S02 - ATT 10 - 581-22-700 - 100 Drawings Part-8 of 24.pdf
PDF 18 MB Posted
- Solicitation number
- 36C77626R0025
About this file
This document is a set of electrical construction plans for the EHRM Infrastructure Upgrades at VA Huntington Medical Center in Huntington, West Virginia. The plans represent 100% Construction Documents dated September 3, 2025, prepared by SPEES Design Build with engineering discipline by Huntington E.H.R.M. and prepared by DCW/NVP and RTS/JNV.
The electrical plans cover multiple buildings (06, 07, 08, 09, 20, 23R, 25, TR1, TR3, TR4, TR5) and include detailed floor-by-floor electrical layouts with power distribution, lighting, emergency systems, and telecommunications infrastructure. Key requirements include: coordination of normal and essential electrical system shutdowns with VA prior to equipment upgrades; provision of backup emergency power to maintain continuity for all existing essential equipment during construction; demolition and removal of electrical equipment and raceways associated with removed walls; sealing of all interior wall and ceiling penetrations to match existing or new fire ratings; provision of updated circuit panel directories for all impacted panels; installation of pull boxes for feeder runs exceeding 250 feet or having more than 270 degrees of total bend; and routing of all raceways above accessible ceilings where present. Specific technical requirements address GFCI receptacles, telecommunications bonding, conduit routing through structural elements, and coordination with mechanical and architectural trades. The facility is fully sprinklered, and all work must conform to VA standards for electrical systems and safety protocols.
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A A
B B
A A
B B
A
B C D E G H I J
OCCUPATIONAL
THERAPY
KITCHEN
ELEC
MECHANINCAL
MECHANICAL
WOMEN
MEN
MULTI PURPOSE
ROOM
STORAGE
CORRIDOR
CORRIDOR
MECH
6013A
CORRIDOR
6009MECH
6009A
SPRINKLER
STAIR
ELEVATOR
6E1
LOBBY
ELEVATOR EQUIP
STAIR
MAIN DISC
ATS-6
06-P-01C
06EP400
06EP400
TO SHEET 06EP401
AREA SHOWN
BLDG 06
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:3
:0 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
.r v t
06EP100
BLDG 06 - LEVEL 00 - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
GENERAL NOTES
1/4" = 1'-0"
BLDG 06 - LEVEL 00 - ELECTRICAL PLAN
ES101
1 2'0 4' 8'
PROJECT
NORTH
TRUE
NORTH
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENTS AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS
WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
UNLESS OTHERWISE NOTED.
Revisions: Date:
KEY PLAN
1 APPROXIMATE FOOTPRINT OF TR 6113 ABOVE. REFERENCE SHEET 06EP401 FOR
ADDITIONAL INFORMATION.
PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG603 FOR
ADDITIONAL INFORMATION.
KEY NOTES
AAAAAAA
B B
A A
B B
A
B C D E G H I J
PANEL L2
ELEVATOR
48 SF
STAFF LOUNGE
154 SF
EDUCATION
THERAPY
195 SF
PSYCHIATRIST
135 SF
SOCIAL 2K
129 SF
PROGRAM MGR
201 SF
SPECIALIST
116 SF
PSYCHOLOGY
172 SF
STAFF TOILET
52 SF
ENG MECH
6208A
32 SF
CORRIDOR
6-1211
69 SF
CORRIDOR
107 SF
STAIR 1
133 SF
STAIR 2
129 SF
CRASH CART
33 SF
LOBBY
433 SF
06-P-04 2
FROM SHEET 06EP401
TO SHEET 06EP103
AREA SHOWN
BLDG 06
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:3
:1 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
.r v t
06EP102
BLDG 06 - LEVEL 02 - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
GENERAL NOTES
1/4" = 1'-0"
BLDG 06 - LEVEL 02 - ELECTRICAL PLAN
ES101
1 2'0 4' 8'
PROJECT
NORTH
TRUE
NORTH
Revisions: Date:
KEY PLAN
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENTS AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS
WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
UNLESS OTHERWISE NOTED.
KEY NOTES
APPROXIMATE FOOTPRINT OF TR 6113 BELOW. REFERENCE SHEET 06EP401 FOR
ADDITIONAL INFORMATION.
CONDUIT ROUTED FROM FLOOR 01 TO FLOOR 3. REFERENCE SHEETS 06EP401 AND
06EP103 FOR ADDITIONAL INFORMATION.
A A
B B
A
B C D E G H I J
PANEL 'LA'
06-CU-01-61131
06-P-04
06-6113A-27
AREA SHOWN
BLDG 06
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:3
:1 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
.r v t
06EP103
BLDG 06 - ATTIC - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
GENERAL NOTES
1/4" = 1'-0"
BLDG 06 - ATTIC - ELECTRICAL PLAN
ES101
1 2'0 4' 8'
PROJECT
NORTH
TRUE
NORTH
EP503
Revisions: Date:
KEY PLAN
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENTS AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS
WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
UNLESS OTHERWISE NOTED.
PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS
REQUIRED PER MANUFACTURER'S INSTRUCTION. REFERENCE MECHANICAL
DRAWINGS AND COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.
PROVIDE SERVICE RECEPTACLE, 20A, 120V, GFCI, HOUSED IN WEATHER RATED DIE
CAST ALUMINUM WHILE-IN-USE COVER.
CONDUIT ROUTED FROM FLOOR 01 TO FLOOR 3. REFERENCE SHEETS 06EP401 AND
06EP102 FOR ADDITIONAL INFORMATION.
B B B B B B B B B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
BB
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
AAAAAAAAAA
A
A
A A
B B
A A
B B
A B C D E F G H
07EP400
07EP400
ELEV EQUIP
W/C STOR
CONFERENCE
OFFICE
SPRINKLER
ELEVATOR
LOBBY
CORRIDOR
CORRIDOR
07-P-03
07EP400
07EP400
07-P-05
07-P-04
TO SHEET 07EP101
CONC COVERED
PORCH
OFFICE
TOILET
HSKP
LOUNGE / CONF
STORAGE
STEAM /MECH
ELEVATOR
E1-7
ELECTRICAL
108 SF
TR
73 SF
AREA SHOWN
BLDG 07
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:1 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
.r v t
07EP100
BLDG 07 - LEVEL 00 - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
GENERAL NOTES
1/4" = 1'-0"
BLDG 07 - LEVEL 00 - ELECTRICAL PLAN
ES101
1 2'0 4' 8'
TRUE
NORTH
PROJECT
NORTH
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENTS AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS
WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
UNLESS OTHERWISE NOTED.
Revisions: Date:
KEY PLAN
KEY NOTES
APPROXIMATE FOOTPRINT OF ROOM "7021" ABOVE. REFERENCE SHEET 07EP101
FOR ADDITIONAL INFORMATION.
PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG603 FOR
ADDITIONAL INFORMATION.
BB
B
B
B
B
B
B
B
B
B
B
B
BB
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A A A A A A A A A A A A A A A
A
A
BB
AAAAAAA
A A
B B
A A
B B
A B C D E F G H
STORAGE
EXAM
TOILET
BARIATRIC EXAM
STAIR 2
DIRTY
CLEAN
INTAKE
TOILET
TOILET
WAITING
RECEPTION
ENTRY
STAIR 1
CORRIDOR
ELEVATOR
CORRIDOR
CORRIDOR
WAITING AREA
7104A
07-CU-01-70041
FROM SHEET 07EP100
TO SHEET 07EP102
07-P-04
07-P-03 07-7004A-17
07-P-05
AREA SHOWN
BLDG 07
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:2 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
.r v t
07EP101
BLDG 07 - LEVEL 01 - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
GENERAL NOTES
1/4" = 1'-0"
BLDG 07 - LEVEL 01 - ELECTRICAL PLAN
ES101
1 2'0 4' 8'
PROJECT
NORTH
TRUE
NORTH
Revisions: Date:
GENERAL NOTES
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENTS AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS
WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
UNLESS OTHERWISE NOTED.
KEY PLAN
PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT
AS REQUIRED PER MANUFACTURER'S INSTRUCTION. REFERENCE MECHANICAL
DRAWINGS AND COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.
PROVIDE SERVICE RECEPTACLE, 20A, 120V, GFCI, HOUSED IN WEATHER RATED
DIE-CAST ALUMINUM WHILE-IN-USE COVER.
APPROXIMATE FOOTPRINT OF ROOM "7008" BELOW. REFERENCE SHEET 07EP100
FOR ADDITIONAL INFORMATION.
APPROXIMATE FOOTPRINT OF ROOM "7213" ABOVE. REFERENCE SHEET 07EP102
FOR ADDITIONAL INFORMATION.
PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG603 FOR
ADDITIONAL INFORMATION.
AA
A A
B B
A A
B B
A B C D E F G H
H-P7-A
MED STORAGE
SECURE MEDS
EXAM
TOILET
EXAM
STAIR 2
E1-13
EXAM
TOILET
EXAM
SOILED HOLDING
CLEAN
STORAGE
ELEVATOR
CORRIDOR
CORRIDOR
STAIR 1
E1-23
CORRIDOR
STAIR 3
E1-25
FROM SHEET 07EP101
TO SHEET 07EP103
07-P-04
07-P-03
AREA SHOWN
BLDG 07
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:2 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
.r v t
07EP102
BLDG 07 - LEVEL 02 - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
GENERAL NOTES
1/4" = 1'-0"
BLDG 07 - LEVEL 02 - ELECTRICAL PLAN
ES101
1 2'0 4' 8'
PROJECT
NORTH
TRUE
NORTH
Revisions: Date:
GENERAL NOTES
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENTS AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS
WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
UNLESS OTHERWISE NOTED.
KEY PLAN
APPROXIMATE FOOTPRINT OF ROOM "7113" BELOW. REFERENCE SHEET 07EP101
FOR ADDITIONAL INFORMATION.
PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG603 FOR
ADDITIONAL INFORMATION.
A A
B B
A B C D E F G H
MECH (TE)
515 SF
EXISTING JCI
EQUIPMENT
PANEL 'H-P7-A'
PANEL 'L-P7-AA'
TX T-7B
EXISTING
JCI PANELS
FROM SHEET 07EP102
TELECOMMUNICATIONS
ENCLOSURE
EP504
EP502
E
E
H 9
07-7004A
07-P-04
07-P-03
07-7004A
07-7004A-10,12
FROM SHEET 07EP102
AREA SHOWN
BLDG 07
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:3 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
.r v t
07EP103
BLDG 07 - LEVEL 03 - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
GENERAL NOTES
1/4" = 1'-0"
BLDG 07 - LEVEL 03 - ELECTRICAL PLAN
ES101
1 2'0 4' 8'
PROJECT
NORTH
TRUE
NORTH
Revisions: Date:
GENERAL NOTES
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENTS AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS
WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
UNLESS OTHERWISE NOTED.
KEY PLAN
PROVIDE 208V, 20A, 1PH, L6-20R RECEPTACLE FOR IN-RACK COOLING UNIT "07-
RCU-01-7300". COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.
PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS
BONDING RISER DIAGRAM(S) FOR ADDITIONAL INFORMATION.
TE POWER RECEPTACLE 120V, 30A, 1PH, L5-30 OUTLET.
PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG603 FOR
ADDITIONAL INFORMATION.
PROVIDE SBC AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG603 FOR
ADDITIONAL INFORMATION.
KEY NOTES
B
AA
BB
AAAAAAAA
A
A
B B B B B B B
B
B
AAAAAAA
A
A
AAAAAAA
AAAAAAA
A A
B B
A A
B B
A C D E F G
PANEL 'L-P8-G-EM'
PANEL 'L-P8-GA'
ENGINEER
ENG TECH
ENG. TECH
MECHANICAL
ROOM
MECHANICAL
TR
SPRINKLER
TOILET
BREAK
CORRIDOR
ENGINEER
CLOSET
PANEL 'H-P8-G'
PANEL '8-EM-LP'
08EP400
08EP400
08-CU-01-8009
B
08-P-05
08-P-03
PRIMARY BONDING
BUSBAR (PBB)
08EP400
08EP400
EP504
08-P-01
STACKING CONTROL
PANELS (X3)
CONTROL PANEL (ABOVE)
XFMR 'T-8A'(BELOW)
PANEL 'L-P8-GB
08-P-02
08-P-04
3TO SHEET 08EP101
AREA SHOWN
BLDG 08
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:0 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
.r v t
08EP100
BLDG 08 - LEVEL 00 - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
1/4" = 1'-0"
BLDG 08 - LEVEL 00 - ELECTRICAL PLAN
ES101
GENERAL NOTES
TRUE
NORTH
PROJECT
NORTH
2'0 4' 8'
Revisions: Date:
KEY PLAN
EXISTING EQUIPMENT SHALL BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON
SHEET 08EP611 FOR ADDITIONAL INFORMATION.
PROVIDE PRIMARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS BONDING
RISER DIAGRAM ON SHEET EG603 FOR ADDITIONAL INFORMATION.
APPROXIMATE FOOTPRINT OF ROOM "8103" ABOVE. REFERENCE SHEET 08EP101
FOR ADDITIONAL INFORMATION.
PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG603 FOR ADDITIONAL
INFORMATION.
PROVIDE TBC AS SHOWN. REFERENCE TELECOM BONDING RISER DIAGRAM ON
SHEET EG603 FOR ADDITIONAL INFORMATION.
PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS
REQUIRED PER MANUFACTURER'S INSTRUCTION. REFERENCE MECHANICAL
DRAWINGS AND COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.
PROVIDE SBC AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG603 FOR ADDITIONAL
INFORMATION.
KEY NOTES
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENTS AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS
WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
UNLESS OTHERWISE NOTED.
B B B B B B B
BBBBBBB
B
B
A
A
A
A A A A A A A
A
A
A
A A
B B
A A
B B
A C D E F G
CHIEF FISCAL
182 SF
FISCAL
148 SF
ENG SECT
139 SF
CHIEF ENGINEER
183 SF
ASST CHIEF
154 SF
COPIER
96 SF
CORRIDOR
138 SF
CORRIDOR
94 SF
CORRIDOR
158 SF
FISCAL
101 SFTOILET
45 SF
TOILET
57 SF
HAC
6 SF
FISCAL
274 SF
B
08-P-01 08-P-04
TO SHEET
08EP102
FROM SHEET
08EP100
AREA SHOWN
BLDG 08
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:1 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
.r v t
08EP101
BLDG 08 - LEVEL 01 - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
1/4" = 1'-0"
BLDG 08 - LEVEL 01 - ELECTRICAL PLAN
ES101
GENERAL NOTES
PROJECT
NORTH
2'0 4' 8'
TRUE
NORTH
Revisions: Date:
KEY PLAN
KEY NOTES
APPROXIMATE FOOTPRINT OF ROOM "8207" ABOVE. REFERENCE SHEET 08EP102 FOR
ADDITIONAL INFORMATION.
PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG603 FOR ADDITIONAL
INFORMATION.
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENTS AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS
WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
A A
B B
A C D E F G
SAFETY MGR
SAFETY TECH
GEMS
I.H.
KITCHEN
TOILET
TOILET
CONFERENCE
HAC
8203 CLOSET
CORRIDOR
ENERGY
ENGINEER
B
08-P-04
08-P-01
EXTEND THROUGH
CLOSET FROM
SHEET 08EP101 TO
SHEET 08EP103
FROM SHEET
08EP101
AREA SHOWN
BLDG 08
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:1 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
.r v t
08EP102
BLDG 08 - LEVEL 02 - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
1/4" = 1'-0"
BLDG 08 - LEVEL 02 - ELECTRICAL PLAN
ES101
GENERAL NOTES
PROJECT
NORTH
2'0 4' 8'
TRUE
NORTH
Revisions: Date:
KEY PLAN
1 CONDUIT ROUTED VERTICALLY TO FLOOR ABOVE. REFERENCE SHEET 08EP103 FOR
ADDITIONAL INFORMATION.
APPROXIMATE FOOTPRINT OF ROOM "XX" ABOVE. REFERENCE SHEET 08EP103 FOR
ADDITIONAL INFORMATION.
PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG603 FOR ADDITIONAL
INFORMATION.
KEY NOTES
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENTS AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS
WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
AAAAA
B B B B
BBBBBBB
EP502
A A
B B
A A
B B
A C D E F G
PANEL 'H-P8-A'
MECHANICAL
SUPPORT
STORAGE
STORAGE
AHU-6AHU-5
MECHANICAL
SUPPORT (TE)
B
08-P-04
08-P-011
TELECOMMUNICATIONS
ENCLOSURE
EP504
E E
08-8009A-10,12
08-8009A-9H
FROM SHEET
08EP102
AREA SHOWN
BLDG 08
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:2 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
.r v t
08EP103
BLDG 08 - LEVEL 03 - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
1/4" = 1'-0"
BLDG 08 - LEVEL 03 ATTIC - ELECTRICAL PLAN
ES101
GENERAL NOTES
PROJECT
NORTH
2'0 4' 8'
TRUE
NORTH
Revisions: Date:
KEY PLAN
PROVIDE SECONDARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS
BONDING RISER DIAGRAM(S) FOR ADDITIONAL INFORMATION.
TE POWER RECEPTACLE. 120V, 30A, 1PH, L5-30 OUTLET.
PROVIDE 208V, 20A, 1PH, L6-20R RECEPTACLE FOR IN-RACK COOLING UNIT "08-
RCU-01-8301". COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.
APPROXIMATE FOOTPRINT OF ROOM "8207" BELOW. REFERENCE SHEET 08EP102 FOR
ADDITIONAL INFORMATION.
PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG603 FOR ADDITIONAL
INFORMATION.
PROVIDE SBC AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG603 FOR ADDITIONAL
INFORMATION.
KEY NOTES
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENTS AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS
WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
UNLESS OTHERWISE NOTED.
B B B B B B
A
A
A
A
A A A A A A
A A A A A A A A
A
A
A
A
A
A
BBBBBBB
BBBBBBB
A A
B B
A A
B B
A B C D E F G H I J K L M O P Q R
MECHANICAL
CCC
833 SF
ELEVATOR PIT
48 SF
DISCONNECT FOR
PORTABLE GENERATOR
TMDPL
T
ATS-2
PANEL 009-MDPH
ATS-1 (BELOW)
FIRE PROTECTION
BBB
09-CU-01-92021
PRIMARY BONDING
BUSBAR (PBB)
EP504
09-9202A-27
09-P-01
09-P-02A
09-P-02C
09-P-03
DISCONNECT 'DE'
XFMR 'TN' (ABOVE)
TRANSFORMER "XFMR-09-9202A"
MECHANICAL DUCT
CONTROL
PANEL
PANEL '009_MDPL
SEC. 2'
HOUSEKEEPING PAD
PANEL '009_MDPL
SEC. 1'
TO SHEET 09EP101
09-P-02B
EP501
ENCLOSED CIRCUIT BREAKER
"ECB-XFMR-09-9202A"
AREA SHOWN
BLDG 09
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:1 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
.r v t
09EP100
BLDG 09 - LEVEL 00 - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
GENERAL NOTES
KEY NOTES
TRUE
NORTH
3/16" = 1'-0"
BLDG 09 - LEVEL 00 - ELECTRICAL PLAN
ES101
1 4'0 8' 12'
PROJECT
NORTH
1 PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS
REQUIRED PER MANUFACTURER'S INSTRUCTION. REFERENCE MECHANICAL
DRAWINGS AND COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.
EXISTING EQUIPMENT SHALL BE MODIFIED. REFERENCE ASSOCIATED BUILDING '09'
ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
PROVIDE PRIMARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS BONDING
RISER DIAGRAM ON SHEET EG603 FOR ADDITIONAL INFORMATION.
PROVIDE TBC AS SHOWN. REFERENCE TELECOM BONDING RISER DIAGRAM ON
SHEET EG603 FOR ADDITIONAL INFORMATION.
PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG603 FOR ADDITIONAL
INFORMATION.
PROVIDE SERVICE RECEPTACLE, 20A, 120V, GFCI, HOUSED IN WEATHER RATED DIE-
CAST ALUMINUM WHILE-IN-USE COVER.
APPROXIMATE FOOTPRINT OF ROOM "9114" ABOVE. REFERENCE SHEET 09EP101
FOR ADDITIONAL INFORMATION.
CONDUIT ROUTED EXTERIOR TO BUILDING FROM FLOOR ABOVE. PROVIDE MOUNTING
HARDWARE AS REQUIRED. REFERENCE SHEET 09EP101 FOR ADDITIONAL
INFORMATION.
Revisions: Date:
KEY PLAN
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL
RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED
SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
2. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS
EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH
ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
2 2 2 2 2
2 2
PB
PB
B B
B
B
B
B
B B B B B B B B B B B B B B B B B B B B B B B B B B B
AAA
A
A
A
A
A
A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A
A
A
A
A
A
A
B
B
B
B
B
A
A
BBBBB
A A
B B
A A
B B
A B C D E F G H I J K L M O P Q R
KITCHEN
SEC. STOR.
SOILED
9105 BATH
ELEVATOR
LOCKED
MEDS
TWO
BEDROOM
BATH
TWO
BEDROOM
BATH
LINEN
CLOSET
ELEC.
ROOM
BATH
BATH
TWO
BEDROOM
STAIR
BATH
TWO
BEDROOM
BATH
TWO
BEDROOM
VESTIBULE
FAMILY
VISITATION
LOBBY
BATH
PRIVATE
BEDROOM
STAIR
CORR.
CORRIDOR
9128LOUNGE
RECREATION
DINING
CORR.
NURSE
STATION
PANEL '1N'
PANEL '1E'
TWO
BEDROOM
ELEV.
MACH.
ROOM
TWO
BEDROOM
TWO
BEDROOM
TWO
BEDROOM
TWO
BEDROOM
LOUNGE
RECREATION
LAUNDRY
09-P-01
09-P-02B
FROM SHEET 09EP100
TO SHEET 09EP402
PB-32
PB-32
09-P-033
AREA SHOWN
BLDG 09
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:5
:1 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
.r v t
09EP101
BLDG 09 - LEVEL 01 - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
3/16" = 1'-0"
BLDG 09 - LEVEL 01 - ELECTRICAL PLAN
ES101
GENERAL NOTES
4'0 8' 12'
PROJECT
NORTH
TRUE
NORTH
KEY NOTES
1 APPROXIMATE FOOTPRINT OF TR "9202" LOCATED ON FLOOR BELOW. FEEDERS
ROUTE VERTICALLY INTO TR ROOM. REFERENCE SHEET 09EP402 FOR ADDITIONAL
INFORMATION.
PROVIDE PULL BOX AND MOUNTING HARDWARE FOR CONDUCTOR PULLING MEANS.
LABEL PULL BOX AS INDICATED. REFERENCE TYPICAL PULL BOX SCHEDULE ON
SHEET EP701 FOR ADDITIONAL INFORMATION.
CONDUIT ROUTED EXTERIOR TO BUILDING FROM FLOOR ABOVE TO FLOOR BELOW.
PROVIDE MOUNTING HARDWARE AS REQUIRED. REFERENCE SHEETS 09EP100 AND
09EP402 FOR ADDITIONAL INFORMATION.
PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG603 FOR ADDITIONAL
INFORMATION.
Revisions: Date:
KEY PLAN
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL
RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED
SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
2. CONTRACTOR SHALL REMOVE ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS
EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH
ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
B
B
B
B
B
B B B B B B
B
B
A A A A
A
A
A
A
A
A
A
AAA
AAAAAAA
AAAAA
A
A
A
A
A
A
A
AAAAAAA
AAAAAAA
A A
B B
A A
B B
ATS-01
TRANSITION PULLBOX FOR
LIFE SAFETY FEEDER
PANEL 'MSB'
PANEL 'SWBD1'
TVSS
20EP401
20EP401
TR
20121
MRT
CODER
20112
MRT
CODER
20111
MRT
CODER
20114
PSA MFH
20115
HBPC
COORD
20116
MECH
20117
MRT
CODER
20113
VENDING
20103
TOILET
ROOM
20104
TOILET
ROOM
20105
132 SF
MRT
CODER
20106
MRT
CODER
20107
20108
MRT
CODER
20109
MRT
CODER
20110
CLOSET
20119
IT CLOSET
20120
MAJOR
ROBERT L.
BIAS
CONFERENCE
ROOM
20122
BREAK
20123
ELECTRICAL
20139EXT
MFH
COORDINATOR
20118A
REC
THERAPIST
20118B
REGISTERED
NURSE /
NURSE
PRACTITIONER
20118
DIETITIAN
20118D
PSYCHOLOGIST
20118C
CORRIDOR
20141
MR
STORAGE
20125
STORAGE
20126
CLEAN
STORAGE
20127
BIO
HAZARD
SOILED
20128
RADIOLOGY
FILE
STORAGE
20129
ELECTRICAL
20130
HAC
20131
TOILET
20132
VOLUNTARY
SERVICE
DAV
SUPPORT
20133
20134
20135
20136
VESTIBULE
20144
WORKERS
COMP FILE
STORAGE
20137
CORRIDOR
20143
FILE
STORAGE
ROOM
(MAS &
HIMS)
20124
SPRINKLER
ROOM
20138EXT
LOBBY
20101
DINING/
BREAK
ROOM
20102
ENTRY
VESTIBULE
20100
CORRIDOR
20140
CORRIDOR
20138
STAIRS
20184
A B C D
E F G H I
PANEL 'SBE1'
GENERATOR
20-P-03
20-P-01
20-P-02
20-P-04
2PRIMARY BONDING
BUSBAR (PBB)EP504
20EP401
20EP401
4 20-P-05
TO SHEET 20EP402
TO SHEET 20EP402
PANEL
'DMM'
AREA SHOWN
BLDG 20
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:0
:0 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
.r v t
20EP101
BLDG 20 - LEVEL 01 - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
GENERAL NOTES
KEY NOTES
1/8" = 1'-0"
BLDG 20 - LEVEL 01 - ELECTRICAL PLAN
ES101
1 4'0 8' 16'
TRUE
NORTH
PROJECT
NORTH
1 EXISTING EQUIPMENT SHALL BE MODIFIED. UTILIZE EXISTING SPACE(S) TO PROVIDE
CIRCUIT BREAKERS TO SERVE ADDED LOAD. REFERENCE ASSOCIATED BUILDING '20'
ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
PROVIDE PRIMARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS
BONDING RISER DIAGRAM ON SHEET EG603 FOR ADDITIONAL INFORMATION.
APPROXIMATE FOOTPRINT OF TR "20211A" LOCATED ON FLOOR ABOVE. FEEDERS
ROUTE VERTICALLY INTO TR ROOM. REFERENCE SHEET 20EP402 FOR ADDITIONAL
INFORMATION.
PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE