S02 - ATT 3 - 581-22-700 - 100 Drawings Part-1 of 24.pdf
PDF 19 MB Posted
- Solicitation number
- 36C77626R0025
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDINGS WITHIN THE SCOPE OF THIS PROJECT
23R
1S
11W
2 3
TRAILER 1
TRAILER 2
TRAILER 3
TRAILER 4TRAILER 5
1A
NEW TR TOWER 2
NEW TR TOWER 3
NEW TR TOWER 4
NEW TR TOWER 1
EXISTING ENCLOSED
COURTYARD - SITE OF
NEW DATA CENTER
ARCHITECTURAL
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
PHONE: (206) 590-2118
DESIGN TEAM
STRUCTURAL
WSP USA, INC.
ELECTRICAL
SPEES DESIGN BUILD
MECHANICAL
SPEES DESIGN BUILD
33301 9TH AVENUE SOUTH
FEDERAL WAY, WA 98003-2600
PHONE: (206) 431-2300
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
PHONE: (206) 590-2118
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
PHONE: (206) 590-2118
CIVIL
WSP USA, INC.
33301 9TH AVENUE SOUTH
FEDERAL WAY, WA 98003-2600
PHONE: (206) 431-2300
PROJECT INFORMATION
STATE:
COUNTY:
JURISDICTION:
OWNER:
CODE ANALYSIS
PROJECT DESCRIPTION
THE PROPOSED DESIGN SHALL IMPROVE,
RECONFIGURE, EXPAND AND RENOVATE EXISTING
SPACES, CONSTRUCT NEW EXTERIOR ROOMS
FOR NEW TELECOMMUNICATION ROOMS, AND TO
CONSTRUCT NEW DATA CENTER IN
REPLACEMENT OF THE EXISTING IN THE INTERIOR
COURTYARD.
APPLICABLE BUILDING
BUILDING 1, 2, 3, 4, 5, 6, 7, 8, 9, 12, 20, 23, 23R,
25, 28, 34, TRAILER 1, TRAILER 2, TRAILER 3,
TRAILER 4, TRAILER 5, DATA CENTER
ICRA CLASS REQUIREMENTS
REQUIREMENTS DEPENDENT ON
EACH INDIVIDUAL ROOM LOCATION,
CLASS II, III AND IV.
WEST VIRGINIA
CABELL
HUNTINGTON
DEPARTMENT OF VETERANS
AFFAIRS
GENERAL NOTES
1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS &
SPECIFICATIONS.
2. SPECIFICATIONS SHALL SUPERSEDE DRAWINGS IN THE CASE OF ANY CONFLICTING INFORMATION.
BRING TO THE AWARENESS OF AND VERIFY WITH VA COR PRIOR TO PROCEEDING.
3. THE CONTRACTOR AND ANY SUB CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID OR BEGINNING WORK. NO ALLOWANCES WILL BE MADE ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE
TO VISIT THE SITE.
4. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT
IMMEDIATELY TO THE ATTENTION OF THE COR.
5. ALL WORK SHALL BE PERFORMED WITH A HIGH-LEVEL OF WORKMANSHIP.
6. THE CONTRACTOR SHALL VERIFY ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK
THROUGH, PRIOR TO PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.
7. THE CONTRACTOR SHALL VERIFY AND COORDINATE WITH ALL INSTALLERS TO ENSURE COMPLIANCE
WITH THE CONTRACT DOCUMENTS.
BUILDING TYPE
BUILDING 07 - ATTIC - HEALTHCARE
BUILDING 08 - LEVEL 00 - ADMIN
BUILDING 08 - LEVEL 01 - ADMIN
BUILDING 08 - LEVEL 02 - ADMIN
BUILDING 08 - ATTIC - ADMIN
BUILDING 09 - LEVEL 00 - HEALTHCARE
BUILDING 09 - LEVEL 01 - HEALTHCARE
BUILDING 09 - LEVEL 02 - HEALTHCARE
BUILDING 12 - LEVEL 00G - ADMIN
BUILDING 12 - LEVEL 01 - ADMIN
BUILDING 12 - LEVEL 02 - ADMIN
BUILDING 20 - LEVEL 01 - ADMIN
BUILDING 20 - LEVEL 02 - ADMIN
BUILDING 23R - LEVEL 00B - HEALTHCARE
BUILDING 23R - LEVEL 00G - HEALTHCARE
BUILDING 23R - LEVEL 01 - HEALTHCARE
BUILDING 23R - LEVEL 02 - HEALTHCARE
BUILDING 25 - LEVEL 01 - ADMIN
BUILDING 25 - LEVEL 02 - ADMIN
BUILDING 25 - LEVEL 03 - ADMIN
BUILDING 25 - LEVEL 04 - ADMIN
BUILDING 25 - LEVEL 05 - ADMIN
BUILDING 28 - LEVEL 01 - ADMIN
BUILDING 34 - LEVEL 00 - ADMIN
BUILDING 34 - LEVEL 01 - ADMIN
BUILDING TR1 - LEVEL 01 - ADMIN
BUILDING TR2 - LEVEL 01 - ADMIN
BUILDING TR3 - LEVEL 01 - ADMIN
BUILDING TR4 - LEVEL 01 - ADMIN
BUILDING TR5 - LEVEL 01 - ADMIN
BUILDING 01S - LEVEL 00B - ADMIN
BUILDING 01S - LEVEL 00G - HEALTHCARE
BUILDING 01S - LEVEL 01 - HEALTHCARE
BUILDING 01S - LEVEL 02 - HEALTHCARE
BUILDING 01S - LEVEL 03 - HEALTHCARE
BUILDING 01S - LEVEL 04 - HEALTHCARE
BUILDING 01S - LEVEL 05 - HEALTHCARE
BUILDING 01S - LEVEL 06 - HEALTHCARE
BUILDING 01W - LEVEL 00B - ADMIN
BUILDING 01W - LEVEL 00G - ADMIN
BUILDING 01W - LEVEL 01 - HEALTHCARE
BUILDING 01W - LEVEL 02 - HEALTHCARE
BUILDING 01W - LEVEL 03 - HEALTHCARE
BUILDING 01W - LEVEL 04 - ADMIN
BUILDING 02 - LEVEL 00B - ADMIN
BUILDING 02 - LEVEL 01 - ADMIN
BUILDING 02 - LEVEL 02 - ADMIN
BUILDING 03 - LEVEL 01 - ADMIN
BUILDING 03 - LEVEL 02 - ADMIN
BUILDING 04 - LEVEL 00 - ADMIN
BUILDING 04 - LEVEL 01 - ADMIN
BUILDING 04 - LEVEL 02 - ADMIN
BUILDING 05 - LEVEL 00 - HEALTHCARE
BUILDING 05 - LEVEL 01 - HEALTHCARE
BUILDING 05 - LEVEL 02 - HEALTHCARE
BUILDING 06 - LEVEL 00 - HEALTHCARE
BUILDING 06 - LEVEL 01 - HEALTHCARE
BUILDING 06 - LEVEL 02 - HEALTHCARE
BUILDING 07 - LEVEL 00 - HEALTHCARE
BUILDING 07 - LEVEL 01 - HEALTHCARE
BUILDING 07 - LEVEL 02 - HEALTHCARE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:0 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /G
E N
E R
A L
S H
E E
T S
.r v t G-001
COVER SHEET
JW/MA RB
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
EHRM INFRASTRUCTURE UPGRADES
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
PROJECT #: 581-22-700
1" = 20'-0"
FACILITY SITE PLAN
TRUE
NORTH
NOT TO SCALE
LOCATION MAP
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
Revisions: Date:
09/03/20259/3/2025 001 OF 693
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0 /2
:2
:5 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /G
E N
E R
A L
S H
E E
T S
.r v t G-002
DRAWING INDEX
JW/MA RB
100% CONSTRUCTION
DOCUMENTS
06/27/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
Revisions: Date:
Location
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
06/27/2025
002 OF 6939/3/2025 09/03/202509/03/2025
SHEET # SHEET NAME
1 OF 693 G-001 COVER SHEET
2 OF 693 G-002 DRAWING INDEX
3 OF 693 G-003 DRAWING INDEX
4 OF 693 C-001 CIVIL SHEET INDEX AND GENERAL NOTES
5 OF 693 C-002 GENERAL NOTES AND LEGEND
6 OF 693 CS100 OVERALL CIVIL SITE PLAN
7 OF 693 CG100 OVERALL EROSION CONTROL PLAN
8 OF 693 CG101 EROSION CONTROL GENERAL NOTES AND DETAILS
9 OF 693 CU250 CIVIL UTILITY CONSTRUCTION DETAILS
10 OF 693 CU300 OVERALL FIBER OPTIC OUTSIDE PLANT UTILITY PLAN
11 OF 693 CU301 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN
12 OF 693 CU302 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN
13 OF 693 CU303 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN
14 OF 693 CU304 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN
15 OF 693 CU305 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN
16 OF 693 CU306 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN
17 OF 693 CU307 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN
18 OF 693 CU500 COMMUNICATION DUCTBANK DETAILS
19 OF 693 CU501 COMMUNICATION TRENCHING DETAILS
20 OF 693 CU502 BUILDING CONNECTION DETAILS
21 OF 693 S-001 STRUCTURAL GENERAL NOTES
22 OF 693 S-002 STRUCTURAL GENERAL NOTES
23 OF 693 S-003 ABRREVIATIONS AND SYMBOLS
24 OF 693 S-101 STRUCTURAL PLANS -TOWER T1
25 OF 693 S-102 STRUCTURAL PLANS -TOWER T2
26 OF 693 S-103 STRUCTURAL PLANS -TOWER T3
27 OF 693 S-104 STRUCTURAL PLANS -TOWER T4
28 OF 693 S-105-1B FOUNDATION PLAN -DATA CENTER -PHASE 1
29 OF 693 S-106-2B FOUNDATION PLAN -DATA CENTER -PHASE 2
30 OF 693 S-107 STRUCTURAL PLANS -BUILDING TR1
31 OF 693 S-115-1B ROOF FRAMING PLAN -DATA CENTER -PHASE 1
32 OF 693 SD105 DEMOLITION PLAN -DTATA CENTER
33 OF 693 S-116-2B ROOF FRAMING PLAN -DATA CENTER -PHASE 2
34 OF 693 S-301 BUILDING SECTIONS -DATA CENTER
35 OF 693 S-501 TYPICAL CONCRETE DETAILS
36 OF 693 S-502 FOUNDATION DETAILS
37 OF 693 S-503 FOUNDATION DETAILS
38 OF 693 S-504 TYPICAL PENETRATIONS IN EXISTING STRUCTURE
39 OF 693 S-511 TYPICAL STRUCTURAL STEEL DETAILS
40 OF 693 S-512 TYPICAL STRUCTURAL STEEL DETAILS
41 OF 693 S-515 TYPICAL STRUCTURAL STEEL DETAILS
42 OF 693 S-525 TYPICAL COLD-FORMED STEEL DETAILS -SHEET 1
43 OF 693 S-526 TYPICAL COLD-FORMED STEEL DETAILS -SHEET 2
44 OF 693 S-527 TYPICAL COLD-FORMED STEEL DETAILS -SHEET 3
45 OF 693 S-528 TYPICAL COLD-FORMED STEEL DETAILS -SHEET 4
46 OF 693 S-541 MECHANICAL ANCHORAGE DETAILS
47 OF 693 S-542 TYPICAL DETAILS-CABINET TO CFS FRAMED WALL
48 OF 693 S-543 TYPICAL DETAILS-CABINET TO WOOD FRAMED WALL
49 OF 693 S-544 TYPICAL DETAILS-CABINET TO CONCRETE AND CMU WALL
50 OF 693 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS
51 OF 693 AS101 ICRA DETAILS
52 OF 693 AD101-1B DATA CENTER -PHASE 1B -DEMO FLOOR PLAN
53 OF 693 AD102-1B DATA CENTER -PHASE 1B -DEMO RCP
54 OF 693 AD103-1B DATA CENTER -PHASE 1B -DEMO ROOF
55 OF 693 AE104-1B DATA CENTER -PHASE 1B -FLOOR PLAN
56 OF 693 AC105-1B DATA CENTER -PHASE 1B -RCP
57 OF 693 AE106-1B DATA CENTER -PHASE 1B -ROOF
58 OF 693 AD107-2A DATA CENTER -PHASE 2A -DEMO FLOOR PLAN
59 OF 693 AD108-2A DATA CENTER -PHASE 2A -DEMO RCP
60 OF 693 AE109-2A DATA CENTER -PHASE 2A -FLOOR PLAN
61 OF 693 AC110-2A DATA CENTER -PHASE 2A -RCP
62 OF 693 AD111-2B DATA CENTER -PHASE 2B -DEMO FLOOR PLAN
63 OF 693 AD112-2B DATA CENTER -PHASE 2B -DEMO RCP
64 OF 693 AD113-2B DATA CENTER -PHASE 2B -DEMO ROOF
65 OF 693 AE114-2B DATA CENTER -PHASE 2B -FLOOR PLAN
66 OF 693 AC115-2B DATA CENTER -PHASE 2B -RCP
67 OF 693 AE116-2B DATA CENTER -PHASE 2B -ROOF
68 OF 693 AE301 BUILDING SECTIONS
69 OF 693 AE501 DETAILS
70 OF 693 AE401 INTERIOR ELEVATIONS
71 OF 693 01AS100B BUILDING 01, 02, 12, 23 & 23R -LEVEL 00B -OVERALL PLAN
72 OF 693 01AS100G BUILDING 01, 02, 12, 23 & 23R -LEVEL 00G -OVERALL PLAN
73 OF 693 01AS101 BUILDING 01, 02, 12, 23 & 23R -LEVEL 01 -OVERALL PLAN
74 OF 693 01AS102 BUILDING 01, 02, 12, 23 & 23R -LEVEL 02 -OVERALL PLAN
75 OF 693 01AS103 BUILDING 01, 02, 12, 23 & 23R -LEVEL 03 -OVERALL PLAN
76 OF 693 01AS104 BUILDING 01, 02, 12, 23 & 23R -LEVEL 04 -OVERALL PLAN
77 OF 693 01AS105 BUILDING 01, 02, 12, 23 & 23R -LEVEL 05 -OVERALL PLAN
78 OF 693 01SAS100B BUILDING 01S -LEVEL 00B -PHASING PLAN
79 OF 693 01SA-100B BUILDING 01S -LEVEL 00B -DEMO, FLOOR PLANS & RCPS
80 OF 693 01SAS100G BUILDING 01S -LEVEL 00G -PHASING PLAN
81 OF 693 01SA-100G BUILDING 01S -LEVEL 00G -TOWER T1 -DEMO, FLOOR PLANS & RCPS
82 OF 693 01SA-200G BUILDING 01S -LEVEL 00G -TOWER T4 -DEMO, FLOOR PLANS & RCPS
83 OF 693 01SAS101 BUILDING 01S -LEVEL 01 -PHASING PLAN
84 OF 693 01SA-101 BUILDING 01S -LEVEL 01 -TOWER T1 -DEMO, FLOOR PLANS & RCPS
85 OF 693 01SA-201 BUILDING 01S -LEVEL 01 -TOWER T4 -DEMO, FLOOR PLANS & RCPS
86 OF 693 01SAS102 BUILDING 01S -LEVEL 02 -PHASING PLAN
87 OF 693 01SA-102 BUILDING 01S -LEVEL 02 -TOWER T1 -DEMO, FLOOR PLANS & RCPS
88 OF 693 01SA-202 BUILDING 01S -LEVEL 02 -TOWER T4 -DEMO, FLOOR PLANS & RCPS
89 OF 693 01SAS103 BUILDING 01S -LEVEL 03 -PHASING PLAN
90 OF 693 01SA-103 BUILDING 01S -LEVEL 03 -TOWER T1 -DEMO, FLOOR PLANS & RCPS
91 OF 693 01SA-203 BUILDING 01S -LEVEL 03 -TOWER T4 -DEMO, FLOOR PLANS & RCPS
92 OF 693 01SAS104 BUILDING 01S -LEVEL 04 -PHASING PLAN
93 OF 693 01SA-104 BUILDING 01S -LEVEL 04 -TOWER T1 -DEMO, FLOOR PLANS & RCPS
94 OF 693 01SA-204 BUILDING 01S -LEVEL 04 -TOWER T4 -DEMO, FLOOR PLANS & RCPS
95 OF 693 01SAS105 BUILDING 01S -LEVEL 05 -PHASING PLAN
96 OF 693 01SA-105 BUILDING 01S -LEVEL 05 -TOWER T1 -DEMO, FLOOR PLANS & RCPS
97 OF 693 01SA-205 BUILDING 01S -LEVEL 05 -TOWER T4 -DEMO, FLOOR PLANS & RCPS
98 OF 693 01SAS106 BUILDING 01S -LEVEL 06 -PHASING PLAN
99 OF 693 01SA-106 BUILDING 01S -LEVEL 06 -DEMO, FLOOR PLANS & RCPS
100 OF 693 01SA-105c TR TOWER 1 -EXTERIOR ELEVATIONS 101 OF 693 01SA-105d TR TOWER 4 -ELEVATIONS 102 OF 693 01SA-105e TR TOWER 1 -BUILDING SECTIONS 103 OF 693 01SA-105f TR TOWER 4 -BUILDING SECTIONS
104 OF 693 01S-A-511 EXTERIOR DETAILS -TR TOWER T1
105 OF 693 01S-A-512 EXTERIOR DETAIL -TR TOWER T1
106 OF 693 01S-A-513 EXTERIOR DETAILS -TOWER T4
107 OF 693 01S-A-514 TYPICAL ROOF DETAILS
DRAWING INDEX
PAGE #
GENERAL
CIVIL
STRUCTURAL
ARCHITECTURAL
SHEET # SHEET NAME
108 OF 693 01S-AE451 TR TOWER 1 -WALL SECTIONS
109 OF 693 01S-AE452 TR TOWER 4 -WALL SECTIONS
110 OF 693 01SA-106a TOWER T1 -ROOF PLAN
111 OF 693 01SA-206 TOWER T4 -ROOF PLAN
112 OF 693 01WAS100G BUILDING 01W -LEVEL 00G -PHASING PLAN
113 OF 693 01WA-100G BUILDING 01W -LEVEL 00G -DEMO, FLOOR PLANS & RCPS
114 OF 693 01WAS101 BUILDING 01W -LEVEL 01 -PHASING PLAN
115 OF 693 01WA-101 BUILDING 01W -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
116 OF 693 01WAS102 BUILDING 01W -LEVEL 02 -PHASING PLAN
117 OF 693 01WA-102 BUILDING 01W -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
118 OF 693 01WAS103 BUILDING 01W -LEVEL 03 -PHASING PLAN
119 OF 693 01WA-103 BUILDING 01W -LEVEL 03 -DEMO, FLOOR PLANS & RCPS
120 OF 693 01WA-103b TR TOWER 2 -EXTERIOR ELEVATIONS 121 OF 693 01WA-103c TR TOWER 2 -BUILDING SECTIONS
122 OF 693 01W-AE451 WALL SECTIONS
123 OF 693 01WA-104 BUILDING 01W -ROOF PLAN
124 OF 693 01W-AE511 EXTERIOR DETAILS
125 OF 693 02AS100B BUILDING 02 -LEVEL 00B -PHASING PLAN
126 OF 693 02A-100B BUILDING 02 -LEVEL 00B -DEMO, FLOOR PLANS & RCPS
127 OF 693 02AS100G BUILDING 02 -LEVEL 00G -PHASING PLAN
128 OF 693 02A-100G BUILDING 02 -LEVEL 00G -DEMO, FLOOR PLANS & RCPS
129 OF 693 02A-100Gb TR TOWER 3 -EXTERIOR ELEVATIONS 130 OF 693 02A-100Gc TR TOWER 3 -BUILDING SECTIONS
131 OF 693 02A-100R BUILDING 02 - ROOF PLAN
132 OF 693 02A-501 TR TOWER T3 MECH SHAFT DETAILS
133 OF 693 02A-511 EXTERIOR DETAILS
134 OF 693 02A-512 EXTERIOR DETAILS
135 OF 693 02AE-451 WALL SECTIONS
136 OF 693 03AS101 BUILDING 03 -LEVEL 01 -PHASING PLAN
137 OF 693 03A-101 BUILDING 03 -LEVEL 01 -DEMO, FLOOR PLANS, & RCPS
138 OF 693 03AS102 BUILDING 03 -LEVEL 02 -PHASING PLAN
139 OF 693 04AS100 BUILDING 04 -LEVEL 00 -PHASING PLAN
140 OF 693 04A-100 BUILDING 04 -LEVEL 00 -DEMO, FLOOR PLAN & RCPS
141 OF 693 04AS101 BUILDING 04 -LEVEL 01 -PHASING PLAN
142 OF 693 04AS102 BUILDING 04 -LEVEL 02 -PHASING PLAN
143 OF 693 05AS100 BUILDING 05 -LEVEL 00 -PHASING PLAN
144 OF 693 05A-100 BUILDING 05 -LEVEL 00 -DEMO, FLOOR PLAN & RCPS
145 OF 693 05AS101 BUILDING 05 -LEVEL 01 -PHASING PLAN
146 OF 693 05AS102 BUILDING 05 -LEVEL 02 -PHASING PLAN
147 OF 693 06AS100 BUILDING 06 -LEVEL 00 -PHASING PLAN
148 OF 693 06AS101 BUILDING 06 -LEVEL 01 -PHASING PLAN
149 OF 693 06A-101 BUILDING 06 -LEVEL 01-DEMO, FLOOR PLANS & RCPS
150 OF 693 06AS102 BUILDING 06 -LEVEL 02 -PHASING PLAN
151 OF 693 07AS100 BUILDING 07 -LEVEL 00 -PHASING PLAN
152 OF 693 07A-100 BUILDING 07 -LEVEL 00 -DEMO, FLOOR PLAN & RCPS
153 OF 693 07AS101 BUILDING 07 -LEVEL 01 -PHASING PLAN
154 OF 693 07AS102 BUILDING 07 -LEVEL 02 -PHASING PLAN
155 OF 693 07AS103 BUILDING 07 -ATTIC -PHASING PLAN
156 OF 693 07A-103 BUILDING 07 -ATTIC LEVEL -DEMO, FLOOR PLAN, & RCPS
157 OF 693 08AS100 BUILDING 08 -LEVEL 00 -PHASING PLAN
158 OF 693 08A-100 BUILDING 08 -LEVEL 00 -DEMO, FLOOR PLAN & RCPS
159 OF 693 08AS101 BUILDING 08 -LEVEL 01 -PHASING PLAN
160 OF 693 08AS102 BUILDING 08 -LEVEL 02 -PHASING PLAN
161 OF 693 08AS103 BUILDING 08 -ATTIC -PHASING PLAN
162 OF 693 08A-103 BUILDING 08 -ATTIC -DEMO, FLOOR PLANS, & RCPS
163 OF 693 09AS101 BUILDING 09 -LEVEL 01 -PHASING PLAN
164 OF 693 09AS102 BUILDING 09 -LEVEL 02 -PHASING PLAN
165 OF 693 09A-102 BUILDING 09 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
166 OF 693 20AS101 BUILDING 20 -LEVEL 01 -PHASING PLAN
167 OF 693 20A-101 BUILDING 20 -LEVEL 01 -DEMO, FLOOR PLANS & RCPS
168 OF 693 20AS102 BUILDING 20 -LEVEL 02 -PHASING PLAN
169 OF 693 20A-102 BUILDING 20 -LEVEL 02 -DEMO, FLOOR PLANS & RCPS
170 OF 693 23RAS100B BUILDING 23 & 23R -LEVEL 00B -PHASING PLAN
171 OF 693 23RA-100B BUILDING 23R -LEVEL 00B -DEMO, FLOOR PLANS & RCPS
172 OF 693 23RA-100C BUILDING 23R -LEVELS 01 & 02 -DEMO, FLOOR PLANS & RCPS
173 OF 693 25AS101 BUILDING 25 -LEVEL 01 -PHASING PLAN
174 OF 693 25A-101 BUILDING 25 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
DRAWING INDEX
PAGE #
175 OF 693 28AS101 BUILDING 28 -LEVEL 01 -PHASING PLAN
176 OF 693 28A-101 BUILDING 28 -LEVEL 01 -DEMO, FLOOR PLANS, & RCPS
177 OF 693 34AS100 BUILDING 34 -LEVEL 00 -PHASING PLAN
178 OF 693 34A-100 BUILDING 34 -LEVEL 00 -DEMO, FLOOR PLANS, & RCPS
179 OF 693 34AS101 BUILDING 34 -LEVEL 01 -PHASING PLAN
180 OF 693 TR1AS101 BUILDING TR1 -LEVEL 01 -PHASING PLAN
181 OF 693 TR1A-101a BUILDING TR1 -LEVEL 01 -DEMO, FLOOR PLANS, & RCPS 182 OF 693 TR1A-101b BUILDING TR1 -LEVEL 01 -SECTION AND DETAIL
183 OF 693 TR2AS101 BUILDING TR2 -LEVEL 01 -PHASING PLAN
184 OF 693 TR3AS101 BUILDING TR3 -LEVEL 01 -PHASING PLAN
185 OF 693 TR3A-101 BUILDING TR3 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
186 OF 693 TR4AS101 BUILDING TR4 -LEVEL 01 -PHASING PLAN
187 OF 693 TR4A-101 BUILDING TR4 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
188 OF 693 TR5AS101 BUILDING TR5 -LEVEL 01 -PHASING PLAN
189 OF 693 TR5A-101 BUILDING TR5 -LEVEL 01 -DEMO, FLOOR PLAN & RCPS
190 OF 693 A-601a ROOM FINISH SCHEDULE 191 OF 693 A-601b ROOM FINISH SCHEDULE
192 OF 693 A-602 DOOR SCHEDULE AND DETAILS
193 OF 693 A-603 DETAILS -WALL TYPES
194 OF 693 A-604 DETAILS
195 OF 693 AW001 IN-03.01 -ROOM NUMBER SIGN & SIGNAGE SCHEDULE
196 OF 693 M-001 FIRE PROTECTION, PLUMBING, AND MECHANICAL GENERAL NOTES
197 OF 693 M-002 FIRE PROTECTION, PLUMBING, AND MECHANICAL GENERAL NOTES
198 OF 693 01-M-101 BUILDING 01S -BASEMENT -OVERALL PLAN -AREA A
199 OF 693 01-M-102 BUILDING 01S -LEVEL 00 -OVERALL PLAN -AREA A
200 OF 693 01-M-103 BUILDING 01S & 01W -LEVEL 00 -OVERALL PLAN -AREA B
201 OF 693 01-M-104 BUILDING 01S -LEVEL 01 -OVERALL PLAN -AREA A
202 OF 693 01-M-105 BUILDING 01S & 01W -LEVEL 01 -OVERALL PLAN -AREA B
203 OF 693 01-M-106 BUILDING 01S -LEVEL 02 -OVERALL PLAN -AREA A
204 OF 693 01-M-107 BUILDING 01S & 01W -LEVEL 02 -OVERALL PLAN -AREA B
205 OF 693 01-M-108 BUILDING 01S -LEVEL 03 -OVERALL PLAN -AREA A
206 OF 693 01-M-109 BUILDING 01S & 01W -LEVEL 03 -OVERALL PLAN -AREA B
207 OF 693 01-M-110 BUILDING 01S -LEVEL 04 -OVERALL PLAN -AREA A
208 OF 693 01-M-111 BUILDING 01S -LEVEL 04 -OVERALL PLAN -AREA B
209 OF 693 01-M-112 BUILDING 01S -LEVEL 05 -OVERALL PLAN
210 OF 693 01-M-113 BUILDING 01S -LEVEL 06 -OVERALL PLAN
211 OF 693 01S-M-401 BASEMENT FLOOR PLAN -MECHANICAL AND PLUMBING PIPING TO TR TOWER 1
212 OF 693 01S-M-402 PIPE BASEMENT FLOOR PLAN -MECHANICAL PIPING TO TR TOWER 4
213 OF 693 01S-M-403 BUILDING 01S -BASEMENT -FIRE PROTECTION AND MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
214 OF 693 01S-M-404 BUILDING 01S -LEVEL 00 -MECHANICAL PIPING -FLOOR PLAN
215 OF 693 01S-M-405 BUILDING 01S -T1 -LEVEL 00 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP 216 OF 693 01S-M-406 BUILDING 01S -T4 -LEVEL 00 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP
217 OF 693 01S-M-407 BUILDING 01S -LEVEL 01 -MECHANICAL PIPING -FLOOR PLAN
MECHANICAL
SHEET # SHEET NAME
218 OF 693 01S-M-408 BUILDING 01S -T1 -LEVEL 01 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP 219 OF 693 01S-M-409 BUILDING 01S -T4 -LEVEL 01 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP 220 OF 693 01S-M-410 BUILDING 01S -T1 -LEVEL 02 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP 221 OF 693 01S-M-411 BUILDING 01S -T4 -LEVEL 02 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP 222 OF 693 01S-M-412 BUILDING 01S -T1 -LEVEL 03 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP 223 OF 693 01S-M-413 BUILDING 01S -T4 -LEVEL 03 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP 224 OF 693 01S-M-414 BUILDING 01S -T1 -LEVEL 04 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP 225 OF 693 01S-M-415 BUILDING 01S -T4 -LEVEL 04 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP 226 OF 693 01S-M-416 BUILDING 01S -T1 -LEVEL 05 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP 227 OF 693 01S-M-417 BUILDING 01S -T4 -LEVEL 05 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP
228 OF 693 01S-M-418 BUILDING 01S -LEVEL 06 -MECHANICAL -FLOOR PLAN
229 OF 693 01W-M-401 BASEMENT FLOOR PLAN -MECHANICAL PIPING -MECHANICAL PIPING TO TR TOWER 2 230 OF 693 01W-M-402 BUILDING 01W -T2 -LEVEL 00 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP 231 OF 693 01W-M-403 BUILDING 01W -T2 -LEVEL 01 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP 232 OF 693 01W-M-404 BUILDING 01W -T2 -LEVEL 02 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP 233 OF 693 01W-M-405 BUILDING 01W -T2 -LEVEL 03 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP
234 OF 693 M-301-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC DUCT -SECTION VIEW
235 OF 693 M-302-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC DUCT & ERV -SECTION VIEW
236 OF 693 MD401-1A PHASE 1A -ROOF -DATA CENTER -DEMOLITION ROOF PLAN
237 OF 693 MH402-1A PHASE 1A -ROOF -DATA CENTER - ROOF PLAN
238 OF 693 FD403-1B PHASE 1B -LVL 00 -DATA CENTER -FIRE PROTECTION -DEMOLITION RCP 239 OF 693 MD404-1B PHASE 1B -LVL 00 -DATA CENTER -HVAC DUCT -DEMOLITION FLOOR PLAN
240 OF 693 MD405-1B PHASE 1B -LVL 00 -DATA CENTER -DEMOLITION RCP
241 OF 693 FX406-1B PHASE 1B -LVL 00 -DATA CENTER -FIRE PROTECTION -FLOOR PLAN
242 OF 693 MP407-1B PHASE 1B -LVL 00 -DATA CENTER -HVAC PIPING -FLOOR PLAN
243 OF 693 MH408-1B PHASE 1B -LVL 00 -DATA CENTER -HVAC DUCT -FLOOR PLAN
244 OF 693 MH409-1B PHASE 1B -LVL 00 -DATA CENTER -RCP
245 OF 693 MH410-1B PHASE 1B -ROOF -DATA CENTER -ROOF PLAN
246 OF 693 PP411-1B PHASE 1B -LVL 00 -DATA CENTER -PLUMBING PIPING -FLOOR PLAN
247 OF 693 MP412-2A PHASE 2A -LVL 00 -DATA CENTER -HVAC PIPING -FLOOR PLAN
248 OF 693 MH413-2A PHASE 2A -ROOF -DATA CENTER -ROOF PLAN
249 OF 693 MD414-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC PIPING -DEMOLITION FLOOR PLAN 250 OF 693 MD415-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC DUCT -DEMOLITION FLOOR PLAN
251 OF 693 MD416-2B PHASE 2B -LVL 00 -DATA CENTER -PLUMBING PIPING
252 OF 693 MD417-2B PHASE 2B -LVL 00 -DATA CENTER -DEMOLITION ROOF FLOOR PLAN
253 OF 693 FD418-2B PHASE 2B -LVL 00 -DATA CENTER -FIRE PROTECTION -DEMOLITION RCP
254 OF 693 FX419-2B PHASE 2B -LVL 00 -DATA CENTER -FIRE PROTECTION -FLOOR PLAN
255 OF 693 MP420-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC PIPING -FLOOR PLAN
256 OF 693 MH421-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC DUCT -FLOOR PLAN
257 OF 693 MH422-2B PHASE 2B -ROOF -DATA CENTER -ROOF PLAN
258 OF 693 PP-423-2B PHASE 2B -LVL 00 -DATA CENTER -PLUMBING PIPING
259 OF 693 02-M-101 BUILDING 02 -BASEMENT -OVERALL PLAN
260 OF 693 02-M-102 BUILDING 02 -LEVEL 00 -OVERALL PLAN
261 OF 693 02-M-401 BASEMENT FLOOR PLAN -MECHANICAL PIPING TO TR TOWER 3
262 OF 693 02-M-402 BUILDING 02 -T3 -BASEMENT -FIRE PROTECTION, PLUMBING, AND MECHANICAL -FLOOR PLAN & RCP 263 OF 693 02-M-403 BUILDING 02 -T3 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND MECHANICAL -FLOOR PLAN & RCP
264 OF 693 03-M-101 BUILDING 03 -LEVEL 01 -OVERALL PLAN
265 OF 693 03-M-401 BUILDING 03 -LEVEL 01 -PLUMBING AND MECHANICAL -FLOOR PLAN
266 OF 693 04-M-101 BUILDING 04 -LEVEL 00 -OVERALL PLAN
267 OF 693 04-M-401 BUILDING 04 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
268 OF 693 04-M-402 BUILDING 04 -LEVEL 01 -MECHANICAL PIPING -FLOOR PLAN
269 OF 693 05-M-101 BUILDING 05 -LEVEL 00 -OVERALL PLAN
270 OF 693 05-M-401 BUILDING 05 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
271 OF 693 05-M-402 BUILDING 05 -LEVEL 01 -MECHANICAL PIPING -FLOOR PLAN
272 OF 693 06-M-101 BUILDING 06 -LEVEL 01 -OVERALL PLAN
273 OF 693 06-M-401 BUILDING 06 -LEVEL 01 -FIRE PROTECTION, PLUMBING, AND MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
274 OF 693 06-M-402 BUILDING 06 -ROOF PLAN
275 OF 693 07-M-101 BUILDING 07 -LEVEL 00 -OVERALL PLAN
276 OF 693 07-M-102 BUILDING 07 -LEVEL 01 -OVERALL PLAN
277 OF 693 07-M-103 BUILDING 07 -LEVEL ATTIC -OVERALL PLAN
278 OF 693 07-M-401 BUILDING 07 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
279 OF 693 07-M-402 BUILDING 07 -LEVEL 01 -MECHANICAL PIPING -FLOOR PLAN
280 OF 693 07-M-403 BUILDING 07 -LEVEL 02 -FLOOR PLAN
281 OF 693 07-M-404 BUILDING 07 -LEVEL ATTIC -FIRE PROTECTION, PLUMBING, AND MECHANICAL -FLOOR PLAN & RCP
282 OF 693 08-M-101 BUILDING 08 -LEVEL 00 -OVERALL PLAN
283 OF 693 08-M-102 BUILDING 08 -LEVEL ATTIC -OVERALL PLAN
284 OF 693 08-M-401 BUILDING 08 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS 285 OF 693 08-M-402 BUILDING 08 -LEVEL ATTIC -FIRE PROTECTION, PLUMBING, AND MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
286 OF 693 09-M-101 BUILDING 09 -LEVEL 02 -OVERALL PLAN
287 OF 693 09-M-401 BUILDING 09 -LEVEL 00 -MECHANICAL PIPING -FLOOR PLAN
288 OF 693 09-M-402 BUILDING 09 -LEVEL 01 -FLOOR PLAN
289 OF 693 09-M-403 BUILDING 09 -LEVEL 02 -FIRE PROTECTION, PLUMBING, AND MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
290 OF 693 20-M-101 BUILDING 20 -LEVEL 01 -OVERALL PLAN
291 OF 693 20-M-102 BUILDING 20 -LEVEL 02 -OVERALL PLAN
292 OF 693 20-M-401 BUILDING 20 -LEVEL 01 -FIRE PROTECTION, PLUMBING, AND MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS 293 OF 693 20-M-402 BUILDING 20 -LEVEL 02 -FIRE PROTECTION, PLUMBING, AND MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
294 OF 693 20-M-403 BUILDING 20 -ROOF PLAN
295 OF 693 23R-M-101 BUILDING 23R -BASEMENT -OVERALL PLAN
296 OF 693 23R-M-401 BUILDING 23R -BASEMENT -FIRE PROTECTION, PLUMBING, AND MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
297 OF 693 25-M-101 BUILDING 25 -LEVEL 01 -OVERALL PLAN
298 OF 693 25-M-401 BUILDING 25 -LEVEL 01 -FIRE PROTECTION AND MECHANICAL -FLOOR PLAN & RCP
299 OF 693 28-M-101 BUILDING 28 -LEVEL 01 -OVERALL PLAN
300 OF 693 28-M-401 BUILDING 28 -LEVEL 01 -PLUMBING AND MECHANICAL -FLOOR PLAN
301 OF 693 34-M-101 BUILDING 34 -LEVEL 00 -OVERALL PLAN
302 OF 693 34-M-401 BUILDING 34 -LEVEL 00 -PLUMBING AND MECHANICAL -FLOOR PLAN
303 OF 693 TR1-M-101 BUILDING TR1 -LEVEL 01 -OVERALL PLAN
304 OF 693 TR1-M-401 BUILDING TR1 -LEVEL 01 -PLUMBING AND MECHANICAL -FLOOR PLAN
305 OF 693 TR3-M-101 BUILDING TR3 -LEVEL 01 -OVERALL PLAN
306 OF 693 TR3-M-401 BUILDING TR3 -LEVEL 01 -MECHANICAL -FLOOR PLAN & RCP
307 OF 693 TR4-M-101 BUILDING TR4 -LEVEL 01 -OVERALL PLAN
308 OF 693 TR4-M-401 BUILDING TR4 -LEVEL 01 -MECHANICAL -FLOOR PLAN & RCP
309 OF 693 TR5-M-101 BUILDING TR5 -LEVEL 01 -OVERALL PLAN
310 OF 693 TR5-M-401 BUILDING TR5 -LEVEL 01 -MECHANICAL -FLOOR PLAN & RCP
311 OF 693 M-501 MECHANICAL DETAILS I
312 OF 693 M-502 MECHANICAL DETAILS II
313 OF 693 M-503 MECHANICAL DETAILS III
314 OF 693 M-504 MECHANICAL DETAILS IV
315 OF 693 M-505 TR TOWER HYDRONIC RISER DIAGRAMS
316 OF 693 M-601 MECHANICAL SCHEDULES I
317 OF 693 M-602 MECHANICAL SCHEDULES II
318 OF 693 M-603 MECHANICAL SCHEDULES III
319 OF 693 M-701 MECHANICAL CONTROLS I
320 OF 693 M-702 MECHANICAL CONTROLS II
321 OF 693 M-703 MECHANICAL CONTROLS III
322 OF 693 M-704 MECHANICAL CONTROLS IV
323 OF 693 E-001 ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
324 OF 693 E-002 ELECTRICAL LEGENDS
325 OF 693 ES101 ELECTRICAL FACILITY SITE PLAN
326 OF 693 01EP100G BLDG 01 -LEVEL 00G -ELECTRICAL PLAN
327 OF 693 01AEP100G BLDG 01A -LEVEL 00G -ELECTRICAL PLAN
DRAWING INDEX
PAGE #
ELECTRICAL
SHEET # SHEET NAME
328 OF 693 01SEP100B BLDG 01S -LEVEL 00B -ELECTRICAL PLAN
329 OF 693 01SEP100G BLDG 01S -LEVEL 00G -ELECTRICAL PLAN
330 OF 693 01SEP101 BLDG 01S -LEVEL 01 -ELECTRICAL PLAN
331 OF 693 01SEP105 BLDG 01S -LEVEL 05 -ELECTRICAL PLAN
332 OF 693 01SEP106 BLDG 01S -LEVEL 06 -ELECTRICAL PLAN
333 OF 693 01WEP100G BLDG 01W -LEVEL 00G -ELECTRICAL PLAN
334 OF 693 01WEP103 BLDG 01W -LEVEL 03 -ELECTRICAL PLAN
335 OF 693 02EP100B BLDG 02 -LEVEL 00B -ELECTRICAL PLAN
336 OF 693 03EP101 BLDG 03 -LEVEL 01 -ELECTRICAL PLAN
337 OF 693 04EP100 BLDG 04 -LEVEL 00 -ELECTRICAL PLAN
338 OF 693 04EP101 BLDG 04 -LEVEL 01 -ELECTRICAL PLAN
339 OF 693 05EP101 BLDG 05 -LEVEL 01 -ELECTRICAL PLAN
340 OF 693 06EP100 BLDG 06 -LEVEL 00 -ELECTRICAL PLAN
341 OF 693 06EP102 BLDG 06 -LEVEL 02 -ELECTRICAL PLAN
342 OF 693 06EP103 BLDG 06 -ATTIC -ELECTRICAL PLAN
343 OF 693 07EP100 BLDG 07 -LEVEL 00 -ELECTRICAL PLAN
344 OF 693 07EP101 BLDG 07 -LEVEL 01 -ELECTRICAL PLAN
345 OF 693 07EP102 BLDG 07 -LEVEL 02 -ELECTRICAL PLAN
346 OF 693 07EP103 BLDG 07 -LEVEL 03 -ELECTRICAL PLAN
347 OF 693 08EP100 BLDG 08 -LEVEL 00 -ELECTRICAL PLAN
348 OF 693 08EP101 BLDG 08 -LEVEL 01 -ELECTRICAL PLAN
349 OF 693 08EP102 BLDG 08 -LEVEL 02 -ELECTRICAL PLAN
DRAWING INDEX
PAGE #
350 OF 693 08EP103 BLDG 08 -LEVEL 03 -ELECTRICAL PLAN
351 OF 693 09EP100 BLDG 09 -LEVEL 00 -ELECTRICAL PLAN
352 OF 693 09EP101 BLDG 09 -LEVEL 01 -ELECTRICAL PLAN
353 OF 693 20EP101 BLDG 20 -LEVEL 01 -ELECTRICAL PLAN
354 OF 693 20EP103 BLDG 20 -LEVEL 03 -ELECTRICAL PLAN
355 OF 693 23REP100B BLDG 23R -LEVEL 00B -ELECTRICAL PLAN
356 OF 693 23REP100G BLDG 23R -LEVEL 00G -ELECTRICAL PLAN
357 OF 693 25EP101 BLDG 25 -LEVEL 01 - ELECTRICAL PLAN
358 OF 693 TR1EP101 BLDG TR1 -LEVEL 01 -ELECTRICAL PLAN
359 OF 693 TR3EP101 BLDG TR3 -LEVEL 01 -ELECTRICAL PLAN
360 OF 693 TR4EP101 BLDG TR4 -LEVEL 01 -ELECTRICAL PLAN
361 OF 693 TR5EP101 BLDG TR5 -LEVEL 01 - ELECTRICAL PLAN
362 OF 693 01EL400Ga-1B DATA CENTER -LIGHTING PLAN -PHASE 1B (1 OF 2) 363 OF 693 01EL400Gb-1B DATA CENTER -LIGHTING PLAN -PHASE 1B (2 OF 2) 364 OF 693 01EL400Gc-2A DATA CENTER -LIGHTING PLAN -PHASE 2A (1 OF 2) 365 OF 693 01EL400Gd-2A DATA CENTER -LIGHTING PLAN -PHASE 2A (2 OF 2) 366 OF 693 01EL400Ge-2B DATA CENTER -LIGHTING PLAN -PHASE 2B (1 OF 2) 367 OF 693 01EL400Gf-2B DATA CENTER -LIGHTING PLAN -PHASE 2B (2 OF 2) 368 OF 693 01EP400Ga-1B DATA CENTER -ELECTRICAL PLAN -PHASE 1B (1 OF 3) 369 OF 693 01EP400Gb-1B DATA CENTER -ELECTRICAL PLAN -PHASE 1B (2 OF 3) 370 OF 693 01EP400Gc-1B DATA CENTER -ELECTRICAL PLAN -PHASE 1B (3 OF 3) 371 OF 693 01EP400Gd-2A DATA CENTER -ELECTRICAL PLAN -PHASE 2A (1 OF 3) 372 OF 693 01EP400Ge-2A DATA CENTER -ELECTRICAL PLAN -PHASE 2A (2 OF 3) 373 OF 693 01EP400Gf-2A DATA CENTER -ELECTRICAL PLAN -PHASE 2A (3 OF 3) 374 OF 693 01EP400Gg-2B DATA CENTER -ELECTRICAL PLAN -PHASE 2B (1 OF 3) 375 OF 693 01EP400Gh-2B DATA CENTER -ELECTRICAL PLAN -PHASE 2B (2 OF 3) 376 OF 693 01EP400Gi-2B DATA CENTER -ELECTRICAL PLAN -PHASE 2B (3 OF 3) 377 OF 693 01EP400Gj-1A DATA CENTER -ROOF PLAN -PHASE 1A (1 OF 2) 378 OF 693 01EP400Gk-1A DATA CENTER -ROOF PLAN -PHASE 1A (2 OF 2) 379 OF 693 01EP400Gl-1B DATA CENTER -ROOF PLAN -PHASE 1B (1 OF 2) 380 OF 693 01EP400Gm-1B DATA CENTER -ROOF PLAN -PHASE 1B (2 OF 2) 381 OF 693 01EP400Gn-2A DATA CENTER -ROOF PLAN -PHASE 2A (1 OF 2) 382 OF 693 01EP400Go-2A DATA CENTER -ROOF PLAN -PHASE 2A (2 OF 2) 383 OF 693 01EP400Gp-2B DATA CENTER -ROOF PLAN -PHASE 2B (1 OF 2) 384 OF 693 01EP400Gq-2B DATA CENTER -ROOF PLAN -PHASE 2B (2 OF 2) 385 OF 693 01EF400Ga-1B DATA CENTER -FIRE ALARM PLAN -PHASE 1B (1 OF 2) 386 OF 693 01EF400Gb-1B DATA CENTER -FIRE ALARM PLAN -PHASE 1B (2 OF 2) 387 OF 693 01EF400Gc-2A DATA CENTER -FIRE ALARM PLAN -PHASE 2A (1 OF 2) 388 OF 693 01EF400Gd-2A DATA CENTER -FIRE ALARM PLAN -PHASE 2A (2 OF 2) 389 OF 693 01EF400Ge-2B DATA CENTER -FIRE ALARM PLAN -PHASE 2B (1 OF 2) 390 OF 693 01EF400Gf-2B DATA CENTER -FIRE ALARM PLAN -PHASE 2B (2 OF 2) 391 OF 693 01EG400Ga-1B DATA CENTER -GROUNDING PLAN -PHASE 1B (1 OF 2) 392 OF 693 01EG400Gb-1B DATA CENTER -GROUNDING PLAN -PHASE 1B (2 OF 2) 393 OF 693 01EG400Gc-2A DATA CENTER -GROUNDING PLAN -PHASE 2A (1 OF 2) 394 OF 693 01EG400Gd-2A DATA CENTER -GROUNDING PLAN -PHASE 2A (2 OF 2) 395 OF 693 01EG400Ge-2B DATA CENTER -GROUNDING PLAN -PHASE 2B (1 OF 2) 396 OF 693 01EG400Gf-2B DATA CENTER -GROUNDING PLAN -PHASE 2B (2 OF 2) 397 OF 693 01EP400Gr BLDG 01 -LEVEL 00G -ENLARGED ELECTRICAL PLANS 398 OF 693 01EP400Gs BLDG 01 -LEVEL 00G -ENLARGED ELECTRICAL PLANS 399 OF 693 01SEP400Ba BLDG 01S -LEVEL 00B -ENLARGED ELECTRICAL PLANS 400 OF 693 01SEP400Bb BLDG 01S -LEVEL 00B -ENLARGED ELECTRICAL PLANS 401 OF 693 01SEP400Bc BLDG 01S -LEVEL 00B -ENLARGED ELECTRICAL PLANS 402 OF 693 01SEP400Ga BLDG 01S -LEVEL 00G -ENLARGED ELECTRICAL PLANS 403 OF 693 01SEP400Gb BLDG 01S -LEVEL 00G -ENLARGED ELECTRICAL PLANS
404 OF 693 01SEP401 BLDG 01S -LEVEL 01 -ENLARGED ELECTRICAL PLANS
405 OF 693 01SEP402 BLDG 01S -LEVEL 02 -ENLARGED ELECTRICAL PLANS
406 OF 693 01SEP403 BLDG 01S -LEVEL 03 -ENLARGED ELECTRICAL PLANS
407 OF 693 01SEP404 BLDG 01S -LEVEL 04 -ENLARGED ELECTRICAL PLANS
408 OF 693 01SEP405 BLDG 01S -LEVEL 05 -ENLARGED ELECTRICAL PLAN
409 OF 693 01SEP406 BLDG 01S -LEVEL 06 -ENLARGED ELECTRICAL PLANS
410 OF 693 01SEP407 BLDG 01S -LEVEL 07 -LIGHTNING PROTECTION PLANS
411 OF 693 01WEP400Ga BLDG 01W -LEVEL 00G -ENLARGED ELECTRICAL PLANS 412 OF 693 01WEP400Gb BLDG 01W -LEVEL 00G -ENLARGED ELECTRICAL PLANS
413 OF 693 01WEP401 BLDG 01W -LEVEL 01 -ENLARGED ELECTRICAL PLANS
414 OF 693 01WEP402 BLDG 01W -LEVEL 02 -ENLARGED ELECTRICAL PLANS
415 OF 693 01WEP403 BLDG 01W -LEVEL 03 -ENLARGED ELECTRICAL PLANS
416 OF 693 02EP400B BLDG 02 -LEVEL 00B -ENLARGED ELECTRICAL PLANS
417 OF 693 02EP400Ga BLDG 02 -LEVEL 00G -ENLARGED ELECTRICAL PLANS 418 OF 693 02EP400Gb BLDG 02 -LEVEL 00G -ENLARGED ELECTRICAL PLANS
419 OF 693 03EP401 BLDG 03 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
420 OF 693 04EP400a BLDG 04 -LEVEL 00 -ENLARGED ELECTRICAL PLANS 421 OF 693 04EP400b BLDG 04 -LEVEL 00 -ENLARGED ELECTRICAL PLANS
422 OF 693 04EP401 BLDG 04 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
423 OF 693 05EP400 BLDG 05 -LEVEL 00 -ENLARGED ELECTRICAL PLANS
424 OF 693 06EP400 BLDG 06 -LEVEL 00 -ENLARGED ELECTRICAL PLANS
425 OF 693 06EP401 BLDG 06 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
426 OF 693 07EP400 BLDG 07 -LEVEL 00 -ENLARGED ELECTRICAL PLANS
427 OF 693 08EP400 BLDG 08 -LEVEL 00 -ENLARGED ELECTRICAL PLANS
428 OF 693 09EP402 BLDG 09 -LEVEL 02 -ENLARGED ELECTRICAL PLANS
429 OF 693 20EP401 BLDG 20 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
430 OF 693 20EP402 BLDG 20 -LEVEL 02 -ENLARGED ELECTRICAL PLANS
431 OF 693 23REP400Ba BLDG 23R -LEVEL 00B -ENLARGED ELECTRICAL PLANS 432 OF 693 23REP400Bb BLDG 23R -LEVEL 00B -ENLARGED ELECTRICAL PLANS
433 OF 693 23REP400G BLDG 23R -LEVEL 00G -ENLARGED ELECTRICAL PLANS
434 OF 693 25EP401a BLDG 25 -LEVEL 01 -ENLARGED ELECTRICAL PLANS 435 OF 693 25EP401b BLDG 25 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
436 OF 693 28EP401 BLDG 28 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
437 OF 693 34EP400 BLDG 34 -LEVEL 00 -ENLARGED ELECTRICAL PLANS
438 OF 693 TR1EP401 BLDG TR1 -LEVEL 01 -ENLARGED ELECTRICAL PLANS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0 /2
:2
:5 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /G
E N
E R
A L
S H
E E
T S
.r v t G-003
DRAWING INDEX
JW/MA RB
100% CONSTRUCTION
DOCUMENTS
06/27/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
Revisions: Date:
Location
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
06/27/2025
003 OF 6939/3/2025 09/03/202509/03/2025
SHEET # SHEET NAME
439 OF 693 EP501 ELECTRICAL DETAILS
440 OF 693 EP502 ELECTRICAL DETAILS
441 OF 693 EP503 ELECTRICAL DETAILS
442 OF 693 EP504 ELECTRICAL DETAILS
443 OF 693 EP505 ELECTRICAL DETAILS
444 OF 693 EP506 ELECTRICAL DETAILS
445 OF 693 EP507 ELECTRICAL DETAILS
446 OF 693 EP508 ELECTRICAL DETAILS
447 OF 693 EP509 ELECTRICAL DETAILS
448 OF 693 EF601 FIRE ALARM RISER DIAGRAM
449 OF 693 EG601 TELECOMMUNICATIONS BONDING RISER DIAGRAMS
450 OF 693 EG602 TELECOMMUNICATIONS BONDING RISER DIAGRAMS
451 OF 693 EG603 TELECOMMUNICATIONS BONDING RISER DIAGRAMS
452 OF 693 EG604 TELECOMMUNICATIONS BONDING RISER DIAGRAMS
453 OF 693 01EP601 BLDG 01 -PARTIAL ONE-LINE DIAGRAM -EXISTING (1 OF 2)
454 OF 693 01EP602 BLDG 01 -PARTIAL ONE-LINE DIAGRAM -EXISTING (2 OF 2)
455 OF 693 01EP611 BLDG 01 -PARTIAL ONE-LINE DIAGRAM -REVISED (1 OF 2)
456 OF 693 01EP612 BLDG 01 -PARTIAL ONE-LINE DIAGRAM -REVISED (2 OF 2)
457 OF 693 01EP601-1A DATA CENTER -ONE-LINE DIAGRAM -PHASE 1A (1 OF 2)
458 OF 693 01EP602-1A DATA CENTER -ONE-LINE DIAGRAM -PHASE 1A (2 OF 2)
459 OF 693 01EP603-1B DATA CENTER -ONE-LINE DIAGRAM -PHASE 1B
460 OF 693 01EP604-2A DATA CENTER -ONE-LINE DIAGRAM -PHASE 2A (1 OF 2)
461 OF 693 01EP605-2A DATA CENTER -ONE-LINE DIAGRAM -PHASE 2A (2 OF 2)
462 OF 693 01EP606-2B DATA CENTER -ONE-LINE DIAGRAM -PHASE 2B (1 OF 4)
463 OF 693 01EP607-2B DATA CENTER -ONE-LINE DIAGRAM -PHASE 2B (2 OF 4)
464 OF 693 01EP608-2B DATA CENTER -ONE-LINE DIAGRAM - PHASE 2B (3 OF 4)
465 OF 693 01EP609-2B DATA CENTER -ONE-LINE DIAGRAM -PHASE 2B (4 OF 4)
466 OF 693 01SEP601 BLDG 01S -PARTIAL ONE-LINE DIAGRAM -EXISTING (1 OF 3)
467 OF 693 01SEP602 BLDG 01S -PARTIAL ONE-LINE DIAGRAM -EXISTING (2 OF 3)
468 OF 693 01SEP603 BLDG 01S -PARTIAL ONE-LINE DIAGRAM -EXISTING (3 OF 3)
469 OF 693 01SEP611 BLDG 01S -ONE-LINE DIAGRAM -REVISED (1 OF 4)
470 OF 693 01SEP612 BLDG 01S -ONE-LINE DIAGRAM -REVISED (2 OF 4)
471 OF 693 01SEP613 BLDG 01S -ONE-LINE DIAGRAM -REVISED (3 OF 4)
472 OF 693 01SEP614 BLDG 01S -ONE-LINE DIAGRAM -REVISED (4 OF 4)
473 OF 693 01WEP601 BLDG 01W -ONE-LINE DIAGRAM -EXISTING (1 OF 3)
474 OF 693 01WEP602 BLDG 01W -ONE-LINE DIAGRAM -EXISTING (2 OF 3)
475 OF 693 01WEP603 BLDG 01W -ONE-LINE DIAGRAM -EXISTING (3 OF 3)
476 OF 693 01WEP611 BLDG 01W -ONE-LINE DIAGRAM -REVISED (1 OF 4)
477 OF 693 01WEP612 BLDG 01W -ONE-LINE DIAGRAM -REVISED (2 OF 4)
478 OF 693 01WEP613 BLDG 01W -ONE-LINE DIAGRAM -REVISED (3 OF 4)
479 OF 693 01WEP614 BLDG 01W -ONE-LINE DIAGRAM -REVISED (4 OF 4)
480 OF 693 02EP601 BLDG 02 -PARTIAL ONE-LINE DIAGRAM -EXISTING (1 OF 2)
481 OF 693 02EP602 BLDG 02 -PARTIAL ONE-LINE DIAGRAM -EXISTING (2 OF 2)
482 OF 693 02EP611 BLDG 02 -ONE-LINE DIAGRAM -REVISED (1 OF 3)
483 OF 693 02EP612 BLDG 02 -ONE-LINE DIAGRAM -REVISED (2 OF 3)
484 OF 693 02EP613 BLDG 02 -ONE-LINE DIAGRAM -REVISED (3 OF 3)
485 OF 693 03EP601 BLDG 03 -ONE-LINE DIAGRAM -EXISTING
486 OF 693 03EP611 BLDG 03 -ONE-LINE DIAGRAM -REVISED
487 OF 693 04EP601 BLDG 04 -ONE-LINE DIAGRAM
488 OF 693 05EP601 BLDG 05 -ONE-LINE DIAGRAM
489 OF 693 06EP601 BLDG 06 -ONE-LINE DIAGRAM -EXISTING
490 OF 693 06EP611 BLDG 06 -ONE-LINE DIAGRAM -REVISED
491 OF 693 07EP601 BLDG 07 -ONE-LINE DIAGRAM
492 OF 693 08EP601 BLDG 08 -ONE-LINE DIAGRAM -EXISTING
493 OF 693 08EP611 BLDG 08 -ONE-LINE DIAGRAM -REVISED
494 OF 693 09EP601 BLDG 09 -ONE-LINE DIAGRAM
495 OF 693 15EP601 BLDG 15 -ONE-LINE DIAGRAM
496 OF 693 20EP601 BLDG 20 -ONE-LINE DIAGRAM
497 OF 693 23REP601 BLDG 23R -ONE-LINE DIAGRAM -EXISTING
498 OF 693 23REP611 BLDG 23R -ONE-LINE DIAGRAM -REVISED
499 OF 693 25EP601 BLDG 25 -ONE-LINE DIAGRAM
500 OF 693 28EP601 BLDG 28 -ONE-LINE DIAGRAMS
501 OF 693 34EP601 BLDG 34 -ONE-LINE DIAGRAMS
502 OF 693 52EP601 BLDG 52 -ONE-LINE DIAGRAM
503 OF 693 TR12EP601 BLDG TR1&2 -ONE-LINE DIAGRAM
504 OF 693 TR345EP601 BLDG TR3,4,&5 -ONE-LINE DIAGRAM
505 OF 693 EP701 TYPICAL ELECTRICAL SCHEDULES
