S02 - ATT 8 - 581-22-700 - 100 Drawings Part-6 of 24.pdf

PDF 19 MB Posted

Attached to
EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades
Solicitation number
36C77626R0025
Issued by

About this file

This document is a set of 100% Construction Documents (detailed architectural and engineering drawings) for the EHRM Infrastructure Upgrades at VA Huntington, located at 1540 Spring Valley Drive, Huntington, WV 25704-9300. The project is identified as 581-22-700 and is being executed by SPEES Design Build with professional services provided by an architect/engineer of record.

The construction documents comprise multiple detailed plans and specifications across fire protection, plumbing, mechanical, and HVAC systems. Key construction elements include window security details with expanded steel mesh, EPDM roof penetration details, semi-recessed fire extinguisher cabinets, and comprehensive building-wide infrastructure. The documents detail multi-phase construction work including Phase 1A (demolition and initial CRAC unit relocation), Phase 1B (data center installation with wet pipe sprinkler systems, HVAC ductwork, piping, and clean agent fire suppression), and Phase 2A-2B (final HVAC and fire protection system completion). Construction specifications require strict compliance with NFPA 13 for sprinkler systems, manufacturer requirements for all equipment installation, coordination with the VA Contracting Officer's Representative (COR), and adherence to applicable federal codes and VA standards. The document set includes floor plans, roof plans, reflected ceiling plans, detailed piping and ductwork layouts, and comprehensive general notes addressing demolition, fire protection, plumbing, and mechanical requirements with multiple keynotes and specifications for equipment installation and testing.

View the file

Other files

File Type Posted
S06 - 36C77626R0025 0008.pdf PDF
S06 - Amendment 0008 - ATT 7 - 02EP100B - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 11 - Burn Permit.pdf PDF
S06 - Amendment 0008 - ATT 10 - 260508 - Sheet AD103-1B Data Center Phase 1B Demo Roof update.pdf PDF
S06 - Amendment 0008 - ATT 9 - 260508 - Sheet AD101-1B Data Center Phase 1B Demo Floor Plan update.pdf PDF
S06 - Amendment 0008 - ATT 1 - TechQuestionsVAresponses Final Set - Huntington EHRM IU.pdf PDF
S06 - Amendment 0008 - ATT 14 - Energized Electrical Work Permit.pdf PDF
S06 - Amendment 0008 - ATT 5 - ELECTRICAL 2026.04.13.pdf PDF
S06 - Amendment 0008 - ATT 6 - 01WEP100G - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 3 - Civil OSP Redesign-signed.pdf PDF
S06 - Amendment 0008 - ATT 12 - Environmental Report Huntington WV.pdf PDF
S06 - Amendment 0008 - ATT 8 - 260508 - Sheet 01S-AE452 TR Tower 4 Wall sections update.pdf PDF
S06 - Amendment 0008 - ATT 13 - Hot Tapping Permit.pdf PDF
S06 - Amendment 0008 - ATT 2 - UPDATED SHEETS.pdf PDF
S06 - Amendment 0008 - ATT 4 - Structural Set 04-21-2026.pdf PDF
S06 - 36C77626R0025 0007.pdf PDF
S06 - Amendment 0007 - ATT 1 - TechQuestionsVAresponses Partial 4 - Huntington EHRM IU.pdf PDF
S06 - Amendment 0007 - ATT 3 - Lift Planning.pdf PDF
S06 - Amendment 0007 - ATT 2 - Geotechnical Report.pdf PDF
S06 - Amendment 0007 - ATT 5 - Appendix A - PFC FPT.pdf PDF
S06 - Amendment 0007 - ATT 4 - 01 00 00 - GENERAL REQUIREMENTS_A1.pdf PDF
S06 - Amendment 0007 - ATT 6 - Crane lift Info.pdf PDF
S06 - 36C77626R0025 0006.pdf PDF
S06 - Amendment 0006 - ATT 1 - TechQuestionsVAresponses Partial 3 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0005.pdf PDF
S06 - Amendment 0004 - ATT 2 - FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
S06 - Amendment 0004 - ATT 1 - TechQuestionsVAresponses Partial 2 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0004.pdf PDF
S06 - Amendment 0003 - ATT 2 - TechQuestionsVAresponses Partial - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0003.pdf PDF
S06 - 36C77626R0025 0002.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit In-Sheet - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0001.pdf PDF
S02 - ATT 28 - 581-22-700 - FLS Compliance Letter.pdf PDF
S02 - ATT 3 - 581-22-700 - 100 Drawings Part-1 of 24.pdf PDF
S02 - ATT 15 - 581-22-700 - 100 Drawings Part-13 of 24.pdf PDF
S02 - ATT 30 - 581-22-700 - 100 Commissioning Plan.pdf PDF
S02 - ATT 20 - 581-22-700 - 100 Drawings Part-18 of 24.pdf PDF
S02 - ATT 24 - 581-22-700 - 100 Drawings Part-22 of 24.pdf PDF
S02 - ATT 1 - 581-22-700 - 100 Specifications Part-1 of 2.pdf PDF
S02 - ATT 10 - 581-22-700 - 100 Drawings Part-8 of 24.pdf PDF
S02 - ATT 12 - 581-22-700 - 100 Drawings Part-10 of 24.pdf PDF
S02 - ATT 23 - 581-22-700 - 100 Drawings Part-21 of 24.pdf PDF
S02 - ATT 31 - 581-22-700 - Topographic Survey TR Tower 3.pdf PDF
S02 - ATT 25 - 581-22-700 - 100 Drawings Part-23 of 24.pdf PDF
S02 - ATT 16 - 581-22-700 - 100 Drawings Part-14 of 24.pdf PDF
S02 - ATT 21 - 581-22-700 - 100 Drawings Part-19 of 24.pdf PDF
S02 - ATT 34 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
S02 - ATT 29 - 581-22-700 - Geotechnical Report - W24044 - VA Duct Bank 11.21.24.pdf PDF
S02 - ATT 14 - 581-22-700 - 100 Drawings Part-12 of 24.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO. 9 3/4-INCH 10-GAUGE FLATTENED EXPANDED

STEEL SECURITY MESH. SECURELY ANCHOR TO

WINDOW FRAME.

INSULATION.

EXISTING GLAZING TO BE REPLACED WITH A

SPANDREL PANEL IN EXISTING WINDOW FRAME

OR NEW SPANDREL WINDOW.

FRT PLYWOOD PER DETAIL 3/AE421. PAINTED WHITE.

INTERIOREXTERIOR

UNDERSIDE OF

STRUCTURE ABOVE

(OR INTERSTITIAL

FLOOR, WHERE

OCCURS)

DEMOLISH EXISTING ACT

ON TR SIDE ONLY,

TYPICAL

EXISTING ACT TO

REMAIN IN ADJACENT

ROOMS, TYPICAL

EXISTING MTL STUD, TYPICAL

EXISTING TOP PLATES

AP SEALANT OR HIGH GRADE SEALANT

FIELD FABRICATED METAL HOOD

ACCEPTABLE PRIMER

9" QUICKSEAM FORMFLASH

CONTINUOUS BEAD OF LAP

SEALANT (SEE NOTE #3)

2" (51 mm)

MEMBRANE ADHESIVE

(ADHERED SYSTEM ONLY)

CONTINUOUS BEAD

OF LAP SEALANT

(SEE NOTE #3)

EPDM MEMBRANE

5" QUICKSEAM

FLASHING

INSULATION

SUBSTRATE

INSULATION

SUBSTRATE

PENETRATION

NOTE:

1. REMOVE ALL EXISTING FLASHING, LEAD, ETC.

PIPE SURFACE MUST BE FREE OF ALL RUST, GREASE,

INSULATION, ETC.

2. PENETRATION MUST BE ANCHORED TO ENSURE STABILITY.

3. APPLY LAP SEALANT AROUND ENTIRE PERIMETER OF FLASHING.

4. DO NOT USE WHEN SERVICE LINE TEMPERATURE EXCEEDS 180 f (82C).

5. ADDITIONAL MEMBRANE SECUREMENT REQUIREMENT WHEN

PENETRATION EXCEEDS 12" DIAMETER.

WALL ASSEMBLY AS NOTED

SEMI-RECESSED FIRE

EXTINGUISHER CABINET

LINE OF WALL BEYOND

FIRE EXTINGUISHER

CAULKING AT PERIMETER,

TYP.

A .F

.F T

O H

A N

D L E

WALL ASSEMBLY AS NOTED

SEMI-RECESSED FIRE

EXTINGUISHER CABINET

LINE OF WALL BEYOND

FIRE EXTINGUISHER

CAULKING AT PERIMETER,

TYP.

FLOOR PLAN SECTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:0 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /G

E N

E R

A L

S H

E E

T S

.r v t A-604

DETAILS

MA ME/RB

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

1 1/2" = 1'-0"

WINDOW SECURITY - DETAIL

NTS

PARTIAL HEIGHT WALL/CEILING

NTS

EPDM ROOF - PENETRATION DETAIL

KEYNOTES

CONTRACTOR HAS OPTION TO PATCH HOLES & TAPE

JOINTS ON UNDERSIDE OF EXISTING GYPSUM PANELS @

UNDERSIDE OF INTERSTITIAL FLOOR OR ADD NEW LAYER

OF 1/2" GYPSUM BOARD THAT IS TAPED & FINISHED.

INSTALL GYP BOARD EACH SIDE OF EXISTING MTL STUDS

FROM EDGE OF EXISTING GYP TO STRUCTURE ABOVE.

APPLY FIRE TAPE ON EDGES, SEAMS AND HOLES OF GYP

BOARD ON SURFACES NOT ON ABOVE SUSPENDED

CEILING. PROVIDE LEVEL 4 FINISH WHERE WALL

SURFACES ARE EXPOSED TO VIEW.

GENERAL NOTES

1. SEE MECH SHEETS FOR COORDINATION ON ROOF

PATCHES.

