S06 - Amendment 0008 - ATT 7 - 02EP100B - ELECTRICAL 20260413.pdf
PDF 954 KB Posted
- Attached to
- EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades Federal contract opportunity
- Solicitation number
- 36C77626R0025
About this file
This is an electrical plan drawing for Building 02, Level 00B (basement) of the Veterans Affairs (VA) EHRM Infrastructure Upgrades project located at 1540 Spring Valley Drive, Huntington, WV 25704-9300. The drawing is dated 09/03/2025 at 100% construction documents phase and is prepared by SPEES Design Build (A/E of record located in Kent, WA).
The electrical plan shows the basement-level power distribution, equipment locations, and feeder routing for Building 02. Key electrical infrastructure includes multiple distribution panels (2-LBC, 2LA-G-C, 2LA-G-F, 2-PA-B-C, 2-LA-B-A, 2-DPA-B-C, 2-LA-B-D Sections 1 and 2, 2D-LA-BB, 2-RPN-BA, 2-LPN-BA, and 2-MN-BA), three 30KVA transformers, a 750KVA-480V substation, and Tower 3 equipment. The plan indicates both A-side and B-side power sourcing with concealed and underground/underfloor routing. General notes specify contractor responsibilities including equipment modification, coordination with the VA for electrical system shutdowns, provision of backup emergency power, fire-rated penetration sealing, feeder pull box installation for runs exceeding 250 feet, and updated circuit panel directories. The drawing references related sheets including one-line diagrams (02EP611), telecommunications bonding riser diagrams (EG602), and typical pull box schedules (EP701). The scope includes UFER conductor and structural steel bonding using #3/0 copper with accessible connection points.
View the file
Other files for this federal contract opportunity
Show all 50
EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PB
PB
PB
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
BB
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
A
A
A
A
A
A
A
A
B
B
BBBBBBB
A
A
A
A
A
A
A
A
A
A A
B B
A A
B B
Z
A7
A5 A4
A3
A8
A11 A10
A9
A2 A1
PANEL '2-LBC'
PANEL '2LA-G-C'
30KVA XFMR
PANEL '2-LA-G-F'
PANEL '2-PA-B-C'
PANEL '2-LA-B-A'
PANEL '2-DPA-B-C'
PANEL '2-LA-B-D (SEC 1)'
PANEL '2-LA-B-D (SEC 2)'
T
T
30A/3P ON ROOF
OF BOILER ROOM
PANEL '2D-LA-BB'
30KVA XFMR
100A/3P
AUTOCALL FIRE ALARM CAB'T
GRINNELL SPRINKLER BOX
PANEL '2-RPN-BA'
30KVA XFMR
PANEL '2-LPN-BA'
4160V, 3P, 4W 600A SWITCHED
SQUARE D #143-51
GE EJO-1 FUSES @150A.
750KVA-480V SUBSTAT 6
WIREWAY
277/480V 1600A CKT BREAKER
SWBD: SUB 6
BLDG 02
BLDG 01
B L D
G
S
S
E E
S H
E E
T
S
E P
B
B L D
G
B L D
G
S
T
PANEL '2-DPA-B-A'
PANEL '2-DLA-B-A'
PANEL '2-DLA-B-B'
PANEL '2-LA-B-C'
PANEL
'2-MN-BA'
TO SHEET 01SEP100B
TR TOWER 3
T3-00B
175 SF
ELEVATOR
MACHINE
ROOM
MAINT.
ELEV
P9
ELEC
BD102
ELECTRIC
BD103
STORAGE
BD107
WATER
INTAKE
BD108
WATER
SOFTENER
BD106
BD105
BIOMEDICAL
ENGINEERING
BD104
BD100
MAS MAIL
ROOM
BD101
CORRIDOR
CORRIDOR
CB
ELEC
SHREDDING
MAS
STOR
TLT
ELEV
F8
ENG.
PLUMPING
SHOP
BD112
ENG. AIR
CONDITIONING
SHOP
BD110
HOT WATER
HEATERS
ENG STORAGE
BD106A
ENG.
ELECTRICAL
SHOP
HVAC
BD104A
LOCKSMITH
BD104B
ENG. M&R
FOREMAN
CARPENTRY
SHOP
M&O
FOREMAN
BD102C
PAINT
VAULT
STORAGE
BD102D
PAINT
BOOTH
BD102B
TOILET
BD102A
TLT
PAINT SHOP
02-P-09
02-P-08
01S-PB-10A
02-P-01
TO SHEET
02EP400Ga
T
02-P-07
02-P-06
FROM SHEET
02EP400Ga
PB-1
7PB-3
7 PB-1
02EP400B
02EP400B
AREA SHOWN
BLDG 02
BLDG 01S
BLDG 23
BLDG 23R
BLDG 01
BLDG 12
BLDG 01W
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:4
:5 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
B A
S E
M E
N T
.r v t
02EP100B
BLDG 02 - LEVEL 00B - ELECTRICAL PLAN
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
1/16" = 1'-0"
BLDG 02 - LEVEL 00B - ELECTRICAL PLAN
ES101
GENERAL NOTES
PROJECT
NORTH
8'0 16' 32'
PROJECT
NORTH
EXISTING EQUIPMENT SHALL BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON
SHEET 02EP611 FOR ADDITIONAL INFORMATION.
PRIMARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS BONDING RISER
DIAGRAM ON SHEET EG602 FOR BONDING JUMPER AND CONNECTION
REQUIREMENTS.
PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL
DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE
TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG602 FOR ADDITIONAL
INFORMATION.
TR TOWER 3: FEEDERS ROUTE THROUGH VERTICALLY STACKED TR TOWER.
REFERENCE SHEET 02EP400B AND ENLARGED ELECTRCIAL PLANS 02EP400G FOR
ADDITIONAL INFORMATION.
PROVIDE TBC AS SHOWN. REFERENCE TELECOM BONDING RISER DIAGRAM ON
SHEET EG602 FOR ADDITIONAL INFORMATION.
APPROXIMATE FOOTPRINT OF MECH ROOM 116 LOCATED ON FLOOR ABOVE.
REFERENCE SHEET 02EP400Ga FOR ADDITIONAL INFORMATION.
PROVIDE PULL BOX AND MOUNTING HARDWARE FOR CONDUCTOR PULLING MEANS.
LABEL PULL BOX WITH EQUIPMENT NAME IT IS SERVING. REFERENCE TYPICAL PULL
BOX SCHEDULE ON SHEET EP701 FOR ADDITIONAL INFORMATION.
KEY NOTES
Revisions: Date:
KEY PLAN
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER
RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENTS AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS
WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. CONDUIT EXPANSION COUPLINGS ARE REQUIRED WHEN CONDUIT IS ROUTED
ACROSS BUILDING EXPANSION JOINTS. REFERENCE DETAIL '1' ON SHEET EP509 FOR
ADDITIONAL INFORMATION.
9. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
UNLESS OTHERWISE NOTED.
Addendum 1: Pre Bid RFIs 4/13/2026
PROVIDE UFER CONDUCTOR AND BONDING OF TOWER STRUCTURAL STEEL TO EXISTING
BUILDING STRUCTURAL STEEL WITH #3/0 COPPER; ALL CONNECTION POINTS SHALL BE
ACCESSIBLE. WHERE EXISTING BUILDING GROUND RING EXISTS, CONTRACTOR SHALL
MATCH EXISTING CONDUCTOR SIZE AND EXTEND RING AROUND TOWER FOOTING.