S02 - ATT 8 - 581-22-700 - 100 Drawings Part-6 of 24.pdf
PDF 19 MB Posted
- Solicitation number
- 36C77626R0025
About this file
This document is a set of 100% Construction Documents (detailed architectural and engineering drawings) for the EHRM Infrastructure Upgrades at VA Huntington, located at 1540 Spring Valley Drive, Huntington, WV 25704-9300. The project is identified as 581-22-700 and is being executed by SPEES Design Build with professional services provided by an architect/engineer of record.
The construction documents comprise multiple detailed plans and specifications across fire protection, plumbing, mechanical, and HVAC systems. Key construction elements include window security details with expanded steel mesh, EPDM roof penetration details, semi-recessed fire extinguisher cabinets, and comprehensive building-wide infrastructure. The documents detail multi-phase construction work including Phase 1A (demolition and initial CRAC unit relocation), Phase 1B (data center installation with wet pipe sprinkler systems, HVAC ductwork, piping, and clean agent fire suppression), and Phase 2A-2B (final HVAC and fire protection system completion). Construction specifications require strict compliance with NFPA 13 for sprinkler systems, manufacturer requirements for all equipment installation, coordination with the VA Contracting Officer's Representative (COR), and adherence to applicable federal codes and VA standards. The document set includes floor plans, roof plans, reflected ceiling plans, detailed piping and ductwork layouts, and comprehensive general notes addressing demolition, fire protection, plumbing, and mechanical requirements with multiple keynotes and specifications for equipment installation and testing.
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO. 9 3/4-INCH 10-GAUGE FLATTENED EXPANDED
STEEL SECURITY MESH. SECURELY ANCHOR TO
WINDOW FRAME.
INSULATION.
EXISTING GLAZING TO BE REPLACED WITH A
SPANDREL PANEL IN EXISTING WINDOW FRAME
OR NEW SPANDREL WINDOW.
FRT PLYWOOD PER DETAIL 3/AE421. PAINTED WHITE.
INTERIOREXTERIOR
UNDERSIDE OF
STRUCTURE ABOVE
(OR INTERSTITIAL
FLOOR, WHERE
OCCURS)
DEMOLISH EXISTING ACT
ON TR SIDE ONLY,
TYPICAL
EXISTING ACT TO
REMAIN IN ADJACENT
ROOMS, TYPICAL
EXISTING MTL STUD, TYPICAL
EXISTING TOP PLATES
AP SEALANT OR HIGH GRADE SEALANT
FIELD FABRICATED METAL HOOD
ACCEPTABLE PRIMER
9" QUICKSEAM FORMFLASH
CONTINUOUS BEAD OF LAP
SEALANT (SEE NOTE #3)
2" (51 mm)
MEMBRANE ADHESIVE
(ADHERED SYSTEM ONLY)
CONTINUOUS BEAD
OF LAP SEALANT
(SEE NOTE #3)
EPDM MEMBRANE
5" QUICKSEAM
FLASHING
INSULATION
SUBSTRATE
INSULATION
SUBSTRATE
PENETRATION
NOTE:
1. REMOVE ALL EXISTING FLASHING, LEAD, ETC.
PIPE SURFACE MUST BE FREE OF ALL RUST, GREASE,
INSULATION, ETC.
2. PENETRATION MUST BE ANCHORED TO ENSURE STABILITY.
3. APPLY LAP SEALANT AROUND ENTIRE PERIMETER OF FLASHING.
4. DO NOT USE WHEN SERVICE LINE TEMPERATURE EXCEEDS 180 f (82C).
5. ADDITIONAL MEMBRANE SECUREMENT REQUIREMENT WHEN
PENETRATION EXCEEDS 12" DIAMETER.
WALL ASSEMBLY AS NOTED
SEMI-RECESSED FIRE
EXTINGUISHER CABINET
LINE OF WALL BEYOND
FIRE EXTINGUISHER
CAULKING AT PERIMETER,
TYP.
A .F
.F T
O H
A N
D L E
WALL ASSEMBLY AS NOTED
SEMI-RECESSED FIRE
EXTINGUISHER CABINET
LINE OF WALL BEYOND
FIRE EXTINGUISHER
CAULKING AT PERIMETER,
TYP.
FLOOR PLAN SECTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:0 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /G
E N
E R
A L
S H
E E
T S
.r v t A-604
DETAILS
MA ME/RB
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
1 1/2" = 1'-0"
WINDOW SECURITY - DETAIL
NTS
PARTIAL HEIGHT WALL/CEILING
NTS
EPDM ROOF - PENETRATION DETAIL
KEYNOTES
CONTRACTOR HAS OPTION TO PATCH HOLES & TAPE
JOINTS ON UNDERSIDE OF EXISTING GYPSUM PANELS @
UNDERSIDE OF INTERSTITIAL FLOOR OR ADD NEW LAYER
OF 1/2" GYPSUM BOARD THAT IS TAPED & FINISHED.
INSTALL GYP BOARD EACH SIDE OF EXISTING MTL STUDS
FROM EDGE OF EXISTING GYP TO STRUCTURE ABOVE.
APPLY FIRE TAPE ON EDGES, SEAMS AND HOLES OF GYP
BOARD ON SURFACES NOT ON ABOVE SUSPENDED
CEILING. PROVIDE LEVEL 4 FINISH WHERE WALL
SURFACES ARE EXPOSED TO VIEW.
GENERAL NOTES
1. SEE MECH SHEETS FOR COORDINATION ON ROOF
PATCHES.
Revisions: Date:
3" = 1'-0"
SEMI-RECESSED FEC
09/03/20259/3/2025 194 OF 693
2"
8.5"W X 5.5"H 5.0"W X 4.5"H
A
B
C
D
E
IN-01.31
IN-01.02
FIRE
EXTINGUISHER
CABINET
WALL
F
G
IN-01.31
2.5"W x 8.5"H SIDE FACING SIGN
IN-01.02
2.5"W x 8.5"H FRONT FACING SIGN
F
G
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:0 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /G
E N
E R
A L
S H
E E
T S
.r v t AW001
IN-03.01 - ROOM NUMBER SIGN & SIGNAGE
SCHEDULE
MA ME/RB
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
SIGNAGE MESSAGE SCHEDULE
BLDG. # ROOM NUMBER SIGNAGE ID
01S BB100B-1S IN-03.01-1
01S T1-00G IN-03.01-2
01S T4-00G IN-03.01-3
01W T2-00G IN-03.01-4
01S T1-01 IN-03.01-5
01S T4-01 IN-03.01-6
01W T2-01 IN-03.01-7
01S T1-02 IN-03.01-8
01S T4-02 IN-03.01-9
01W T2-02 IN-03.01-10
01S T1-03 IN-03.01-11
01S T4-03 IN-03.01-12
01W T2-03 IN-03.01-13
01S T1-04 IN-03.01-14
01S T4-04 IN-03.01-15
01S T1-05 IN-03.01-16
01S T4-05 IN-03.01-17
02 T3-00B IN-03.01-18
02 T3-00G IN-03.01-19
04 4001 IN-03.01-20
05 5044 IN-03.01-21
06 6113 IN-03.01-22
07 7004 IN-03.01-23
08 8009 IN-03.01-24
20 20121 IN-03.01-25
20 20211A IN-03.01-26
23R B09 IN-03.01-27
25 PG103-25 IN-03.01-28
28 TELECOM ROOM-28 IN-03.01-29
TRAILER 1 TR1-103A IN-03.01-30
DATA CENTER 1 IN-03.01-31
DATA CENTER GC115-1 IN-03.01-32
DATA CENTER GC115-1 IN-03.01-32
DATA CENTER 6 IN-03.01-33
DATA CENTER GC114a IN-03.01-34
DATA CENTER GC114 IN-03.01-35
DATA CENTER C2-35 IN-03.01-36
DATA CENTER 1 IN-03.01-37
DATA CENTER 3 IN-03.01-38
DATA CENTER 4 IN-03.01-39
DATA CENTER 5 IN-03.01-40
DATA CENTER 7 IN-03.01-41
DATA CENTER 8 IN-03.01-42
1" = 1'-0"
IN-03.01 ROOM NUMBER SIGN - ELEVATION LOCATION
6" = 1'-0"
IN-03.01 ROOM NUMBER SIGN - ELEVATIONS
Revisions: Date:
1" = 1'-0"
ELEVATION LOCATIONS
GENERAL NOTES
1. CONTRACTOR TO COORDINATE WITH VA COR AND
SIGNAGE MANUFACTURER TAKEFORM FOR EXACT
SIGNAGE LANGUAGE AND TYPES.
