S06 - Amendment 0008 - ATT 5 - ELECTRICAL 2026.04.13.pdf

PDF 1 MB Posted

Attached to
EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades Federal contract opportunity
Solicitation number
36C77626R0025
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This is an electrical plan drawing for Building 01S, Level 00G (ground floor) at the VA Huntington facility located at 1540 Spring Valley Drive, Huntington, WV 25704. The drawing is part of the EHRM Infrastructure Upgrades project (IM 360://581-22-700) and was issued at 100% construction document phase on September 3, 2025. The plan depicts the electrical distribution system for the ground floor of Building 01S, including power routing, panel locations, and equipment connections serving medical and administrative spaces such as examination rooms, audiology facilities, geriatric patient care units, pharmacy, walk-in clinics, and various support functions.

Key construction requirements include: contractor field verification of all existing power, lighting, and circuitry; demolition of equipment and raceways associated with removed walls; coordination with VA prior to electrical system shutdowns; provision of backup emergency power to maintain uninterrupted service to essential equipment; sealing of all interior penetrations to match fire ratings; and provision of updated circuit panel directories. The contractor must provide pull boxes for feeders exceeding 250 feet or with more than 270 degrees of total bend, route raceways above accessible ceilings where present, and provide UFER grounding and bonding of tower structural steel to existing building steel using #3/0 copper conductors. The plan references corresponding one-line diagrams, typical pull box schedules, and detailed sheets for TR Tower routing and expansion joint details. The project involves both A-side and B-side power sourcing distributed through concealed raceways and underground/underfloor feeders as indicated in the legend.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades, newest first.
File Type Posted
S06 - 36C77626R0025 0008.pdf PDF
S06 - Amendment 0008 - ATT 2 - UPDATED SHEETS.pdf PDF
S06 - Amendment 0008 - ATT 6 - 01WEP100G - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 9 - 260508 - Sheet AD101-1B Data Center Phase 1B Demo Floor Plan update.pdf PDF
S06 - Amendment 0008 - ATT 1 - TechQuestionsVAresponses Final Set - Huntington EHRM IU.pdf PDF
S06 - Amendment 0008 - ATT 10 - 260508 - Sheet AD103-1B Data Center Phase 1B Demo Roof update.pdf PDF
S06 - Amendment 0008 - ATT 11 - Burn Permit.pdf PDF
S06 - Amendment 0008 - ATT 14 - Energized Electrical Work Permit.pdf PDF
S06 - Amendment 0008 - ATT 3 - Civil OSP Redesign-signed.pdf PDF
S06 - Amendment 0008 - ATT 7 - 02EP100B - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 8 - 260508 - Sheet 01S-AE452 TR Tower 4 Wall sections update.pdf PDF
S06 - Amendment 0008 - ATT 12 - Environmental Report Huntington WV.pdf PDF
S06 - 36C77626R0025 0007.pdf PDF
S06 - Amendment 0007 - ATT 2 - Geotechnical Report.pdf PDF
S06 - Amendment 0007 - ATT 3 - Lift Planning.pdf PDF
S06 - Amendment 0007 - ATT 4 - 01 00 00 - GENERAL REQUIREMENTS_A1.pdf PDF
S06 - Amendment 0007 - ATT 6 - Crane lift Info.pdf PDF
S06 - Amendment 0007 - ATT 5 - Appendix A - PFC FPT.pdf PDF
S06 - Amendment 0007 - ATT 1 - TechQuestionsVAresponses Partial 4 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0005.pdf PDF
S06 - Amendment 0004 - ATT 1 - TechQuestionsVAresponses Partial 2 - Huntington EHRM IU.pdf PDF
S06 - Amendment 0004 - ATT 2 - FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
S06 - 36C77626R0025 0003.pdf PDF
S06 - Amendment 0003 - ATT 2 - TechQuestionsVAresponses Partial - Huntington EHRM IU.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit In-Sheet - Huntington EHRM IU.pdf PDF
S02 - ATT 8 - 581-22-700 - 100 Drawings Part-6 of 24.pdf PDF
S02 - ATT 12 - 581-22-700 - 100 Drawings Part-10 of 24.pdf PDF
S02 - ATT 13 - 581-22-700 - 100 Drawings Part-11 of 24.pdf PDF
S02 - ATT 16 - 581-22-700 - 100 Drawings Part-14 of 24.pdf PDF
S02 - ATT 21 - 581-22-700 - 100 Drawings Part-19 of 24.pdf PDF
S02 - ATT 25 - 581-22-700 - 100 Drawings Part-23 of 24.pdf PDF
S02 - ATT 29 - 581-22-700 - Geotechnical Report - W24044 - VA Duct Bank 11.21.24.pdf PDF
S02 - ATT 31 - 581-22-700 - Topographic Survey TR Tower 3.pdf PDF
S02 - ATT 32 - Limitations on Subcontracting - Huntington EHRM IU.pdf PDF
S02 - ATT 34 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
S02 - 36C77626R0025.pdf PDF
S02 - ATT 1 - 581-22-700 - 100 Specifications Part-1 of 2.pdf PDF
S02 - ATT 2 - 581-22-700 - 100 Specifications Part-2 of 2.pdf PDF
S02 - ATT 9 - 581-22-700 - 100 Drawings Part-7 of 24.pdf PDF
S02 - ATT 11 - 581-22-700 - 100 Drawings Part-9 of 24.pdf PDF
S02 - ATT 15 - 581-22-700 - 100 Drawings Part-13 of 24.pdf PDF
S02 - ATT 18 - 581-22-700 - 100 Drawings Part-16 of 24.pdf PDF
S02 - ATT 20 - 581-22-700 - 100 Drawings Part-18 of 24.pdf PDF
S02 - ATT 23 - 581-22-700 - 100 Drawings Part-21 of 24.pdf PDF
S02 - ATT 24 - 581-22-700 - 100 Drawings Part-22 of 24.pdf PDF
S02 - ATT 30 - 581-22-700 - 100 Commissioning Plan.pdf PDF
S02 - ATT 10 - 581-22-700 - 100 Drawings Part-8 of 24.pdf PDF
S02 - ATT 14 - 581-22-700 - 100 Drawings Part-12 of 24.pdf PDF
S02 - ATT 27 - 581-22-700 - Asbestos locations.xlsx XLSX spreadsheet
S02 - ATT 28 - 581-22-700 - FLS Compliance Letter.pdf PDF
Show all 50

EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PB

PB

PB

A A

AA

A A A A A A A A

A

A

B

B

B

B

B

B

B

B

A A A A A AB B

B B B

B B B B

A A

B B

A A

B B

AREA SHOWN

J K L M N O P Q R S T U V W X Y

01SEP400Ga

01SEP400Ga

B L D

G

A

B L D

G

B L D

G

S

B L D

G

S E

E S

H E

E T

E

P G

BLDG 01S

BLDG 12

B L D

G

01SEP400Gb

01SEP400Gb

GB160

PUBLIC ELEV.

P3

PUBLIC ELEV.

P2

PUBLIC ELEV.

P1

MEN

GB174

STAIR 1

LINEN

GB169

HAC

GB170

GB173

PUBLIC LOBBY

CG19

TELE.

GB171

ELEC.

GB172

SERVICE ELEV.

S1

SERVICE ELEV.

S2

SERVICE LOBBY

CG17

GB168g

BVA

GB168c

IRM

GB168a

EXAM

GB168k

FEE CLAIMS

GB168b

BOOTH

EXAMINER

GB168j

GB168l

GB168

GB168i

GB168h

MEDICAL RECORDS

GB168d

GB168f

GB168e

STAIR 4

MECH RM

GB167

HEALTH TECH

GB149c

HEALTH TECH

GB149d

EXAM

GB149e

EXAM

GB149fEXAM

GB149g

AUDIOLOGY ROOM

GB149

RECEP

GB148

OFFICE

GB148a

OFFICE

GB148b

OFFICE

GB146

TLT

GB145

CERUMEN MGMT

GB147b

TLT

GB144

GB143

HAC

GB142

GERI PACT

GB151

GERI PACT

GB152

GB140

GB141

STORAGE

GB141a

CLEAN SUPPLY

GB139

PALL CARE

GB138

PALL CARE

GB137

GERI PACT

GB153

GERI PACT

GB154

EXAM 8

GB136

PHARM

GB135

AMCARE ADMIN

GB150

AMCARE

GB150A

AMCARE ADMIN

GB168rr

GERI PACT

GB155H

CORRIDOR

CG11

CORRIDOR

CG13

CORRIDOR

CG10

EXAM 7

GB134

EXAM 6

GB133

WALK IN CLINIC

GB156

EXAM 15

EXAM 4

GB132

LOUNGE

GB129

WALK IN CLINIC

GB158

GB127

GB130

EXAM 5

GB131

CORRIDOR

CG16

AMCARE ADMIN

GB155b

AMCARE

GB155G

EXAM 5

GB155F

VAPD

GB155c

VAPD

GB165

AMCARE ADMIN

CG24

VAPD

GB164

GB159

GB161

EXAMINER

GB149h

EXAMINER

GB149i

BOOTH

BOOTH

BOOTH

ELEC.

GB166b

TEL

GB166a

EXAMINER

GB149j

POSTIOGRAPHY & LAB

GA121

CORRIDOR

CG14

CORRIDOR

CG15

STAIR 3

STAIR 2

MECH

GB166

BLDG 01A: SEE SHEET 01AEP100G

WOMEN

GB175

PANEL 'RPN-GC'

PANEL 'LPN-GC1'

TR TOWER 4

T4-00G

TR TOWER 1

T1-00G

FROM SHEET 01SEP100B

01S-P-DCA

01S-P-DCB

FROM SHEET 01SEP100B

TE

1S_RPN-GA

1S_LPN-GA

1S_RCP-GA

1S_MCC-NGA

1S_LPC-GB

1S_LPN-GB

1S_LPS-GB

1S_RPN-GB

1S_RPC-GB

1S_RPS-GB

XFMR'S (ABOVE)

01-FA-01

PB-1

PB-13

TO SHEET

01AEP100G

3 PB-2

BLDG 01

BLDG 02

BLDG 01W

BLDG 01SBLDG 23R

BLDG 23

BLDG 01A

BLDG 12

A SIDE POWER, CONCEALED WHERE POSSIBLE

B SIDE POWER, CONCEALED WHERE POSSIBLE

A SIDE POWER, UNDERGROUND / UNDERFLOOR

B SIDE POWER, UNDERGROUND / UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL

INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:4

:0 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /E

E

B L D

G

G R

O U

N D

F L

O O

R .r v t

01SEP100G

BLDG 01S - LEVEL 00G - ELECTRICAL PLAN

01S

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

PROJECT

NORTH

3/32" = 1'-0"

BLDG 01S - LEVEL 00G - ELECTRICAL PLAN

ES101

1 0 20' 40'10'

PROJECT

NORTH

GENERAL NOTES

KEY PLAN

KEY NOTES

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL

RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED

SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,

UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE

WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.

5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS

EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX

PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH

ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.

8. CONDUIT EXPANSION COUPLINGS ARE REQUIRED WHEN CONDUIT IS ROUTED

ACROSS BUILDING EXPANSION JOINTS. REFERENCE DETAIL '1' ON SHEET EP509 FOR

ADDITIONAL INFORMATION.

9. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,

UNLESS OTHERWISE NOTED.

1 TR TOWER 1: FEEDERS ROUTE THROUGH VERTICALLY STACKED TR TOWER.

REFERENCE SHEET 01SEP401a AND ENLARGED PLANS 01SEP402a, 01SEP403a, 01SEP404a, 01SEP405a FOR ADDITIONAL INFORMATION.

TR TOWER 4: FEEDERS ROUTE THROUGH VERTICALLY STACKED TR TOWER.

REFERENCE SHEET 01SEP401b AND ENLARGED PLANS 01SEP402b, 01SEP403b, 01SEP404b, 01SEP405b FOR ADDITIONAL INFORMATION.

PROVIDE PULL BOX AND MOUNTING HARDWARE FOR CONDUCTOR PULLING MEANS.

LABEL PULL BOX WITH EQUIPMENT NAME IT IS SERVING. REFERENCE TYPICAL PULL

BOX SCHEDULE ON SHEET EP701 FOR ADDITIONAL INFORMATION.

REFERENCE GENERAL NOTE '7' ON THIS SHEET FOR PULL BOX REQUIREMENTS.

Revisions: Date:

Addendum 1: Pre Bid RFIs 4/13/2026

PROVIDE UFER CONDUCTOR AND BONDING OF TOWER STRUCTURAL STEEL TO EXISTING

BUILDING STRUCTURAL STEEL WITH #3/0 COPPER; ALL CONNECTION POINTS SHALL BE

ACCESSIBLE. WHERE EXISTING BUILDING GROUND RING EXISTS, CONTRACTOR SHALL

MATCH EXISTING CONDUCTOR SIZE AND EXTEND RING AROUND TOWER FOOTING.

File details come from the government source that posted it. Updated .