S06 - Amendment 0008 - ATT 3 - Civil OSP Redesign-signed.pdf

PDF 8 MB Posted

Attached to
EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades Federal contract opportunity
Solicitation number
36C77626R0025
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

VA Huntington EHRM Infrastructure Upgrades – Civil and Fiber Optic Utility Plans

This document comprises civil engineering and fiber optic outside plant utility construction drawings for the EHRM Infrastructure Upgrades project at the VA Huntington facility located at 1540 Spring Valley Drive, Huntington, West Virginia. The drawings are 100% construction documents issued September 3, 2025, with an addendum addressing pre-bid RFIs dated April 13, 2026. The project involves installation of a dual-sided fiber optic network (Side A and Side B) with 24 strands of OS2 fiber per transmission route serving multiple medical and non-medical buildings across the campus.

The scope includes fiber duct bank trenching throughout the facility, with two primary duct bank types specified (Type 1 and Type 2 per detail sheets CU500). Contractor responsibilities include conducting ground penetrating radar surveys to locate existing utilities, performing exploratory excavation with hand tools, obtaining approvals from the Contracting Officer before commencing work, and coordinating with campus maintenance staff. Underground handholes are proposed at multiple locations along the fiber pathways. The work requires phased implementation to minimize operational disruption, with parking lot trenching limited to 150 linear feet of exposed excavation at a time, maintenance of minimum driveway access, and road crossings completed during night or weekend hours only. All existing wire and fiber must be removed from existing ductbanks after the new system becomes operational, with existing structures and pathways retained for future VA use. The project references VA standards including Specification 26 05 41 and the VA Design Guide for duct bank construction.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades, newest first.
File Type Posted
S06 - 36C77626R0025 0008.pdf PDF
S06 - Amendment 0008 - ATT 7 - 02EP100B - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 8 - 260508 - Sheet 01S-AE452 TR Tower 4 Wall sections update.pdf PDF
S06 - Amendment 0008 - ATT 12 - Environmental Report Huntington WV.pdf PDF
S06 - Amendment 0008 - ATT 13 - Hot Tapping Permit.pdf PDF
S06 - Amendment 0008 - ATT 1 - TechQuestionsVAresponses Final Set - Huntington EHRM IU.pdf PDF
S06 - Amendment 0008 - ATT 10 - 260508 - Sheet AD103-1B Data Center Phase 1B Demo Roof update.pdf PDF
S06 - Amendment 0008 - ATT 11 - Burn Permit.pdf PDF
S06 - Amendment 0008 - ATT 14 - Energized Electrical Work Permit.pdf PDF
S06 - Amendment 0008 - ATT 4 - Structural Set 04-21-2026.pdf PDF
S06 - 36C77626R0025 0007.pdf PDF
S06 - Amendment 0007 - ATT 1 - TechQuestionsVAresponses Partial 4 - Huntington EHRM IU.pdf PDF
S06 - Amendment 0007 - ATT 5 - Appendix A - PFC FPT.pdf PDF
S06 - 36C77626R0025 0006.pdf PDF
S06 - Amendment 0006 - ATT 1 - TechQuestionsVAresponses Partial 3 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0005.pdf PDF
S06 - Amendment 0004 - ATT 2 - FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
S06 - Amendment 0004 - ATT 1 - TechQuestionsVAresponses Partial 2 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0004.pdf PDF
S06 - Amendment 0003 - ATT 2 - TechQuestionsVAresponses Partial - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0003.pdf PDF
S06 - 36C77626R0025 0002.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit In-Sheet - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0001.pdf PDF
S02 - ATT 10 - 581-22-700 - 100 Drawings Part-8 of 24.pdf PDF
S02 - ATT 14 - 581-22-700 - 100 Drawings Part-12 of 24.pdf PDF
S02 - ATT 27 - 581-22-700 - Asbestos locations.xlsx XLSX spreadsheet
S02 - ATT 28 - 581-22-700 - FLS Compliance Letter.pdf PDF
S02 - 36C77626R0025.pdf PDF
S02 - ATT 1 - 581-22-700 - 100 Specifications Part-1 of 2.pdf PDF
S02 - ATT 2 - 581-22-700 - 100 Specifications Part-2 of 2.pdf PDF
S02 - ATT 9 - 581-22-700 - 100 Drawings Part-7 of 24.pdf PDF
S02 - ATT 11 - 581-22-700 - 100 Drawings Part-9 of 24.pdf PDF
S02 - ATT 15 - 581-22-700 - 100 Drawings Part-13 of 24.pdf PDF
S02 - ATT 18 - 581-22-700 - 100 Drawings Part-16 of 24.pdf PDF
S02 - ATT 20 - 581-22-700 - 100 Drawings Part-18 of 24.pdf PDF
S02 - ATT 23 - 581-22-700 - 100 Drawings Part-21 of 24.pdf PDF
S02 - ATT 24 - 581-22-700 - 100 Drawings Part-22 of 24.pdf PDF
S02 - ATT 30 - 581-22-700 - 100 Commissioning Plan.pdf PDF
S02 - ATT 3 - 581-22-700 - 100 Drawings Part-1 of 24.pdf PDF
S02 - ATT 4 - 581-22-700 - 100 Drawings Part-2 of 24.pdf PDF
S02 - ATT 5 - 581-22-700 - 100 Drawings Part-3 of 24.pdf PDF
S02 - ATT 6 - 581-22-700 - 100 Drawings Part-4 of 24.pdf PDF
S02 - ATT 7 - 581-22-700 - 100 Drawings Part-5 of 24.pdf PDF
S02 - ATT 17 - 581-22-700 - 100 Drawings Part-15 of 24.pdf PDF
S02 - ATT 19 - 581-22-700 - 100 Drawings Part-17 of 24.pdf PDF
S02 - ATT 22 - 581-22-700 - 100 Drawings Part-20 of 24.pdf PDF
S02 - ATT 26 - 581-22-700 - 100 Drawings Part-24 of 24.pdf PDF
S02 - ATT 33 - WD - WV20260048 - 01-02-2026.pdf PDF
S02 - ATT 35 - Site Visit Information - Huntington EHRM IU.pdf PDF
Show all 50

EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WAYNE COUNTY BOARD OF EDUCATION

VA PROPERTY

CITY OF HUNTINGTON,

SPRING VALLEY DRIVE

EL

PW

S

SN

SN

EL

ST

ST

SN

SD

PW

ST

ST

SN

SD

SD

SD

SD

SN

SN

SN

SN

ST

SD

ST

SG

SD

SN

ST

SN

SNSDSD

SN

SG

SD

SD

SD

SG

ST

SS

S

SD

SD

SD

SD

SD

SN

PW

PW

SD

SD

PW

SD

SN

SN

SN

SN

SN

SN SN

SN

SN

SN

ST

ST

SN

ST

ST

ST

SN

ST

ST

ST

ST

ST CB

F F

S

SN

SN

SDDI

DI

DI

DI

DI

ST

ST

ST

DI

ST

DI

DI

DI

DI

DI

DI

DI

DI

DI

DI

DI

ST

DI

DI

DI

DI

W

G

E

E E

E

F

S

SN

SG

PW

SG

PW

PW

PW

SG

PW

PW

PW

PW

PW

PW

PW

PW

EE

EE

EE

W

SN

SN

SN

DI

DI

SN

DI

ST

DI

SD

WW

W

W

SA

N

SAN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

E

EFO

FO

E

E

E

E

E

E

E

SN

ST

PW

W

PW

E

E

PW

SD

SD

ST

M

E

E

DI

SD

SD

SD

SD

DI

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

ST

SN

ST

SN

SN

ST

SD

SN

S

S

S

ST

SD

SD

SD

DI

SD

E

GREATER PARKS & RECREATION

ST

ST

ST

DI

SN SN

DI

DI

DI

DI

SD

SD

SD

SD

SD

E

E

PW

EL

W

W

W

W W

W

WC

O

M M

C O

M M

C O

M M

C O

M M

C O

M M

COMM

PFC ERNIE E W DR

HONOR HL RD

H O

N O

R H

L R

D

H O

N O

R H

L R

D

COURAGE DR

COURAGE DR

HONOR HL RD

HO

NO

R

HL

R D

O

AK

L N

BU

EN

A VISTA D

R

OAK LN

OAK LN

VI

ST

A

CR

ES

T

DR

SPRING VALLEY DR

DI

ST

ST ST

S

SN

E

T

E T

E T

T

PARKING GARAGE

BLDG 25

AMBL.

ENT.

AMBL.

ENT.

BLDG 42

DECON

UNIT

BLDG 20

F.F.E.: 646.14

BLDG. 51

BLDG. 52

18 UG

RSVR

E-85

BLDG 19 BLDG 21

BLDG 16

BLDG 23BLDG 12

BLDG 23R

BLDG 26

BLDG 34

BLDG 1S

BLDG 2

BL

D

G

BLDG 17

BLDG 1BLDG 1W

T-1T-2

BLDG 4

SHELTER

BLDG 1A

PARKING GARAGE

BLD

G. 9

BLDG 8

BLD

G 7

BLD

G

BLDG 5

BL

DG

T

BL

DG

BL

DG

T

BLDG 29

BLDG T5

BLDG 28

TR 1

TR 2

C(A

C(A

C(A)

TR 3

TR 4

C( B)

MCR

C(B

C (A)

C(A)

TR

C(B)

C(B)

C(A)

C(A)

C(B)

C(B)

C (B

C (B

C (A

C (A

C (B)

C (B)

C(B)

C(B)

C (A)

C (A)

C(A)

C(A)

C(A)

C(A)

C(B)

C (B

C

(B

C(A

C (A

C

(A

1" = 150' scale feet

3001500150

La st

S av ed b y:

U

SR

M o n:

M ay

1, 3:

P M

F ile : C

:\U se rs \U

SR

M

\W

SP

O

5\

Fe de ra l G ro up

Jo bs \3

8\

7\

C

AD

D \O

SP

R ed es ig n\

D w gs \V

A H un tin gt on

C iv il.

dw g

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

Revisions: Date:

A/E:CIVIL ENGINEER:

SPEES DESIGN BUILD

WSP USA Solutions Inc.

1201 Pacific Avenue Suite 550 Tacoma, WA 98402

TEL: (206) 431-2300

FAX: (206) 431-2250

VA HUNTINGTON

23830 PACIFIC HIGHWAY S, STE 300

KENT, WA 98032

(206) 209-2246

BUILDING TYPES

NON-MEDICAL BUILDINGS MEDICAL BUILDINGS

2 (2 TRs) 1 & 1A (TRs fed from 1S) 3 (1 TR) 1S (12 TRs) 4 (1 TR) 1W (4 TRs)

25 (1 TR) 5 (1 TR)

28 (1 TR) 6 (1 TR)

34 (1 TE) 7 (2 TR)

T-1 (1 TR) 8 (2 TRs)

T-2 (fed from T-2) 9 (1 TR) T-3 (1 TR) 12 (fed from 1S) T-4 (1 TR) 20 (2 TRs)

T-5 (1 TR) 23 & 23R (1 TR)

NOTE: 24 STRANDS OS2 PER TR EACH FOR A & B SIDE FIBER

FIBER DUCT BANK TRENCHING NOTES:

1. THE CONTRACTOR IS ADVISED THAT ALL EXISTING UNDERGROUND UTILITIES, CABLES, DUCTS, MANHOLES, ETC. (UNDERGROUND FACILITIES) SHOWN ON PLANS WERE SHOWN USING THE BEST

INFORMATION AVAILABLE. INFORMATION SHOWN ON THE DRAWING CONCERNING TYPE, SIZE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL-INCLUSIVE, AND IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THE CONTRACTOR IS SOLELY

RESPONSIBLE FOR LOCATING AND PROTECTING ALL UTILITIES. CONTRACTOR MUST ALSO REVIEW

ALL UTILITIES WITH THE CAMPUS MAINTENANCE STAFF PRIOR TO BEGINNING WORK.

2. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR MUST HAVE

A GROUND PENETRATING RADAR (GPR) SURVEY CAREFULLY PERFORMED BY A CERTIFIED

TECHNICIAN TO REVEAL ALL EXISTING UNDERGROUND DUCTS, CONDUITS, CABLES, AND OTHER

UTILITY SYSTEMS ALONG THE PROPOSED FIBER DUCT BANK ROUTE.

3. EXPLORATORY EXCAVATIONS IN THE VICINITY OF EXISTING UNDERGROUND UTILITIES MUST BE

CARRIED OUT WITH EXTREME CARE USING HAND TOOLS UNTIL THE EXACT CHARACTER AND

LOCATION OF SUCH FACILITIES ARE DETERMINED.

4. THE CONTRACTOR MUST SUBMIT ALL INFORMATION OBTAINED FROM THE GPR UTILITY LOCATION

SURVEY AND POTHOLING EFFORTS TO THE CONTRACTING OFFICER AND/OR CONTRACTING

OFFICER'S REPRESENTATIVE AND THE A/E PRIOR TO STARTING CONSTRUCTION. CONTRACTOR

MUST RECEIVE APPROVAL FROM CONTRACTING OFFICE PRIOR TO STARTING ANY TRENCHING.

5. THE CONTRACTOR MUST REFER TO COR AND/OR PREVIOUS GEOTECHNICAL REPORTS FOR THIS

SITE FOR ALL DEWATERING AND EXCAVATION REQUIREMENTS.

6. CONTRACTOR MUST PERFORM ALL DUCT BANK TRENCHING IN ACCORDANCE WITH VA STANDARDS.

REFER TO STANDARD SPECIFICATION 26 05 41 AND VA DESIGN GUIDE FOR ADDITIONAL

INFORMATION.

7. THE CONTRACTOR MUST REFER TO BUILDING TELECOMM SHEETS FOR DETAIL AND LOCATION OF

BUILDING CONNECTIONS AND INTERIOR ROUTES.

8. THE CONTRACTOR MUST REMOVE ALL EXISTING WIRE AND FIBER FROM EXISTING DUCTBANKS AFTER THE NEW FIBER SYSTEM IS OPERATIONAL. THE EXISTING STRUCTURES AND PATHWAYS ARE TO BE LEFT IN PLACE FOR FUTURE USE BY THE VA. THE NEW A-SIDE FIBER WILL NOT BE GOING

INTO THE EXISTING DUCTBANK.

9. FOR CONTINUATION OF ALL CONDUITS AND FIBER ROUTING WITHIN BUILDINGS, REFER TO

TELECOMMUNICATIONS DOCUMENTS, TYPICAL.

10. ALL PARKING LOT TRENCHING TO BE PHASED TO MINIMIZE DISTURBANCE OF NORMAL

OPERATIONS TO THE EXTENT FEASIBLE. CONTRACTOR TO PHASE THE DUCTBANK TRENCHING

TO 150 LINEAR FEET EXPOSED EXCAVATION AT A TIME. CONTRACTOR TO MAINTAIN A MINIMUM

OF ONE DRIVEWAY OPEN AT ALL TIMES FOR PARKING LOT ACCESS. CONTRACTOR TO

COORDINATE PARKING LOT WORK WITH COR PRIOR TO CONSTRUCTION.

11. ALL ROAD CROSSINGS TO BE COMPLETED ON NIGHTS OR WEEKENDS. CONTRACTOR TO

MAINTAIN AT LEAST ONE LANE OPEN AT ALL TIMES FOR EMERGENCY VEHICLE ACCESS.

CONTRACTOR TO COORDINATE ROAD CROSSING WORK WITH COR PRIOR TO CONSTRUCTION.

B-T-2 WILL BE FED OVERHEAD

FROM B-T-1. CONTRACTOR

TO INSTALL CONDUITS

BETWEEN BUILDINGS. SEE

COMMUNICATIONS PLANS

FOR DETAILS.

CONTRACTOR TO KEEP

WORK AREA SOUTH OF

SIDEWALK AND AWAY FROM

EXISTING WATER TOWER

APPROXIMATE INTERIOR

ROUTE FOR FIBER TO

NEW MCR THROUGH

CRAWLSPACE THROUGH

BUILDINGS 1, 1A, AND 12

PB RDM

OVERALL CIVIL SITE PLAN

CS100

100% CONSTRUCTION

DOCUMENTS

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

581-22-700

09/03/2025 Addendum 1: Pre Bid RFIs 4/13/2026

PARKING LOT DUCTBANK,

SEE NOTE 10

ROAD CROSSING,

SEE NOTE 11

WAYNE COUNTY BOARD OF EDUCATION

VA PROPERTY

CITY OF HUNTINGTON,

SPRING VALLEY DRIVE

EL

PW

S

SN

SN

EL

ST

ST

SN

SD

PW

ST

ST

SN

SD

SD

SD

SD

SN

SN

SN

SN

ST

SD

ST

SG

SD

SN

ST

SN

SNSDSD

SN

SG

SD

SD

SD

SG

ST

SS

S

SD

SD

SD

SD

SD

SN

PW

PW

SD

SD

PW

SD

SN

SN

SN

SN

SN

SN SN

SN

SN

SN

ST

ST

SN

ST

ST

ST

SN

ST

ST

ST

ST

ST CB

F F

S

SN

SN

SDDI

DI

DI

DI

DI

ST

ST

ST

DI

ST

DI

DI

DI

DI

DI

DI

DI

DI

DI

DI

DI

ST

DI

DI

DI

DI

W

G

E

E E

E

F

S

SN

SG

PW

SG

PW

PW

PW

SG

PW

PW

PW

PW

PW

PW

PW

PW

EE

EE

EE

W

SN

SN

SN

DI

DI

SN

DI

ST

DI

SD

WW

W

W

SA

N

SAN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

E

EFO

FO

E

E

E

E

E

E

E

SN

ST

PW

W

PW

E

E

PW

SD

SD

ST

M

E

E

DI

SD

SD

SD

SD

DI

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

ST

SN

ST

SN

SN

ST

SD

SN

S

S

S

ST

SD

SD

SD

DI

SD

E

GREATER PARKS & RECREATION

ST

ST

ST

DI

SN SN

DI

DI

DI

DI

SD

SD

SD

SD

SD

E

E

PW

EL

W

W

W

W W

W

WC

O

M M

C O

M M

C O

M M

C O

M M

C O

M M

COMM

PFC ERNIE E W DR

HONOR HL RD

H O

N O

R H

L R

D

H O

N O

R H

L R

D

COURAGE DR

COURAGE DR

HONOR HL RD

HO

NO

R

HL

R D

O

AK

L N

BU

EN

A VISTA D

R

OAK LN

OAK LN

VI

ST

A

CR

ES

T

DR

SPRING VALLEY DR

DI

ST

ST ST

S

SN

E

T

E T

E T

T

PARKING GARAGE

BLDG 25

AMBL.

ENT.

AMBL.

ENT.

BLDG 42

DECON

UNIT

BLDG 20

F.F.E.: 646.14

BLDG. 51

BLDG. 52

18 UG

RSVR

E-85

BLDG 19 BLDG 21

BLDG 16

BLDG 23BLDG 12

BLDG 23R

BLDG 26

BLDG 34

BLDG 1S

BLDG 2

BL

D

G

BLDG 17

BLDG 1BLDG 1W

T-1T-2

BLDG 4

SHELTER

BLDG 1A

PARKING GARAGE

BLD

G. 9

BLDG 8

BLD

G 7

BLD

G

BLDG 5

BL

DG

T

BL

DG

BL

DG

T

BLDG 29

BLDG T5

BLDG 28

TR 1

TR 2

C(A

C(A

C(A)

TR 3

TR 4

C( B)

MCR

C(B

C (A)

C(A)

TR

C(B)

C(B)

C(A)

C(A)

C(B)

C(B)

C (B

C (B

C (A

C (A

C (B)

C (B)

C(B)

C(B)

C (A)

C (A)

C(A)

C(A)

C(A)

C(A)

C(B)

C (B

C

(B

C(A

C (A

C

(A

CU301

CU302

CU303

CU304

CU305

La st

S av ed b y:

U

SR

M o n:

M ay

1, 3:

: C

:\U se rs \U

SR

M

\W

SP

O

5\

Fe de ra l G ro up

Jo bs \3

8\

7\

C

AD

D \O

SP

R ed es ig n\

D w gs \V

A H un tin gt on

C iv il.

dw g

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

Revisions: Date:

A/E:CIVIL ENGINEER:

SPEES DESIGN BUILD

WSP USA Solutions Inc.

1201 Pacific Avenue Suite 550 Tacoma, WA 98402

TEL: (206) 431-2300

FAX: (206) 431-2250

VA HUNTINGTON

23830 PACIFIC HIGHWAY S, STE 300

KENT, WA 98032

(206) 209-2246

CU306

CU307

1" = 150' scale feet

3001500150

PB RDM

OVERALL FIBER OPTIC OUTSIDE

PLANT UTILITY PLAN

CU300

100% CONSTRUCTION

DOCUMENTS

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

581-22-700

09/03/2025 Addendum 1: Pre Bid RFIs 4/13/2026

SD

E

E

E

SD

SD

SA

N

SA

N

SAN

SAN

SN

SN

E

E

E

SN

ST

PW

SD

X

SD

SD

SD

SD

SD

SD

SD

SD

SD

SN

SAN

SAN

SAN

SAN

SAN

SD

SD

SD

SD

ST

SAN

SAN

SAN

SN

X X

X

X

X

X

X

X

X

X SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SAN

SAN SAN

SAN SAN SAN

W

W

W

W

W

W

W

W

W

F

F

F

F

F

F

F

SD

E

E

E

E

E

W

W

W

W

W

W

W

W

F

F

F

W

W

E

E

E

E

E

E

E

E

E

E

GREATER PARKS & RECREATION

SN SN

DI

DI

DI

X

X

X

X

X

X

X

X

X X

XSD

SD

SD

E

E

E

G

G

G

G

G

G

G

G

G

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

C O

M M

BLDG 20

F.F.E.: 646.14

E-85

BLDG 19

C(B) C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C (A)

C (A)

C (A)

C (A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(B)

C(B)

C(B)

C(A)

La st

S av ed b y:

U

SR

M o n:

M ay

1, 3:

: C

:\U se rs \U

SR

M

\W

SP

O

5\

Fe de ra l G ro up

Jo bs \3

8\

7\

C

AD

D \O

SP

R ed es ig n\

D w gs \V

A H un tin gt on

C iv il.

dw g

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

Revisions: Date:

A/E:CIVIL ENGINEER:

SPEES DESIGN BUILD

WSP USA Solutions Inc.

1201 Pacific Avenue Suite 550 Tacoma, WA 98402

TEL: (206) 431-2300

FAX: (206) 431-2250

VA HUNTINGTON

23830 PACIFIC HIGHWAY S, STE 300

KENT, WA 98032

(206) 209-2246

1" = 20' scale feet

4020020

C(A)

C(B)

LEGEND

PROPOSED SIDE A FIBER PATHWAY

PROPOSED SIDE A UNDERGROUND HANDHOLE

PROPOSED SIDE B FIBER PATHWAY

PROPOSED SIDE B UNDERGROUND HANDHOLE

KEYMAP

NOT TO SCALE

SITE KEYNOTES#

TYPE 1 DUCT BANK PER DETAIL F3 ON SHEET CU5001

2 TYPE 2 DUCT BANK PER DETAIL F6 ON SHEET CU500

PB RDM

FIBER OPTIC OUTSIDE PLANT

UTILITY PLAN

CU301

100% CONSTRUCTION

DOCUMENTS

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

581-22-700

SS

S

TV

C O

M M

TV

E

TV

SD

SD

SD

SD

E

E

EE

E

E

EE

SN

SAN

SAN

SAN

SA

N

SN

SN

SA

N

SA

N

SN

SAN

SN

SN

SN

SAN SAN SAN SAN

SD

ST SAN SAN

SD

ST

SD SD SD SD SD

S

SD

SD

SD

SD

E

E

E

E

E

E

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

EE

PW

SG

SD

SAN

SAN

SAN

E

E E E

E E E

E

E

E

E

E

E

E

E E

E

E

FO

FO

FO

FO

FO

E

TV

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

SN

ST

W

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

SD

FO

FO

FO

FO

FO

FO

FO

E

E

E

E

E

E

S

E

E

E

E

E

E

E

E

E

F

F

F

F

F

F

SD

SD

SD

W

W

CP

CP

E

E

ST

ST

SD

SD

SD

SD

SD

SD

E

E

E E

E

W

W

W

W

W

W

W

W

W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

WW

W

COMM

SD

ST

S

SAN

SA

N

SN

E E

E E

E E E

T

E T

E E

FO FO

BLDG. 9

BLDG 8

BLDG 7

BLDG 6

BLDG 5

C(A

C(A

C(A

C(A

C(A

C(A

C(A

C(A

C(A

C(B)

C(B)

C(B) C(B)

C(B)

C (B

C (B)

C (B)

C (B)

C (A

C

(A

C (A

C

(A

C (A

C(A)

C(A)

C (A)

C(B

C(B

C(B

C(B

C(B

C(B

C(B

C(B

C(B

C(B

C(B

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(B)

C(B

C (B

C (B

C (B

C(B) C(B)

C (B

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(A)

C(A)

C(A)

C (A

C

(A

C (A

C

(A

C (A

C(B)

C(B)

C(B)

MATCHLINE SEE SHEET CU303

M

AT

C H

LI

N

E

SE

E

SH

EE

T

C U

La st

S av ed b y:

U

SR

M o n:

M ay

1, 3:

: C

:\U se rs \U

SR

M

\W

SP

O

5\

Fe de ra l G ro up

Jo bs \3

8\

7\

C

AD

D \O

SP

R ed es ig n\

D w gs \V

A H un tin gt on

C iv il.

dw g

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

Revisions: Date:

A/E:CIVIL ENGINEER:

SPEES DESIGN BUILD

WSP USA Solutions Inc.

1201 Pacific Avenue Suite 550 Tacoma, WA 98402

TEL: (206) 431-2300

FAX: (206) 431-2250

VA HUNTINGTON

23830 PACIFIC HIGHWAY S, STE 300

KENT, WA 98032

(206) 209-2246

M

AT

C H

LI

N

E

SE

E

SH

EE

T

C U

1" = 20' scale feet

4020020

C(A)

C(B)

LEGEND

PROPOSED SIDE A FIBER PATHWAY

PROPOSED SIDE A UNDERGROUND HANDHOLE

PROPOSED SIDE B FIBER PATHWAY

PROPOSED SIDE B UNDERGROUND HANDHOLE

KEYMAP

NOT TO SCALE

SITE KEYNOTES#

TYPE 1 DUCT BANK PER DETAIL F3 ON SHEET CU5001

2 TYPE 2 DUCT BANK PER DETAIL F6 ON SHEET CU500

PB RDM

FIBER OPTIC OUTSIDE PLANT

UTILITY PLAN

CU302

100% CONSTRUCTION

DOCUMENTS

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

581-22-700

09/03/2025

E

C O

M M

C O

M M

C O

M M

C O

M M

CO

M

M

CO

M

M

CO

M

M

E

E

E

SN

SN

SAN

SD

E

E

E

E

SD

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SN

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

FO

E

E

E

E

E

E

E

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

SD

E

E

E

E

E E

E E

S E

E

E

E

SD

E

E

E

E

E E E E

E

E

E

E

E

E

ST

SD

SD

SD

E

E

E

E

E

E

E

E

E

E

W W

W

W

W

W

W W

W

HO

NO

R

HL

R D

BL

DG

T

BL

DG

BL

DG

T

BLDG 29

BLDG T5

C (A)

C (A)

C(A)

C(A)

C(A

C(A

C(A

C(A

C(A

C(A

C(A

C(A

C(A

C(A

C(A)

C(A)

C(B

C(B

C(B

C( B)

C( B)

C(B

C(B

C(A)

C(A)

C( A)

C( A)

C( B)

C( B)

C( B)

C( B)

C( B)

C( B)

C( B)

C( A)

C( A)

C( A)

C( B)

C( B)

C( A)

C( A)

C(A)

C(A)

C(A)

MATCHLINE SEE SHEET CU302

M

AT

C H

LI

N

E

SE

E

SH

EE

T

C U

La st

S av ed b y:

U

SR

M o n:

M ay

1, 3:

: C

:\U se rs \U

SR

M

\W

SP

O

5\

Fe de ra l G ro up

Jo bs \3

8\

7\

C

AD

D \O

SP

R ed es ig n\

D w gs \V

A H un tin gt on

C iv il.

dw g

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

Revisions: Date:

A/E:CIVIL ENGINEER:

SPEES DESIGN BUILD

WSP USA Solutions Inc.

1201 Pacific Avenue Suite 550 Tacoma, WA 98402

TEL: (206) 431-2300

FAX: (206) 431-2250

VA HUNTINGTON

23830 PACIFIC HIGHWAY S, STE 300

KENT, WA 98032

(206) 209-2246

1" = 20' scale feet

4020020

C(A)

C(B)

LEGEND

PROPOSED SIDE A FIBER PATHWAY

PROPOSED SIDE A UNDERGROUND HANDHOLE

PROPOSED SIDE B FIBER PATHWAY

PROPOSED SIDE B UNDERGROUND HANDHOLE

KEYMAP

NOT TO SCALE

2 1

SITE KEYNOTES#

TYPE 1 DUCT BANK PER DETAIL F3 ON SHEET CU5001

2 TYPE 2 DUCT BANK PER DETAIL F6 ON SHEET CU500

PB RDM

FIBER OPTIC OUTSIDE PLANT

UTILITY PLAN

CU303

100% CONSTRUCTION

DOCUMENTS

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

581-22-700

09/03/2025 Addendum 1: Pre Bid RFIs 4/13/2026

S

EL

ST

ST

ST

SN

SNSDSD

SN

SG

SD

SD

SD

SD

SG

E

E

E

E

E

W

W

W

W

W

PW

E

E

E

E

E

E

E

SN

SAN

SAN

SAN

SD

SD

E

E

SD

SD

SD

SD

SD

SD

SD

SD

SD

DI

SD

DI

DI

SD

S

TV

TV

TV

TV

TV

TV

PW

E

E

E

DI

SD

SD

CP

DI

E

COMM

C O

M M

DI

SD

SD

ST

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN SAN SAN

SAN

SN

SN

SN

SN

SN

E E

E E

PW

E

E

E

E

E

E

E

E

E

E

E E

E

EE

E

E

X

X

X X

X X

X X

SAN

SAN

SN

E

E

E E

E

S

SD

SD

SA

N

SA

N

SA

N

SAN

SD

E

E

E

E

E

E E

E

E

E E

SAN

SAN

SAN

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

COMM

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

HONOR HL RD

COURAGE DR

E E E E E

E

E

T

BLDG 1

BLDG 1W

T-1T-2

BLDG 4

SHELTER

C(A)

C(A)

C(A)

C(A) C(A) C(A)

C(A) C(A)

C(A)

TR

C (B)

C (B)

C (B)

C(B)

C(B)

C (B)

C(B)

C(B)

C(B)

C(B)

C(B)

C( B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B) C(B)

C(B)

C(B)

C(B)

C(B) C(B)

C(B) C(B)

C(B) C(B)

C(B)

C(A) C(A)

C(A) C(A)

C (A)

C (A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A) C(A) C(A)

C (A)

C (A)

C(A) C(A) C(A) C(A) C(A) C(A)

C(A)

C(A)

C(A

C(A

C(A

C(A

C(A

C(A

C(A

C(A

MATCHLINE SEE SHEET CU305

La st

S av ed b y:

U

SR

M o n:

M ay

1, 3:

: C

:\U se rs \U

SR

M

\W

SP

O

5\

Fe de ra l G ro up

Jo bs \3

8\

7\

C

AD

D \O

SP

R ed es ig n\

D w gs \V

A H un tin gt on

C iv il.

dw g

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

Revisions: Date:

A/E:CIVIL ENGINEER:

SPEES DESIGN BUILD

WSP USA Solutions Inc.

1201 Pacific Avenue Suite 550 Tacoma, WA 98402

TEL: (206) 431-2300

FAX: (206) 431-2250

VA HUNTINGTON

23830 PACIFIC HIGHWAY S, STE 300

KENT, WA 98032

(206) 209-2246

M

AT

C H

LI

N

E

SE

E

SH

EE

T

C U

1" = 20' scale feet

4020020

C(A)

C(B)

LEGEND

PROPOSED SIDE A FIBER PATHWAY

PROPOSED SIDE A UNDERGROUND HANDHOLE

PROPOSED SIDE B FIBER PATHWAY

PROPOSED SIDE B UNDERGROUND HANDHOLE

M

AT

C H

LI

N

E

SE

E

SH

EE

T

C U

KEYMAP

NOT TO SCALE

MATCH EXISTING GRADE AROUND

PROPOSED TR ADDITION

SITE KEYNOTES#

TYPE 1 DUCT BANK PER DETAIL F3 ON SHEET CU5001

2 TYPE 2 DUCT BANK PER DETAIL F6 ON SHEET CU500

PB RDM

FIBER OPTIC OUTSIDE PLANT

UTILITY PLAN

CU304

100% CONSTRUCTION

DOCUMENTS

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

581-22-700

09/03/2025

SD

SD

SD

EL

SNW

PW

E

ST

SN

SD

SD

SD

DI

DI

ST

SD

SD

SD

SD

SD

SD

SD

ST

SD

W

W G

F SN

E

E

E E

E

SG

COMM

COMM

COMM

C O

M M

SN

SAN

SAN

SAN

SAN

SAN

SAN

SD

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

X

X

X

X

X

X

X

X

X

X

SD

E

W

W

W

W

W

W

W W

W

W

W W

W

DI

SD

SD

ST STSD SD SD

SD

SD

FO FO FO FO FO

FO

FO

FO

T

W G

SAN

SAN

SAN

SAN

SAN

SAN

SAN

AMBL. ENT.

BLDG 42

DECON UNIT

BLDG. 51

BLDG. 52

BLDG 2

PARKING GARAGE

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(B)

C (B)

C (B)

C (B)

C (B)

C (B)

C (B)

C (B)

SD

C(B)

C(B)

C(A)

C(A)

C(B) C(B)

C (A

C

(A

TR 2

TR 3

C(B

C(B)

C(B)

C(B)

C(B)

C(B)

C (B)

C (B)

C (B)

C (B)

C (B)

C(B)

C(A)

C(A)

C(A)

C(A)

MATCHLINE SEE SHEET CU304

La st S av ed b y:

U

SR

M o n:

M ay

1, 3:

: C :\U se rs

\U

SR

M

\W

SP

O

5\ Fe de ra l G ro up

Jo bs

\3

8\

7\ C

AD

D

\O

SP

R ed es ig n\ D w gs

\V A

H un tin gt on

C iv il.

dw g

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

Revisions: Date:

A/E:CIVIL ENGINEER:

SPEES DESIGN BUILD

WSP USA Solutions Inc.

1201 Pacific Avenue Suite 550 Tacoma, WA 98402

TEL: (206) 431-2300

FAX: (206) 431-2250

VA HUNTINGTON

23830 PACIFIC HIGHWAY S, STE 300

KENT, WA 98032

(206) 209-2246

M

AT

C H

LI

N

E

SE

E

SH

EE

T

C U

1" = 20' scale feet

4020020

C(A)

C(B)

LEGEND

PROPOSED SIDE A FIBER PATHWAY

PROPOSED SIDE A UNDERGROUND HANDHOLE

PROPOSED SIDE B FIBER PATHWAY

PROPOSED SIDE B UNDERGROUND HANDHOLE

M

AT

C H

LI

N

E

SE

E

SH

EE

T

C U

M

AT

C H

LI

N

E

SE

E

SH

EE

T

C U

KEYMAP

NOT TO SCALE

GUARD POSTS, SEE

DETAIL B1 ON SHEET

CU250 (TYP.)

SITE KEYNOTES#

TYPE 1 DUCT BANK PER DETAIL F3 ON SHEET CU5001

2 TYPE 2 DUCT BANK PER DETAIL F6 ON SHEET CU500

PB RDM

FIBER OPTIC OUTSIDE PLANT

UTILITY PLAN

CU305

100% CONSTRUCTION

DOCUMENTS

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

581-22-700

SN

E

E

E

SD

SD

SD

SD

SN

SN

SN

SN

ST

SD

ST

SG

SD

SN

ST

SD

SD

SD

SD

SD

SD

CP

W

W

W

W

W

W

SN

SA

N

SA

N

SA

N

SA

N

ST

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SAN

SN

SAN

SAN

SAN

SN

SA

N

SA

N

SD

SD

SD

DI

SD

SD

DI

DI

W

SD

W

W

SAN

SD

E E

E E

E

SG

E

E

E

E

E E

E

SN

SN

SAN

SAN

SN

SAN

SAN

SAN

SAN

SAN

DI

SAN

SAN

SAN

SAN

SAN

SAN

SAN SAN SAN SAN SN

E E

E

E

E

E

E

E

SD

SD

SD

ST

E

E

E

E

E

E

E E

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

DI

SD

SD

SD

SD

DI

X

W

SD

SD

SD

SD

SD

SD

SD

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E E

E

E

PW

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W

W

W

W W

C(IS

P)

C(IS

P)

C(IS

P)

PARKING GARAGE

BLDG 25

AMBL. ENT.

BLDG 23BLDG 12

BLDG 1A

C(A) C(A)

C(A)

C (A)

C (A)

C (A)

C (A)

C (A)

C (A)

C (A)

C (A

C (A

)TR 1

MCR

C(B)

C(B)

C(A)

C(A)

C (A

C

(A

C (B

C

(B

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C (B

C

(B

C (B

C

(B

C (B

C

(B

C (B

C

(B

C (B

C

(B

C (B

C (B

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C (B

C(B)

C(B)

C(B)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C(A)

C (A

C

(A

C (A

C

(A

C (A

C

(A

C (A

C

(A

C (A

C

(A

C (A

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

C(B)

MATCHLINE SEE SHEET CU307

La st

S av ed b y:

U

SR

M o n:

M ay

1, 3:

: C

:\U se rs \U

SR

M

\W

SP

O

5\

Fe de ra l G ro up

Jo bs \3

8\

7\

C

AD

D \O

SP

R ed es ig n\

D w gs \V

A H un tin gt on

C iv il.

dw g

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

Revisions: Date:

A/E:CIVIL ENGINEER:

SPEES DESIGN BUILD

WSP USA Solutions Inc.

1201 Pacific Avenue Suite 550 Tacoma, WA 98402

TEL: (206) 431-2300

FAX: (206) 431-2250

VA HUNTINGTON

23830 PACIFIC HIGHWAY S, STE 300

KENT, WA 98032

(206) 209-2246

1" = 20' scale feet

4020020

C(A)

C(B)

LEGEND

PROPOSED SIDE A FIBER PATHWAY

PROPOSED SIDE A UNDERGROUND HANDHOLE

PROPOSED SIDE B FIBER PATHWAY

PROPOSED SIDE B UNDERGROUND HANDHOLE

M

AT

C H

LI

N

E

SE

E

SH

EE

T

C U

KEYMAP

NOT TO SCALE

SITE KEYNOTES#

TYPE 1 DUCT BANK PER DETAIL F3 ON SHEET CU5001

2 TYPE 2 DUCT BANK PER DETAIL F6 ON SHEET CU500

PB RDM

FIBER OPTIC OUTSIDE PLANT

UTILITY PLAN

CU306

100% CONSTRUCTION

DOCUMENTS

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

581-22-700

SD

SD

PW

SN

SD

PW

ST

ST

SN

PW

ST

SD

SD

SD

SD

SD

ST

SN

SAN

SAN

SAN

SAN

SD

ST

ST CB

SD

F FSAN

SD

SD

ST

DI

ST

SD

DI

SD

SD

SD

SD

W

W W

W

W

W

W

W

SAN

DI

SD

SD

SD

DI

SD

G

G

G

O

O

O

O

O

O

EE

E

E

SA

N

E

E

PW

E

SD

SD

E

E

M

E

SD

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

SAN

SAN

SAN

SAN

E

SD

SD

ST

SD

SD

SD

SD

SD

X

X

X

X

X

X

SD

SD

SD

SD

SD

G

LP

G

LP

G

SAN

SAN

W

SA

N

SA

N

SA

N

SAN

BLDG 23R

BLDG 26

BLDG 34

BLDG 1S

BLDG 3

BLDG 17

C(A) C(A)

C(A) C(A)

C(A) C(A)

C(A)

SD

C (B

C (B

C (B

C (A

C (A

C (A

C(A) C(A)

C(A) C(A)

C (A

C (A

C (A

C (A

C(A) C(A)

C(A) C(A)

C(A) C(A)

C(A)

TR 4

C(A) C(A)

C(B)

C (B

C (B

C (B

C(B)

C(B) C(B)

C (A

C (A

C (A

C(A)

MATCHLINE SEE SHEET CU306

La st S av ed b y:

U

SR

M o n:

M ay

1, 3:

: C :\U se rs

\U

SR

M

\W

SP

O

5\ Fe de ra l G ro up

Jo bs

\3

8\

7\ C

AD

D

\O

SP

R ed es ig n\ D w gs

\V A

H un tin gt on

C iv il.

dw g

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD STAMPCONSULTANT

7 8 9 10321 4 5 6

Revisions: Date:

A/E:CIVIL ENGINEER:

SPEES DESIGN BUILD

WSP USA Solutions Inc.

1201 Pacific Avenue Suite 550 Tacoma, WA 98402

TEL: (206) 431-2300

FAX: (206) 431-2250

VA HUNTINGTON

23830 PACIFIC HIGHWAY S, STE 300

KENT, WA 98032

(206) 209-2246

1" = 20' scale feet

4020020

C(A)

C(B)

LEGEND

PROPOSED SIDE A FIBER PATHWAY

PROPOSED SIDE A UNDERGROUND HANDHOLE

PROPOSED SIDE B FIBER PATHWAY

PROPOSED SIDE B UNDERGROUND HANDHOLE

M

AT

C H

LI

N

E

SE

E

SH

EE

T

C U

KEYMAP

NOT TO SCALE

SITE KEYNOTES#

TYPE 1 DUCT BANK PER DETAIL F3 ON SHEET CU5001

2 TYPE 2 DUCT BANK PER DETAIL F6 ON SHEET CU500

PB RDM

FIBER OPTIC OUTSIDE PLANT

UTILITY PLAN

CU307

100% CONSTRUCTION

DOCUMENTS

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

581-22-700

Sheets and Views
CS100
CU300
CU301
CU302
CU303
CU304
CU305
CU306
CU307

File details come from the government source that posted it. Updated .