TAKEFORM
ADDRESS: 11601 MAPLE RIDGE RD, MEDINA, NY, 14103
PHONE: (800)-528-1398
WWW.TAKEFORM.NET
SIGNAGE FINISHES
ID DESCRIPTION
A VINYL: FINISH 220-BLACK, FONT: HELVETICA (ADA), CUT: FACE
B BACKER FINISH: LT3526 TRAVERTINE
C FACE FINISH: LW101 LIGHT MAPLE
D RAISED COPY: C0101, FONT: HELVETICA (ADA)
E METAL ACCENT: POLISHED
F CO104 WHITE
G LS105 COTTAGE RED
6" = 1'-0"
FIRE EXTINGUISHER IDENTIFICATION FLAG
FEC SIGNAGE SCHEDULE
BLDG. # ROOM NUMBER SIGNAGE ID
01S 6B-100 IN-01.02
01S BB100B-1S IN-01.31
01S T1-00G IN-01.02
01S T1-00G IN-01.31
01S T1-01 IN-01.31
01S T1-02 IN-01.02
01S T1-02 IN-01.31
01S T1-03 IN-01.02
01S T1-03 IN-01.31
01S T1-04 IN-01.02
01S T1-04 IN-01.31
01S T1-05 IN-01.02
01S T1-05 IN-01.31
01S T4-00G IN-01.31
01S T4-01 IN-01.31
01S T4-02 IN-01.31
01S T4-03 IN-01.31
01S T4-04 IN-01.31
01S T4-05 IN-01.31
01W T2-00G IN-01.31
01W T2-01 IN-01.02
01W T2-02 IN-01.02
01W T2-03 IN-01.31
02 T3-00B IN-01.02
02 T3-00G IN-01.02
03 SP3005-3A IN-01.02
04 4001 IN-01.31
05 5044 IN-01.31
06 6113 IN-01.31
07 7004 IN-01.02
07 7300 IN-01.02
08 8009 IN-01.31
08 8301 IN-01.31
09 9202 IN-01.31
20 20121 IN-01.31
20 20211A IN-01.02
23R B09 IN-01.31
25 PG103-25 IN-01.02
28 TELECOM ROOM-28 IN-01.02
34 SP3401-34 IN-01.02
DATA CENTER (GC115-1) GC115-1 IN-01.31
DATA CENTER (GC115-1) GC115-1 IN-01.31
TRAILER 1 TR1-103A IN-01.02
TRAILER 3 TR3-105 IN-01.31
TRAILER 4 TR4-106a IN-01.31
TRAILER 5 TR5-109a IN-01.02
09/03/20259/3/2025 195 OF 693
1. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE CURRENT VA
GUIDES AND LOCAL FIRE PROTECTION CODES AND ORDINANCES.
2. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURER'S REQUIREMENTS. IN CASES OF CONFLICT BETWEEN MANUFACTURER
REQUIREMENTS, DRAWINGS, OR SPECIFICATIONS, THE MORE STRINGENT REQUIREMENT
SHALL GOVERN.
3. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND VA COR PRIOR TO
ANY CUTTING OF WALLS AND ROOF.
4. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING PENETRATIONS OF
FIRE RATED ASSEMBLIES AS REQUIRED.
5. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END OF
THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHALL BE
INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE
SPREAD THROUGH THE UNSEALED PENETRATION.
6. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES,
TRAPS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND INSTALLED IN
ACCORDANCE WITH THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION
WITH FIRE PROTECTION INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT
SERVED.
7. ROOMS THAT DO NOT HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE
BRANCH PIPING MODIFIED TO TURN THE SPRINKLER HEAD UPRIGHT. PROVIDE
SPRINKLER PROTECTION CAGE. ALL EXPOSED FIRE PROTECTION LINES SHALL BE
PAINTED RED.
8. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS
NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.
9. TELECOM ROOMS AND DATA CENTERS ARE CONSIDERED LIGHT HAZARD FOR SPRINKLER
HEAD DENSITY. ANY OTHER HAZARD CLASSIFICATION AND SPRINKLER DENSITY ARE TO
BE IN ACCORDANCE WITH THE LATEST VERISONS OF NFPA 13 AND VA FIRE PROTECTION
DESIGN GUIDE.
10. MODIFY EXISTING SPRINKLER SYSTEM WITHIN THE LIMITS OF CONTRUCTION TO COMPLY
WITH NFPA 13. PROVIDE TEMPORARY UPRIGHT SPRINKLER HEADS TO PROTECT SPACES
WHERE CEILINGS ARE REMOVED FOR CONSTRUCTION UNTIL THE NEW CEILING IS
INSTALLED AND NEW DROPS TO NEW PENDENT SPRINKLERS ARE INSTALLED.
TEMPORARY SPRINKLERS ARE NOT REQUIRED IF NEW OR EXISTING CEILING IS IN PLACE
AT THE END OF THE WORK SHIFT. PROVIDE TEMPORARY SPRINKLERS AS REQUIRED TO
PROVIDE CONTINUOUS COVERAGE OF ALL AREAS WITH CONSTRUCTION OF
CONSTRUCTION BARRIER WALLS.
11. NFPA STANDARDS: FIRE-SUPPRESSION-SYSTEM,SPECIALTIES, ACCESSORIES,
INSTALLATION, AND TESTING SHALL COMPLY WITH THE LATEST EDITION OF NFPA 13
"INSTALLATION OF SPRINKLER SYSTEMS."
12. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN DRAWINGS OR A LICENSED
FIRE PROTECTION ENGINEER STAMP ON ALL SHOP DRAWINGS.
13. NEW FIRE PROTECTION PIPING SHALL BE PAINTED PER VA SPECIFICATIONS.
14. SEE MECHANICAL DRAWINGS FOR TELECOM ROOM FIRE PROTECTION WORK.
15. CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,
EQUIPMENT AND MATERIALS WITH OTHER TRADES IN ACCORDANCE WITH NFPA 13.
16. TELECOM ROOMS AND DATA CENTERS SHALL HAVE FIRE MARSHAL APPROVED,
UPRIGHT, STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS. PROVIDE LISTED
MECHANICAL GUARDS. ALL EXPOSED FIRE PROTECTION LINES SHALL BE PAINTED
RED. ALL SPACES OTHER THAN MCR AND GENERATOR ENCLOSURE SHALL HAVE
QUICK RESPONSE SPRINKLERS.
17. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE TELECOMMUNICATION RACKS
WHERE FEASIBLE BUT STILL IN ACCORDANCE WITH NFPA 13.
18. FIRE SPRINKLER SYSTEM INSTALLATION IN SOME AREAS IS PHASED. CONTRACTOR TO
ENSURE THAT NFPA 13 COMPLIANT WORKING DRAWING SUBMITTALS ACCOUNT FOR
FINAL PHASE SPRINKLER DENSITY AND LAYOUT.
19. SPRINKLER LOCATIONS ARE SCHEMATIC IN NATURE ONLY. CONTRACTOR RESPONSIBLE
FOR FINAL LOCATIONS OF ALL SPRINKLERS AND HEAD COUNT TO PROVIDE A FULLY
FINISHED SPRINKLER SYSTEM IN COMPLIANCE WITH NFPA 13.
FIRE PROTECTION DEMOLITION NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:
A) PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT AND
SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.
B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING
DURING DEMOLITION.
C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.
D) PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
E) REPAIRING DAMAGED PROPERTY TO ITS ORIGINAL CONDITION IMMEDIATELY
AFTER THE DAMAGE OCCURS.
F) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING FIRE PROTECTION EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL
EQUIPMENT THAT IS TO REMAIN.
FIRE PROTECTION GENERAL NOTES
FIRE PROTECTION GENERAL NOTES
20. IT IS THE RESPONSBILITY OF THIS PROJECT'S CONTRACTOR TO
PROVIDE NEW WATER SUPPLY FLOW TESTS IN ACCORDANCE WITH THE
REQUIREMENTS OF NFPA 13 AND NFPA 291, PRIOR TO SUBMITTING FIRE
SPRINKLER SHOP DRAWINGS.
21. PER NFPA 13, PROVIDE AN AUTOMATIC AIR VENT AND ISOLATION
CONTROL VALVE AT A HIGH POINT OF EACH WET PIPE SYSTEM. IF THE
AUTOMATIC AIR VENT INCORPORATES A DISCHARGE OUTLET, THE
DISCHARGE SHALL BE PIPED TO A SAFE DISCHARGE LOCATION.
22. ALL SPRINKLER BRANCH LINES SHALL BE RESTRAINED AGAINST
EXCESSIVE MOVEMENT PER NFPA 13.
23. THE FIRE PROTECTION SPRINKLER SYSTEM CONTRACTOR SHALL
TAKE INTO ACCOUNT THE CONFIGURATION OF EACH AREA BEING
PROTECTED AND SHALL LAYOUT THE SPRINKLER LOCATIONS TO BE
SYMMETRICALLY SPACED TO THE GREATEST EXTENT POSSIBLE.
24. THE FIRE PROTECTION SPRINKLER SYSTEM PIPING SHALL BE
INSTALLED TO MINIMIZE PIPING OFFSETS IN ROOMS OF EXPOSED
STRUCTURE. PIPING SHALL BE INSTALLED AS TIGHT TO STRUCTURE AS
POSSIBLE AND SHALL BE INSTALLED TO MINIMIZE VISUAL
IMPACTS.
25. NFPA 70 REQUIRES A DEDICATED SPACE OF 6'-0" ABOVE ALL
ELECTRICAL PANELS, TRANSFORMERS, SWITCHGEARS, ETC. NO
PIPING, DUCTS, OR OTHER EQUIPMENT FOREIGN TO THE ELECTRICAL
INSTALLATION SHALL BE LOCATED IN THIS ZONE. ALL SPRINKLER
PIPING THAT IS NOT COORDINATED TO AVOID THESE AREAS SHALL BE
MODIFIED AND RELOCATED AT THE FIRE PROTECTION SPRINKLER
CONTRACTORS EXPENSE.
26. ALL SPRINKLER SYSTEM COMPONENTS, DEVICES, AND MATERIALS
INSTALLED AS PART OF THIS PROJECT SHALL BE NEW.
