About this file

This is an Amendment 0007 attachment containing Pre-Functional Checklists (PFC) and Functional Performance Tests (FPT) for HVAC equipment installations at the Huntington VAMC EHRM Upgrades project located in Huntington, West Virginia. The document serves as a template and verification tool for the mechanical contractor and construction manager to confirm proper installation, startup, and operational testing of cooling and heating equipment.

The PFC covers two primary equipment types: Computer Room Air Conditioner (CRAC) units and Variable Refrigerant Flow (VRF) units. For CRAC systems (CRAC-01 and CRAC-02 in Building 01S Data Center), the checklist verifies delivery, physical condition, piping integrity, electrical connections, and controls functionality, including refrigerant line sealing, proper insulation, pressure testing, thermostat operation, and completion of startup reports and training documentation. For VRF units deployed across multiple buildings (01S, 01W, Building 2, Building 5, Building 20, Building 23R, Building 25, Building 28, and Building TR1), the PFC examines similar installation requirements including indoor unit filters, air-cooled condensing unit specifications, refrigerant line protection and sealing, electrical wiring security, control sensor calibration, and operational manual compilation. The FPT procedures validate that CRAC and VRF systems achieve proper cooling and heating operation through temperature setpoint adjustments, damper positioning, airflow measurement, and sensor accuracy verification, with trending data collection at 15-minute intervals. All testing documentation requires contractor initials and construction manager sign-off, with sections for recording issues, corrective actions, and final system status (Pass/Fail/Partial with corrective actions).

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades, newest first.
File Type Posted
S06 - 36C77626R0025 0008.pdf PDF
S06 - Amendment 0008 - ATT 3 - Civil OSP Redesign-signed.pdf PDF
S06 - Amendment 0008 - ATT 7 - 02EP100B - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 8 - 260508 - Sheet 01S-AE452 TR Tower 4 Wall sections update.pdf PDF
S06 - Amendment 0008 - ATT 12 - Environmental Report Huntington WV.pdf PDF
S06 - Amendment 0008 - ATT 13 - Hot Tapping Permit.pdf PDF
S06 - Amendment 0008 - ATT 4 - Structural Set 04-21-2026.pdf PDF
S06 - Amendment 0008 - ATT 1 - TechQuestionsVAresponses Final Set - Huntington EHRM IU.pdf PDF
S06 - Amendment 0008 - ATT 10 - 260508 - Sheet AD103-1B Data Center Phase 1B Demo Roof update.pdf PDF
S06 - Amendment 0008 - ATT 11 - Burn Permit.pdf PDF
S06 - Amendment 0008 - ATT 14 - Energized Electrical Work Permit.pdf PDF
S06 - 36C77626R0025 0007.pdf PDF
S06 - Amendment 0007 - ATT 1 - TechQuestionsVAresponses Partial 4 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0006.pdf PDF
S06 - Amendment 0006 - ATT 1 - TechQuestionsVAresponses Partial 3 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0005.pdf PDF
S06 - Amendment 0004 - ATT 2 - FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
S06 - 36C77626R0025 0004.pdf PDF
S06 - Amendment 0004 - ATT 1 - TechQuestionsVAresponses Partial 2 - Huntington EHRM IU.pdf PDF
S06 - Amendment 0003 - ATT 2 - TechQuestionsVAresponses Partial - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0003.pdf PDF
S06 - 36C77626R0025 0002.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit In-Sheet - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0001.pdf PDF
S02 - ATT 10 - 581-22-700 - 100 Drawings Part-8 of 24.pdf PDF
S02 - ATT 14 - 581-22-700 - 100 Drawings Part-12 of 24.pdf PDF
S02 - ATT 27 - 581-22-700 - Asbestos locations.xlsx XLSX spreadsheet
S02 - ATT 28 - 581-22-700 - FLS Compliance Letter.pdf PDF
S02 - ATT 3 - 581-22-700 - 100 Drawings Part-1 of 24.pdf PDF
S02 - ATT 4 - 581-22-700 - 100 Drawings Part-2 of 24.pdf PDF
S02 - ATT 5 - 581-22-700 - 100 Drawings Part-3 of 24.pdf PDF
S02 - ATT 6 - 581-22-700 - 100 Drawings Part-4 of 24.pdf PDF
S02 - ATT 7 - 581-22-700 - 100 Drawings Part-5 of 24.pdf PDF
S02 - ATT 17 - 581-22-700 - 100 Drawings Part-15 of 24.pdf PDF
S02 - ATT 19 - 581-22-700 - 100 Drawings Part-17 of 24.pdf PDF
S02 - ATT 22 - 581-22-700 - 100 Drawings Part-20 of 24.pdf PDF
S02 - ATT 26 - 581-22-700 - 100 Drawings Part-24 of 24.pdf PDF
S02 - ATT 33 - WD - WV20260048 - 01-02-2026.pdf PDF
S02 - ATT 35 - Site Visit Information - Huntington EHRM IU.pdf PDF
S02 - 36C77626R0025.pdf PDF
S02 - ATT 1 - 581-22-700 - 100 Specifications Part-1 of 2.pdf PDF
S02 - ATT 2 - 581-22-700 - 100 Specifications Part-2 of 2.pdf PDF
S02 - ATT 9 - 581-22-700 - 100 Drawings Part-7 of 24.pdf PDF
S02 - ATT 11 - 581-22-700 - 100 Drawings Part-9 of 24.pdf PDF
S02 - ATT 15 - 581-22-700 - 100 Drawings Part-13 of 24.pdf PDF
S02 - ATT 18 - 581-22-700 - 100 Drawings Part-16 of 24.pdf PDF
S02 - ATT 20 - 581-22-700 - 100 Drawings Part-18 of 24.pdf PDF
S02 - ATT 23 - 581-22-700 - 100 Drawings Part-21 of 24.pdf PDF
S02 - ATT 24 - 581-22-700 - 100 Drawings Part-22 of 24.pdf PDF
S02 - ATT 30 - 581-22-700 - 100 Commissioning Plan.pdf PDF
Show all 50

EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2207 Garnet Avenue Suite I

San Diego, CA 92109

Direct: (619) 770-8552

Contractor Initial VA CM Initial Date

Contractor Initial VA CM Initial Date

Contractor Initial VA CM Initial Date

Size (in)

Fan Power/Speed (hp/rpm)

Model

Yes, No, N/A

Voltage / Phase / Frequency (V/ph/Hz)

Equipment Location: Data Center

Manufacturer: Liebert

A. Model Verification (Note: 1. as specified, 2. as submitted, 3. as installed) Enter Note #

Manufacturer

Model #:

Serial #:

Service:

DS105

Comment/ Issues

1. Delivery Book

Building: 01S

Computer Room Air Conditioner (CRAC) Pre-Functional Checklist

Project: Huntington VAMC EHRM Upgrades Design Cx

Project Location:

Equipment ID: CRAC-01

Huntington , WV

Unit is free from physical damage

All components present

The refrigerant line openings are sealed

Serial Number

Start-up report is complete and has been provided to the GC for approval by the Owner

Training plan and instructor qualifications has been complete and provided to the GC for approval by the

Owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the Owner

B. Physical Checks

Airflow Max/Min (cfm)

Heating Capacity (MBH/gpm)

Filter drier is installed

Vacuum pulled on lineset

Lineset is strapped properly

A. Piping Yes, No, N/A

Unit tags affixed

2. Construction Checklist

Installation and startup manual provided

Comment/ Issues

Lineset is properly insulated

Refrigeration lineset pressure tested

Lineset insulation above roofline is UV protected

Comment/ Issues

Davenergy Project #: 61109

3/7/2024 1 CRAC-01 PFC

Direct: (619) 770-8552

Computer Room Air Conditioner (CRAC)Contractor Initial VA CM Initial Date

Contractor Initial VA CM Initial Date

Motors and compressors running in the right direction

System has correct refrigerant charge

Control wiring between fan coil and condensing unit installed

Comment/ Issues

Comment/ Issues

Controls contractor has status monitored

System graphics have been installed

Specified point-to-point checks have been completed and documentation record submitted for this system

Split system works off thermostat and reaches setpoint

C. Controls Yes, No, N/A

Thermostat mounted and wired if not remote controller

B. Electrical Yes, No, N/A

Power wiring connected, secure and grounded to both units

3/7/2024 2 CRAC-01 PFC

Direct: (619) 770-8552

Contractor Initial VA CM Initial Date

Contractor Initial VA CM Initial Date

Contractor Initial VA CM Initial Date

Lineset insulation above roofline is UV protected

Filter drier is installed

Lineset is strapped properly

Lineset is properly insulated

Refrigeration lineset pressure tested

Vacuum pulled on lineset

Unit tags affixed

2. Construction Checklist

A. Piping Yes, No, N/A Comment/ Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Training plan and instructor qualifications has been complete and provided to the GC for approval by the

Owner

B. Physical Checks Yes, No, N/A Comment/ Issues

Start-up report is complete and has been provided to the GC for approval by the Owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the Owner

Fan Power/Speed (hp/rpm)

Voltage / Phase / Frequency (V/ph/Hz)

Airflow Max/Min (cfm)

Heating Capacity (MBH/gpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2. as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer: Liebert

Model #: DS105

Serial #:

Project Location: Huntington , WV

Equipment ID: CRAC-02

Equipment Location: Data Center

Computer Room Air Conditioner (CRAC) Pre-Functional Checklist

Project: Huntington VAMC EHRM Upgrades Design Cx

Building: 01S

3/7/2024 3 CRAC-02 PFC

Direct: (619) 770-8552

Computer Room Air Conditioner (CRAC)Contractor Initial VA CM Initial Date

Contractor Initial VA CM Initial Date

8 System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

C. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

B. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

3/7/2024 4 CRAC-02 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

Equipment Location:

Manufacturer:

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note #

Manufacturer

Model #:

Serial #:

Service:

Comment/ Issues

1. Delivery Book

Serial Number

B. Physical Checks

Size (in)

Fan Power/Speed (hp/rpm)

Model

Yes, No, N/A

Voltage / Phase / Frequency (V/ph/Hz)

Huntington, WV

Building: 01S

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Project Location:

Equipment ID: CU-01

Airflow Max/Min (cfm)

Unit tags affixed

Installation and startup manual provided

Unit is free from physical damage

All components present

The refrigerant line openings are sealed

C. Other Yes, No, N/A Comment/Issues

TAB report is complete and has been provided to the GC for approval by the owner

Comment/ Issues

3/7/2024 1 B01S CU-01 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Seismic rated equipment stand for roof mounted units installed

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Crank case heater installed

Factory wall mounting hardware used in installation

Minimum 3/4" condensate drain line

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

Low ambient temperature controls installed

System graphics have been installed

Split system works off thermostat and reaches setpoint

E. Controls Yes, No, N/A

Thermostat mounted and wired if not remote controller

Controls contractor has status monitored

Motors and compressors running in the right direction

System has correct refrigerant charge

Control wiring between fan coil and condensing unit installed

Specified point-to-point checks have been completed and documentation record submitted for this system

Device Calibration checks have been completed and documentation record submitted for this system

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A

2. Construction Checklist

Comment/ Issues

Comment/ Issues

Power wiring connected, secure and grounded to both units

Refrigeration lineset pressure tested

Minimum of 12" braided flexible refrigerant line

Lineset is properly insulated

D. Electrical Yes, No, N/A

Comment/ Issues

3/7/2024 2 B01S CU-01 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-02

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01S

3/7/2024 3 B01S CU-02 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

Crank case heater installed

Seismic rated equipment stand for roof mounted units installed

Minimum 3/4" condensate drain line

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Low ambient temperature controls installed

Factory wall mounting hardware used in installation

2. Construction Checklist

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

3/7/2024 4 B01S CU-02 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-03

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01S

3/7/2024 5 B01S CU-03 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

Crank case heater installed

Seismic rated equipment stand for roof mounted units installed

Minimum 3/4" condensate drain line

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Low ambient temperature controls installed

Factory wall mounting hardware used in installation

2. Construction Checklist

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

3/7/2024 6 B01S CU-03 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-04

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01S

3/7/2024 7 B01S CU-04 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

Crank case heater installed

Seismic rated equipment stand for roof mounted units installed

Minimum 3/4" condensate drain line

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Low ambient temperature controls installed

Factory wall mounting hardware used in installation

2. Construction Checklist

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

3/7/2024 8 B01S CU-04 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-05

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01S

3/7/2024 9 B01S CU-05 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

Crank case heater installed

Seismic rated equipment stand for roof mounted units installed

Minimum 3/4" condensate drain line

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Low ambient temperature controls installed

Factory wall mounting hardware used in installation

2. Construction Checklist

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

3/7/2024 10 B01S CU-05 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-06

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01S

3/7/2024 11 B01S CU-06 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

Crank case heater installed

Seismic rated equipment stand for roof mounted units installed

Minimum 3/4" condensate drain line

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Low ambient temperature controls installed

Factory wall mounting hardware used in installation

2. Construction Checklist

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

3/7/2024 12 B01S CU-06 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-07

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01S

3/7/2024 13 B01S CU-07 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

Crank case heater installed

Seismic rated equipment stand for roof mounted units installed

Minimum 3/4" condensate drain line

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Low ambient temperature controls installed

Factory wall mounting hardware used in installation

2. Construction Checklist

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

3/7/2024 14 B01S CU-07 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-08

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01S

3/7/2024 15 B01S CU-08 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

Crank case heater installed

Seismic rated equipment stand for roof mounted units installed

Minimum 3/4" condensate drain line

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Low ambient temperature controls installed

Factory wall mounting hardware used in installation

2. Construction Checklist

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

3/7/2024 16 B01S CU-08 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-09

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01S

3/7/2024 17 B01S CU-09 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

Crank case heater installed

Seismic rated equipment stand for roof mounted units installed

Minimum 3/4" condensate drain line

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Low ambient temperature controls installed

Factory wall mounting hardware used in installation

2. Construction Checklist

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

3/7/2024 18 B01S CU-09 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-10

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01S

3/7/2024 19 B01S CU-10 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

Crank case heater installed

Seismic rated equipment stand for roof mounted units installed

Minimum 3/4" condensate drain line

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Low ambient temperature controls installed

Factory wall mounting hardware used in installation

2. Construction Checklist

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

3/7/2024 20 B01S CU-10 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-06

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01S

3/7/2024 21 B01S CU-11 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

Crank case heater installed

Seismic rated equipment stand for roof mounted units installed

Minimum 3/4" condensate drain line

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Low ambient temperature controls installed

Factory wall mounting hardware used in installation

2. Construction Checklist

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

3/7/2024 22 B01S CU-11 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-12

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01S

3/7/2024 23 B01S CU-12 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

Crank case heater installed

Seismic rated equipment stand for roof mounted units installed

Minimum 3/4" condensate drain line

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Low ambient temperature controls installed

Factory wall mounting hardware used in installation

2. Construction Checklist

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

3/7/2024 24 B01S CU-12 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-13

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01S

3/7/2024 25 B01S CU-13 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

Crank case heater installed

Seismic rated equipment stand for roof mounted units installed

Minimum 3/4" condensate drain line

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Low ambient temperature controls installed

Factory wall mounting hardware used in installation

2. Construction Checklist

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

3/7/2024 26 B01S CU-13 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-01

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01W

3/7/2024 27 B01W CU-01 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

Crank case heater installed

Seismic rated equipment stand for roof mounted units installed

Minimum 3/4" condensate drain line

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Low ambient temperature controls installed

Factory wall mounting hardware used in installation

2. Construction Checklist

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

3/7/2024 28 B01W CU-01 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-02

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01W

3/7/2024 29 B01W CU-02 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted to match building color of oil base paint

Condensate drain pump installed

Legs for roof mounted support is sealed for water proof

Crank case heater installed

Seismic rated equipment stand for roof mounted units installed

Minimum 3/4" condensate drain line

B. Air-Cooled Condensing Unit Yes, No, N/A Comment/ Issues

Low ambient temperature controls installed

Factory wall mounting hardware used in installation

2. Construction Checklist

A. Indoor Unit Yes, No, N/A Comment/ Issues

Slide-in air filter installed

3/7/2024 30 B01W CU-02 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Training plan and instructor qualifications has been complete and provided to the GC for approval by the owner

TAB report is complete and has been provided to the GC for approval by the owner

Start-up report is complete and has been provided to the GC for approval by the owner

Operation & Maintenance manual has been compiled and provided to the GC for approval by the owner

Unit tags affixed

C. Other Yes, No, N/A Comment/Issues

The refrigerant line openings are sealed

Installation and startup manual provided

Unit is free from physical damage

All components present

Voltage / Phase / Frequency (V/ph/Hz)

B. Physical Checks Yes, No, N/A Comment/ Issues

Airflow Max/Min (cfm)

Fan Power/Speed (hp/rpm)

Serial Number

Size (in)

Manufacturer

Model

Service:

1. Delivery Book

A. Model Verification (Note: 1. as specified, 2.

as submitted, 3. as installed) Enter Note # Comment/ Issues

Manufacturer:

Model #:

Serial #:

Project Location: Huntington, WV

Equipment ID: CU-03

Equipment Location:

VRV Unit

Pre-Functional Checklist Project: Huntington VAMC EHRM Upgrades Cx

Building: 01W

3/7/2024 31 B01W CU-03 PFC

Direct: (619) 770-8552

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Contractor

Initial

CM

Initial Date

Device Calibration checks have been completed and documentation record submitted for this system

System graphics have been installed

Split system works off thermostat and reaches setpoint

Specified point-to-point checks have been completed and documentation record submitted for this system

System has correct refrigerant charge

Motors and compressors running in the right direction

Control wiring between fan coil and condensing unit installed

Controls contractor has status monitored

E. Controls Yes, No, N/A Comment/ Issues

Thermostat mounted and wired if not remote controller

D. Electrical Yes, No, N/A Comment/ Issues

Power wiring connected, secure and grounded to both units

Lineset is properly insulated

Minimum of 12" braided flexible refrigerant line

Vacuum pulled on lineset

Lineset is strapped properly

C. Piping Yes, No, N/A Comment/ Issues

Refrigeration lineset pressure tested

Minimum 20 gage sheet metal pan around refrigerant lines from bottom wall anchor to eave

20 gage sheet metal pan is painted…