This document is a set of electrical schedules for the VA Huntington EHRM Infrastructure Upgrades project. The drawings are 100% Construction Documents prepared by SPEES Design Build, dated September 3, 2025, and cover Buildings 09, 20, 23R, and 25 at the VA Huntington facility located at 1540 Spring Valley Drive, Huntington, WV 25704-9300. Project number 581-22-700 is designated as fully sprinklered.

The electrical schedules provide detailed panelboard ratings, circuit directories, and electrical distribution equipment specifications for the referenced buildings. Key requirements include that contractors must update all panel circuit directories to document any changes with typewritten revised directories, and all "revised" panel schedules reference associated equipment load schedules for overall panel load calculations. The schedules distinguish between existing conditions shown in grey text and revised circuits/provided equipment shown in black text. All Digital Power Meters (DPM) and Surge Protective Devices (SPD) are integral to the electrical distribution equipment unless otherwise noted. The drawings also include conduit and wire schedules specifying routing, quantities, sizes, voltage, fault current ratings, and conductor specifications for each building's electrical infrastructure. These are construction documents prepared under VA Form 08-6231 by the Architect/Engineer of Record and consultant SPEES Design Build.

View the file

Other files

File Type Posted
S06 - 36C77626R0025 0008.pdf PDF
S06 - Amendment 0008 - ATT 7 - 02EP100B - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 11 - Burn Permit.pdf PDF
S06 - Amendment 0008 - ATT 10 - 260508 - Sheet AD103-1B Data Center Phase 1B Demo Roof update.pdf PDF
S06 - Amendment 0008 - ATT 9 - 260508 - Sheet AD101-1B Data Center Phase 1B Demo Floor Plan update.pdf PDF
S06 - Amendment 0008 - ATT 1 - TechQuestionsVAresponses Final Set - Huntington EHRM IU.pdf PDF
S06 - Amendment 0008 - ATT 14 - Energized Electrical Work Permit.pdf PDF
S06 - Amendment 0008 - ATT 5 - ELECTRICAL 2026.04.13.pdf PDF
S06 - Amendment 0008 - ATT 6 - 01WEP100G - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 3 - Civil OSP Redesign-signed.pdf PDF
S06 - Amendment 0008 - ATT 12 - Environmental Report Huntington WV.pdf PDF
S06 - Amendment 0008 - ATT 8 - 260508 - Sheet 01S-AE452 TR Tower 4 Wall sections update.pdf PDF
S06 - Amendment 0008 - ATT 13 - Hot Tapping Permit.pdf PDF
S06 - Amendment 0008 - ATT 2 - UPDATED SHEETS.pdf PDF
S06 - Amendment 0008 - ATT 4 - Structural Set 04-21-2026.pdf PDF
S06 - 36C77626R0025 0007.pdf PDF
S06 - Amendment 0007 - ATT 1 - TechQuestionsVAresponses Partial 4 - Huntington EHRM IU.pdf PDF
S06 - Amendment 0007 - ATT 3 - Lift Planning.pdf PDF
S06 - Amendment 0007 - ATT 2 - Geotechnical Report.pdf PDF
S06 - Amendment 0007 - ATT 5 - Appendix A - PFC FPT.pdf PDF
S06 - Amendment 0007 - ATT 4 - 01 00 00 - GENERAL REQUIREMENTS_A1.pdf PDF
S06 - Amendment 0007 - ATT 6 - Crane lift Info.pdf PDF
S06 - 36C77626R0025 0006.pdf PDF
S06 - Amendment 0006 - ATT 1 - TechQuestionsVAresponses Partial 3 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0005.pdf PDF
S06 - Amendment 0004 - ATT 2 - FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
S06 - Amendment 0004 - ATT 1 - TechQuestionsVAresponses Partial 2 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0004.pdf PDF
S06 - Amendment 0003 - ATT 2 - TechQuestionsVAresponses Partial - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0003.pdf PDF
S06 - 36C77626R0025 0002.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit In-Sheet - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0001.pdf PDF
S02 - ATT 28 - 581-22-700 - FLS Compliance Letter.pdf PDF
S02 - ATT 3 - 581-22-700 - 100 Drawings Part-1 of 24.pdf PDF
S02 - ATT 15 - 581-22-700 - 100 Drawings Part-13 of 24.pdf PDF
S02 - ATT 30 - 581-22-700 - 100 Commissioning Plan.pdf PDF
S02 - ATT 20 - 581-22-700 - 100 Drawings Part-18 of 24.pdf PDF
S02 - ATT 24 - 581-22-700 - 100 Drawings Part-22 of 24.pdf PDF
S02 - ATT 1 - 581-22-700 - 100 Specifications Part-1 of 2.pdf PDF
S02 - ATT 10 - 581-22-700 - 100 Drawings Part-8 of 24.pdf PDF
S02 - ATT 12 - 581-22-700 - 100 Drawings Part-10 of 24.pdf PDF
S02 - ATT 23 - 581-22-700 - 100 Drawings Part-21 of 24.pdf PDF
S02 - ATT 31 - 581-22-700 - Topographic Survey TR Tower 3.pdf PDF
S02 - ATT 25 - 581-22-700 - 100 Drawings Part-23 of 24.pdf PDF
S02 - ATT 16 - 581-22-700 - 100 Drawings Part-14 of 24.pdf PDF
S02 - ATT 34 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
S02 - ATT 29 - 581-22-700 - Geotechnical Report - W24044 - VA Duct Bank 11.21.24.pdf PDF
S02 - ATT 14 - 581-22-700 - 100 Drawings Part-12 of 24.pdf PDF
S02 - ATT 27 - 581-22-700 - Asbestos locations.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/3

/2

:1

:4

A M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

L e g e n d

G e n e ra l N o te s D ia g ra m s a n d

D e ta ils

.r v t

09EP701

BLDG 09 - ELECTRICAL SCHEDULES

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

Revisions: Date:

GENERAL NOTES

1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

3. ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

4. SCHEDULES WITH GREY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

INDICATES REVISED CIRCUITS, PROVIDED EQUIPMENT, AND

ADDITIONAL LOAD.

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/3

/2

:1

:4

A M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

L e g e n d

G e n e ra l N o te s D ia g ra m s a n d

D e ta ils

.r v t

20EP701

BLDG 20 - ELECTRICAL SCHEDULES

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

Revisions: Date:

GENERAL NOTES

1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

3. ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

4. SCHEDULES WITH GREY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/3

/2

:1

:5

A M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

L e g e n d

G e n e ra l N o te s D ia g ra m s a n d

D e ta ils

.r v t

23REP701

BLDG 23R - ELECTRICAL SCHEDULES

23R

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

Revisions: Date:

GENERAL NOTES

1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

3. ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

4. SCHEDULES WITH GREY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/3

/2

:1

:5

A M

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /V

A H

U N

T

IN

G T

O N

L e g e n d

G e n e ra l N o te s D ia g ra m s a n d

D e ta ils

.r v t

25EP701

BLDG 25 - ELECTRICAL SCHEDULES

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

Revisions: Date:

GENERAL NOTES

1. CONTRACTOR SHALL UPDATE ALL PANEL CIRCUIT

DIRECTORIES TO INDICATE IN ANY AND ALL CHANGES; ALL

REVISED CIRCUIT DIRECTORIES SHALL BE TYPEWRITTEN.

2. FOR ALL "REVISED" PANEL SCHEDULES REFERENCE

ASSOCIATED EQUIPMENT LOAD SCHEDULE FOR OVERALL

PANEL LOAD. "REVISED" PANEL SCHEDULES ON THIS SHEET

ARE SHOWN FOR ADDED BRANCH CIRCUIT SIZING ONLY.

3. ALL DIGITAL POWER METERS (DPM) AND SURGE

PROTECTIVE DEVICES (SPD) ARE INTEGRAL TO ELECTRICAL

DISTRIBUTION EQUIPMENT, UNLESS OTHERWISE NOTED.

4. SCHEDULES WITH GREY TEXT INDICATE EXISTING

PANELBOARD RATINGS, CIRCUITS, AND LOADS. BLACK TEXT

File details come from the government source that posted it. Updated .