ES103 - ELECTRICAL - SITE PLAN - POWER -TELECOMMUNICATIONS.pdf
PDF 316 KB Posted
- Attached to
- WVA Fire Station Construction Acquisition Federal contract opportunity
- Solicitation number
- W912DS25RA009
About this file
This document is an Electrical - Site Plan sheet (ES103) for a 3 Company Fire Station project at Watervliet Arsenal in New York, prepared by the US Army Corps of Engineers. The detailed site plan includes specifications for electrical infrastructure, telecommunications, and utility connections. Key elements include a 750KVA/13.2 KV substation, 600KW diesel backup generators, multiple ductbanks for electrical and communications infrastructure, and provisions for six future EV charging stations. The plan involves complex utility routing, including a 600 pair copper cable from Building 44, fiber optic cables, and new electrical and communications manholes. The document emphasizes contractor responsibilities for utility verification, coordination with facility managers, and adherence to specific installation requirements, with a planned issue date of April 29, 2025 and a revision noted on August 5, 2025.
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UGT
UGT
UGT
UGT
UGT
UGT
UG
T
X
UG
E
UG
E
W
1 24
1 21 1
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
CCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM
X X
X
XXXXXXXX
X X
X
X X X X X X X X
EE
E
COMM
ES103
EL
EC
TR
IC
AL
SI
TE
P
LA
N
PO
W
ER
,T
EL
EC
O M
M U
N
IC
AT
IO
N S
SHEET KEYNOTES
GENERAL NOTES
1. REFER TO SHEET E001 FOR SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES.
2. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
ACCURACY AND COMPLETENESS OF UTILITIES SHOWN ON THIS DRAWING WITH
THE FACILITY MANAGER PRIOR ANY CONSTRUCTION ACTIVITY AND REPORT
DISCREPANCIES TO THE COR.
3. MINIMUM BURIAL DEPTHS AND SUFFICIENT CLEARANCES BETWEEN NEW AND
EXISTING UTILITIES AND/OR STRUCTURES SHALL BE COORDINATED WITH THE
RESPECTIVE DISCIPLINES AND MAINTAINED IN ACCORDANCE WITH
APPLICABLE CODES AND AUTHORITY HAVING JURISDICTION. NEW UTILITIES
SHALL BE PLACED ABOVE OR BELOW EXISTING UTILITIES/STRUCTURES AT
CROSSINGS IN ACCORDANCE WITH REQUIRED DEPTHS AND CLEARANCES.
4. ALL EMPTY CONDUITS SHALL BE PROVIDED WITH PULL STRINGS.
5. REFER TO EP600 SERIES FOR ONE LINE DIAGRAMS.
6. PROVIDE BOLLARDS FOR EXTERIOR ELECTRICAL EQUIPMENT PER UFC
3-550-01.
7. ELECTRICAL SERVICE SHALL BE PROVIDED TO THE SITE BY WATERVLIET
13.2KV DISTRIBUTION SERVICE, THE CONTRACTOR SHALL CONTRACT
DIRECTLY TO MAKE THE SERVICE CONNECTION.
1. EXISTING ELECTRICAL MANHOLE #52.
2. SIX WAY CONCRETE-ENCASED SCHEDULE 40 5" PVC DUCTBANK.
3. SIX WAY CONCRETE ENCASED SCHEDULE 40 4" PVC DUCTBANK.
4. ELECTRIC RM #125
5. NEW ELECTRICAL MANHOLE
6. 750KVA/13.2 KV/3P/4W/65 KAIC SUBSTATION IN AN OUTDOOR WALK-IN
WEATHERPROOF ENCLOSURE
7. 600KW/480Y/277V/3P/4W DIESEL BACKUP GENERATORS WITH CONCRETE PAD IN
NEMA 3R EXTERIOR ENCLOSURE
8. 4-WAY 4 IN. SCHEDULE 40 PVC CONCRETE ENCASED DUCT BANK. 600 PAIR #24
AWG PE-89 OSP COPPER CABLE FROM BUILDING 44 THROUGH MH44 TO THE
NEW TELECOMM RM #126. ONE OF THE 4" CONDUITS WILL HAVE (3) 3X3"
FABRIC MESH INTERDUCTS FOR FIBER. 24 ST SM FOC AND A 12 ST MM FOC
(FOR THE FIRE CENTRAL ALARM SYSTEM) WILL RUN THROUGH THIS DUCTBANK
FROM BLDG 44 TO THE NEW TELECOM RM #126. COORDINATE WITH NEC FOR
ADDITIONAL REQUIREMENTS.
9. NEW COMMUNICATIONS DUCTBANK CONTINUES TO COMM MH #44. IT IS THE
SOLE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THAT ALL
TELECOMMUNICATIONS INFRASTRUCTURE ORIGINATING FROM BUILDING 44,
ROUTED THROUGH MANHOLE 44, AND TERMINATING AT THE NEW FIRE
STATION BE FULLY INSTALLED AND OPERATIONAL PRIOR TO THE
CONSTRUCTION OF RETAINING WALL #1 AT FARLEY DRIVE INTERSECTION. TO
ENSURE CONTINUITY OF SERVICE AND PREVENT FUTURE DISRUPTIONS, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE RESTORATION OF
ANY ROADWAYS FOLLOWING THE INSTALLATION OF THE DUCTBANK.
COORDINATE WITH DPW TO ENSURE THE NEW DUCTBANKS ARE NOT IN
CONFLICT WITH THE NORTH APRON AND ITS RETAINING WALL. REFER TO
SHEET ES104 FOR CONTINUATION.
10. NEW COMMUNICATIONS MANHOLE
11. TELECOMMUNICATIONS RM #126
12. ROUTE PULLSTRING AND CONDUIT FROM PANEL AB (APPARATUS BAY 001) TO
THE HANDHOLES FOR SIX FUTURE EV CHARGING STATIONS.
13. APPROXIMATE LOCATION OF PANEL AB LOCATED IN APPARATUS BAY 001.
N
20'10' 40'0
SCALE: 1" = 20'-0"
A1 ELECTRICAL - SITE PLAN
1" = 20'
W
AT
ER
VL
IE
T
AR
SE
N
AL
N Y
C
O M
PA
N
Y
FI
R E
ST
AT
IO
N
PN
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
M .D
AV
IS
M .D
AV
IS
M .D
AV
IS
M .G
IU
R
G
IU
AP
R
IL
9, IS
SU
E
D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
, N
EW
Y
O R
K, N
Y
(TYP. OF 6)
R
EV
IS
ED
P
ER
A
M
EN
D M
EN
T
A U
G
AutoCAD SHX Text
AutoCAD SHX Text
| Sheets and Views |
| ES103 |
| Sheet 1 |
File details come from the government source that posted it. Updated .