506 OF 693 EP702 ELECTRICAL SCHEDULES
507 OF 693 01EP701 BLDG 01 -ELECTRICAL SCHEDULES
508 OF 693 01EP702 BLDG 01 -ELECTRICAL SCHEDULES
509 OF 693 01EP703 BLDG 01 -ELECTRICAL SCHEDULES
510 OF 693 01EP704 BLDG 01 -ELECTRICAL SCHEDULES
511 OF 693 01SEP701 BLDG 01S -ELECTRICAL SCHEDULES
512 OF 693 01SEP702 BLDG 01S -ELECTRICAL SCHEDULES
513 OF 693 01SEP703 BLDG 01S -ELECTRICAL SCHEDULES
514 OF 693 01SEP704 BLDG 01S -ELECTRICAL SCHEDULES
515 OF 693 01SEP705 BLDG 01S -ELECTRICAL SCHEDULES
516 OF 693 01WEP701 BLDG 01W -ELECTRICAL SCHEDULES
517 OF 693 01WEP702 BLDG 01W -ELECTRICAL SCHEDULES
518 OF 693 01WEP703 BLDG 01W -ELECTRICAL SCHEDULES
519 OF 693 02EP701 BLDG 02 -ELECTRICAL SCHEDULES
520 OF 693 02EP702 BLDG 02 -ELECTRICAL SCHEDULES
521 OF 693 03EP701 BLDG 03 -ELECTRICAL SCHEDULES
522 OF 693 04EP701 BLDG 04 -ELECTRICAL SCHEDULES
523 OF 693 05EP701 BLDG 05 -ELECTRICAL SCHEDULES
524 OF 693 06EP701 BLDG 06 -ELECTRICAL SCHEDULES
525 OF 693 07EP701 BLDG 07 -ELECTRICAL SCHEDULES
526 OF 693 08EP701 BLDG 08 -ELECTRICAL SCHEDULES
527 OF 693 09EP701 BLDG 09 -ELECTRICAL SCHEDULES
528 OF 693 20EP701 BLDG 20 -ELECTRICAL SCHEDULES
529 OF 693 23REP701 BLDG 23R -ELECTRICAL SCHEDULES
DRAWING INDEX
PAGE #
530 OF 693 25EP701 BLDG 25 -ELECTRICAL SCHEDULES
531 OF 693 28EP701 BLDG 28 -ELECTRICAL SCHEDULES
532 OF 693 34EP701 BLDG 34 -ELECTRICAL SCHEDULES
533 OF 693 TR1EP701 BLDG TR1 -ELECTRICAL SCHEDULES
534 OF 693 TR3EP701 BLDG TR3 -ELECTRICAL SCHEDULES
535 OF 693 TNG000 SHEET INDEX
536 OF 693 TNG001 ABBREVIATIONS AND GENERAL NOTES
537 OF 693 TNG002 TELECOMMUNICATIONS LEGENDS
538 OF 693 TNG003 TELECOMMUNICATIONS FIBER GENERAL NOTES
539 OF 693 01TN100G BLDG 01 -LEVEL 00G -TELECOMMUNICATIONS PLAN
540 OF 693 01TN101 BLDG 01 -LEVEL 01 -TELECOMMUNICATIONS PLAN
541 OF 693 01TN102 BLDG 01 -LEVEL 02 -TELECOMMUNICATIONS PLAN
542 OF 693 01TN103 BLDG 01 -LEVEL 03 -TELECOMMUNICATIONS PLAN
543 OF 693 01TN104 BLDG 01 -LEVEL 04 -TELECOMMUNICATIONS PLAN
544 OF 693 01ATN100G BLDG 01A -LEVEL 00G -TELECOMMUNICATIONS PLAN
545 OF 693 01ATN101 BLDG 01A -LEVEL 01 -TELECOMMUNICATIONS PLAN
546 OF 693 01ATN102 BLDG 01A -LEVEL 02 -TELECOMMUNICATIONS PLAN
547 OF 693 01ATN103 BLDG 01A -LEVEL 03 -TELECOMMUNICATIONS PLAN
548 OF 693 01ATN104 BLDG 01A -LEVEL 04 -TELECOMMUNICATIONS PLAN
TELECOMMUNICATIONS
SHEET # SHEET NAME
549 OF 693 01STN100B BLDG 01S -LEVEL 00B -TELECOMMUNICATIONS PLAN
550 OF 693 01STN100G BLDG 01S -LEVEL 00G -TELECOMMUNICATIONS PLAN
551 OF 693 01STN101 BLDG 01S -LEVEL 01 -TELECOMMUNICATIONS PLAN
552 OF 693 01STN102 BLDG 01S -LEVEL 02 -TELECOMMUNICATIONS PLAN
553 OF 693 01STN103 BLDG 01S -LEVEL 03 -TELECOMMUNICATIONS PLAN
554 OF 693 01STN104 BLDG 01S -LEVEL 04 -TELECOMMUNICATIONS PLAN
555 OF 693 01STN105 BLDG 01S -LEVEL 05 -TELECOMMUNICATIONS PLAN
556 OF 693 01STN106 BLDG 01S -LEVEL 06 -TELECOMMUNICATIONS PLAN
557 OF 693 01WTN100B BLDG 01W -LEVEL 00B -TELECOMMUNICATIONS PLAN
558 OF 693 01WTN100G BLDG 01W -LEVEL 00G -TELECOMMUNICATIONS PLAN
559 OF 693 01WTN101 BLDG 01W -LEVEL 01 -TELECOMMUNICATIONS PLAN
560 OF 693 01WTN102 BLDG 01W -LEVEL 02 -TELECOMMUNICATIONS PLAN
561 OF 693 01WTN103 BLDG 01W -LEVEL 03 -TELECOMMUNICATIONS PLAN
562 OF 693 01WTN104 BLDG 01W -LEVEL 04 -TELECOMMUNICATIONS PLAN
563 OF 693 02TN100B BLDG 02 -LEVEL 00B -TELECOMMUNICATIONS PLAN
564 OF 693 02TN100G BLDG 02 -LEVEL 00G -TELECOMMUNICATIONS PLAN
565 OF 693 02TN101 BLDG 02 -LEVEL 01 -TELECOMMUNICATIONS PLAN
566 OF 693 02TN102 BLDG 02 -LEVEL 02 -TELECOMMUNICATIONS PLAN
567 OF 693 03TN101 BLDG 03 -LEVEL 01 -TELECOMMUNICATIONS PLAN
568 OF 693 03TN102 BLDG 03 -LEVEL 02 -TELECOMMUNICATIONS PLAN
569 OF 693 04TN100 BLDG 04 -LEVEL 00 -TELECOMMUNICATIONS PLAN
570 OF 693 04TN101 BLDG 04 -LEVEL 01 -TELECOMMUNICATIONS PLAN
571 OF 693 04TN102 BLDG 04 -LEVEL 02 -TELECOMMUNICATIONS PLAN
572 OF 693 05TN100 BLDG 05 -LEVEL 00 -TELECOMMUNICATIONS PLAN
573 OF 693 05TN101 BLDG 05 -LEVEL 01 -TELECOMMUNICATIONS PLAN
574 OF 693 05TN102 BLDG 05 -LEVEL 02 -TELECOMMUNICATIONS PLAN
575 OF 693 06TN100 BLDG 06 -LEVEL 00 -TELECOMMUNICATIONS PLAN
576 OF 693 06TN101 BLDG 06 -LEVEL 01 -TELECOMMUNICATIONS PLAN
577 OF 693 06TN102 BLDG 06 -LEVEL 02 -TELECOMMUNICATIONS PLAN
578 OF 693 07TN100 BLDG 07 -LEVEL 00 -TELECOMMUNICATIONS PLAN
579 OF 693 07TN101 BLDG 07 -LEVEL 01 -TELECOMMUNICATIONS PLAN
580 OF 693 07TN102 BLDG 07 -LEVEL 02 -TELECOMMUNICATIONS PLAN
581 OF 693 07TN103 BLDG 07 -LEVEL 03 -TELECOMMUNICATIONS PLAN
582 OF 693 08TN100 BLDG 08 -LEVEL 00 -TELECOMMUNICATIONS PLAN
583 OF 693 08TN101 BLDG 08 -LEVEL 01 -TELECOMMUNICATIONS PLAN
584 OF 693 08TN102 BLDG 08 -LEVEL 02 -TELECOMMUNICATIONS PLAN
585 OF 693 08TN103 BLDG 08 - LEVEL 03 -TELECOMMUNICATIONS PLAN
586 OF 693 09TN100 BLDG 09 -LEVEL 00 -TELECOMMUNICATIONS PLAN
587 OF 693 09TN101 BLDG 09 -LEVEL 01 -TELECOMMUNICATIONS PLAN
588 OF 693 09TN102 BLDG 09 -LEVEL 02 -TELECOMMUNICATIONS PLAN
589 OF 693 12TN100G BLDG 12 -LEVEL 00G -TELECOMMUNICATIONS PLAN
590 OF 693 12TN101 BLDG 12 -LEVEL 01 -TELECOMMUNICATIONS PLAN
591 OF 693 12TN102 BLDG 12 -LEVEL 02 -TELECOMMUNICATIONS PLAN
592 OF 693 20TN101 BLDG 20 -LEVEL 01 -TELECOMMUNICATIONS PLAN
593 OF 693 20TN102 BLDG 20 -LEVEL 02 -TELECOMMUNICATIONS PLAN
594 OF 693 23RTN100B BLDG 23R -LEVEL 00B -TELECOMMUNICATIONS PLAN
595 OF 693 23RTN100G BLDG 23R -LEVEL 00G -TELECOMMUNICATIONS PLAN
596 OF 693 23RTN101 BLDG 23R -LEVEL 01 -TELECOMMUNICATIONS PLAN
597 OF 693 23RTN102 BLDG 23R -LEVEL 02 -TELECOMMUNICATIONS PLAN
598 OF 693 25TN101 BLDG 25 -LEVEL 01 - TELECOMMUNICATIONS PLAN
599 OF 693 25TN102 BLDG 25 -LEVEL 02 - TELECOMMUNICATIONS PLAN
600 OF 693 25TN103 BLDG 25 -LEVEL 03 - TELECOMMUNICATIONS PLAN
601 OF 693 25TN104 BLDG 25 -LEVEL 04 - TELECOMMUNICATIONS PLAN
602 OF 693 25TN105 BLDG 25 -LEVEL 05 - TELECOMMUNICATIONS PLAN
603 OF 693 28TN101 BLDG 28 -LEVEL 01 -TELECOMMUNICATIONS PLAN
604 OF 693 34TN100 BLDG 34 -LEVEL 00 -TELECOMMUNICATIONS PLAN
605 OF 693 34TN101 BLDG 34 -LEVEL 01 -TELECOMMUNICATIONS PLAN
606 OF 693 TR1TN101 BLDG TR1 -LEVEL 01 -TELECOMMUNICATION PLAN
607 OF 693 TR2TN101 BLDG TR2 -LEVEL 01 -TELECOMMUNICATIONS PLAN
608 OF 693 TR3TN101 BLDG TR3 -LEVEL 01 -TELECOMMUNICATIONS PLAN
609 OF 693 TR4TN101 BLDG TR4 -LEVEL 01 -TELECOMMUNICATIONS PLAN
610 OF 693 TR5TN101 BLDG TR5 -LEVEL 01 -TELECOMMUNICATIONS PLAN