27. THE FIRE PROTECTION SPRINKLER SYSTEM CONTRACTOR IS
RESPONSIBLE FOR MAKING ALL ELEVATION AND HORIZONTAL
ADJUSTMENTS IN THE PIPING REQUIRED TO FOLLOW THE BUILDING'S
STRUCTURE, CEILING HEIGHTS, AND ARCHITECTURAL FEATURES. THE
CONTRACT DOCUMENTS ARE CONCEPTUAL IN NATURE AND SHOW A
PROPOSED FIRE SPRINKLER MAIN PIPE ROUTING, AND ROUTING IN
EXPOSED AREAS, BUT DO NOT INCLUDE ALL REQUIRED FITTINGS OR
OFFSETS THAT ALLOW THE PIPING TO BE INSTALLED AS IT IS SHOWN
ON THE CONTRACT DOCUMENTS.
28. WHERE TELECOM ROOM PIPING DRIP PANS EXCEED 4' IN WIDTH PROVIDE
AN ADDITIONAL SPRINKLER BELOW THE DRIP PAN IN COMPLIANCE WITH NFPA 13
REQUIREMENTS.
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT
BEFORE BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA
STANDARDS, AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURER'S REQUIREMENTS. IN CASES OF CONFLICT BETWEEN
MANUFACTURER REQUIREMENTS, DRAWINGS, OR SPECIFICATIONS, THE
MORE STRINGENT REQUIREMENT SHALL GOVERN.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER
TRADES.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC
EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND VA
COR PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE
END OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF
MINERAL WOOL SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE
PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED
PENETRATION.
8. INSTALL ALL GRAVITY CONDENSATE DRAIN PIPING WITH A MINIMUM OF 1/8"
PER LINEAR FOOT (1%) SLOPE.
9. INSTALL ALL SANITARY SEWER LINES WITH A SLOPE OF 1/4" PER LINEAR
FOOT (2%) OF RUN. WHERE INDICATED ON PLANS, SANITARY SEWER LINES
CAN BE INSTALLED WITH A MINIMUM SLOPE OF 1/8" PER LINEAR FOOT (1%) OF
RUN. CONTRACTOR MAY INSTALL PIPING WITH A SLOPE GREATER THAN THAT
SPECIFIED ABOVE, BUT NEVER LESS.
10. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A
FURRED CHASE, ABOVE HARD SUSPENDED CEILING, OR ABOVE AN
ACOUSTICAL CEILING UNLESS EXPLICITLY NOTED ON THE DRAWINGS AS
BEING ROUTED EXPOSED IN A FINISHED ROOM OR SPACE.
11. ACCESS PANELS IN HARD SUSPENDED CEILINGS AND WALLS (NOT INCLUDING
ACCESSIBLE WET WALLS) ARE REQUIRED FOR ALL VALVES, TRAPS,
CLEANOUTS, CONTROLS, WATER HAMMER ARRESTORS ETC. ACCESS
PANELS SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH THE
ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH PLUMBING
INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED
12. ALL PRESSURES LISTED ARE GAUGE PRESSURE UNLESS OTHERWISE NOTED.
PLUMBING DEMOLITION NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:
A) PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT AND
SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.
B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING
DURING DEMOLITION.
C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.
D) PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
E) REPAIRING DAMAGED PROPERTY TO ITS ORIGINAL CONDITION IMMEDIATELY
AFTER THE DAMAGE OCCURS.
F) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT
FIRST OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING PLUMBING EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING PLUMBING
EQUIPMENT THAT IS TO REMAIN.
PLUMBING GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:5
:5
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
-0
M
E S
D B
.r v t
M-001
FIRE PROTECTION, PLUMBING, AND
MECHANICAL GENERAL NOTES
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS
AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURERS REQUIREMENTS. IN CASES OF CONFLICT BETWEEN
MANUFACTURER REQUIREMENTS, DRAWINGS AND SPECIFICATIONS THE MORE
STRINGENT REQUIREMENT SHALL GOVERN.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER
TRADES.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER
PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE
END OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL
WOOL SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION
AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
8. INSTALL GRAVITY DRAIN PIPING WITH A MINIMUM OF 1/8" PER LINEAR FOOT (1%)
SLOPE.
9. WHERE OPENING EXISTING WALLS TO ROUTE CONDENSATE PIPING OR OTHER
WORK, REFER TO ARCHITECTURAL DETAILS FOR PATCHING.
10. IN CASE OF A DISCREPANCY BETWEEN MANUFACTURER RECOMMENDED
REFRIGERANT PIPE SIZING AND THE REFRIGERANT PIPE SIZES SHOWN ON THE
PLANS THE MANUFACTURER REQUIREMENTS SHALL GOVERN.
11. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED
IN A FURRED CHASE OR ABOVE HARD SUSPENDED CEILING, OR ACOUSTICAL
CEILING.
12. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR
INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.
13. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL
VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS
SHALL BE FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL
SPECIFICATIONS. COORDINATE LOCATION WITH MECHANICAL INSTALLATION AND
DEMONSTRATE ACCESS TO EQUIPMENT SERVED.
14. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK
SIZES.
15. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE
MADE TO PROVIDE COUNTERFLOW BETWEEN WATER AND AIR.
16. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS
OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.
17. ALL PIPING ROUTED THROUGH A TELECOM ROOM EXCEPT FIRE PROTECTION
PIPING THAT SERVES SPRINKLER IN THE TELECOM ROOM SHALL BE PROVIDED
WITH DRIP PANS WITH A MOISTURE SENSOR TIED INTO THE BMS.
18. EXISTING CONDITIONS SHOWN ARE BASED ON AS-BUILT DRAWINGS AND VISUAL
FIELD INVESTIGATION. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS
PRIOR TO STARTING WORK.
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:
A) PROTECTING, COVERING AND SEALING EXISTING EQUIPMENT AND
SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.
B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING
DURING DEMOLITION.
C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.
D) PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
E) IMMEDIATELY REPAIRING DAMAGED PROPERTY TO ITS CONDITION BEFORE BEING
DAMAGED.
F) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL
EQUIPMENT THAT IS TO REMAIN.
GENERAL NOTES
MECHANICAL GENERAL NOTES
MECHANICAL DEMOLITION NOTES
Revisions: Date: 09 /0
3/
ABS:
AC:
ACR:
A/E:
AFF:
AFG:
AG:
AI:
AISI:
AO:
ASHRAE:
ASJ:
ASME:
ASPE:
ASR:
AWG:
BACNET:
BAG:
BAS:
BCUP:
BFP:
BHP:
BTU:
BTU/H:
BSG:
C:
CD:
CDA:
CGA:
CFM:
CO:
COR:
CPVC:
CR:
CRS:
CV:
CWFT:
CWTT:
CXA
DB:
DB(A):
DDC:
DFU:
DI:
DI:
DISS:
DN:
DO:
DOE:
DVD:
DW:
DWG:
DWV:
ECC:
EL:
EPA:
EPACT:
EPDM:
EPT:
ETO:
EX:
F:
FAR:
FCO:
FD:
FDC:
FNPT:
FOP:
FOR:
FOS:
FOV:
FPM:
FS:
FSK:
FSS:
FU:
IV:
N2:
N20:
NC:
NF:
NFPA:
NG:
NIC:
NO:
NOM:
NPTF:
NPS:
NPT:
NTS:
O2:
OC:
OCAMES:
OD:
OR:
OSD:
OS&Y:
OXY:
ACRYLONITRILE BUTADIENE STYRENE
ALTERNATING CURRENT
AIR CONDITIONING AND REFRIGERATION
ARCHITECT/ENGINEER
ABOVE FINISH FLOOR
ABOVE FINISH GRADE
AIR GAP
ANALOG INPUT
AMERICAN IRON AND STEEL INSTITUTE
ANALOG OUTPUT
AMERICAN SOCIETY OF HEATING REFRIGERATION,
AIR CONDITIONING ENGINEERS
ALL SERVICE JACKET
AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AMERICAN SOCIETY OF PLUMBING ENGINEERS
AUTOMATIC SPRINKLER RISER
AMERICAN WIRE GAUGE
BUILDING AUTOMATION AND CONTROL NETWORK
SILVER-COPPER-ZINC BRAZING ALLOY
BUILDING AUTOMATION SYSTEM
SILVER-COPPER-PHOSPHORUS BRAZING ALLOY
REDUCED PRESSURE BACKFLOW PREVENTER
BRAKE HORSEPOWER
BRITISH THERMAL UNIT
BRITISH THERMAL UNIT PER HOUR
BOROSILICATE GLASS PIPE
CELSIUS
COMPACT DISK
COPPER DEVELOPMENT ASSOCIATION
COMPRESSED GAS ASSOCIATION
CUBIC FEET PER MINUTE
CLEANOUT
CONTRACTING OFFICER'S REPRESENTATIVE
CHLORINATED POLYVINYL CHLORIDE
CHLOROPRENE
CORROSION RESISTANT STEEL
CONTROL VALVE
CONDENSER WATER FROM TOWER
CONDENSER WATER TO TOWER
COMMISSIONING AGENT
DECIBELS
DECIBELS (A WEIGHTED)
DIRECT DIGITAL CONTROL
DRAINAGE FIXTURE UNITS
DIGITAL INPUT
DEIONIZED WATER
DIAMETER INDEX SAFETY SYSTEM
DIAMETER NOMINAL
DIGITAL OUTPUT
DEPARTMENT OF ENERGY
DIGITAL VIDEO DISC
DISHWASHER
DRAWING
DRAINAGE, WASTE AND VENT
ENGINEERING CONTROL CENTER AKA BAS
ELEVATION
ENVIRONMENTAL PROTECTION AGENCY
ENERGY POLICY ACT
ETHYLENE PROPYLENE DIENE MONOMER
ETHYLENE PROPYLENE TERPOLYMER
ETHYLENE OXIDE
EXISTING
FAHRENHEIT
FEDERAL ACQUISITION REGULATIONS
FLOOR CLEANOUT
FLOOR DRAIN
FIRE DEPARTMENT (HOSE) CONNECTION
FEMALE NATIONAL PIPE THREAD
FUEL OIL PUMP
FUEL OIL RETURN
FUEL OIL SUPPLY
FUEL OIL VENT
FLUOROELASTOMER POLYMER
FLOW SWITCH
FOIL-SCRIM-KRAFT FACING
VA CONSTRUCTION & FACILITIES MANAGEMENT,
FACILITY STANDARDS SERVICE
FIXTURE UNITS
ISOLATION VALVE
NITROGEN
NITROGEN OXIDE
NORMALLY CLOSED
OIL FREE DRY (NITROGEN)
NATIONAL FIRE PROTECTION ASSOCIATION
NATURAL GAS
NOT IN CONTRACT
NORMALLY OPEN
NOMINAL
NATIONAL PIPE THREAD FEMALE
NOMINAL PIPE SIZE
NOMINAL PIPE THREAD
NOT TO SCALE
OXYGEN
ON CENTER
REPLACED BY HEFP
OUTSIDE DIAMETER
OPERATING ROOM
OPEN SIGHT DRAIN
OUTSIDE STEM AND YOKE
OXYGEN
P Pa
PC
PCF
PD
PEF
PF
PGW
PHC
PPM
PRS
PRV
PSI
PSIA
PSIG
PSS
PSV
PTAC
R/E
RA
RAD
RAF
RAHX
RAT
RCCH
RCU
RD
RDS
REA
RELAD
RF
RG
RH
RHC
RHG
RL
RLA
RO
RPM
RR
RS
RTU
RV
SA
SAD
SAT
SC
SCFM
SCI
SCR
SD
SD
SD-1
SD-2
SDPR
SDR
SDS
SEN
SF
SG
SH
SHC
SI
SP
SP GR
SPD
SPRV
SPS
SQ FT
SR
SS
SSHX
SSR
ST
SUH
SV
SVS
SW
SWHX
T&PCV
TAB
TD
TDH
TDS
TG
TP
TR
TSP
TSTAT
TU
TWU
W:
WAGD:
WC:
WCO:
WG:
WH:
WOG:
WPD:
WS:
WSFU:
YCO:
YH:
PUMP
PASCAL
PUMPED CONDENSATE
POUNDS PER CUBIC FOOT (FEET)
PRESSURE DROP
PROPELLER (TYPE) EXHAUST FAN
PRE-FILTER
PROPYLENE GLYCOL-WATER (SOLUTION)
PREHEAT COIL
PARTS PER MILLION
PRESSURE REGULATING (VALVE) STATION
PRESSURE REGULATING VALVE
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH – ABSOLUTE
POUNDS PER SQUARE INCH – GAGE
PRIMARY SECONDARY SYSTEM
PRESSURE SAFETY VALVE
PACKAGED TERMINAL AIR CONDITIONER
RETURN OR EXHAUST
RETURN AIR
RETURN AIR DAMPER
RADIO FREQUENCY
ROTARY AIR HEAT EXCHANGER
RETURN AIR TEMPERATURE
REMOTE CONDENSER CHILLER
RECIPROCATING CHILLER UNIT
REFRIGERANT DISCHARGE
ROOM DATA SHEETS
RELIEF AIR
RELIEF AIR DAMPER
RETURN FAN
RETURN GRILLE
RELATIVE HUMIDITY
REHEAT COIL
REFRIGERANT HOT GAS
REFRIGERANT LIQUID LINE
RUN LOAD AMPERE
REVERSE OSMOSIS
REVOLUTIONS PER MINUTE
RETURN REGISTER
REFRIGERANT SUCTION
ROOF TOP UNIT
RELIEF VALVE
SUPPLY AIR
SOUND ATTENUATING DEVICE
SUPPLY AIR TEMPERATURE
SHADING COEFFICIENT
STANDARD CUBIC FEET PER MINUTE
SPINAL CODE INJURY
SILICON CONTROLLED RECTIFIER
SMOKE DETECTOR
SUPPLY AIR DIFFUSER
SCHEMATIC DESIGN (SUBMISSION1)
SCHEMATIC DESIGN (SUBMISSION2)
SMOKE DAMPER
SMOKE DAMPER (RETURN)
SMOKE DAMPER (SUPPLY)
SENSIBLE HEAT
SUPPLY FAN
SUPPLY AIR GRILLE
STEAM HUMIDIFIER
STEAM HEATING COIL
SQUARE INCHES
STATIC PRESSURE
SPECIFIC GRAVITY
SUPPLY PROCESS AND DISTRIBUTION
STEAM PRESSURE REDUCING VALVE
STATIC PRESSURE SENSOR
SQUARE FOOT (FEET)
SUPPLY AIR REGISTER
STAINLESS STEEL
STEAM TO STEAM HEAT EXCHANGER
SOLID SEPARATOR
STEAM TRAP
STEAM UNIT HEATER
STEAM PRESSURE REDUCING VALVE
STEAM VENT SILENCER
SOFTWATER
STEAM TO WATER HEAT EXCHANGER
TEMPERATURE AND PRESSURE
CONTROL VALVE
TESTING, ADJUSTING, BALANCE
TEMPERATURE DIFFERENCE
TOTAL DYNAMIC HEAD
TOTAL DISSOLVED SOLIDS
TRANSFER GRILLE
TRAP
TOP REGISTER
TOTAL STATIC PRESSURE
THERMOSTAT
TERMINAL UNIT
THRU-WALL UNIT
WASTE
WASTE ANESTHESIA GAS DISPOSAL
WATER CLOSET
WATER CLEANOUT
WATER GAUGE
WALL HYDRANT
WATER, OIL, GAS
WATER PRESSURE DROP
WASTE STACK
WATER SUPPLY FIXTURE UNITS
YARD CLEANOUT
YARD HYDRANT
SINGLE LINE DOUBLE LINE
DUCTWORK SYMBOLS
ADDITIONAL SYMBOLS
SINGLE LINE DOUBLE LINE
BALL VALVE WITH MEMORY STOP (BALANCING VALVE)
UNION OR FLANGE (AS INDICATED BY PIPE SIZE - SEE SPEC.)
PIPE BREAK (SINGLE LINE)
RISE (SINGLE LINE - PLAN VIEW)
DROP (SINGLE LINE - PLAN VIEW)
BOTTOM TAKEOFF
TOP TAKEOFF
BLIND FLANGE
END CAP
BALL VALVE
GATE VALVE
EXISTING PIPE TO BE REMOVED
HEATING HOT WATER SUPPLY
HEATING HOT WATER RETURN
CONDENSATE DRAIN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
PIPING LEGEND
TAKE-OFF
SUPPLY
CEILING
DUCT MTD.
DIFF/GRILLE
BULLHEAD SPLIT
TAKEOFF
DIFF/GRILLE
TO
OR
HARD
ELBOW
SUPPLY DUCT DOWN
SUPPLY DUCT UP
OR
R w
RETURN/EXHAUST
CONVERGE
BULLHEAD
TAKE-OFF
90°F
TAP
45°F
TAP
DUCT
FLEXIBLE
1/4"x1/4" WMS
OPEN END
DUCT W/
ACOUSTICALLY
LINED DUCT
CEILING
DUCT MTD.
DIFF/GRILLE
REG./GRILLE
DUCT MTD.
SIDEWALL
LD MF'R
BOOT BY
VD VD
VD VD
EQUIPMENT
DUCTWORK OR
TO BE REMOVED
TURNING VANES
ROUND DUCT UP
SUPPLY SIDEWALL
LINEAR DIFFUSER
(W/SHEET METAL
PLENUM W/1"
LINING & BRANCH
CONN FOR EVERY
4' OF LENGTH)
SUPPLY CEILING
LINEAR DIFFUSER
(W/SHEET METAL
PLENUM W/1"
LINING & BRANCH
CONN FOR EVERY
4' OF LENGTH)
STANDARD
RADIUS ELBOW (R= W)
SUPPLY/RETURN
/EXHAUST
ROUND DUCT DOWN
ROUND TAPROUND
DUCT
RECT. TAP
TAKE-OFF
90°F
TAP
ROUND TAKEOFF
RECTANGULAR MAIN DUCT
ROUND MAIN DUCT
RECT TAP
RISE/DROP
SUPPLY/RETURN/
RISE OR DROP
SUPPLY/RETURN
TAKE-OFF
45°F
TAP
/EXHAUST
HORIZONTAL
EXHAUST
OFFSET
RISE
RETURN DUCT UP
UP
DROP
DN
EXHAUST DUCT UP
RETURN DUCT DOWN
EXHAUST DUCT DOWN
HWR
HWS
CHR
CHS
D
NEW AND EXISTING WORK
W"/H" WIDTH AND HEIGHT
IN INCHES FOR FLAT
OVAL DUCT
POINT OF CONNECTION BETWEEN
BLANKED FOR 1-WAY
BLANKED FOR 2-WAY
BLANKED FOR 3-WAY
STANDARD 4-WAY
BD
OR
BACKDRAFT DAMPER
BLOW SUPPLY DIFFUSER
BLOW SUPPLY DIFFUSER
BLOW SUPPLY DIFFUSER
BLOW SUPPLY DIFFUSER
FIRE DAMPER
M MOTORIZED DAMPER LIMIT OF DEMOLITION
TEMPERATURE SENSOR OR
THERMOSTAT
T
H ROOM HUMIDISTAT
M
R
MOISTURE SENSOR
REFRIGERANT SENSOR
ADDITIONAL SYMBOLS
H4
H7
A
26-SF 3
26-TU-I-I
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
ROOM NUMBER (ALPHA-NUMERIC)
ITEM (TERMINAL UNIT SHOWN)
SCHEDULED EQUIPMENT NUMBER
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
26-SF 3
26-TU-I-I
OR
OR
AIR OUTLET CALLOUT
PENDENT SPRINKLER
UPRIGHT SPRINKLER WITH GUARD
1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
SMOKE RATED WALL
SMOKE & 1 HR FIRE RATED WALL
FIRE PROTECTION
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HIGH PRESSURE STEAM CONDENSATE RETURN
PUMPED CONDENSATE
LOW PRESSURE PRESSURE STEAM (15 PSIG AND BELOW)
HIGH PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
LOW PRESSURE STEAM CONDENSATE RETURN
PC
CR-15
S-30
CR-30
S-60
CR-60
S-15
GLYCOL-WATER HEATING RETURN
GLYCOL-WATER HEATING SUPPLYGHS
GHR
REFRIGERANT LIQUID/SUCTIONRL/RS
X
SANITARY SEWERSS
FIRE PROTECTIONFP
DOMESTIC COLD WATERCW
STORM DRAINSD
STORM DRAIN OVERFLOWOFD
WALL HYDRANT (PLUMBING)
WALL HYDRANT (FIRE
PROTECTION)
[SD] 18X18
1 2
AIR OUTLET TYPE
NECK SIZE (IN)
AIRFLOW (CFM)
PRESSURE INDEPENDENT BALANCING VALVE
FIRE DRAINFD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:2
:3
P M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
-0
M
E S
D B
.r v t
M-002
FIRE PROTECTION, PLUMBING, AND
MECHANICAL GENERAL NOTES
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
ABBREVIATIONSLEGEND
DESIGN CONDITIONS
OUTDOOR DESIGN CONDITIONS
STATE COUNTY WMO STATION IDENTIFIER ALTITUDE (FT)
CLIMATE
ZONE
SUMMER WINTER
TEMP DB
(°F)
TEMP WB
(°F)
TEMP DB
(°F)
WEST VIRGINIA CABELL 724250 824 4A 91.4 °F 74.0 °F 9.4 °F
INDOOR DESIGN CONDITIONS
ROOM TYPE
SUMMER WINTER
TEMP DB (°F) REL HUM (%) TEMP DB (°F) REL HUM (%)
DATA ROOM 75 30-60 70 30-60
TELECOM ROOM 75 30-60 70 30-60
Revisions: Date: 09 /0
3/
A B D E F H I J K L MGC N O P Q R S T U V
01S-M-403
01S-M-403
01S-M-403
01S-M-403
A R
E A
A
A R
E A
B
N O
T S
H O
W N
DIAGNOST
TREATMENT
B20
FEED/ BEDDING
B21
ELEC.
B22
REFRIG
B23
QUARNTN
ROOM
B01
SIG./PH.
B27
T. SURG.
B19A
PRO LAB
B19
S. SURG.
B18A
ELEVATOR
SE-1
CORRIDOR
CB-6
CORRIDOR
CB-5
WORK/SUPP
B18
POST OP
B17
PREP/ SCRUB
B16
ANIMAL
B15
ANIMAL
B14
ANIMAL
B24
ANIMAL
B25
ANIMAL
B26
ANIMAL
B13
CLN CAGE
WASH
B08
SOILED CAGE
WASH
B10
CAGE STO.
B08A
RECEIVING
B02
MEN
B03
WOMEN
B04
COLD RM
B05
H.A.C.
B06
NECROPSY
B07
TRASH
B32
MU FLAM
B31
VA FLAM
B28
VA GAS
B29
MU GAS
B30
EMERG.
GENERATOR
BB115
ELECTRICAL
SWITCH
BB116
VET OFF
B12
PRO LAB
B11
SUP. OFF
B12A
TR
B09
CORRIDOR
CB-2
CORRIDOR
CB-1
STAIR
ENGR.
CONTROL
BB117C
ELEC.
BB117A
TELE.
BB117B
MECHANICAL
ROOM
BB117
STAIR
S-1
CORRIDOR
CART LIFT
MACH RM
BB106E
H.A.C.
BB106D
BB102B
MEDIVATOR
BB106C
PREP. &
ASSEMBLY
STERILE
BB106A
STERIL
BB106B
H.A.C.
BB102A
M. LKR
BB103
DECON VEST
SOILED
W. LKR
BB101
MACH RM.
BB104
ADMIN OFFICE
BB105
AUTO CART
WASH
BB102C
A CHIEF SPS
BB105B
CHIEF SPS
BB105A
STERILE
PROCESSING
SERVICE CLEAN
SUPPLY
BB106
OFFICE
BB106F
CLEAN
RECEIVING
ANTEROOM
CORRIDOR
TOILET
BB108A
SUPPLY
SERVICE
WAREHOUSE
BB100
DECONTAMINATION
BB102
CORRIDOR
MARSHALL
CAMPUS
MECHANICAL
EQUIPMENT
B41
ELECTRIC
SUBSTATION
B41B
STORAGE
PARTS & TOOLS
B39
RADIOACTIVE
MATERIAL
STORAGE
B38A
GENERAL
STORAGE
B38
TELEPHONE
ROOM
B38B
ELECTRIC
CLOSET
B36
ELEVATOR
MACHINE
B40
B40A
B37
P-1
TR
BB100B-1S
IRM STORAGE
BB100A-1S
01S-M-401
01S-M-402
MECHANICAL
ROOM
BB117
TR LOCATION
PROJECT
NORTH
RM BB100B-1S
23R
01S
01W
A R
E A
A
A R
E A
B
AREA C
AREA B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:0
:2
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
01-M-101
BUILDING 01S - BASEMENT - OVERALL PLAN -
AREA A
01S
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/16" = 1'-0"1
BASEMENT - OVERALL PLAN - AREA A
KEY PLAN
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date: 09 /0
3/
A B D E F H I J K L MGC N O P Q R S T U V W X Y
A7A6 A5
A4 A3
A8
A11 A10
A9
A2 A1
01S-M-406
01S-M-406
AREA B: SEE SHEET 01-M-103
AREA A
A R
E A
B
S E
E S
H E
E T
-M
-1
A R
E A
A
TR TOWER 4
T4-00G
AREA A
AREA C
01S-M-405
CORRIDOR
CG-43
CLOSET
GB160
SOILED
GD113
CPU ROOM
GD112
LOUNGE/BREAK
PT. CLOTH
GD111
LOCKERS
G112D
SHR
GD112B
MEN
GD112A
FPMS
GC155
GD110A
GD110
ELEV
F8
FREEZER
FREEZER
FRIDGE
FREEZER
SALAD PREP
GD109
MECH
GD105
GD104
GD106
IRM
GD108
IRM
GD100
GD103
GD102
GD101
GD107
MAINT. ELEV
P9
HAC
GB170TELE.
GB171
SERVICE LOBBY
CG17
GB168g
BVA
GB168c
IRM
GB168a
EXAM
GB168k
FEE CLAIMS
GB168b
BOOTH
EXAMINER
GB168j
GB168l
GB168
GB168i
GB168h
MEDICAL
RECORDS
GB168d
GB168f
GB168e
STAIR 4
MECH RM
GB167
HEALTH TECH
GB149c
HEALTH TECH
GB149d
EXAM
GB149e
EXAM
GB149f
EXAM
GB149g
AUDIOLOGY
ROOM
GB149
RECEP
GB148
OFFICE
GB148a
OFFICE
GB148b
OFFICE
GB146
TLT
GB145
CERUMEN
MGMT
GB147b
TLT
GB144
GB143
HAC
GB142
GERI PACT
GB151
GERI PACT
GB152
GB140
GB141
STORAGE
GB141a
CLEAN SUPPLY
GB139
PALL CARE
GB138
PALL CARE
GB137
GERI PACT
GB153
GERI PACT
GB154
EXAM 8
GB136
PHARM
GB135
AMCARE ADMIN
GB150
AMCARE
GB150A
AMCARE ADMIN
GB168rr
GERI PACT
GB155H
CORRIDOR
CG11
CORRIDOR
CG13
CORRIDOR
CG10
EXAM 7
GB134
EXAM 6
GB133
WALK IN CLINIC
GB156
EXAM 15
EXAM 4
GB132
LOUNGE
GB129
WALK IN CLINIC
GB158
GB127
GB130
EXAM 5
GB131
CORRIDOR
CG16
AMCARE ADMIN
GB155b
AMCARE
GB155G
EXAM 5
GB155F
VAPD
GB155c
VAPD
GB165
AMCARE ADMIN
CG24
VAPD
GB164
GB159
GB161
STAIR 8
STAFF TLT
GB119B
ELEC.
GB126
CASHIER
GA100
CHIEF DENTAL
GA112
CONF.
GA110
RECEIVING
ENTRY
EXAMINER
GB149h
EXAMINER
GB149i
BOOTH
BOOTH
BOOTH
ELEC.
GB166b
TEL
GB166a
EXAMINER
GB149j
POSTIOGRAPHY
& LAB
GA121
CORRIDOR
CG14
CORRIDOR
CG15
STAIR 3
GC160
STAIR 2
MECH
GB166
ELEVATOR
EQUIP.
G01
LIFT EQUIP.
G06
CORRIDOR
G07
LOBBY
G05
CORRIDOR
C-G1
ELEC.
G03
STAIR
S-1
ELEVATOR
SE-1
SIGNAL/PH
SE-2
OPEN
MECHANICAL
SPACE
GO7
MECH.
G02
EXIT CORRIDOR
ELEVATOR
P-2
P-1
GC162
STAIR
S-2
VAPD LOCKER
GA101
DENTAL ADMIN
GA111
LOCKER
GC163
HAC
GA109
MECH
GC166
MEN
GC168
WOMEN
GA104
COM
GA105
WAITING
GC172
CORRIDOR
GC179
RECEIVING
AREA
GA108
BREAKROOM
GA107
RECEIVING
ENTRY
GC180
STORAGE
GC181
PHARMACY
GA106G
OFFICE
GA106E
GA106H
MECH
GC182
PHARMACY
GC183
TTT
LAB
GC184
X-RAY
GC185
STAIR 6
GC186
CORRIDOR
GC187
STAIR 7
S-7
PHARMACY
WAITING
GC188
CHAIR 5
GC189
CHAIR 6
GC190
CHAIR 7
GC191
CHAIR 8
GC192
RECEPTIONIST
GC193
CHAIR 1
GC194
CHAIR 2
GC195
CHAIR 3
GC196
CHAIR 4
GC197
CORRIDOR
GC198
BATH
GB120A
NOUR
GB121
CORRIDOR
T3-00N
EQUIP.
GB115
BREAK ROOM
GB116
SOILED
T3-00Q
ISOLATION
T3-00S
EXAM
GC199
EXAM
GB122
EXAM
GB123
BARI. EXAM
GB124
TELECOM
GB125A
ALCOVE
HAC
GB125B
CORR
CG-49
TOILET/SHWR
GB120B
ALCOVE
CG-50A
ANTE
T3-00X
ALCOVE
CG-50C
ALCOVE
CG-50B
CORR
CG-50
MENTAL
HEALTH EXAM
CB-113
MENTAL
HEALTH EXAM
CB-114
NURSE STATION
CB-105
EXAM
CB-106
RESULTS
CB-107
CONSULT
CB-108
OFFICE
CB-109
OFFICE
CB-110
CLEAN
CB-111
VEST
GB100
ANTE
GB112A
TOILET/SHWR
GB112B
VEST.
CG-53
TRIAGE
CG-54
MEDS
GB105A
TLT
GB104A
TLT
GB104B
CORR
CG-52
CORR
CG-51
ISOLATION
CB-112
POLICE/VOL
GB101E
Room
GC211
GC213
GC215
GC216
GC217
GC218
GC219
GC221
GC222
GC223
GC224
GC225
GC226
GC227
GC228
GC229
GC230
GC231
GC232
GC233
GC234
GC235
GC236
GC237
ELEV.
P7
Room
XXX
Room
XXX
Room
XXX
01S-M-404
TR TOWER 4
23R
01S
01W
A R
E A
A
A R
E A
B
01A
AREA A
AREA C
AREA B
TR LOCATION
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:0
:2
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
01-M-102
BUILDING 01S - LEVEL 00 - OVERALL PLAN -
AREA A
01S
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/16" = 1'-0"1
LEVEL 00 - OVERALL PLAN AREA - A
PROJECT
NORTH
KEY PLAN
Revisions: Date: 09 /0
3/
W X Y Z
A16 A15 A14
A12
A13
CORRIDOR
CORRIDOR
01W-M-402
01W-M-402
AREA A
AREA B
A R
E A
A
S E
E S
H E
E T
-M
-1
A R
E A
B
T2-A
T2-1
T2-B
T2-2
ELEC. EQUIP.
GC149
IRM
GC150
ELEC.
GC151a
HBPC
GC151
HBPC
GC152
ISO OFFICE
GC153
MID SOUTH
CPAC
GC157
MID SOUTH
CPAC
GC158
HAC
GC159
MY HLTH VET
GC165
VOLUNTEER
GC164
VOLUNTEER
GC163A
VOLUNTEER
GC163
EMPLOYEE
UNION
GC145
LRC
GC145A
LRC
GC154
MIDSOUTH
CPAC
GC155
NURSING
GC156
NURSING
GC160
TELEHEALTH
GC161
TELEHEALTH
GC162
EMPLOYEE
UNION
GC146
M FOSTER HM
OFFICE
GC143
HBPC OFFICE
GC144
HBPC OFFICE
HBPC PHARM
OFFICE
GC142
HBPC OFFICE
GC140
HBPC OFFICE
GC139
HBPC DIETICIAN
OFFICE
GC138
STOR
GC135
EMPLOYEE
UNION
GC141A
NURSING
GC166
STOR
GC141B
ELEV
W-1
ELEV
W-2
MECH. EQUIP
GC148
STAIR 12
GC148
STAFF
RESTROOM
GC137
STAFF
RESTROOM
GC136
NURSING
GC171
VESTIBULE
GC167
OBVER.ROOM
GC150
SIMULATION
LAB
GC169
TOILET
GC174
STOR
GC173
NURSING
CLASSROOM
GC170
WORKMAN'S
COMP. OFFICE
GC175
GC128h
GC128i
GC128a
GC128b
GC128c
GC128d
GC128e
GC128f
GC128g
PRIVACY
GC134
GC128
HBPC OFFICE
GC176
WAITING
GC175A
BILLING OFFICE
GC177BARBER SHOP
GC178
VENDING
GC130ESCORT
GC100
GC100B
LOCKER
GC100A
STOR
GC100C
DECON
42-101
STAIR 11
ELEC/IRM
GC127
ELEC
GC125
COMPLIANCE
GC124
COMPLIANCE
GC123
ELEC
GC121
MECH
GC122
STERILE PREP
42-100
STERI SVC
42-103
IRM MECH.
SUPPORT
GC103
ELEC
GC111
WOMEN
GC109MEN
GC108
STAIR 9
ELEV.
E-6
ELEV.
E-5
OXYGEN STOR
GC112
DATA CENTER
GC115-1
COOLER
GC120F
ELEC
GC120A
STO
GC120B
SLIDES
GC120C
TLT
GC120D
OFFICE
GC120E
AUTOPSY
GC120
MECH.
42-102
BATTERY
GC119
GC126
VOLUNTEER
SPECIALIST
GC101
VOLUNTEER
CHIEF
GC102
ENROLL. #3
GC104
ENROLL. #2
GC105
ENROLL. #1
GC106OUTPATIENT
COORD.
GC107
PUBLIC ELEV.
P3
PUBLIC ELEV.
P2
PUBLIC ELEV.
P1
MEN
GB174
STAIR 1
LINEN
GB169
HAC
GB170
GB173
PUBLIC LOBBY
CG19
ELEC.
GB172
SERVICE ELEV.
S1
SERVICE ELEV.
S2
SMOK. SHLTR
S100
STORAGE
GB101C
VAPD HOLDING
GB101D
STOR
VAPD CHIEF
GB176AVAPD SECY
GB176
VAPD
GB177
VAPD WEAPON
GB177A
COFFEE
VEST
42-104
WOMEN
GB175
CORRIDOR
COMPUTER
TELE
GC118
CORRIDOR
01S-M-405
01S-M-405
TR TOWER 1
T1-00G
WAITING
GB102A
TR TOWER 2
T2-00G
1W-1
1W-2
1W-3
1W-4
IRM
GB125
ELECTRICAL 1
IRM
GC117
FD403-1B
MD414-2B
PP411-1B
MP412-2A
MH410-1B
MH409-1B
MP407-1B
MH408-1B
FX406-1B
MD405-1B
MD404-1B
MH422-2B
MH421-2B
MP420-2B
FX419-2B
FD418-2B
MD416-2B
MD415-2B
MD414-2B
TR LOCATION
PROJECT
NORTH
23R
01S
01W
A R
E A
A
A R
E A
B
01A
AREA A
AREA C
AREA B
TR TOWER 1
TR TOWER 2
TR TOWER 4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:0
:3
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
01-M-103
BUILDING 01S & 01W - LEVEL 00 - OVERALL
PLAN - AREA B
01S AND 01W
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/16" = 1'-0"1
LEVEL 00 - OVERALL PLAN - AREA B
PROJECT
NORTH
KEY PLAN
Revisions: Date: 09 /0
3/
01S-M-409
01S-M-409
A R
E A
R
E A
B
S E
E S
H E
E T
-M
-1
TR TOWER 4
T4-01
E.M.S. CHIEF
1A116
INT. DESIGN
1A116A
E.M.S. SECT.
1A117
E.M.S.
1A117B
E.M.S. SUPERS
1A117A
HR
1A119
HR
1A120
HR
1A120A
ELEV
P7
STAIRS
BUS OFFICE PC
1A114
BUS DATA
OFFICE
1A113A
CHIEF STAFF
CREDENTIAL
PRIVILEGE
1A113
QM INFECTION
CONTROL
1A112B
QM
1A112A
HR
1A112
IRM
1A111
ELEC
1A110
F. TLT
1A109A
M. TLT
1A109
QM
1A108
QM
1A107
QM
1A106
QM
1A105
QM
1A104
QM
1A103
HR
1A102
PIV
1A101
PIV
1A101A
LOBBY
STAIRS
HAC
1A121
HR
1A122
HRM
1A123
HR
1A124
HRM
1A125
HR
1A129
HR
1A128
HR ASST. CHIEF
1A127
HR SECT.
1A126
CHIEF HRM
1A126A
STAIRS
INPATIENT
PHARMACY
1B101
HAC
1B102
ADMIN OFFICE
1B100
CHIEF
1B100A
ANTE
IV ADM
1B101A
CHEMO
1B101B
ANTE
SECURE
1B101C
ELEC
1B103
TELE
1B101d
SECURE STOR.
1B105C
RECEIV.
1B104
FLAMM/TOXIC
1B105D
COLD RM
1B105E
BLOOD BANK
1B105A
BLOOD SPEC'L
1B107
TLT
1B106
SPECIAL
CHEMISTRY
1B105F
M. TLT
F. TLT
ROOM
1B114A
1B14B
BREAK RM
1B114
DI WATER
1B113
CHIEF TECH
1B105G SLIDE & BLOCK
1B108A
HISTOLOGY
1B108
FLOUR. MICRO
1B112
HAC
1B111
CHIEF
1B110G
RESID.
1B110F
CYTOLOGY
1B108C
PROSTHETICS
INVENT/DISTR.
1B109
HISTO REVIEW
1B109A
GROSS RM
1B108B
STERIL
1B115
COLD
1B116B
MICROBIOLOGY
1B116
BIO-LAB
1B116A
MEN
1B117
WOMEN
1B119
HSC
1B118
STAFF
1B110A
STAFF
1B110B
STAFF
1B110C
SEC'Y
LAB SERVICE
1B110
STAIRS
ELEC
1B120a
TRAINING
DIRECTOR
ROOM
1B121
CONF.
INSTR. STOR.
WOMEN
MEN
ELEC
117 SIG/PH
STAIRS
S-1
LAB
STORAGE
H.A.C.
LAB
LAB
LOUNGE
BSL
107B
LAB
SEC'Y CLERICAL
WP/
COMPUTER
COPY
LAB
105ALAB
105B
LAB
105C
ADM. OFFICE
110B
ASSOC. CHIEF
STAFF
110A GEN. LAB.
ANTE
107A
TLT
107C
EXAM D
1B124G
EXAM E
1B124F
POLYTRAUMA
1B124E
1B124A
1B123E
ELEC
1B1241
1B124B
1B123D
1B123C
ORTHOTICS
SPLINT
1B124C
1B123B
1B123A
CONFERENCE
1B122H
AAD
1B122I
PR / QA
1B122
1B123
ADP FILES
1B122K
WAIT
1B122L
SEC'Y
PASS
1B1221
PASS
1B122M
ASSOC.
DIRECTOR
1B122F
DIRECTOR
1B122E
COS
1B122D
AA / COS
1B122A
STOR
1B122B
KITCHEN
1B122C
CORRIDOR
C1-8
CORRIDOR
C1-9
CORRIDOR
C1-4
CONN.
CORRIDOR TO
BUILDING
1S
SPECIMEN
ACCESSION
1B105H
BULK STORAGE
1B105B
CORRIDOR
C1-6
GENERAL LAB
1B105
CORRIDOR
C1-10
CHILLER PLANT
BUILDING #1S
ELEVATOR
SE - 1
MECH
SHAFT
SE-2
SAFETY
ALCOVE
SE-3
STR 3
CORR.
C1-7
1B120b
LAB
CHAIRMAN LAB
WOMENS TLT
SHOWER
ELEC.
ROOM
FACULTY LAB
SECRETARY
CLERK
CHAIRMAN
OFFICE
128A
SAFETY
ALCOVE
SE - 4
SHOWER
102A
MEN'S
TOILET
ELECTRIC
CLOSET
MARSHALL
CAMPUS
TELEPHONE
CLOSET
CORRIDOR
C1-3
CHAIRMAN LAB
S-2 P-2
- 131A
132A 133A
134 134A
C1-5
- 135
135A
121A
124A
124 125
125A
114A
116A
136B 136C
136D
107A
136A
101A
S-1
P-1
104A
108A
108B
C1-1
111A
112B 112C 112D
115112A
117A 115A
118A
C1-2 181
Room
1C133
Room
1C137
Room
1C138
HR
1A122A
01S-M-407
TR LOCATION
PROJECT
NORTH
TR TOWER 4
23R
01S
01W
A R
E A
A
A R
E A
B
01A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:0
:4
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
01-M-104
BUILDING 01S - LEVEL 01 - OVERALL PLAN -
AREA A
01S
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/16" = 1'-0"1
LEVEL 01 - OVERALL PLAN - AREA A
KEY PLAN
PROJECT
NORTH
Revisions: Date: 09 /0
3/
A16 A15 A14
A7A6 A5
A4 A3
A8
A11A10A9
A12
A13
A2 A1
01S-M-408
01S-M-408
01W-M-403
01W-M-403
A R
E A
A
S E
E S
H E
E T
-M
-1
A R
E
B
T2-A
T2-1
T2-B
T2-2
TR TOWER 1
T1-01
TR TOWER 2
T2-01
PREP
1C106B
KITCHEN
1D102
NOURISH
1D101
ELEV
F8
1D102A
EXAM
1C132
EXAM
1C135
TLT
SHWR
1C135A
EXAM
1C136
EXAM
1C 138
TLT
1C138A
TLT
1C140A
EXAM
1C140
EXAM
1C143
TLT
SHWR
1C143A
EXAM
1C 145 EXAM
1C 147
EXAM
1C149
EXAM
1C150
EXAM
1C152
EXAM
1C153
EXAM
1C156
EXAM
1C159
MMS ADMIN
1C160
BRK
NURSE RM
1C160A
LPN
1C160B
MALE TOILET
1C161B
FEMALE TOILET
1C161A
OFFICE
1C162
MALE LOCKER
1C163
TOILET
TOILET
FEMALE
LOCKER
1C164
VISN HR
1C165
PATIENT REP
1C166A
PATIENT REP
1C166
PATIENT REP
1C167
MECH
1C168
LOBBY
1C100
SWITCHBOARD
1C101
CHAPLAIN
OFFICE
1C102
CHAPLAIN SECY
1C104
CHAPLAIN
1C104A
TLT
1C106
TELE
1C105
COMM
1C146
ELEC
1C144
IRM
1C142
NURSES
1C141SOILED
1C154
CLEAN
1C155
TOIL
1C139C
MECH
1C139D
EQUIP
1C161C
KIT
1C139A
MED ROOM
1C139B
MECH
1C123
HAC
1C134
EXAM
1C 148
STAIR
1C151A
EXAM
1C151
1C153A
1C158A
EXAM
1C158
RECEPTIONIST
1C139
CLINIC
MANAGER
WAITING
1C161
STAIR
TIME KEEPER
1C107
H.A.C.
1C107A
TLT
NURSE RECRUIT
1C108
ELEC
1C109
PROSTHETICS
1C110
PROSTHETICS
1C111
STAIR
SHOWER
1C116A
CLINICAL
PHARMACY
1C112
PHARMACY
RESIDENT
1C113
DIETETICS
1C114
FEMALE TOILET
1C116
FEMALE
LOCKER
1C115
EEO
1C117
EEO
1C118
EEO
1C119
EEO
1C120
1C120A
ELEC
1C121
IRM
1C123
STAIR
BIOMED
1C124
CLINIC
1C125
NUT
1C127
NUT?
1C127A
C&P CHIEF
1C126A
C & P
1C126
C&P NURSE
1C128
CLINICAL
PHARMACIST
1C129
CLINICAL
PHARMACIST
1C130
PM & R
1B134E
PM & R
1B134D
PM & R ADMIN
1B134
PM & R
1B134C
PM & R
1B134A
CHIEF PM &R
1B134B
FEMALE TOILET
1B133
MALE TOILET
1B132
STAIR
PROSTHETICS
OFFICE
1B127
PROSTHETICS
OFFICE
1B127A
TRASH CH
1B128
LINEN CH
1B129
ELEC
1B 131
TELE
1B130
HAC
1C114A
1B126L
FITTING
1B126J
FITTING
1B1261
HISA PROG
1B126H
LAB FUME
1B126G
CPO
1B126F
BREAK
1B126E
PLSTR
1B126D
STORAGE
1B126K
CORRIDOR
1B126A
ORTHO
1B126B
RECEP
1B126C
RECEP
1B125A
WAITING
1B126 EXAM PROC
1B125C
PHYS
1B125D
EXAM
1B125H
LIN
1B125G
1B125E
1B125F
1B125M
WC TOILET
1B1251
TOILET
1B125J
ELEC
1B125Q
IT
1B125P
1B125O
P.T.
1B125I
PT TREATMENT /
CT EXERCISE
1B125K
1B125N
STAIR
CORRIDOR
C1-26
CORRIDOR
C1-25
STAIR
LOUNGE
1D107
FOREMAN
1D104
COOLER
C1-30
CANNED GOODS
1D103
WORK
1D110
FEMALE TOILET
1D108
TRAINING
1D111
SUPERV.
2D111A
MEN TOILET
1D109
STORAGE
1D105
STOR
1D106
FOOD SERVICE
LINE
DISHWASHING
1D100A
CORRIDOR
C1-15
SERVICE LOBBY
C1-14
PUBLIC LOBBY
C1-17
TEL
1C122
CORRIDOR
C1-19
CHAPEL
1C106D
CORRIDOR
C1-13
CORRIDOR
C1-12
ELEV
P9
ELEV
W -1
ELEV
W -2
CORR.
BLDG. 2
DIETETICS
C1-31
ELEV
S-2
ELEV
E-6
S-3
E-5
S-4
CORRIDOR
1W-1
1W-2
1W-3
1W-4
EXAM
1C131
TR LOCATION
PROJECT
NORTH
TR TOWER 1
23R
01S
01W
A R
E A
A
A R
E A
B
01A
TR TOWER 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:0
:5
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
01-M-105
BUILDING 01S & 01W - LEVEL 01 - OVERALL
PLAN - AREA B
01S AND 01W
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/16" = 1'-0"1
LEVEL 01 - OVERALL PLAN - AREA B
KEY PLAN
PROJECT
NORTH
Revisions: Date: 09 /0
3/
01S-M-411
01S-M-411
A R
E
E A
B
S E
E S
H E
E T
-M
-1
CARDIOLOGY
OFFICE
2B101
EXAM
2B100f
EXAM
2B100eSPECIAL BREAK
EQUIP. RM.
2B107
CLEAN UTIL.
2B106
2B105a
SCRUB
2B104
2B105
CARDIOLOGY
2B108
CONTROL
2B108a
F. TLT
2B112a
LKR
2B112
LKR
2B111
MEN
2B111a
HAC
2B110
SOIL.
2B109
STAIR
EXAM
2B102
EXAM
2B103
CARDIAC
HOLDING
2B114
ELEC.
2B116
TELE
2B115
CHIEF TECH.
2B117
LOUNGE
2B119
M.TLT.
2B121
F.TLT.
2B123
ULTRA - SOUND
2B124
DRESS
2B127
DRS
2B128
DRS
2B129
DRS
2B126DRS
2B125
WC TLT
2B122a
WC STRET
2B130a
RADIO FLOUR.
2B122
RADIO FLOUR
2B120
WC TLT
2B120a
2A130A
2A130
2A129
2A128
F. TLT
2A126
SUP
2A127
2A125
ELEV
P7
OFFICE
2A124
CHF. S.W.
2A123
OFFICE
2A122C
VEST.
2A122
OFFICE
2A122B
2A122A
2A121
2A117
2A116
2A115
2A120
CARDIOLOGY
CORRIDOR
C2-6
DED. CHEST
2B131
2B132a
FILM
2B132
EQUIP
2B136
UPS
CLEAN
2B135
SOIL UTIL.
2B137
G.P. ROOM
2B153
G.P. ROOM
2B152
AUTOMATED
2B148
VIEW
2B144
HAC
2B138
DRS
2B140
DRS
2B142
I/R SUITE
2B118
BARIUM PREP
2B133
CORRIDOR
C2-8
CORRIDOR
C2-7
CORRIDOR
C2-13
FILE STORAGE
2B166f
ELEC CLOSET
2B166e
CLERK TYP.
2B165
SEC'Y
2B164
COMMON VIEW
2B163
CHIEF
2B162
MRI EQUIP
SCAN RM
2B166b
DRESS
2B166c
MRI WAITING
2B161a
COMPUTER
2B145a
READING
2B145
HAC
2B151
TLT
2B154
ELECT. CLO.
2B155a
TELE. CLO.
2B155b
MECH
2B155
CORRIDOR
C2-41
IMAGING
LOUNGE
2B160
IRM
2B159
IRM
2B158
COMPUTER
TRAINING
2B156
STAIR
CONTROL
ROOM
STAIR
2A119
CORRIDOR
C2-11
INPT BEDS
2B161
CT BRIGHTSCR
2B146
32 SLICE CT
2B149
CONTROL RM
2B147
MRI CONTROL
2B166d
MRI SCAN
ROOM
2B166a
CORRIDOR
C2-12
CORRIDOR
C2-10
STAIR
2A114
2A113A
2A113
KITCHEN
2A112
HAC
2A111
ELEC
2A110
SUP
2A108
MEN
2A107
LIBRARY
CORRIDOR
WALSH
CONFERENCE
2A100
2A101a
STAIRS
LRC EQUIP
2A135
EDUC ASST
2A134
VISUAL INFO.
SPEC.
2A133
2A101b
2A101
CORRIDOR
C2-19
WAITING
2B130
CORRIDOR
C2-5
CORRIDOR
C2-6
CLOSET
2B111b
MED. MEDIA
PRODUCTION
2A132
EQUIPMENT
2B108b
LAB
CONTROL TEMP.
CONTROL TEMP.
INVEST. OFFICE
STORAGE
FLAM STO.
INVEST.
OFFICE
GLASS WASH
LAB
LAB
STORAGE
MECH. SHAFT
MEN
WOMENS
ELEVATOR
SE-1
SIG./PH
ELEC.
INSTR.
STORAGE
H.S. R&D
OFFICE
216A
H.S. R & D SEC'Y
LAB
LAB
SAFETY ALCOVE
SAFETY ALCOVE
H.A.C
STAIR
CORRIDOR
C2-9
MEN'S TOILET
ELECTRIC
CLOSET
STORAGE
226A
STORAGE
MARSHALL
CAMPUS
FACULTY LAB
TELEPHONE
CLOSET
2C180
LAB
WOMEN'S
TOILET
ELEC. ROOM
E-123
STUDENT
OFFICE
FACULTY LAB
FACULTY
OFFICE
FACULTY
OFFICE
224A
FACULTY LAB
LEARNING
RESOURCES
S-2
P-2
217A
216A 215A
212A
209A
207 - 206
205A
206A
P-1
S-1
C2-1
C2-2
C2-4
C2-3
213 211A
201A
204A
- 229
229A
C2-5
225214A
TR TOWER 4
T4-02
TR LOCATION
PROJECT
NORTH
23R
01S
01W
A R
E A
A
A R
E A
B
01A
TR TOWER 4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT/DISCIPLINE
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
(206) 590-2118
RAY SPEES
/2
/2
:0
:0
A
M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
M
E S
D B
.r v t
01-M-106
BUILDING 01S - LEVEL 02 - OVERALL PLAN -
AREA A
01S
MGH/JW LB/CY/JJ/MA/EA/RQ/BC
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300
1/16" = 1'-0"1
LEVEL 02 - OVERALL PLAN - AREA A
KEY PLAN
PROJECT
NORTH
Revisions: Date: 09 /0
3/
A16 A15 A14
A7A6 A5
A4 A3
A8
A11 A10
A9
A12
A12
A13
A13
A2 A1
01S-M-410
01S-M-410
01W-M-404
01W-M-404
A R
E A
A
S E
E S
H E
E T
-M
-1
A R
E
T2-1
T2-B
T2-B
T2-2
EXAM 7
2C154
EXAM 7
2C156
EXAM 7
2C158
EXAM 7
2C160
EXAM 6
2C162
EXAM 6
2C163
SOILED 245
2C153
TELEHEALTH
2C152
SOCIAL WK
2C151
DIETITIAN
2C150
PHARMACY
2C148
COMM
2C149A
ELEC
2C147
IRM
2C145
STAIRS
BARIATRIC/
SPINAL EXAM 4
2C146
EXAM 4
2C144
EXAM 4
2C142
EXAM 4
2C140
PHLEB EKG
2C143
PHLEB TOILET
2C141
MED
2C161
WOMEN'S
TOILET
2C139
NURSE MGR
2C168
CLEAN SUPPLY
2C165
MENTAL
HEALTH
2C155
TELERETINAL
2C157
STAFF TLT
2C167
MEN'S TOILET
2C137
EXAM 6
2C164
EXAM 6
2C166
EXAM 5
2C170
EXAM 5
2C176
EXAM 5
2C174
STAFF LOUNGE
2c177
CLERKS 3 & 4
2C138
RECEPTION 3 &
2C136
EXAM 3
2C135
EXAM 3
2C134
EXAM 3
2C133
EXAM 3
2C132
PHARMACY
2C131
EXAM 1
2C128
EXAM 1
2C127
EXAM 1
2C126
EXAM 1
2C125
2c129
2c135a
ELEV
W-1
EXAM 2
2C124
ELEV
W-2
CLEAN LINEN
MED. EQUIP.
2C159
C4
C4
EXAM 5
2C172
RECEPTION 5, 6,
& 7
2C173
CLERKS 5, 6, & 7
2C169
CLERKS 1&2
2C120A
RECEPTION 1&2
2C120
EXAM 2
2C121
EXAM 2
2C122
EXAM 2
2C123
C1
2c183
EXAM - 18
2c178
EXAM - 19
2c179
EXAM - 20
2c180
EXAM - 17
2c175c
EXAM - 14
2c175a
TOILET
2c175d
TOILET
2c175e
ONCOLOGY
OFFICE
2c182
EXAM - 21
2c181
HAC
SECURE
2c182a
RECEPTIONIST -
2C100
MECH
2c184
FEMALE
2C115 MEN
2C116 COMM.
CLOSET
2C117 TLT
2C118A
CHEMOTHERAPY
2C118
ELEC
2C119A
ELEC
2C119
EXAM ROOM - 11
STAIR
ONCOLOGY
SUITE
2c175b
VESTIBULE
2C123
STAIR
EXAM - 10
2C114
EXAM - 9
2C113
EXAM - 8
2C112
EXAM - 7
2C111
EXAM - 6
2C110
EXAM 5
2C109
E - 6
E - 5
ELEVATOR
LOBBY
GROUP PATIENT
RM.
2c171
WAITING AREA
-1
2C100A
B.M.E. OFFICE
DIA. SUPPORT
2C102A
NURSING
2C108
EXAM - 4
2C107
EXAM - 3
2C106
EXAM - 2
2C105
DIALYSIS
STOR-1
2C104
CHAIR-DIALYSIS
2C102
SPECIAL EKG
EXAM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .