Revised Sheet A-604 with Fire rated window listed as Type E, Type F is eliminated.
BIDDER INQUIRY: Please confirm where the OP-1, operable partition, is located. This is showin in the specification and the material legend, but not the location. Please Clarify
RESPONSE: Operable Partition is the accordion door in Room 113A.
BIDDER INQUIRY: Please provide a specification on opening 113E, the accordian door as per door schedule.
RESPONSE: Operable Partition/ Accordion door shall be installed per manufacturer recommendations. It must meet requirements. Listed in the drawings and Send submittals from manufacturer to COR/ DO for review and approval.
BIDDER INQUIRY: Please clarify where the steel shelving is located on this project.
RESPONSE: See interior drawings for all steel shelving locations. I-107- I-109.
BIDDER INQUIRY: Please provide a specification and elevation on FRP-1, shown on Drawing I-601, to get an accurate estimate on this.
RESPONSE: Product specified as a basis of design on Sheet I-601
Room 008 PPE Gear Storage receives FRP-1 8' high around the room and PT-2 above that to the ceiling.
Room 007 Hose Storage receives FRP-1 8' high on Plan west and plan north walls and PT-2 above that to the ceiling.
Recycle Room 123 and Janitor Closets 122 and 202receive FRP-1 floor to ceiling.
| IDCode: J |
| Page: 1 |
| Pages: 9 |
| AmendNo: 0004 |
| EffDate: 18 AUG 2025 |
| ReqNo: |
| ProjNo: PN81503 |
| IssCode: W912DS |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW YORK |
KO CONTRACTING DIVISION, 26 FEDERAL PLAZA ROOM 16 300
NEW YORK, NY 10278-0004
UNITED STATES
DENISSE SOTO, EMAIL: DENISSE.M.SOTO@USACE.ARMY.MIL TELEPHONE: 000-000-0000
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912DS25RA009 |
| SolDate: 11 JUL 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE RESPONSES TO RFIS. BID DATE REMAINS THE SAME. |
NOTE: BIDDERS MUST ACKNOWLEDGE RECEIPT OF THIS AMENDMENT BY THE DATE SPECIFIED IN THE SOLICITATION (OR AS AMENDED) BY ONE OF THE FOLLOWING METHODS: IN THE SPACE PROVIDED ON THE SF1442, BY SEPARATE LETTER, OR BY SIGNING THE BLOCK 15 BELOW. FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
| ContNameTitle: |
| CoNameTitle: NICHOLAS EMANUEL |
| ContDate: |
| CODate: 18 AUG 2025 |