About this file

This is a Hot Tap Work Permit template used for performing maintenance and modifications on pressurized piping equipment and vessels while they remain in service.

The permit is structured in four parts with specific approval authorities. Part I requires the requester to document the piping/equipment location, description of work to be performed, and justification for why the equipment cannot be de-energized, with explicit notation that inconvenience is not an acceptable justification. Part II obligates qualified personnel executing the hot tap to confirm personnel training documentation, competent person oversight availability, welding requirements with API-2201 compliance, emergency action plans, personal protective equipment specifications, access restriction measures, job briefing completion, multi-gas meter availability and calibration, and overall safety feasibility of the work. Part III requires recommendations from the Chief of Engineering and Facility Safety Officer. Part IV grants final approval from the Medical Center Director. Additional sections require detailed technical specifications including header/vessel information (line size, metallurgy, operating pressure and temperature), branch connection details, wall thickness measurements at the hot tap location, weld procedures with X-ray requirements, nozzle and reinforcing pad pressure ratings, hydrostatic seat testing, and hot tap machine specifications (make, model, serial number, pressure rating and testing documentation). The permit emphasizes compliance with API-2201 standards for hot tapping welding safety and requires location sketches with scaffolding and insulation removal prior to pressure equipment inspection notification.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades, newest first.
File Type Posted
S06 - 36C77626R0025 0008.pdf PDF
S06 - Amendment 0008 - ATT 3 - Civil OSP Redesign-signed.pdf PDF
S06 - Amendment 0008 - ATT 7 - 02EP100B - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 8 - 260508 - Sheet 01S-AE452 TR Tower 4 Wall sections update.pdf PDF
S06 - Amendment 0008 - ATT 12 - Environmental Report Huntington WV.pdf PDF
S06 - Amendment 0008 - ATT 1 - TechQuestionsVAresponses Final Set - Huntington EHRM IU.pdf PDF
S06 - Amendment 0008 - ATT 10 - 260508 - Sheet AD103-1B Data Center Phase 1B Demo Roof update.pdf PDF
S06 - Amendment 0008 - ATT 11 - Burn Permit.pdf PDF
S06 - Amendment 0008 - ATT 14 - Energized Electrical Work Permit.pdf PDF
S06 - Amendment 0008 - ATT 2 - UPDATED SHEETS.pdf PDF
S06 - Amendment 0008 - ATT 5 - ELECTRICAL 2026.04.13.pdf PDF
S06 - Amendment 0008 - ATT 6 - 01WEP100G - ELECTRICAL 20260413.pdf PDF
S06 - 36C77626R0025 0007.pdf PDF
S06 - Amendment 0007 - ATT 1 - TechQuestionsVAresponses Partial 4 - Huntington EHRM IU.pdf PDF
S06 - Amendment 0007 - ATT 5 - Appendix A - PFC FPT.pdf PDF
S06 - Amendment 0007 - ATT 2 - Geotechnical Report.pdf PDF
S06 - Amendment 0007 - ATT 3 - Lift Planning.pdf PDF
S06 - Amendment 0007 - ATT 4 - 01 00 00 - GENERAL REQUIREMENTS_A1.pdf PDF
S06 - Amendment 0007 - ATT 6 - Crane lift Info.pdf PDF
S06 - 36C77626R0025 0005.pdf PDF
S06 - Amendment 0004 - ATT 2 - FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
S06 - Amendment 0004 - ATT 1 - TechQuestionsVAresponses Partial 2 - Huntington EHRM IU.pdf PDF
S06 - Amendment 0003 - ATT 2 - TechQuestionsVAresponses Partial - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0003.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit In-Sheet - Huntington EHRM IU.pdf PDF
S02 - ATT 10 - 581-22-700 - 100 Drawings Part-8 of 24.pdf PDF
S02 - ATT 14 - 581-22-700 - 100 Drawings Part-12 of 24.pdf PDF
S02 - ATT 27 - 581-22-700 - Asbestos locations.xlsx XLSX spreadsheet
S02 - ATT 28 - 581-22-700 - FLS Compliance Letter.pdf PDF
S02 - 36C77626R0025.pdf PDF
S02 - ATT 1 - 581-22-700 - 100 Specifications Part-1 of 2.pdf PDF
S02 - ATT 2 - 581-22-700 - 100 Specifications Part-2 of 2.pdf PDF
S02 - ATT 9 - 581-22-700 - 100 Drawings Part-7 of 24.pdf PDF
S02 - ATT 11 - 581-22-700 - 100 Drawings Part-9 of 24.pdf PDF
S02 - ATT 15 - 581-22-700 - 100 Drawings Part-13 of 24.pdf PDF
S02 - ATT 18 - 581-22-700 - 100 Drawings Part-16 of 24.pdf PDF
S02 - ATT 20 - 581-22-700 - 100 Drawings Part-18 of 24.pdf PDF
S02 - ATT 23 - 581-22-700 - 100 Drawings Part-21 of 24.pdf PDF
S02 - ATT 24 - 581-22-700 - 100 Drawings Part-22 of 24.pdf PDF
S02 - ATT 30 - 581-22-700 - 100 Commissioning Plan.pdf PDF
S02 - ATT 8 - 581-22-700 - 100 Drawings Part-6 of 24.pdf PDF
S02 - ATT 12 - 581-22-700 - 100 Drawings Part-10 of 24.pdf PDF
S02 - ATT 13 - 581-22-700 - 100 Drawings Part-11 of 24.pdf PDF
S02 - ATT 16 - 581-22-700 - 100 Drawings Part-14 of 24.pdf PDF
S02 - ATT 21 - 581-22-700 - 100 Drawings Part-19 of 24.pdf PDF
S02 - ATT 25 - 581-22-700 - 100 Drawings Part-23 of 24.pdf PDF
S02 - ATT 29 - 581-22-700 - Geotechnical Report - W24044 - VA Duct Bank 11.21.24.pdf PDF
S02 - ATT 31 - 581-22-700 - Topographic Survey TR Tower 3.pdf PDF
S02 - ATT 32 - Limitations on Subcontracting - Huntington EHRM IU.pdf PDF
S02 - ATT 34 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
Show all 50

EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31-1

HOT TAP WORK PERMIT - EQUIPMENT IN SERVICE

Part I: TO BE COMPLETED BY THE REQUESTER:

Note: Separate request required for each individual hot tap. Job/Work Order Number_____________

(1) Description of piping/equipment/job location:

(2) Description of work to be done:

(3) Justification of why the piping/equipment cannot be de-energized through explanation of continuity of service is essential & shutdown impractical (Note: Inconvenience is not a factor):

Requestor/Title ___________________ Date _______________

Part II: TO BE COMPLETED BY THE QUALIFIED PERSONS DOING THE WORK:

(1) Have personnel executing the “Hot Tap” procedure provided documentation of the necessary level of training to meet their responsibilities associated with the procedure:

YES / NO (circle)

(2) Competent Person oversight is available and will be present during the hot tapping:

YES / NO (circle)

(3) Welding Required: YES / NO (circle)

Hot Work permit was obtained and includes a specific Hot Tapping Welding Safety Task Review (API-2201, Appendix C): YES / NO (circle)

(4) Emergency Action Plan developed (i.e.API-2201, Appendix D): YES / NO (circle)

(5) Necessary personal protective equipment to safely perform the assigned task (FR Clothing, Welding Helmet, Gloves, etc)

(6) Means employed to restrict the access of unqualified persons from the work area:

(7) Evidence of completion of a Job Briefing including discussion of any job-related hazards:

(8) Multi-Gas Meter is available, calibrated, and will be used for monitoring: YES / NO (circle)

(9) Do you agree the above described work can be done safely? YES / NO (circle: If no return to requester)

MEDICAL CENTER MEMORANDUM OS-1 CHAPTER 31

31-2

Contractor/ VA Operation Supervisor(s) Date COR/VA Project Engineer Date

Part III: RECOMMENDATION(S) TO PERFORM THE WORK WHILE EQUIPMENT IS IN

SERVICE:

Chief of Engineering Date Facility Safety Officer Date

Part IV: APPROVAL TO PERFORM THE WORK WHILE EQUIPMENT IS IN SERVICE:

Medical Center Director Date

TO BE FILLED OUT BY THE REQUESTER

TYPE OF PROPOSED INSTALLATION

HEADER OR VESSEL INFORMATION

LINE SIZE (in.)_________________ _ METALLURGY_________________

OPERATING PRESSURE__________ PSIG TEMPERATURE ___________ F

PROCESS DESCRIPTION _________________________________________

BRANCH CONNECTION INFORMATION

LINE SIZE (in.)_________________ _ FLANGE RATING_______________ PSI

OPERATING PRESSURE__________ METALLURGY _________________

INITIATOR _____________________ DATE _________________________

Provide location sketch of the proposed hot tap. The hot tap location must have scaffolding (where required for access), insulation must be removed and the equipment must be marked for the exact hot tap location prior to notifying Pressure Equipment Inspection.

TO BE FILLED OUT BY THE CONTRACTOR/VA PROJECT ENGINEER (COMPETENT

PERSON) AND PRESSURE EQUIPMENT ENGINEER (QUALIFIED PERSON)

WALL THICKNESS AT HOT TAP LOCATION _____(in.) DETERMINED BY: __________

DATE: ________

WELD DETAIL NUMBER:

1. PROCEDURE ______ X-RAY ______

2. PROCEDURE ______ X-RAY ______

3. PROCEDURE ______ X-RAY ______

INSPECTOR: ______________________

TESTS REQUIRED:

MEDICAL CENTER MEMORANDUM OS-1 CHAPTER 31

31-3

(A) NOZZLE ______________________ PSIG MEDIUM __________________

(B) REINFORCING PAD ____________ PSIG MEDIUM __________________

(C) BLOCK VALVE: HYDROSTATIC SEAT EACH SIDE AT ____________ PSIG

AREA INSPECTOR ________________ DATE ____________

PRESSURE EQUIPMENT ENGINEER___________________ DATE ___________

TO BE FILLED OUT BY THE CONTRACTOR PERFORMING THE HOT TAP

HOT TAP MACHINE:

MAKE _____________ MACHINE RATING: _____________ PSIG AT : ___________ F

MODEL __________________ PRESSURE TESTED AT _________ PSIG

SERIAL NO. __________________________ BY _____________________DATE __________

CONTRACTOR REPRESENTATIVE ______________________________DATE ___________

HOT TAPPING