Revisions: Date:

3" = 1'-0"

SEMI-RECESSED FEC

09/03/20259/3/2025 194 OF 693

2"

8.5"W X 5.5"H 5.0"W X 4.5"H

A

B

C

D

E

IN-01.31

IN-01.02

FIRE

EXTINGUISHER

CABINET

WALL

F

G

IN-01.31

2.5"W x 8.5"H SIDE FACING SIGN

IN-01.02

2.5"W x 8.5"H FRONT FACING SIGN

F

G

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:5

:0 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /G

E N

E R

A L

S H

E E

T S

.r v t AW001

IN-03.01 - ROOM NUMBER SIGN & SIGNAGE

SCHEDULE

MA ME/RB

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

SIGNAGE MESSAGE SCHEDULE

BLDG. # ROOM NUMBER SIGNAGE ID

01S BB100B-1S IN-03.01-1

01S T1-00G IN-03.01-2

01S T4-00G IN-03.01-3

01W T2-00G IN-03.01-4

01S T1-01 IN-03.01-5

01S T4-01 IN-03.01-6

01W T2-01 IN-03.01-7

01S T1-02 IN-03.01-8

01S T4-02 IN-03.01-9

01W T2-02 IN-03.01-10

01S T1-03 IN-03.01-11

01S T4-03 IN-03.01-12

01W T2-03 IN-03.01-13

01S T1-04 IN-03.01-14

01S T4-04 IN-03.01-15

01S T1-05 IN-03.01-16

01S T4-05 IN-03.01-17

02 T3-00B IN-03.01-18

02 T3-00G IN-03.01-19

04 4001 IN-03.01-20

05 5044 IN-03.01-21

06 6113 IN-03.01-22

07 7004 IN-03.01-23

08 8009 IN-03.01-24

20 20121 IN-03.01-25

20 20211A IN-03.01-26

23R B09 IN-03.01-27

25 PG103-25 IN-03.01-28

28 TELECOM ROOM-28 IN-03.01-29

TRAILER 1 TR1-103A IN-03.01-30

DATA CENTER 1 IN-03.01-31

DATA CENTER GC115-1 IN-03.01-32

DATA CENTER GC115-1 IN-03.01-32

DATA CENTER 6 IN-03.01-33

DATA CENTER GC114a IN-03.01-34

DATA CENTER GC114 IN-03.01-35

DATA CENTER C2-35 IN-03.01-36

DATA CENTER 1 IN-03.01-37

DATA CENTER 3 IN-03.01-38

DATA CENTER 4 IN-03.01-39

DATA CENTER 5 IN-03.01-40

DATA CENTER 7 IN-03.01-41

DATA CENTER 8 IN-03.01-42

1" = 1'-0"

IN-03.01 ROOM NUMBER SIGN - ELEVATION LOCATION

6" = 1'-0"

IN-03.01 ROOM NUMBER SIGN - ELEVATIONS

Revisions: Date:

1" = 1'-0"

ELEVATION LOCATIONS

GENERAL NOTES

1. CONTRACTOR TO COORDINATE WITH VA COR AND

SIGNAGE MANUFACTURER TAKEFORM FOR EXACT

SIGNAGE LANGUAGE AND TYPES.

TAKEFORM

ADDRESS: 11601 MAPLE RIDGE RD, MEDINA, NY, 14103

PHONE: (800)-528-1398

WWW.TAKEFORM.NET

SIGNAGE FINISHES

ID DESCRIPTION

A VINYL: FINISH 220-BLACK, FONT: HELVETICA (ADA), CUT: FACE

B BACKER FINISH: LT3526 TRAVERTINE

C FACE FINISH: LW101 LIGHT MAPLE

D RAISED COPY: C0101, FONT: HELVETICA (ADA)

E METAL ACCENT: POLISHED

F CO104 WHITE

G LS105 COTTAGE RED

6" = 1'-0"

FIRE EXTINGUISHER IDENTIFICATION FLAG

FEC SIGNAGE SCHEDULE

BLDG. # ROOM NUMBER SIGNAGE ID

01S 6B-100 IN-01.02

01S BB100B-1S IN-01.31

01S T1-00G IN-01.02

01S T1-00G IN-01.31

01S T1-01 IN-01.31

01S T1-02 IN-01.02

01S T1-02 IN-01.31

01S T1-03 IN-01.02

01S T1-03 IN-01.31

01S T1-04 IN-01.02

01S T1-04 IN-01.31

01S T1-05 IN-01.02

01S T1-05 IN-01.31

01S T4-00G IN-01.31

01S T4-01 IN-01.31

01S T4-02 IN-01.31

01S T4-03 IN-01.31

01S T4-04 IN-01.31

01S T4-05 IN-01.31

01W T2-00G IN-01.31

01W T2-01 IN-01.02

01W T2-02 IN-01.02

01W T2-03 IN-01.31

02 T3-00B IN-01.02

02 T3-00G IN-01.02

03 SP3005-3A IN-01.02

04 4001 IN-01.31

05 5044 IN-01.31

06 6113 IN-01.31

07 7004 IN-01.02

07 7300 IN-01.02

08 8009 IN-01.31

08 8301 IN-01.31

09 9202 IN-01.31

20 20121 IN-01.31

20 20211A IN-01.02

23R B09 IN-01.31

25 PG103-25 IN-01.02

28 TELECOM ROOM-28 IN-01.02

34 SP3401-34 IN-01.02

DATA CENTER (GC115-1) GC115-1 IN-01.31

DATA CENTER (GC115-1) GC115-1 IN-01.31

TRAILER 1 TR1-103A IN-01.02

TRAILER 3 TR3-105 IN-01.31

TRAILER 4 TR4-106a IN-01.31

TRAILER 5 TR5-109a IN-01.02

09/03/20259/3/2025 195 OF 693

1. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE CURRENT VA

GUIDES AND LOCAL FIRE PROTECTION CODES AND ORDINANCES.

2. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

MANUFACTURER'S REQUIREMENTS. IN CASES OF CONFLICT BETWEEN MANUFACTURER

REQUIREMENTS, DRAWINGS, OR SPECIFICATIONS, THE MORE STRINGENT REQUIREMENT

SHALL GOVERN.

3. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND VA COR PRIOR TO

ANY CUTTING OF WALLS AND ROOF.

4. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING PENETRATIONS OF

FIRE RATED ASSEMBLIES AS REQUIRED.

5. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END OF

THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHALL BE

INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE

SPREAD THROUGH THE UNSEALED PENETRATION.

6. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES,

TRAPS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND INSTALLED IN

ACCORDANCE WITH THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION

WITH FIRE PROTECTION INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT

SERVED.

7. ROOMS THAT DO NOT HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE

BRANCH PIPING MODIFIED TO TURN THE SPRINKLER HEAD UPRIGHT. PROVIDE

SPRINKLER PROTECTION CAGE. ALL EXPOSED FIRE PROTECTION LINES SHALL BE

PAINTED RED.

8. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS

NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.

9. TELECOM ROOMS AND DATA CENTERS ARE CONSIDERED LIGHT HAZARD FOR SPRINKLER

HEAD DENSITY. ANY OTHER HAZARD CLASSIFICATION AND SPRINKLER DENSITY ARE TO

BE IN ACCORDANCE WITH THE LATEST VERISONS OF NFPA 13 AND VA FIRE PROTECTION

DESIGN GUIDE.

10. MODIFY EXISTING SPRINKLER SYSTEM WITHIN THE LIMITS OF CONTRUCTION TO COMPLY

WITH NFPA 13. PROVIDE TEMPORARY UPRIGHT SPRINKLER HEADS TO PROTECT SPACES

WHERE CEILINGS ARE REMOVED FOR CONSTRUCTION UNTIL THE NEW CEILING IS

INSTALLED AND NEW DROPS TO NEW PENDENT SPRINKLERS ARE INSTALLED.

TEMPORARY SPRINKLERS ARE NOT REQUIRED IF NEW OR EXISTING CEILING IS IN PLACE

AT THE END OF THE WORK SHIFT. PROVIDE TEMPORARY SPRINKLERS AS REQUIRED TO

PROVIDE CONTINUOUS COVERAGE OF ALL AREAS WITH CONSTRUCTION OF

CONSTRUCTION BARRIER WALLS.

11. NFPA STANDARDS: FIRE-SUPPRESSION-SYSTEM,SPECIALTIES, ACCESSORIES,

INSTALLATION, AND TESTING SHALL COMPLY WITH THE LATEST EDITION OF NFPA 13

"INSTALLATION OF SPRINKLER SYSTEMS."

12. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN DRAWINGS OR A LICENSED

FIRE PROTECTION ENGINEER STAMP ON ALL SHOP DRAWINGS.

13. NEW FIRE PROTECTION PIPING SHALL BE PAINTED PER VA SPECIFICATIONS.

14. SEE MECHANICAL DRAWINGS FOR TELECOM ROOM FIRE PROTECTION WORK.

15. CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS,

EQUIPMENT AND MATERIALS WITH OTHER TRADES IN ACCORDANCE WITH NFPA 13.

16. TELECOM ROOMS AND DATA CENTERS SHALL HAVE FIRE MARSHAL APPROVED,

UPRIGHT, STANDARD RESPONSE SPRINKLERS WITH FUSIBLE LINKS. PROVIDE LISTED

MECHANICAL GUARDS. ALL EXPOSED FIRE PROTECTION LINES SHALL BE PAINTED

RED. ALL SPACES OTHER THAN MCR AND GENERATOR ENCLOSURE SHALL HAVE

QUICK RESPONSE SPRINKLERS.

17. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE TELECOMMUNICATION RACKS

WHERE FEASIBLE BUT STILL IN ACCORDANCE WITH NFPA 13.

18. FIRE SPRINKLER SYSTEM INSTALLATION IN SOME AREAS IS PHASED. CONTRACTOR TO

ENSURE THAT NFPA 13 COMPLIANT WORKING DRAWING SUBMITTALS ACCOUNT FOR

FINAL PHASE SPRINKLER DENSITY AND LAYOUT.

19. SPRINKLER LOCATIONS ARE SCHEMATIC IN NATURE ONLY. CONTRACTOR RESPONSIBLE

FOR FINAL LOCATIONS OF ALL SPRINKLERS AND HEAD COUNT TO PROVIDE A FULLY

FINISHED SPRINKLER SYSTEM IN COMPLIANCE WITH NFPA 13.

FIRE PROTECTION DEMOLITION NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS

OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON

THE PROJECT SITE IS PROHIBITED.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:

A) PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT AND

SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.

B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING

DURING DEMOLITION.

C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.

D) PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

E) REPAIRING DAMAGED PROPERTY TO ITS ORIGINAL CONDITION IMMEDIATELY

AFTER THE DAMAGE OCCURS.

F) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

4. MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING FIRE PROTECTION EQUIPMENT AS SHOWN, UNLESS

NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF

DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL

EQUIPMENT THAT IS TO REMAIN.

FIRE PROTECTION GENERAL NOTES

FIRE PROTECTION GENERAL NOTES

20. IT IS THE RESPONSBILITY OF THIS PROJECT'S CONTRACTOR TO

PROVIDE NEW WATER SUPPLY FLOW TESTS IN ACCORDANCE WITH THE

REQUIREMENTS OF NFPA 13 AND NFPA 291, PRIOR TO SUBMITTING FIRE

SPRINKLER SHOP DRAWINGS.

21. PER NFPA 13, PROVIDE AN AUTOMATIC AIR VENT AND ISOLATION

CONTROL VALVE AT A HIGH POINT OF EACH WET PIPE SYSTEM. IF THE

AUTOMATIC AIR VENT INCORPORATES A DISCHARGE OUTLET, THE

DISCHARGE SHALL BE PIPED TO A SAFE DISCHARGE LOCATION.

22. ALL SPRINKLER BRANCH LINES SHALL BE RESTRAINED AGAINST

EXCESSIVE MOVEMENT PER NFPA 13.

23. THE FIRE PROTECTION SPRINKLER SYSTEM CONTRACTOR SHALL

TAKE INTO ACCOUNT THE CONFIGURATION OF EACH AREA BEING

PROTECTED AND SHALL LAYOUT THE SPRINKLER LOCATIONS TO BE

SYMMETRICALLY SPACED TO THE GREATEST EXTENT POSSIBLE.

24. THE FIRE PROTECTION SPRINKLER SYSTEM PIPING SHALL BE

INSTALLED TO MINIMIZE PIPING OFFSETS IN ROOMS OF EXPOSED

STRUCTURE. PIPING SHALL BE INSTALLED AS TIGHT TO STRUCTURE AS

POSSIBLE AND SHALL BE INSTALLED TO MINIMIZE VISUAL

IMPACTS.

25. NFPA 70 REQUIRES A DEDICATED SPACE OF 6'-0" ABOVE ALL

ELECTRICAL PANELS, TRANSFORMERS, SWITCHGEARS, ETC. NO

PIPING, DUCTS, OR OTHER EQUIPMENT FOREIGN TO THE ELECTRICAL

INSTALLATION SHALL BE LOCATED IN THIS ZONE. ALL SPRINKLER

PIPING THAT IS NOT COORDINATED TO AVOID THESE AREAS SHALL BE

MODIFIED AND RELOCATED AT THE FIRE PROTECTION SPRINKLER

CONTRACTORS EXPENSE.

26. ALL SPRINKLER SYSTEM COMPONENTS, DEVICES, AND MATERIALS

INSTALLED AS PART OF THIS PROJECT SHALL BE NEW.

27. THE FIRE PROTECTION SPRINKLER SYSTEM CONTRACTOR IS

RESPONSIBLE FOR MAKING ALL ELEVATION AND HORIZONTAL

ADJUSTMENTS IN THE PIPING REQUIRED TO FOLLOW THE BUILDING'S

STRUCTURE, CEILING HEIGHTS, AND ARCHITECTURAL FEATURES. THE

CONTRACT DOCUMENTS ARE CONCEPTUAL IN NATURE AND SHOW A

PROPOSED FIRE SPRINKLER MAIN PIPE ROUTING, AND ROUTING IN

EXPOSED AREAS, BUT DO NOT INCLUDE ALL REQUIRED FITTINGS OR

OFFSETS THAT ALLOW THE PIPING TO BE INSTALLED AS IT IS SHOWN

ON THE CONTRACT DOCUMENTS.

28. WHERE TELECOM ROOM PIPING DRIP PANS EXCEED 4' IN WIDTH PROVIDE

AN ADDITIONAL SPRINKLER BELOW THE DRIP PAN IN COMPLIANCE WITH NFPA 13

REQUIREMENTS.

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT

BEFORE BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA

STANDARDS, AND SPECIFICATIONS.

3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

MANUFACTURER'S REQUIREMENTS. IN CASES OF CONFLICT BETWEEN

MANUFACTURER REQUIREMENTS, DRAWINGS, OR SPECIFICATIONS, THE

MORE STRINGENT REQUIREMENT SHALL GOVERN.

4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER

TRADES.

5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC

EQUIPMENT.

6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND VA

COR PRIOR TO ANY CUTTING OF WALLS AND ROOF.

7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE

END OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF

MINERAL WOOL SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE

PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED

PENETRATION.

8. INSTALL ALL GRAVITY CONDENSATE DRAIN PIPING WITH A MINIMUM OF 1/8"

PER LINEAR FOOT (1%) SLOPE.

9. INSTALL ALL SANITARY SEWER LINES WITH A SLOPE OF 1/4" PER LINEAR

FOOT (2%) OF RUN. WHERE INDICATED ON PLANS, SANITARY SEWER LINES

CAN BE INSTALLED WITH A MINIMUM SLOPE OF 1/8" PER LINEAR FOOT (1%) OF

RUN. CONTRACTOR MAY INSTALL PIPING WITH A SLOPE GREATER THAN THAT

SPECIFIED ABOVE, BUT NEVER LESS.

10. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A

FURRED CHASE, ABOVE HARD SUSPENDED CEILING, OR ABOVE AN

ACOUSTICAL CEILING UNLESS EXPLICITLY NOTED ON THE DRAWINGS AS

BEING ROUTED EXPOSED IN A FINISHED ROOM OR SPACE.

11. ACCESS PANELS IN HARD SUSPENDED CEILINGS AND WALLS (NOT INCLUDING

ACCESSIBLE WET WALLS) ARE REQUIRED FOR ALL VALVES, TRAPS,

CLEANOUTS, CONTROLS, WATER HAMMER ARRESTORS ETC. ACCESS

PANELS SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH THE

ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH PLUMBING

INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED

12. ALL PRESSURES LISTED ARE GAUGE PRESSURE UNLESS OTHERWISE NOTED.

PLUMBING DEMOLITION NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS

OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON

THE PROJECT SITE IS PROHIBITED.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:

A) PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT AND

SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.

B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING

DURING DEMOLITION.

C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.

D) PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

E) REPAIRING DAMAGED PROPERTY TO ITS ORIGINAL CONDITION IMMEDIATELY

AFTER THE DAMAGE OCCURS.

F) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

4. MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT

FIRST OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING PLUMBING EQUIPMENT AS SHOWN, UNLESS

NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF

DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING PLUMBING

EQUIPMENT THAT IS TO REMAIN.

PLUMBING GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:5

:5

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

-0

M

E S

D B

.r v t

M-001

FIRE PROTECTION, PLUMBING, AND

MECHANICAL GENERAL NOTES

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS

AND SPECIFICATIONS.

3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

MANUFACTURERS REQUIREMENTS. IN CASES OF CONFLICT BETWEEN

MANUFACTURER REQUIREMENTS, DRAWINGS AND SPECIFICATIONS THE MORE

STRINGENT REQUIREMENT SHALL GOVERN.

4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER

TRADES.

5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC EQUIPMENT.

6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER

PRIOR TO ANY CUTTING OF WALLS AND ROOF.

7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE

END OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL

WOOL SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION

AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

8. INSTALL GRAVITY DRAIN PIPING WITH A MINIMUM OF 1/8" PER LINEAR FOOT (1%)

SLOPE.

9. WHERE OPENING EXISTING WALLS TO ROUTE CONDENSATE PIPING OR OTHER

WORK, REFER TO ARCHITECTURAL DETAILS FOR PATCHING.

10. IN CASE OF A DISCREPANCY BETWEEN MANUFACTURER RECOMMENDED

REFRIGERANT PIPE SIZING AND THE REFRIGERANT PIPE SIZES SHOWN ON THE

PLANS THE MANUFACTURER REQUIREMENTS SHALL GOVERN.

11. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED

IN A FURRED CHASE OR ABOVE HARD SUSPENDED CEILING, OR ACOUSTICAL

CEILING.

12. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR

INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.

13. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL

VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS

SHALL BE FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL

SPECIFICATIONS. COORDINATE LOCATION WITH MECHANICAL INSTALLATION AND

DEMONSTRATE ACCESS TO EQUIPMENT SERVED.

14. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK

SIZES.

15. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE

MADE TO PROVIDE COUNTERFLOW BETWEEN WATER AND AIR.

16. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS

OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.

17. ALL PIPING ROUTED THROUGH A TELECOM ROOM EXCEPT FIRE PROTECTION

PIPING THAT SERVES SPRINKLER IN THE TELECOM ROOM SHALL BE PROVIDED

WITH DRIP PANS WITH A MOISTURE SENSOR TIED INTO THE BMS.

18. EXISTING CONDITIONS SHOWN ARE BASED ON AS-BUILT DRAWINGS AND VISUAL

FIELD INVESTIGATION. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS

PRIOR TO STARTING WORK.

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS

OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON

THE PROJECT SITE IS PROHIBITED.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:

A) PROTECTING, COVERING AND SEALING EXISTING EQUIPMENT AND

SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.

B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING

DURING DEMOLITION.

C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.

D) PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

E) IMMEDIATELY REPAIRING DAMAGED PROPERTY TO ITS CONDITION BEFORE BEING

DAMAGED.

F) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS

NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF

DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL

EQUIPMENT THAT IS TO REMAIN.