611 OF 693 01TN400Ga BLDG 01 -LEVEL 00G -ENLARGED TELECOMMUNICATIONS PLANS 612 OF 693 01TN400Gb DATA CENTER -DEMOLITION FLOOR PLAN -PHASE 1B 613 OF 693 01TN400Gc DATA CENTER -DEMOLITION OVERHEAD PLAN -PHASE 1B 614 OF 693 01TN400Gd DATA CENTER -TELECOMMUNICATIONS PLAN -PHASE 1B 615 OF 693 01TN400Ge DATA CENTER -OVERHEAD PLAN -PHASE 1B 616 OF 693 01TN400Gf DATA CENTER -DEMOLITION FLOOR PLAN -PHASE 2A 617 OF 693 01TN400Gg DATA CENTER -DEMOLITION OVERHEAD PLAN -PHASE 2A 618 OF 693 01TN400Gh DATA CENTER -TELECOMMUNICATIONS PLAN -PHASE 2A 619 OF 693 01TN400Gi DATA CENTER -OVERHEAD PLAN -PHASE 2A 620 OF 693 01TN400Gj DATA CENTER -DEMOLITION FLOOR PLAN -PHASE 2B 621 OF 693 01TN400Gk DATA CENTER -DEMOLITION OVERHEAD PLAN -PHASE 2B 622 OF 693 01TN400Gl DATA CENTER -TELECOMMUNICATIONS PLAN -PHASE 2B 623 OF 693 01TN400Gm DATA CENTER -OVERHEAD PLAN -PHASE 2B
624 OF 693 01TN401 BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
625 OF 693 01TN402 BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
626 OF 693 01TN403 BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS
627 OF 693 01ATN400G BLDG 01A -LEVEL 00G -ENLARGED TELECOMMUNICATIONS PLANS
628 OF 693 01ATN402 BLDG 01A -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
629 OF 693 01ATN403 BLDG 01A -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS
630 OF 693 01STN400Ba BLDG 01S -LEVEL 00B -ENLARGED TELECOMMUNICATIONS PLANS 631 OF 693 01STN400Bb BLDG 01S -LEVEL 00B -ENLARGED TELECOMMUNICATIONS PLANS 632 OF 693 01STN400Ga BLDG 01S -LEVEL 00G -ENLARGED TELECOMMUNICATIONS PLANS 633 OF 693 01STN400Gb BLDG 01S -LEVEL 00G -ENLARGED TELECOMMUNICATIONS PLANS 634 OF 693 01STN401a BLDG 01S -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 635 OF 693 01STN401b BLDG 01S -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 636 OF 693 01STN401c BLDG 01S -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 637 OF 693 01STN401d BLDG 01S -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 638 OF 693 01STN402a BLDG 01S -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS 639 OF 693 01STN402b BLDG 01S -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS 640 OF 693 01STN403a BLDG 01S -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS 641 OF 693 01STN403b BLDG 01S -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS 642 OF 693 01STN404a BLDG 01S -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS 643 OF 693 01STN404b BLDG 01S -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS 644 OF 693 01STN405a BLDG 01S -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS 645 OF 693 01STN405b BLDG 01S -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS
646 OF 693 01STN406 BLDG 01S -LEVEL 06 -ENLARGED TELECOMMUNICATIONS PLANS
647 OF 693 01WTN400Ga BLDG 01W -LEVEL 00G -ENLARGED TELECOMMUNICATIONS PLANS 648 OF 693 01WTN400Gb BLDG 01W -LEVEL 00G -ENLARGED TELECOMMUNICATIONS PLANS 649 OF 693 01WTN401a BLDG 01W -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 650 OF 693 01WTN401b BLDG 01W -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 651 OF 693 01WTN402a BLDG 01W -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS 652 OF 693 01WTN402b BLDG 01W -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS 653 OF 693 01WTN403a BLDG 01W -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS 654 OF 693 01WTN403b BLDG 01W -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS
655 OF 693 02TN400B BLDG 02 -LEVEL 00B -ENLARGED TELECOMMUNICATIONS PLANS
656 OF 693 02TN400G BLDG 02 -LEVEL 00G -ENLARGED TELECOMMUNICATIONS PLANS
657 OF 693 03TN401 BLDG 03 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
658 OF 693 04TN400a BLDG 04 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS 659 OF 693 04TN400b BLDG 04 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS
PAGE #
DRAWING INDEX
SHEET # SHEET NAME
660 OF 693 05TN400 BLDG 05 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS
661 OF 693 06TN401 BLDG 06 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
662 OF 693 07TN400 BLDG 07 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS
663 OF 693 08TN400 BLDG 08 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS
664 OF 693 09TN402 BLDG 09 -LEVEL 02 -ENLARGED TELECOMMUNICATION PLANS
665 OF 693 12TN401 BLDG 12 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
666 OF 693 12TN402 BLDG 12 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
667 OF 693 20TN401a BLDG 20 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 668 OF 693 20TN401b BLDG 20 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 669 OF 693 20TN402a BLDG 20 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS 670 OF 693 20TN402b BLDG 20 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS
671 OF 693 23RTN400B BLDG 23R -LEVEL 00B -ENLARGED TELECOMMUNICATIONS PLANS
672 OF 693 23RTN401 BLDG 23R -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
673 OF 693 25TN401 BLDG 25 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLAN
674 OF 693 28TN401 BLDG 28 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
675 OF 693 34TN400 BLDG 34 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS
676 OF 693 TR1TN401a BLDG TR1 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 677 OF 693 TR1TN401b BLDG TR1 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
678 OF 693 TR2TN401 BLDG TR2 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
679 OF 693 TR3TN401 BLDG TR3 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
680 OF 693 TR4TN401 BLDG TR4 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
681 OF 693 TR5TN401 BLDG TR5 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS
682 OF 693 TN501 TELECOMMUNICATIONS DETAILS
683 OF 693 TN502 TELECOMMUNICATIONS DETAILS
684 OF 693 TN503 TELECOMMUNICATIONS DETAILS
685 OF 693 TN504 TELECOMMUNICATIONS DETAILS
686 OF 693 TN505 TELECOMMUNICATIONS DETAILS
687 OF 693 TN506 TELECOMMUNICATIONS DETAILS
688 OF 693 TN507 TELECOMMUNICATIONS DETAILS
689 OF 693 TN508 TELECOMMUNICATIONS DETAILS
690 OF 693 TN509 TELECOMMUNICATIONS DETAILS
691 OF 693 TN510 TELECOMMUNICATIONS DETAILS
692 OF 693 TN601 FIBER RISER DIAGRAM
693 OF 693 TN701 TELECOMMUNICATIONS SCHEDULES
DRAWING INDEX
PAGE #
ABBREVIATIONS
GENERAL NOTES:
1. CONTRACTOR MUST COMPLY WITH ALL LOCAL, STATE AND FEDERAL LAWS PERTINENT TO THE
WORK, AND AS DESCRIBED IN THE SPECIFICATIONS AND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .