S06 - Amendment 0008 - ATT 13 - Hot Tapping Permit.pdf
PDF 108 KB Posted
- Attached to
- EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades Federal contract opportunity
- Solicitation number
- 36C77626R0025
About this file
This is a Hot Tap Work Permit template used for performing maintenance and modifications on pressurized piping equipment and vessels while they remain in service.
The permit is structured in four parts with specific approval authorities. Part I requires the requester to document the piping/equipment location, description of work to be performed, and justification for why the equipment cannot be de-energized, with explicit notation that inconvenience is not an acceptable justification. Part II obligates qualified personnel executing the hot tap to confirm personnel training documentation, competent person oversight availability, welding requirements with API-2201 compliance, emergency action plans, personal protective equipment specifications, access restriction measures, job briefing completion, multi-gas meter availability and calibration, and overall safety feasibility of the work. Part III requires recommendations from the Chief of Engineering and Facility Safety Officer. Part IV grants final approval from the Medical Center Director. Additional sections require detailed technical specifications including header/vessel information (line size, metallurgy, operating pressure and temperature), branch connection details, wall thickness measurements at the hot tap location, weld procedures with X-ray requirements, nozzle and reinforcing pad pressure ratings, hydrostatic seat testing, and hot tap machine specifications (make, model, serial number, pressure rating and testing documentation). The permit emphasizes compliance with API-2201 standards for hot tapping welding safety and requires location sketches with scaffolding and insulation removal prior to pressure equipment inspection notification.
View the file
Other files for this federal contract opportunity
Show all 50
EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
31-1
HOT TAP WORK PERMIT - EQUIPMENT IN SERVICE
Part I: TO BE COMPLETED BY THE REQUESTER:
Note: Separate request required for each individual hot tap. Job/Work Order Number_____________
(1) Description of piping/equipment/job location:
(2) Description of work to be done:
(3) Justification of why the piping/equipment cannot be de-energized through explanation of continuity of service is essential & shutdown impractical (Note: Inconvenience is not a factor):
Requestor/Title ___________________ Date _______________
Part II: TO BE COMPLETED BY THE QUALIFIED PERSONS DOING THE WORK:
(1) Have personnel executing the “Hot Tap” procedure provided documentation of the necessary level of training to meet their responsibilities associated with the procedure:
YES / NO (circle)
(2) Competent Person oversight is available and will be present during the hot tapping:
YES / NO (circle)
(3) Welding Required: YES / NO (circle)
Hot Work permit was obtained and includes a specific Hot Tapping Welding Safety Task Review (API-2201, Appendix C): YES / NO (circle)
(4) Emergency Action Plan developed (i.e.API-2201, Appendix D): YES / NO (circle)
(5) Necessary personal protective equipment to safely perform the assigned task (FR Clothing, Welding Helmet, Gloves, etc)
(6) Means employed to restrict the access of unqualified persons from the work area:
(7) Evidence of completion of a Job Briefing including discussion of any job-related hazards:
(8) Multi-Gas Meter is available, calibrated, and will be used for monitoring: YES / NO (circle)
(9) Do you agree the above described work can be done safely? YES / NO (circle: If no return to requester)
MEDICAL CENTER MEMORANDUM OS-1 CHAPTER 31
31-2
Contractor/ VA Operation Supervisor(s) Date COR/VA Project Engineer Date
Part III: RECOMMENDATION(S) TO PERFORM THE WORK WHILE EQUIPMENT IS IN
SERVICE:
Chief of Engineering Date Facility Safety Officer Date
Part IV: APPROVAL TO PERFORM THE WORK WHILE EQUIPMENT IS IN SERVICE:
Medical Center Director Date
TO BE FILLED OUT BY THE REQUESTER
TYPE OF PROPOSED INSTALLATION
HEADER OR VESSEL INFORMATION
LINE SIZE (in.)_________________ _ METALLURGY_________________
OPERATING PRESSURE__________ PSIG TEMPERATURE ___________ F
PROCESS DESCRIPTION _________________________________________
BRANCH CONNECTION INFORMATION
LINE SIZE (in.)_________________ _ FLANGE RATING_______________ PSI
OPERATING PRESSURE__________ METALLURGY _________________
INITIATOR _____________________ DATE _________________________
Provide location sketch of the proposed hot tap. The hot tap location must have scaffolding (where required for access), insulation must be removed and the equipment must be marked for the exact hot tap location prior to notifying Pressure Equipment Inspection.
TO BE FILLED OUT BY THE CONTRACTOR/VA PROJECT ENGINEER (COMPETENT
PERSON) AND PRESSURE EQUIPMENT ENGINEER (QUALIFIED PERSON)
WALL THICKNESS AT HOT TAP LOCATION _____(in.) DETERMINED BY: __________
DATE: ________
WELD DETAIL NUMBER:
1. PROCEDURE ______ X-RAY ______
2. PROCEDURE ______ X-RAY ______
3. PROCEDURE ______ X-RAY ______
INSPECTOR: ______________________
TESTS REQUIRED:
MEDICAL CENTER MEMORANDUM OS-1 CHAPTER 31
31-3
(A) NOZZLE ______________________ PSIG MEDIUM __________________
(B) REINFORCING PAD ____________ PSIG MEDIUM __________________
(C) BLOCK VALVE: HYDROSTATIC SEAT EACH SIDE AT ____________ PSIG
AREA INSPECTOR ________________ DATE ____________
PRESSURE EQUIPMENT ENGINEER___________________ DATE ___________
TO BE FILLED OUT BY THE CONTRACTOR PERFORMING THE HOT TAP
HOT TAP MACHINE:
MAKE _____________ MACHINE RATING: _____________ PSIG AT : ___________ F
MODEL __________________ PRESSURE TESTED AT _________ PSIG
SERIAL NO. __________________________ BY _____________________DATE __________
CONTRACTOR REPRESENTATIVE ______________________________DATE ___________
HOT TAPPING
File details come from the government source that posted it. Updated .