S02 - ATT 20 - 581-22-700 - 100 Drawings Part-18 of 24.pdf
PDF 19 MB Posted
- Solicitation number
- 36C77626R0025
About this file
This document is a set of electrical schedules for a construction project at VA Huntington EHRM Infrastructure Upgrades located at 1540 Spring Valley Drive, Huntington, WV 25704-9300. The schedules are prepared as 100% Construction Documents dated September 3, 2025, and cover electrical panel schedules for Buildings 03 through 08. The project is managed by SPEES Design Build (address: 23830 Pacific Highway S., Suite 300, Kent, WA 98032) serving as the Architect/Engineer of Record, with the U.S. Department of Veterans Affairs Office of Construction and Facilities Management overseeing the work.
The electrical schedules document provides detailed panelboard information for multiple buildings, including panel ratings, circuit configurations, and load calculations. Key general notes specify that contractors must update all panel circuit directories with typewritten revisions, that revised panel schedules reference associated equipment load schedules for overall panel load determination, and that all digital power meters (DPM) and surge protective devices (SPD) are integral to electrical distribution equipment unless otherwise noted. The schedules use color coding where grey text indicates existing panelboard ratings and loads, while black text indicates revised circuits and additional loads. Each building section includes conduit and wire schedules showing routing from source to destination with specifications for quantity, wire size, conduit size, voltage, and fault current drop calculations.
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/3
/2
:1
:3
A M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
L e g e n d
G e n e ra l N o te s D ia g ra m s a n d
D e ta ils
.r v t
03EP701
BLDG 03 - ELECTRICAL SCHEDULES
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
Revisions: Date:
GENERAL NOTES
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
4. SCHEDULES WITH GREY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
ADDITIONAL LOAD.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/3
/2
:1
:3
A M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
L e g e n d
G e n e ra l N o te s D ia g ra m s a n d
D e ta ils
.r v t
04EP701
BLDG 04 - ELECTRICAL SCHEDULES
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
Revisions: Date:
GENERAL NOTES
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
4. SCHEDULES WITH GREY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/3
/2
:1
:4
A M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
L e g e n d
G e n e ra l N o te s D ia g ra m s a n d
D e ta ils
.r v t
05EP701
BLDG 05 - ELECTRICAL SCHEDULES
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
Revisions: Date:
GENERAL NOTES
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
4. SCHEDULES WITH GREY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/3
/2
:1
:4
A M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
L e g e n d
G e n e ra l N o te s D ia g ra m s a n d
D e ta ils
.r v t
06EP701
BLDG 06 - ELECTRICAL SCHEDULES
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
Revisions: Date:
GENERAL NOTES
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
4. SCHEDULES WITH GREY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/3
/2
:1
:4
A M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
L e g e n d
G e n e ra l N o te s D ia g ra m s a n d
D e ta ils
.r v t
07EP701
BLDG 07 - ELECTRICAL SCHEDULES
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
Revisions: Date:
GENERAL NOTES
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
4. SCHEDULES WITH GREY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/3
/2
:1
:4
A M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
L e g e n d
G e n e ra l N o te s D ia g ra m s a n d
D e ta ils
.r v t
08EP701
BLDG 08 - ELECTRICAL SCHEDULES
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
Revisions: Date:
GENERAL NOTES
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
4. SCHEDULES WITH GREY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
File details come from the government source that posted it. Updated .