GENERAL NOTES

MECHANICAL GENERAL NOTES

MECHANICAL DEMOLITION NOTES

Revisions: Date: 09 /0

3/

ABS:

AC:

ACR:

A/E:

AFF:

AFG:

AG:

AI:

AISI:

AO:

ASHRAE:

ASJ:

ASME:

ASPE:

ASR:

AWG:

BACNET:

BAG:

BAS:

BCUP:

BFP:

BHP:

BTU:

BTU/H:

BSG:

C:

CD:

CDA:

CGA:

CFM:

CO:

COR:

CPVC:

CR:

CRS:

CV:

CWFT:

CWTT:

CXA

DB:

DB(A):

DDC:

DFU:

DI:

DI:

DISS:

DN:

DO:

DOE:

DVD:

DW:

DWG:

DWV:

ECC:

EL:

EPA:

EPACT:

EPDM:

EPT:

ETO:

EX:

F:

FAR:

FCO:

FD:

FDC:

FNPT:

FOP:

FOR:

FOS:

FOV:

FPM:

FS:

FSK:

FSS:

FU:

IV:

N2:

N20:

NC:

NF:

NFPA:

NG:

NIC:

NO:

NOM:

NPTF:

NPS:

NPT:

NTS:

O2:

OC:

OCAMES:

OD:

OR:

OSD:

OS&Y:

OXY:

ACRYLONITRILE BUTADIENE STYRENE

ALTERNATING CURRENT

AIR CONDITIONING AND REFRIGERATION

ARCHITECT/ENGINEER

ABOVE FINISH FLOOR

ABOVE FINISH GRADE

AIR GAP

ANALOG INPUT

AMERICAN IRON AND STEEL INSTITUTE

ANALOG OUTPUT

AMERICAN SOCIETY OF HEATING REFRIGERATION,

AIR CONDITIONING ENGINEERS

ALL SERVICE JACKET

AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AMERICAN SOCIETY OF PLUMBING ENGINEERS

AUTOMATIC SPRINKLER RISER

AMERICAN WIRE GAUGE

BUILDING AUTOMATION AND CONTROL NETWORK

SILVER-COPPER-ZINC BRAZING ALLOY

BUILDING AUTOMATION SYSTEM

SILVER-COPPER-PHOSPHORUS BRAZING ALLOY

REDUCED PRESSURE BACKFLOW PREVENTER

BRAKE HORSEPOWER

BRITISH THERMAL UNIT

BRITISH THERMAL UNIT PER HOUR

BOROSILICATE GLASS PIPE

CELSIUS

COMPACT DISK

COPPER DEVELOPMENT ASSOCIATION

COMPRESSED GAS ASSOCIATION

CUBIC FEET PER MINUTE

CLEANOUT

CONTRACTING OFFICER'S REPRESENTATIVE

CHLORINATED POLYVINYL CHLORIDE

CHLOROPRENE

CORROSION RESISTANT STEEL

CONTROL VALVE

CONDENSER WATER FROM TOWER

CONDENSER WATER TO TOWER

COMMISSIONING AGENT

DECIBELS

DECIBELS (A WEIGHTED)

DIRECT DIGITAL CONTROL

DRAINAGE FIXTURE UNITS

DIGITAL INPUT

DEIONIZED WATER

DIAMETER INDEX SAFETY SYSTEM

DIAMETER NOMINAL

DIGITAL OUTPUT

DEPARTMENT OF ENERGY

DIGITAL VIDEO DISC

DISHWASHER

DRAWING

DRAINAGE, WASTE AND VENT

ENGINEERING CONTROL CENTER AKA BAS

ELEVATION

ENVIRONMENTAL PROTECTION AGENCY

ENERGY POLICY ACT

ETHYLENE PROPYLENE DIENE MONOMER

ETHYLENE PROPYLENE TERPOLYMER

ETHYLENE OXIDE

EXISTING

FAHRENHEIT

FEDERAL ACQUISITION REGULATIONS

FLOOR CLEANOUT

FLOOR DRAIN

FIRE DEPARTMENT (HOSE) CONNECTION

FEMALE NATIONAL PIPE THREAD

FUEL OIL PUMP

FUEL OIL RETURN

FUEL OIL SUPPLY

FUEL OIL VENT

FLUOROELASTOMER POLYMER

FLOW SWITCH

FOIL-SCRIM-KRAFT FACING

VA CONSTRUCTION & FACILITIES MANAGEMENT,

FACILITY STANDARDS SERVICE

FIXTURE UNITS

ISOLATION VALVE

NITROGEN

NITROGEN OXIDE

NORMALLY CLOSED

OIL FREE DRY (NITROGEN)

NATIONAL FIRE PROTECTION ASSOCIATION

NATURAL GAS

NOT IN CONTRACT

NORMALLY OPEN

NOMINAL

NATIONAL PIPE THREAD FEMALE

NOMINAL PIPE SIZE

NOMINAL PIPE THREAD

NOT TO SCALE

OXYGEN

ON CENTER

REPLACED BY HEFP

OUTSIDE DIAMETER

OPERATING ROOM

OPEN SIGHT DRAIN

OUTSIDE STEM AND YOKE

OXYGEN

P Pa

PC

PCF

PD

PEF

PF

PGW

PHC

PPM

PRS

PRV

PSI

PSIA

PSIG

PSS

PSV

PTAC

R/E

RA

RAD

RAF

RAHX

RAT

RCCH

RCU

RD

RDS

REA

RELAD

RF

RG

RH

RHC

RHG

RL

RLA

RO

RPM

RR

RS

RTU

RV

SA

SAD

SAT

SC

SCFM

SCI

SCR

SD

SD

SD-1

SD-2

SDPR

SDR

SDS

SEN

SF

SG

SH

SHC

SI

SP

SP GR

SPD

SPRV

SPS

SQ FT

SR

SS

SSHX

SSR

ST

SUH

SV

SVS

SW

SWHX

T&PCV

TAB

TD

TDH

TDS

TG

TP

TR

TSP

TSTAT

TU

TWU

W:

WAGD:

WC:

WCO:

WG:

WH:

WOG:

WPD:

WS:

WSFU:

YCO:

YH:

PUMP

PASCAL

PUMPED CONDENSATE

POUNDS PER CUBIC FOOT (FEET)

PRESSURE DROP

PROPELLER (TYPE) EXHAUST FAN

PRE-FILTER

PROPYLENE GLYCOL-WATER (SOLUTION)

PREHEAT COIL

PARTS PER MILLION

PRESSURE REGULATING (VALVE) STATION

PRESSURE REGULATING VALVE

POUNDS PER SQUARE INCH

POUNDS PER SQUARE INCH – ABSOLUTE

POUNDS PER SQUARE INCH – GAGE

PRIMARY SECONDARY SYSTEM

PRESSURE SAFETY VALVE

PACKAGED TERMINAL AIR CONDITIONER

RETURN OR EXHAUST

RETURN AIR

RETURN AIR DAMPER

RADIO FREQUENCY

ROTARY AIR HEAT EXCHANGER

RETURN AIR TEMPERATURE

REMOTE CONDENSER CHILLER

RECIPROCATING CHILLER UNIT

REFRIGERANT DISCHARGE

ROOM DATA SHEETS

RELIEF AIR

RELIEF AIR DAMPER

RETURN FAN

RETURN GRILLE

RELATIVE HUMIDITY

REHEAT COIL

REFRIGERANT HOT GAS

REFRIGERANT LIQUID LINE

RUN LOAD AMPERE

REVERSE OSMOSIS

REVOLUTIONS PER MINUTE

RETURN REGISTER

REFRIGERANT SUCTION

ROOF TOP UNIT

RELIEF VALVE

SUPPLY AIR

SOUND ATTENUATING DEVICE

SUPPLY AIR TEMPERATURE

SHADING COEFFICIENT

STANDARD CUBIC FEET PER MINUTE

SPINAL CODE INJURY

SILICON CONTROLLED RECTIFIER

SMOKE DETECTOR

SUPPLY AIR DIFFUSER

SCHEMATIC DESIGN (SUBMISSION1)

SCHEMATIC DESIGN (SUBMISSION2)

SMOKE DAMPER

SMOKE DAMPER (RETURN)

SMOKE DAMPER (SUPPLY)

SENSIBLE HEAT

SUPPLY FAN

SUPPLY AIR GRILLE

STEAM HUMIDIFIER

STEAM HEATING COIL

SQUARE INCHES

STATIC PRESSURE

SPECIFIC GRAVITY

SUPPLY PROCESS AND DISTRIBUTION

STEAM PRESSURE REDUCING VALVE

STATIC PRESSURE SENSOR

SQUARE FOOT (FEET)

SUPPLY AIR REGISTER

STAINLESS STEEL

STEAM TO STEAM HEAT EXCHANGER

SOLID SEPARATOR

STEAM TRAP

STEAM UNIT HEATER

STEAM PRESSURE REDUCING VALVE

STEAM VENT SILENCER

SOFTWATER

STEAM TO WATER HEAT EXCHANGER

TEMPERATURE AND PRESSURE

CONTROL VALVE

TESTING, ADJUSTING, BALANCE

TEMPERATURE DIFFERENCE

TOTAL DYNAMIC HEAD

TOTAL DISSOLVED SOLIDS

TRANSFER GRILLE

TRAP

TOP REGISTER

TOTAL STATIC PRESSURE

THERMOSTAT

TERMINAL UNIT

THRU-WALL UNIT

WASTE

WASTE ANESTHESIA GAS DISPOSAL

WATER CLOSET

WATER CLEANOUT

WATER GAUGE

WALL HYDRANT

WATER, OIL, GAS

WATER PRESSURE DROP

WASTE STACK

WATER SUPPLY FIXTURE UNITS

YARD CLEANOUT

YARD HYDRANT

SINGLE LINE DOUBLE LINE

DUCTWORK SYMBOLS

ADDITIONAL SYMBOLS

SINGLE LINE DOUBLE LINE

BALL VALVE WITH MEMORY STOP (BALANCING VALVE)

UNION OR FLANGE (AS INDICATED BY PIPE SIZE - SEE SPEC.)

PIPE BREAK (SINGLE LINE)

RISE (SINGLE LINE - PLAN VIEW)

DROP (SINGLE LINE - PLAN VIEW)

BOTTOM TAKEOFF

TOP TAKEOFF

BLIND FLANGE

END CAP

BALL VALVE

GATE VALVE

EXISTING PIPE TO BE REMOVED

HEATING HOT WATER SUPPLY

HEATING HOT WATER RETURN

CONDENSATE DRAIN

CHILLED WATER SUPPLY

CHILLED WATER RETURN

PIPING LEGEND

TAKE-OFF

SUPPLY

CEILING

DUCT MTD.

DIFF/GRILLE

BULLHEAD SPLIT

TAKEOFF

DIFF/GRILLE

TO

OR

HARD

ELBOW

SUPPLY DUCT DOWN

SUPPLY DUCT UP

OR

R w

RETURN/EXHAUST

CONVERGE

BULLHEAD

TAKE-OFF

90°F

TAP

45°F

TAP

DUCT

FLEXIBLE

1/4"x1/4" WMS

OPEN END

DUCT W/

ACOUSTICALLY

LINED DUCT

CEILING

DUCT MTD.

DIFF/GRILLE

REG./GRILLE

DUCT MTD.

SIDEWALL

LD MF'R

BOOT BY

VD VD

VD VD

EQUIPMENT

DUCTWORK OR

TO BE REMOVED

TURNING VANES

ROUND DUCT UP

SUPPLY SIDEWALL

LINEAR DIFFUSER

(W/SHEET METAL

PLENUM W/1"

LINING & BRANCH

CONN FOR EVERY

4' OF LENGTH)

SUPPLY CEILING

LINEAR DIFFUSER

(W/SHEET METAL

PLENUM W/1"

LINING & BRANCH

CONN FOR EVERY

4' OF LENGTH)

STANDARD

RADIUS ELBOW (R= W)

SUPPLY/RETURN

/EXHAUST

ROUND DUCT DOWN

ROUND TAPROUND

DUCT

RECT. TAP

TAKE-OFF

90°F

TAP

ROUND TAKEOFF

RECTANGULAR MAIN DUCT

ROUND MAIN DUCT

RECT TAP

RISE/DROP

SUPPLY/RETURN/

RISE OR DROP

SUPPLY/RETURN

TAKE-OFF

45°F

TAP

/EXHAUST

HORIZONTAL

EXHAUST

OFFSET

RISE

RETURN DUCT UP

UP

DROP

DN

EXHAUST DUCT UP

RETURN DUCT DOWN

EXHAUST DUCT DOWN

HWR

HWS

CHR

CHS

D

NEW AND EXISTING WORK

W"/H" WIDTH AND HEIGHT

IN INCHES FOR FLAT

OVAL DUCT

POINT OF CONNECTION BETWEEN

BLANKED FOR 1-WAY

BLANKED FOR 2-WAY

BLANKED FOR 3-WAY

STANDARD 4-WAY

BD

OR

BACKDRAFT DAMPER

BLOW SUPPLY DIFFUSER

BLOW SUPPLY DIFFUSER

BLOW SUPPLY DIFFUSER

BLOW SUPPLY DIFFUSER

FIRE DAMPER

M MOTORIZED DAMPER LIMIT OF DEMOLITION

TEMPERATURE SENSOR OR

THERMOSTAT

T

H ROOM HUMIDISTAT

M

R

MOISTURE SENSOR

REFRIGERANT SENSOR

ADDITIONAL SYMBOLS

H4

H7

A

26-SF 3

26-TU-I-I

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

SUPPLY FAN NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (SUPPLY FAN)

ROOM NUMBER (ALPHA-NUMERIC)

ITEM (TERMINAL UNIT SHOWN)

SCHEDULED EQUIPMENT NUMBER

DRAWING NUMBER WHERE DRAWN

BUILDING NO. WHERE EQUIPMENT IS LOCATED

26-SF 3

26-TU-I-I

OR

OR

AIR OUTLET CALLOUT

PENDENT SPRINKLER

UPRIGHT SPRINKLER WITH GUARD

1 HR FIRE RATED WALL

2 HR FIRE RATED WALL

SMOKE RATED WALL

SMOKE & 1 HR FIRE RATED WALL

FIRE PROTECTION

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

HIGH PRESSURE STEAM CONDENSATE RETURN

PUMPED CONDENSATE

LOW PRESSURE PRESSURE STEAM (15 PSIG AND BELOW)

HIGH PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

LOW PRESSURE STEAM CONDENSATE RETURN

PC

CR-15

S-30

CR-30

S-60

CR-60

S-15

GLYCOL-WATER HEATING RETURN

GLYCOL-WATER HEATING SUPPLYGHS

GHR

REFRIGERANT LIQUID/SUCTIONRL/RS

X

SANITARY SEWERSS

FIRE PROTECTIONFP

DOMESTIC COLD WATERCW

STORM DRAINSD

STORM DRAIN OVERFLOWOFD

WALL HYDRANT (PLUMBING)

WALL HYDRANT (FIRE

PROTECTION)

[SD] 18X18

1 2

AIR OUTLET TYPE

NECK SIZE (IN)

AIRFLOW (CFM)

PRESSURE INDEPENDENT BALANCING VALVE

FIRE DRAINFD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:2

:3

P M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

-0

M

E S

D B

.r v t

M-002

FIRE PROTECTION, PLUMBING, AND

MECHANICAL GENERAL NOTES

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

ABBREVIATIONSLEGEND

DESIGN CONDITIONS

OUTDOOR DESIGN CONDITIONS

STATE COUNTY WMO STATION IDENTIFIER ALTITUDE (FT)

CLIMATE

ZONE

SUMMER WINTER

TEMP DB

(°F)

TEMP WB

(°F)

TEMP DB

(°F)

WEST VIRGINIA CABELL 724250 824 4A 91.4 °F 74.0 °F 9.4 °F

INDOOR DESIGN CONDITIONS

ROOM TYPE

SUMMER WINTER

TEMP DB (°F) REL HUM (%) TEMP DB (°F) REL HUM (%)

DATA ROOM 75 30-60 70 30-60

TELECOM ROOM 75 30-60 70 30-60

Revisions: Date: 09 /0

3/

A B D E F H I J K L MGC N O P Q R S T U V

01S-M-403

01S-M-403

01S-M-403

01S-M-403

A R

E A

A

A R

E A

B

N O

T S

H O

W N

DIAGNOST

TREATMENT

B20

FEED/ BEDDING

B21

ELEC.

B22

REFRIG

B23

QUARNTN

ROOM

B01

SIG./PH.

B27

T. SURG.

B19A

PRO LAB

B19

S. SURG.

B18A

ELEVATOR

SE-1

CORRIDOR

CB-6

CORRIDOR

CB-5

WORK/SUPP

B18

POST OP

B17

PREP/ SCRUB

B16

ANIMAL

B15

ANIMAL

B14

ANIMAL

B24

ANIMAL

B25

ANIMAL

B26

ANIMAL

B13

CLN CAGE

WASH

B08

SOILED CAGE

WASH

B10

CAGE STO.

B08A

RECEIVING

B02

MEN

B03

WOMEN

B04

COLD RM

B05

H.A.C.

B06

NECROPSY

B07

TRASH

B32

MU FLAM

B31

VA FLAM

B28

VA GAS

B29

MU GAS

B30

EMERG.

GENERATOR

BB115

ELECTRICAL

SWITCH

BB116

VET OFF

B12

PRO LAB

B11

SUP. OFF

B12A

TR

B09

CORRIDOR

CB-2

CORRIDOR

CB-1

STAIR

ENGR.

CONTROL

BB117C

ELEC.

BB117A

TELE.

BB117B

MECHANICAL

ROOM

BB117

STAIR

S-1

CORRIDOR

CART LIFT

MACH RM

BB106E

H.A.C.

BB106D

BB102B

MEDIVATOR

BB106C

PREP. &

ASSEMBLY

STERILE

BB106A

STERIL

BB106B

H.A.C.

BB102A

M. LKR

BB103

DECON VEST

SOILED

W. LKR

BB101

MACH RM.

BB104

ADMIN OFFICE

BB105

AUTO CART

WASH

BB102C

A CHIEF SPS

BB105B

CHIEF SPS

BB105A

STERILE

PROCESSING

SERVICE CLEAN

SUPPLY

BB106

OFFICE

BB106F

CLEAN

RECEIVING

ANTEROOM

CORRIDOR

TOILET

BB108A

SUPPLY

SERVICE

WAREHOUSE

BB100

DECONTAMINATION

BB102

CORRIDOR

MARSHALL

CAMPUS

MECHANICAL

EQUIPMENT

B41

ELECTRIC

SUBSTATION

B41B

STORAGE

PARTS & TOOLS

B39

RADIOACTIVE

MATERIAL

STORAGE

B38A

GENERAL

STORAGE

B38

TELEPHONE

ROOM

B38B

ELECTRIC

CLOSET

B36

ELEVATOR

MACHINE

B40

B40A

B37

P-1

TR

BB100B-1S

IRM STORAGE

BB100A-1S

01S-M-401

01S-M-402

MECHANICAL

ROOM

BB117

TR LOCATION

PROJECT

NORTH

RM BB100B-1S

23R

01S

01W

A R

E A

A

A R

E A

B

AREA C

AREA B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:0

:2

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

01-M-101

BUILDING 01S - BASEMENT - OVERALL PLAN -

AREA A

01S

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/16" = 1'-0"1

BASEMENT - OVERALL PLAN - AREA A

KEY PLAN

PROJECT

NORTH

PROJECT

NORTH

Revisions: Date: 09 /0

3/

A B D E F H I J K L MGC N O P Q R S T U V W X Y

A7A6 A5

A4 A3

A8

A11 A10

A9

A2 A1

01S-M-406

01S-M-406

AREA B: SEE SHEET 01-M-103

AREA A

A R

E A

B

S E

E S

H E

E T

-M

-1

A R

E A

A

TR TOWER 4

T4-00G

AREA A

AREA C

01S-M-405

CORRIDOR

CG-43

CLOSET

GB160

SOILED

GD113

CPU ROOM

GD112

LOUNGE/BREAK

PT. CLOTH

GD111

LOCKERS

G112D

SHR

GD112B

MEN

GD112A

FPMS

GC155

GD110A

GD110

ELEV

F8

FREEZER

FREEZER

FRIDGE

FREEZER

SALAD PREP

GD109

MECH

GD105

GD104

GD106

IRM

GD108

IRM

GD100

GD103

GD102

GD101

GD107

MAINT. ELEV

P9

HAC

GB170TELE.

GB171

SERVICE LOBBY

CG17

GB168g

BVA

GB168c

IRM

GB168a

EXAM

GB168k

FEE CLAIMS

GB168b

BOOTH

EXAMINER

GB168j

GB168l

GB168

GB168i

GB168h

MEDICAL

RECORDS

GB168d

GB168f

GB168e

STAIR 4

MECH RM

GB167

HEALTH TECH

GB149c

HEALTH TECH

GB149d

EXAM

GB149e

EXAM

GB149f

EXAM

GB149g

AUDIOLOGY

ROOM

GB149

RECEP

GB148

OFFICE

GB148a

OFFICE

GB148b

OFFICE

GB146

TLT

GB145

CERUMEN

MGMT

GB147b

TLT

GB144

GB143

HAC

GB142

GERI PACT

GB151

GERI PACT

GB152

GB140

GB141

STORAGE

GB141a

CLEAN SUPPLY

GB139

PALL CARE

GB138

PALL CARE

GB137

GERI PACT

GB153

GERI PACT

GB154

EXAM 8

GB136

PHARM

GB135

AMCARE ADMIN

GB150

AMCARE

GB150A

AMCARE ADMIN

GB168rr

GERI PACT

GB155H

CORRIDOR

CG11

CORRIDOR

CG13

CORRIDOR

CG10

EXAM 7

GB134

EXAM 6

GB133

WALK IN CLINIC

GB156

EXAM 15

EXAM 4

GB132

LOUNGE

GB129

WALK IN CLINIC

GB158

GB127

GB130

EXAM 5

GB131

CORRIDOR

CG16

AMCARE ADMIN

GB155b

AMCARE

GB155G

EXAM 5

GB155F

VAPD

GB155c

VAPD

GB165

AMCARE ADMIN

CG24

VAPD

GB164

GB159

GB161

STAIR 8

STAFF TLT

GB119B

ELEC.

GB126

CASHIER

GA100

CHIEF DENTAL

GA112

CONF.

GA110

RECEIVING

ENTRY

EXAMINER

GB149h

EXAMINER

GB149i

BOOTH

BOOTH

BOOTH

ELEC.

GB166b

TEL

GB166a

EXAMINER

GB149j

POSTIOGRAPHY

& LAB

GA121

CORRIDOR

CG14

CORRIDOR

CG15

STAIR 3

GC160

STAIR 2

MECH

GB166

ELEVATOR

EQUIP.

G01

LIFT EQUIP.

G06

CORRIDOR

G07

LOBBY

G05

CORRIDOR

C-G1

ELEC.

G03

STAIR

S-1

ELEVATOR

SE-1

SIGNAL/PH

SE-2

OPEN

MECHANICAL

SPACE

GO7

MECH.

G02

EXIT CORRIDOR

ELEVATOR

P-2

P-1

GC162

STAIR

S-2

VAPD LOCKER

GA101

DENTAL ADMIN

GA111

LOCKER

GC163

HAC

GA109

MECH

GC166

MEN

GC168

WOMEN

GA104

COM

GA105

WAITING

GC172

CORRIDOR

GC179

RECEIVING

AREA

GA108

BREAKROOM

GA107

RECEIVING

ENTRY

GC180

STORAGE

GC181

PHARMACY

GA106G

OFFICE

GA106E

GA106H

MECH

GC182

PHARMACY

GC183

TTT

LAB

GC184

X-RAY

GC185

STAIR 6

GC186

CORRIDOR

GC187

STAIR 7

S-7

PHARMACY

WAITING

GC188

CHAIR 5

GC189

CHAIR 6

GC190

CHAIR 7

GC191

CHAIR 8

GC192

RECEPTIONIST

GC193

CHAIR 1

GC194

CHAIR 2

GC195

CHAIR 3

GC196

CHAIR 4

GC197

CORRIDOR

GC198

BATH

GB120A

NOUR

GB121

CORRIDOR

T3-00N

EQUIP.

GB115

BREAK ROOM

GB116

SOILED

T3-00Q

ISOLATION

T3-00S

EXAM

GC199

EXAM

GB122

EXAM

GB123

BARI. EXAM

GB124

TELECOM

GB125A

ALCOVE

HAC

GB125B

CORR

CG-49

TOILET/SHWR

GB120B

ALCOVE

CG-50A

ANTE

T3-00X

ALCOVE

CG-50C

ALCOVE

CG-50B

CORR

CG-50

MENTAL

HEALTH EXAM

CB-113

MENTAL

HEALTH EXAM

CB-114

NURSE STATION

CB-105

EXAM

CB-106

RESULTS

CB-107

CONSULT

CB-108

OFFICE

CB-109

OFFICE

CB-110

CLEAN

CB-111

VEST

GB100

ANTE

GB112A

TOILET/SHWR

GB112B

VEST.

CG-53

TRIAGE

CG-54

MEDS

GB105A

TLT

GB104A

TLT

GB104B

CORR

CG-52

CORR

CG-51

ISOLATION

CB-112

POLICE/VOL

GB101E

Room

GC211

GC213

GC215

GC216

GC217

GC218

GC219

GC221

GC222

GC223

GC224

GC225

GC226

GC227

GC228

GC229

GC230

GC231

GC232

GC233

GC234

GC235

GC236

GC237

ELEV.

P7

Room

XXX

Room

XXX

Room

XXX

01S-M-404

TR TOWER 4

23R

01S

01W

A R

E A

A

A R

E A

B

01A

AREA A

AREA C

AREA B

TR LOCATION

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:0

:2

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

01-M-102

BUILDING 01S - LEVEL 00 - OVERALL PLAN -

AREA A

01S

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/16" = 1'-0"1

LEVEL 00 - OVERALL PLAN AREA - A

PROJECT

NORTH

KEY PLAN

Revisions: Date: 09 /0

3/

W X Y Z

A16 A15 A14

A12

A13

CORRIDOR

CORRIDOR

01W-M-402

01W-M-402

AREA A

AREA B

A R

E A

A

S E

E S

H E

E T

-M

-1

A R

E A

B

T2-A

T2-1

T2-B

T2-2

ELEC. EQUIP.

GC149

IRM

GC150

ELEC.

GC151a

HBPC

GC151

HBPC

GC152

ISO OFFICE

GC153

MID SOUTH

CPAC

GC157

MID SOUTH

CPAC

GC158

HAC

GC159

MY HLTH VET

GC165

VOLUNTEER

GC164

VOLUNTEER

GC163A

VOLUNTEER

GC163

EMPLOYEE

UNION

GC145

LRC

GC145A

LRC

GC154

MIDSOUTH

CPAC

GC155

NURSING

GC156

NURSING

GC160

TELEHEALTH

GC161

TELEHEALTH

GC162

EMPLOYEE

UNION

GC146

M FOSTER HM

OFFICE

GC143

HBPC OFFICE

GC144

HBPC OFFICE

HBPC PHARM

OFFICE

GC142

HBPC OFFICE

GC140

HBPC OFFICE

GC139

HBPC DIETICIAN

OFFICE

GC138

STOR

GC135

EMPLOYEE

UNION

GC141A

NURSING

GC166

STOR

GC141B

ELEV

W-1

ELEV

W-2

MECH. EQUIP

GC148

STAIR 12

GC148

STAFF

RESTROOM

GC137

STAFF

RESTROOM

GC136

NURSING

GC171

VESTIBULE

GC167

OBVER.ROOM

GC150

SIMULATION

LAB

GC169

TOILET

GC174

STOR

GC173

NURSING

CLASSROOM

GC170

WORKMAN'S

COMP. OFFICE

GC175

GC128h

GC128i

GC128a

GC128b

GC128c

GC128d

GC128e

GC128f

GC128g

PRIVACY

GC134

GC128

HBPC OFFICE

GC176

WAITING

GC175A

BILLING OFFICE

GC177BARBER SHOP

GC178

VENDING

GC130ESCORT

GC100

GC100B

LOCKER

GC100A

STOR

GC100C

DECON

42-101

STAIR 11

ELEC/IRM

GC127

ELEC

GC125

COMPLIANCE

GC124

COMPLIANCE

GC123

ELEC

GC121

MECH

GC122

STERILE PREP

42-100

STERI SVC

42-103

IRM MECH.

SUPPORT

GC103

ELEC

GC111

WOMEN

GC109MEN

GC108

STAIR 9

ELEV.

E-6

ELEV.

E-5

OXYGEN STOR

GC112

DATA CENTER

GC115-1

COOLER

GC120F

ELEC

GC120A

STO

GC120B

SLIDES

GC120C

TLT

GC120D

OFFICE

GC120E

AUTOPSY

GC120

MECH.

42-102

BATTERY

GC119

GC126

VOLUNTEER

SPECIALIST

GC101

VOLUNTEER

CHIEF

GC102

ENROLL. #3

GC104

ENROLL. #2

GC105

ENROLL. #1

GC106OUTPATIENT

COORD.

GC107

PUBLIC ELEV.

P3

PUBLIC ELEV.

P2

PUBLIC ELEV.

P1

MEN

GB174

STAIR 1

LINEN

GB169

HAC

GB170

GB173

PUBLIC LOBBY

CG19

ELEC.

GB172

SERVICE ELEV.

S1

SERVICE ELEV.

S2

SMOK. SHLTR

S100

STORAGE

GB101C

VAPD HOLDING

GB101D

STOR

VAPD CHIEF

GB176AVAPD SECY

GB176

VAPD

GB177

VAPD WEAPON

GB177A

COFFEE

VEST

42-104

WOMEN

GB175

CORRIDOR

COMPUTER

TELE

GC118

CORRIDOR

01S-M-405

01S-M-405

TR TOWER 1

T1-00G

WAITING

GB102A

TR TOWER 2

T2-00G

1W-1

1W-2

1W-3

1W-4

IRM

GB125

ELECTRICAL 1

IRM

GC117

FD403-1B

MD414-2B

PP411-1B

MP412-2A

MH410-1B

MH409-1B

MP407-1B

MH408-1B

FX406-1B

MD405-1B

MD404-1B

MH422-2B

MH421-2B

MP420-2B

FX419-2B

FD418-2B

MD416-2B

MD415-2B

MD414-2B

TR LOCATION

PROJECT

NORTH

23R

01S

01W

A R

E A

A

A R

E A

B

01A

AREA A

AREA C

AREA B

TR TOWER 1

TR TOWER 2

TR TOWER 4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:0

:3

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

01-M-103

BUILDING 01S & 01W - LEVEL 00 - OVERALL

PLAN - AREA B

01S AND 01W

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/16" = 1'-0"1

LEVEL 00 - OVERALL PLAN - AREA B

PROJECT

NORTH

KEY PLAN

Revisions: Date: 09 /0

3/

01S-M-409

01S-M-409

A R

E A

R

E A

B

S E

E S

H E

E T

-M

-1

TR TOWER 4

T4-01

E.M.S. CHIEF

1A116

INT. DESIGN

1A116A

E.M.S. SECT.

1A117

E.M.S.

1A117B

E.M.S. SUPERS

1A117A

HR

1A119

HR

1A120

HR

1A120A

ELEV

P7

STAIRS

BUS OFFICE PC

1A114

BUS DATA

OFFICE

1A113A

CHIEF STAFF

CREDENTIAL

PRIVILEGE

1A113

QM INFECTION

CONTROL

1A112B

QM

1A112A

HR

1A112

IRM

1A111

ELEC

1A110

F. TLT

1A109A

M. TLT

1A109

QM

1A108

QM

1A107

QM

1A106

QM

1A105

QM

1A104

QM

1A103

HR

1A102

PIV

1A101

PIV

1A101A

LOBBY

STAIRS

HAC

1A121

HR

1A122

HRM

1A123

HR

1A124

HRM

1A125

HR

1A129

HR

1A128

HR ASST. CHIEF

1A127

HR SECT.

1A126

CHIEF HRM

1A126A

STAIRS

INPATIENT

PHARMACY

1B101

HAC

1B102

ADMIN OFFICE

1B100

CHIEF

1B100A

ANTE

IV ADM

1B101A

CHEMO

1B101B

ANTE

SECURE

1B101C

ELEC

1B103

TELE

1B101d

SECURE STOR.

1B105C

RECEIV.

1B104

FLAMM/TOXIC

1B105D

COLD RM

1B105E

BLOOD BANK

1B105A

BLOOD SPEC'L

1B107

TLT

1B106

SPECIAL

CHEMISTRY

1B105F

M. TLT

F. TLT

ROOM

1B114A

1B14B

BREAK RM

1B114

DI WATER

1B113

CHIEF TECH

1B105G SLIDE & BLOCK

1B108A

HISTOLOGY

1B108

FLOUR. MICRO

1B112

HAC

1B111

CHIEF

1B110G

RESID.

1B110F

CYTOLOGY

1B108C

PROSTHETICS

INVENT/DISTR.

1B109

HISTO REVIEW

1B109A

GROSS RM

1B108B

STERIL

1B115

COLD

1B116B

MICROBIOLOGY

1B116

BIO-LAB

1B116A

MEN

1B117

WOMEN

1B119

HSC

1B118

STAFF

1B110A

STAFF

1B110B

STAFF

1B110C

SEC'Y

LAB SERVICE

1B110

STAIRS

ELEC

1B120a

TRAINING

DIRECTOR

ROOM

1B121

CONF.

INSTR. STOR.

WOMEN

MEN

ELEC

117 SIG/PH

STAIRS

S-1

LAB

STORAGE

H.A.C.

LAB

LAB

LOUNGE

BSL

107B

LAB

SEC'Y CLERICAL

WP/

COMPUTER

COPY

LAB

105ALAB

105B

LAB

105C

ADM. OFFICE

110B

ASSOC. CHIEF

STAFF

110A GEN. LAB.

ANTE

107A

TLT

107C

EXAM D

1B124G

EXAM E

1B124F

POLYTRAUMA

1B124E

1B124A

1B123E

ELEC

1B1241

1B124B

1B123D

1B123C

ORTHOTICS

SPLINT

1B124C

1B123B

1B123A

CONFERENCE

1B122H

AAD

1B122I

PR / QA

1B122

1B123

ADP FILES

1B122K

WAIT

1B122L

SEC'Y

PASS

1B1221

PASS

1B122M

ASSOC.

DIRECTOR

1B122F

DIRECTOR

1B122E

COS

1B122D

AA / COS

1B122A

STOR

1B122B

KITCHEN

1B122C

CORRIDOR

C1-8

CORRIDOR

C1-9

CORRIDOR

C1-4

CONN.

CORRIDOR TO

BUILDING

1S

SPECIMEN

ACCESSION

1B105H

BULK STORAGE

1B105B

CORRIDOR

C1-6

GENERAL LAB

1B105

CORRIDOR

C1-10

CHILLER PLANT

BUILDING #1S

ELEVATOR

SE - 1

MECH

SHAFT

SE-2

SAFETY

ALCOVE

SE-3

STR 3

CORR.

C1-7

1B120b

LAB

CHAIRMAN LAB

WOMENS TLT

SHOWER

ELEC.

ROOM

FACULTY LAB

SECRETARY

CLERK

CHAIRMAN

OFFICE

128A

SAFETY

ALCOVE

SE - 4

SHOWER

102A

MEN'S

TOILET

ELECTRIC

CLOSET

MARSHALL

CAMPUS

TELEPHONE

CLOSET

CORRIDOR

C1-3

CHAIRMAN LAB

S-2 P-2

- 131A

132A 133A

134 134A

C1-5

- 135

135A

121A

124A

124 125

125A

114A

116A

136B 136C

136D

107A

136A

101A

S-1

P-1

104A

108A

108B

C1-1

111A

112B 112C 112D

115112A

117A 115A

118A

C1-2 181

Room

1C133

Room

1C137

Room

1C138

HR

1A122A

01S-M-407

TR LOCATION

PROJECT

NORTH

TR TOWER 4

23R

01S

01W

A R

E A

A

A R

E A

B

01A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:0

:4

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

01-M-104

BUILDING 01S - LEVEL 01 - OVERALL PLAN -

AREA A

01S

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/16" = 1'-0"1

LEVEL 01 - OVERALL PLAN - AREA A

KEY PLAN

PROJECT

NORTH

Revisions: Date: 09 /0

3/

A16 A15 A14

A7A6 A5

A4 A3

A8

A11A10A9

A12

A13

A2 A1

01S-M-408

01S-M-408

01W-M-403

01W-M-403

A R

E A

A

S E

E S

H E

E T

-M

-1

A R

E

B

T2-A

T2-1

T2-B

T2-2

TR TOWER 1

T1-01

TR TOWER 2

T2-01

PREP

1C106B

KITCHEN

1D102

NOURISH

1D101

ELEV

F8

1D102A

EXAM

1C132

EXAM

1C135

TLT

SHWR

1C135A

EXAM

1C136

EXAM

1C 138

TLT

1C138A

TLT

1C140A

EXAM

1C140

EXAM

1C143

TLT

SHWR

1C143A

EXAM

1C 145 EXAM

1C 147

EXAM

1C149

EXAM

1C150

EXAM

1C152

EXAM

1C153

EXAM

1C156

EXAM

1C159

MMS ADMIN

1C160

BRK

NURSE RM

1C160A

LPN

1C160B

MALE TOILET

1C161B

FEMALE TOILET

1C161A

OFFICE

1C162

MALE LOCKER

1C163

TOILET

TOILET

FEMALE

LOCKER

1C164

VISN HR

1C165

PATIENT REP

1C166A

PATIENT REP

1C166

PATIENT REP

1C167

MECH

1C168

LOBBY

1C100

SWITCHBOARD

1C101

CHAPLAIN

OFFICE

1C102

CHAPLAIN SECY

1C104

CHAPLAIN

1C104A

TLT

1C106

TELE

1C105

COMM

1C146

ELEC

1C144

IRM

1C142

NURSES

1C141SOILED

1C154

CLEAN

1C155

TOIL

1C139C

MECH

1C139D

EQUIP

1C161C

KIT

1C139A

MED ROOM

1C139B

MECH

1C123

HAC

1C134

EXAM

1C 148

STAIR

1C151A

EXAM

1C151

1C153A

1C158A

EXAM

1C158

RECEPTIONIST

1C139

CLINIC

MANAGER

WAITING

1C161

STAIR

TIME KEEPER

1C107

H.A.C.

1C107A

TLT

NURSE RECRUIT

1C108

ELEC

1C109

PROSTHETICS

1C110

PROSTHETICS

1C111

STAIR

SHOWER

1C116A

CLINICAL

PHARMACY

1C112

PHARMACY

RESIDENT

1C113

DIETETICS

1C114

FEMALE TOILET

1C116

FEMALE

LOCKER

1C115

EEO

1C117

EEO

1C118

EEO

1C119

EEO

1C120

1C120A

ELEC

1C121

IRM

1C123

STAIR

BIOMED

1C124

CLINIC

1C125

NUT

1C127

NUT?

1C127A

C&P CHIEF

1C126A

C & P

1C126

C&P NURSE

1C128

CLINICAL

PHARMACIST

1C129

CLINICAL

PHARMACIST

1C130

PM & R

1B134E

PM & R

1B134D

PM & R ADMIN

1B134

PM & R

1B134C

PM & R

1B134A

CHIEF PM &R

1B134B

FEMALE TOILET

1B133

MALE TOILET

1B132

STAIR

PROSTHETICS

OFFICE

1B127

PROSTHETICS

OFFICE

1B127A

TRASH CH

1B128

LINEN CH

1B129

ELEC

1B 131

TELE

1B130

HAC

1C114A

1B126L

FITTING

1B126J

FITTING

1B1261

HISA PROG

1B126H

LAB FUME

1B126G

CPO

1B126F

BREAK

1B126E

PLSTR

1B126D

STORAGE

1B126K

CORRIDOR

1B126A

ORTHO

1B126B

RECEP

1B126C

RECEP

1B125A

WAITING

1B126 EXAM PROC

1B125C

PHYS

1B125D

EXAM

1B125H

LIN

1B125G

1B125E

1B125F

1B125M

WC TOILET

1B1251

TOILET

1B125J

ELEC

1B125Q

IT

1B125P

1B125O

P.T.

1B125I

PT TREATMENT /

CT EXERCISE

1B125K

1B125N

STAIR

CORRIDOR

C1-26

CORRIDOR

C1-25

STAIR

LOUNGE

1D107

FOREMAN

1D104

COOLER

C1-30

CANNED GOODS

1D103

WORK

1D110

FEMALE TOILET

1D108

TRAINING

1D111

SUPERV.

2D111A

MEN TOILET

1D109

STORAGE

1D105

STOR

1D106

FOOD SERVICE

LINE

DISHWASHING

1D100A

CORRIDOR

C1-15

SERVICE LOBBY

C1-14

PUBLIC LOBBY

C1-17

TEL

1C122

CORRIDOR

C1-19

CHAPEL

1C106D

CORRIDOR

C1-13

CORRIDOR

C1-12

ELEV

P9

ELEV

W -1

ELEV

W -2

CORR.

BLDG. 2

DIETETICS

C1-31

ELEV

S-2

ELEV

E-6

S-3

E-5

S-4

CORRIDOR

1W-1

1W-2

1W-3

1W-4

EXAM

1C131

TR LOCATION

PROJECT

NORTH

TR TOWER 1

23R

01S

01W

A R

E A

A

A R

E A

B

01A

TR TOWER 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:0

:5

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

01-M-105

BUILDING 01S & 01W - LEVEL 01 - OVERALL

PLAN - AREA B

01S AND 01W

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/16" = 1'-0"1

LEVEL 01 - OVERALL PLAN - AREA B

KEY PLAN

PROJECT

NORTH

Revisions: Date: 09 /0

3/

01S-M-411

01S-M-411

A R

E

E A

B

S E

E S

H E

E T

-M

-1

CARDIOLOGY

OFFICE

2B101

EXAM

2B100f

EXAM

2B100eSPECIAL BREAK

EQUIP. RM.

2B107

CLEAN UTIL.

2B106

2B105a

SCRUB

2B104

2B105

CARDIOLOGY

2B108

CONTROL

2B108a

F. TLT

2B112a

LKR

2B112

LKR

2B111

MEN

2B111a

HAC

2B110

SOIL.

2B109

STAIR

EXAM

2B102

EXAM

2B103

CARDIAC

HOLDING

2B114

ELEC.

2B116

TELE

2B115

CHIEF TECH.

2B117

LOUNGE

2B119

M.TLT.

2B121

F.TLT.

2B123

ULTRA - SOUND

2B124

DRESS

2B127

DRS

2B128

DRS

2B129

DRS

2B126DRS

2B125

WC TLT

2B122a

WC STRET

2B130a

RADIO FLOUR.

2B122

RADIO FLOUR

2B120

WC TLT

2B120a

2A130A

2A130

2A129

2A128

F. TLT

2A126

SUP

2A127

2A125

ELEV

P7

OFFICE

2A124

CHF. S.W.

2A123

OFFICE

2A122C

VEST.

2A122

OFFICE

2A122B

2A122A

2A121

2A117

2A116

2A115

2A120

CARDIOLOGY

CORRIDOR

C2-6

DED. CHEST

2B131

2B132a

FILM

2B132

EQUIP

2B136

UPS

CLEAN

2B135

SOIL UTIL.

2B137

G.P. ROOM

2B153

G.P. ROOM

2B152

AUTOMATED

2B148

VIEW

2B144

HAC

2B138

DRS

2B140

DRS

2B142

I/R SUITE

2B118

BARIUM PREP

2B133

CORRIDOR

C2-8

CORRIDOR

C2-7

CORRIDOR

C2-13

FILE STORAGE

2B166f

ELEC CLOSET

2B166e

CLERK TYP.

2B165

SEC'Y

2B164

COMMON VIEW

2B163

CHIEF

2B162

MRI EQUIP

SCAN RM

2B166b

DRESS

2B166c

MRI WAITING

2B161a

COMPUTER

2B145a

READING

2B145

HAC

2B151

TLT

2B154

ELECT. CLO.

2B155a

TELE. CLO.

2B155b

MECH

2B155

CORRIDOR

C2-41

IMAGING

LOUNGE

2B160

IRM

2B159

IRM

2B158

COMPUTER

TRAINING

2B156

STAIR

CONTROL

ROOM

STAIR

2A119

CORRIDOR

C2-11

INPT BEDS

2B161

CT BRIGHTSCR

2B146

32 SLICE CT

2B149

CONTROL RM

2B147

MRI CONTROL

2B166d

MRI SCAN

ROOM

2B166a

CORRIDOR

C2-12

CORRIDOR

C2-10

STAIR

2A114

2A113A

2A113

KITCHEN

2A112

HAC

2A111

ELEC

2A110

SUP

2A108

MEN

2A107

LIBRARY

CORRIDOR

WALSH

CONFERENCE

2A100

2A101a

STAIRS

LRC EQUIP

2A135

EDUC ASST

2A134

VISUAL INFO.

SPEC.

2A133

2A101b

2A101

CORRIDOR

C2-19

WAITING

2B130

CORRIDOR

C2-5

CORRIDOR

C2-6

CLOSET

2B111b

MED. MEDIA

PRODUCTION

2A132

EQUIPMENT

2B108b

LAB

CONTROL TEMP.

CONTROL TEMP.

INVEST. OFFICE

STORAGE

FLAM STO.

INVEST.

OFFICE

GLASS WASH

LAB

LAB

STORAGE

MECH. SHAFT

MEN

WOMENS

ELEVATOR

SE-1

SIG./PH

ELEC.

INSTR.

STORAGE

H.S. R&D

OFFICE

216A

H.S. R & D SEC'Y

LAB

LAB

SAFETY ALCOVE

SAFETY ALCOVE

H.A.C

STAIR

CORRIDOR

C2-9

MEN'S TOILET

ELECTRIC

CLOSET

STORAGE

226A

STORAGE

MARSHALL

CAMPUS

FACULTY LAB

TELEPHONE

CLOSET

2C180

LAB

WOMEN'S

TOILET

ELEC. ROOM

E-123

STUDENT

OFFICE

FACULTY LAB

FACULTY

OFFICE

FACULTY

OFFICE

224A

FACULTY LAB

LEARNING

RESOURCES

S-2

P-2

217A

216A 215A

212A

209A

207 - 206

205A

206A

P-1

S-1

C2-1

C2-2

C2-4

C2-3

213 211A

201A

204A

- 229

229A

C2-5

225214A

TR TOWER 4

T4-02

TR LOCATION

PROJECT

NORTH

23R

01S

01W

A R

E A

A

A R

E A

B

01A

TR TOWER 4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

(206) 590-2118

RAY SPEES

/2

/2

:0

:0

A

M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

M

E S

D B

.r v t

01-M-106

BUILDING 01S - LEVEL 02 - OVERALL PLAN -

AREA A

01S

MGH/JW LB/CY/JJ/MA/EA/RQ/BC

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV, 25704-9300

1/16" = 1'-0"1

LEVEL 02 - OVERALL PLAN - AREA A

KEY PLAN

PROJECT

NORTH

Revisions: Date: 09 /0

3/

A16 A15 A14

A7A6 A5

A4 A3

A8

A11 A10

A9

A12

A12

A13

A13

A2 A1

01S-M-410

01S-M-410

01W-M-404

01W-M-404

A R

E A

A

S E

E S

H E

E T

-M

-1

A R

E

T2-1

T2-B

T2-B

T2-2

EXAM 7

2C154

EXAM 7

2C156

EXAM 7

2C158

EXAM 7

2C160

EXAM 6

2C162

EXAM 6

2C163

SOILED 245

2C153

TELEHEALTH

2C152

SOCIAL WK

2C151

DIETITIAN

2C150

PHARMACY

2C148

COMM

2C149A

ELEC

2C147

IRM

2C145

STAIRS

BARIATRIC/

SPINAL EXAM 4

2C146

EXAM 4

2C144

EXAM 4

2C142

EXAM 4

2C140

PHLEB EKG

2C143

PHLEB TOILET

2C141

MED

2C161

WOMEN'S

TOILET

2C139

NURSE MGR

2C168

CLEAN SUPPLY

2C165

MENTAL

HEALTH

2C155

TELERETINAL

2C157

STAFF TLT

2C167

MEN'S TOILET

2C137

EXAM 6

2C164

EXAM 6

2C166

EXAM 5

2C170

EXAM 5

2C176

EXAM 5

2C174

STAFF LOUNGE

2c177

CLERKS 3 & 4

2C138

RECEPTION 3 &

2C136

EXAM 3

2C135

EXAM 3

2C134

EXAM 3

2C133

EXAM 3

2C132

PHARMACY

2C131

EXAM 1

2C128

EXAM 1

2C127

EXAM 1

2C126

EXAM 1

2C125

2c129

2c135a

ELEV

W-1

EXAM 2

2C124

ELEV

W-2

CLEAN LINEN

MED. EQUIP.

2C159

C4

C4

EXAM 5

2C172

RECEPTION 5, 6,

& 7

2C173

CLERKS 5, 6, & 7

2C169

CLERKS 1&2

2C120A

RECEPTION 1&2

2C120

EXAM 2

2C121

EXAM 2

2C122

EXAM 2

2C123

C1

2c183

EXAM - 18

2c178

EXAM - 19

2c179

EXAM - 20

2c180

EXAM - 17

2c175c

EXAM - 14

2c175a

TOILET

2c175d

TOILET

2c175e

ONCOLOGY

OFFICE

2c182

EXAM - 21

2c181

HAC

SECURE

2c182a

RECEPTIONIST -

2C100

MECH

2c184

FEMALE

2C115 MEN

2C116 COMM.

CLOSET

2C117 TLT

2C118A

CHEMOTHERAPY

2C118

ELEC

2C119A

ELEC

2C119

EXAM ROOM - 11

STAIR

ONCOLOGY

SUITE

2c175b

VESTIBULE

2C123

STAIR

EXAM - 10

2C114

EXAM - 9

2C113

EXAM - 8

2C112

EXAM - 7

2C111

EXAM - 6

2C110

EXAM 5

2C109

E - 6

E - 5

ELEVATOR

LOBBY

GROUP PATIENT

RM.

2c171

WAITING AREA

-1

2C100A

B.M.E. OFFICE

DIA. SUPPORT

2C102A

NURSING

2C108

EXAM - 4

2C107

EXAM - 3

2C106

EXAM - 2

2C105

DIALYSIS

STOR-1

2C104

CHAIR-DIALYSIS

2C102

SPECIAL EKG

EXAM…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .