S02 - ATT 21 - 581-22-700 - 100 Drawings Part-19 of 24.pdf
PDF 15 MB Posted
- Solicitation number
- 36C77626R0025
About this file
This document is a set of electrical schedules for the VA Huntington EHRM Infrastructure Upgrades project. The drawings are 100% Construction Documents prepared by SPEES Design Build, dated September 3, 2025, and cover Buildings 09, 20, 23R, and 25 at the VA Huntington facility located at 1540 Spring Valley Drive, Huntington, WV 25704-9300. Project number 581-22-700 is designated as fully sprinklered.
The electrical schedules provide detailed panelboard ratings, circuit directories, and electrical distribution equipment specifications for the referenced buildings. Key requirements include that contractors must update all panel circuit directories to document any changes with typewritten revised directories, and all "revised" panel schedules reference associated equipment load schedules for overall panel load calculations. The schedules distinguish between existing conditions shown in grey text and revised circuits/provided equipment shown in black text. All Digital Power Meters (DPM) and Surge Protective Devices (SPD) are integral to the electrical distribution equipment unless otherwise noted. The drawings also include conduit and wire schedules specifying routing, quantities, sizes, voltage, fault current ratings, and conductor specifications for each building's electrical infrastructure. These are construction documents prepared under VA Form 08-6231 by the Architect/Engineer of Record and consultant SPEES Design Build.
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/3
/2
:1
:4
A M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
L e g e n d
G e n e ra l N o te s D ia g ra m s a n d
D e ta ils
.r v t
09EP701
BLDG 09 - ELECTRICAL SCHEDULES
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
Revisions: Date:
GENERAL NOTES
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
4. SCHEDULES WITH GREY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND
ADDITIONAL LOAD.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/3
/2
:1
:4
A M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
L e g e n d
G e n e ra l N o te s D ia g ra m s a n d
D e ta ils
.r v t
20EP701
BLDG 20 - ELECTRICAL SCHEDULES
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
Revisions: Date:
GENERAL NOTES
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
4. SCHEDULES WITH GREY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/3
/2
:1
:5
A M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
L e g e n d
G e n e ra l N o te s D ia g ra m s a n d
D e ta ils
.r v t
23REP701
BLDG 23R - ELECTRICAL SCHEDULES
23R
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
Revisions: Date:
GENERAL NOTES
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
4. SCHEDULES WITH GREY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/3
/2
:1
:5
A M
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /V
A H
U N
T
IN
G T
O N
L e g e n d
G e n e ra l N o te s D ia g ra m s a n d
D e ta ils
.r v t
25EP701
BLDG 25 - ELECTRICAL SCHEDULES
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
Revisions: Date:
GENERAL NOTES
1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT
DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL
REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.
2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE
ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL
PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET
ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.
3. ALL DIGITAL POWER METERS (DPM) AND SURGE
PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL
DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.
4. SCHEDULES WITH GREY TEXT INDICATE EXISTING
PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT
File details come from the government source that posted it. Updated .