S06 - Amendment 0008 - ATT 7 - 02EP100B - ELECTRICAL 20260413.pdf

PDF 954 KB Posted

Attached to
EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades Federal contract opportunity
Solicitation number
36C77626R0025
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This is an electrical plan drawing for Building 02, Level 00B (basement) of the Veterans Affairs (VA) EHRM Infrastructure Upgrades project located at 1540 Spring Valley Drive, Huntington, WV 25704-9300. The drawing is dated 09/03/2025 at 100% construction documents phase and is prepared by SPEES Design Build (A/E of record located in Kent, WA).

The electrical plan shows the basement-level power distribution, equipment locations, and feeder routing for Building 02. Key electrical infrastructure includes multiple distribution panels (2-LBC, 2LA-G-C, 2LA-G-F, 2-PA-B-C, 2-LA-B-A, 2-DPA-B-C, 2-LA-B-D Sections 1 and 2, 2D-LA-BB, 2-RPN-BA, 2-LPN-BA, and 2-MN-BA), three 30KVA transformers, a 750KVA-480V substation, and Tower 3 equipment. The plan indicates both A-side and B-side power sourcing with concealed and underground/underfloor routing. General notes specify contractor responsibilities including equipment modification, coordination with the VA for electrical system shutdowns, provision of backup emergency power, fire-rated penetration sealing, feeder pull box installation for runs exceeding 250 feet, and updated circuit panel directories. The drawing references related sheets including one-line diagrams (02EP611), telecommunications bonding riser diagrams (EG602), and typical pull box schedules (EP701). The scope includes UFER conductor and structural steel bonding using #3/0 copper with accessible connection points.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades, newest first.
File Type Posted
S06 - 36C77626R0025 0008.pdf PDF
S06 - Amendment 0008 - ATT 2 - UPDATED SHEETS.pdf PDF
S06 - Amendment 0008 - ATT 5 - ELECTRICAL 2026.04.13.pdf PDF
S06 - Amendment 0008 - ATT 6 - 01WEP100G - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 9 - 260508 - Sheet AD101-1B Data Center Phase 1B Demo Floor Plan update.pdf PDF
S06 - Amendment 0008 - ATT 3 - Civil OSP Redesign-signed.pdf PDF
S06 - Amendment 0008 - ATT 8 - 260508 - Sheet 01S-AE452 TR Tower 4 Wall sections update.pdf PDF
S06 - Amendment 0008 - ATT 12 - Environmental Report Huntington WV.pdf PDF
S06 - Amendment 0008 - ATT 13 - Hot Tapping Permit.pdf PDF
S06 - Amendment 0008 - ATT 4 - Structural Set 04-21-2026.pdf PDF
S06 - Amendment 0007 - ATT 2 - Geotechnical Report.pdf PDF
S06 - Amendment 0007 - ATT 3 - Lift Planning.pdf PDF
S06 - Amendment 0007 - ATT 4 - 01 00 00 - GENERAL REQUIREMENTS_A1.pdf PDF
S06 - Amendment 0007 - ATT 6 - Crane lift Info.pdf PDF
S06 - Amendment 0007 - ATT 1 - TechQuestionsVAresponses Partial 4 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0006.pdf PDF
S06 - Amendment 0006 - ATT 1 - TechQuestionsVAresponses Partial 3 - Huntington EHRM IU.pdf PDF
S06 - Amendment 0004 - ATT 2 - FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
S06 - 36C77626R0025 0004.pdf PDF
S06 - Amendment 0003 - ATT 2 - TechQuestionsVAresponses Partial - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0002.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit In-Sheet - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0001.pdf PDF
S02 - ATT 8 - 581-22-700 - 100 Drawings Part-6 of 24.pdf PDF
S02 - ATT 12 - 581-22-700 - 100 Drawings Part-10 of 24.pdf PDF
S02 - ATT 13 - 581-22-700 - 100 Drawings Part-11 of 24.pdf PDF
S02 - ATT 16 - 581-22-700 - 100 Drawings Part-14 of 24.pdf PDF
S02 - ATT 21 - 581-22-700 - 100 Drawings Part-19 of 24.pdf PDF
S02 - ATT 25 - 581-22-700 - 100 Drawings Part-23 of 24.pdf PDF
S02 - ATT 29 - 581-22-700 - Geotechnical Report - W24044 - VA Duct Bank 11.21.24.pdf PDF
S02 - ATT 31 - 581-22-700 - Topographic Survey TR Tower 3.pdf PDF
S02 - ATT 32 - Limitations on Subcontracting - Huntington EHRM IU.pdf PDF
S02 - ATT 34 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
S02 - ATT 10 - 581-22-700 - 100 Drawings Part-8 of 24.pdf PDF
S02 - ATT 14 - 581-22-700 - 100 Drawings Part-12 of 24.pdf PDF
S02 - ATT 27 - 581-22-700 - Asbestos locations.xlsx XLSX spreadsheet
S02 - ATT 28 - 581-22-700 - FLS Compliance Letter.pdf PDF
S02 - ATT 3 - 581-22-700 - 100 Drawings Part-1 of 24.pdf PDF
S02 - ATT 4 - 581-22-700 - 100 Drawings Part-2 of 24.pdf PDF
S02 - ATT 5 - 581-22-700 - 100 Drawings Part-3 of 24.pdf PDF
S02 - ATT 6 - 581-22-700 - 100 Drawings Part-4 of 24.pdf PDF
S02 - ATT 7 - 581-22-700 - 100 Drawings Part-5 of 24.pdf PDF
S02 - ATT 17 - 581-22-700 - 100 Drawings Part-15 of 24.pdf PDF
S02 - ATT 19 - 581-22-700 - 100 Drawings Part-17 of 24.pdf PDF
S02 - ATT 22 - 581-22-700 - 100 Drawings Part-20 of 24.pdf PDF
S02 - ATT 26 - 581-22-700 - 100 Drawings Part-24 of 24.pdf PDF
S02 - ATT 33 - WD - WV20260048 - 01-02-2026.pdf PDF
S02 - ATT 35 - Site Visit Information - Huntington EHRM IU.pdf PDF
S02 - 36C77626R0025.pdf PDF
S02 - ATT 1 - 581-22-700 - 100 Specifications Part-1 of 2.pdf PDF
Show all 50

EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PB

PB

PB

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

BB

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

A

A

A

A

A

A

A

A

B

B

BBBBBBB

A

A

A

A

A

A

A

A

A

A A

B B

A A

B B

Z

A7

A5 A4

A3

A8

A11 A10

A9

A2 A1

PANEL '2-LBC'

PANEL '2LA-G-C'

30KVA XFMR

PANEL '2-LA-G-F'

PANEL '2-PA-B-C'

PANEL '2-LA-B-A'

PANEL '2-DPA-B-C'

PANEL '2-LA-B-D (SEC 1)'

PANEL '2-LA-B-D (SEC 2)'

T

T

30A/3P ON ROOF

OF BOILER ROOM

PANEL '2D-LA-BB'

30KVA XFMR

100A/3P

AUTOCALL FIRE ALARM CAB'T

GRINNELL SPRINKLER BOX

PANEL '2-RPN-BA'

30KVA XFMR

PANEL '2-LPN-BA'

4160V, 3P, 4W 600A SWITCHED

SQUARE D #143-51

GE EJO-1 FUSES @150A.

750KVA-480V SUBSTAT 6

WIREWAY

277/480V 1600A CKT BREAKER

SWBD: SUB 6

BLDG 02

BLDG 01

B L D

G

S

S

E E

S H

E E

T

S

E P

B

B L D

G

B L D

G

S

T

PANEL '2-DPA-B-A'

PANEL '2-DLA-B-A'

PANEL '2-DLA-B-B'

PANEL '2-LA-B-C'

PANEL

'2-MN-BA'

TO SHEET 01SEP100B

TR TOWER 3

T3-00B

175 SF

ELEVATOR

MACHINE

ROOM

MAINT.

ELEV

P9

ELEC

BD102

ELECTRIC

BD103

STORAGE

BD107

WATER

INTAKE

BD108

WATER

SOFTENER

BD106

BD105

BIOMEDICAL

ENGINEERING

BD104

BD100

MAS MAIL

ROOM

BD101

CORRIDOR

CORRIDOR

CB

ELEC

SHREDDING

MAS

STOR

TLT

ELEV

F8

ENG.

PLUMPING

SHOP

BD112

ENG. AIR

CONDITIONING

SHOP

BD110

HOT WATER

HEATERS

ENG STORAGE

BD106A

ENG.

ELECTRICAL

SHOP

HVAC

BD104A

LOCKSMITH

BD104B

ENG. M&R

FOREMAN

CARPENTRY

SHOP

M&O

FOREMAN

BD102C

PAINT

VAULT

STORAGE

BD102D

PAINT

BOOTH

BD102B

TOILET

BD102A

TLT

PAINT SHOP

02-P-09

02-P-08

01S-PB-10A

02-P-01

TO SHEET

02EP400Ga

T

02-P-07

02-P-06

FROM SHEET

02EP400Ga

PB-1

7PB-3

7 PB-1

02EP400B

02EP400B

AREA SHOWN

BLDG 02

BLDG 01S

BLDG 23

BLDG 23R

BLDG 01

BLDG 12

BLDG 01W

A SIDE POWER, CONCEALED WHERE POSSIBLE

B SIDE POWER, CONCEALED WHERE POSSIBLE

A SIDE POWER, UNDERGROUND / UNDERFLOOR

B SIDE POWER, UNDERGROUND / UNDERFLOOR

PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.

REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL

INFORMATION.

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/0

/2

:4

:5 a m

B

IM

/5

-2

-7

V A

H u n t i n g to n E

H R

M /E

E

B L D

G

B A

S E

M E

N T

.r v t

02EP100B

BLDG 02 - LEVEL 00B - ELECTRICAL PLAN

DCW/NVP RTS/JNV

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

1/16" = 1'-0"

BLDG 02 - LEVEL 00B - ELECTRICAL PLAN

ES101

GENERAL NOTES

PROJECT

NORTH

8'0 16' 32'

PROJECT

NORTH

EXISTING EQUIPMENT SHALL BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON

SHEET 02EP611 FOR ADDITIONAL INFORMATION.

PRIMARY BONDING BUSBAR. REFERENCE TELECOMMUNICATIONS BONDING RISER

DIAGRAM ON SHEET EG602 FOR BONDING JUMPER AND CONNECTION

REQUIREMENTS.

PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL

DAMAGE, CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE

TELECOMMUNICATIONS BONDING RISER DIAGRAM ON SHEET EG602 FOR ADDITIONAL

INFORMATION.

TR TOWER 3: FEEDERS ROUTE THROUGH VERTICALLY STACKED TR TOWER.

REFERENCE SHEET 02EP400B AND ENLARGED ELECTRCIAL PLANS 02EP400G FOR

ADDITIONAL INFORMATION.

PROVIDE TBC AS SHOWN. REFERENCE TELECOM BONDING RISER DIAGRAM ON

SHEET EG602 FOR ADDITIONAL INFORMATION.

APPROXIMATE FOOTPRINT OF MECH ROOM 116 LOCATED ON FLOOR ABOVE.

REFERENCE SHEET 02EP400Ga FOR ADDITIONAL INFORMATION.

PROVIDE PULL BOX AND MOUNTING HARDWARE FOR CONDUCTOR PULLING MEANS.

LABEL PULL BOX WITH EQUIPMENT NAME IT IS SERVING. REFERENCE TYPICAL PULL

BOX SCHEDULE ON SHEET EP701 FOR ADDITIONAL INFORMATION.

KEY NOTES

Revisions: Date:

KEY PLAN

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,

UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE

WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.

5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER

RUNS EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX

PLACEMENTS AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS

WITH ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.

8. CONDUIT EXPANSION COUPLINGS ARE REQUIRED WHEN CONDUIT IS ROUTED

ACROSS BUILDING EXPANSION JOINTS. REFERENCE DETAIL '1' ON SHEET EP509 FOR

ADDITIONAL INFORMATION.

9. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,

UNLESS OTHERWISE NOTED.

Addendum 1: Pre Bid RFIs 4/13/2026

PROVIDE UFER CONDUCTOR AND BONDING OF TOWER STRUCTURAL STEEL TO EXISTING

BUILDING STRUCTURAL STEEL WITH #3/0 COPPER; ALL CONNECTION POINTS SHALL BE

ACCESSIBLE. WHERE EXISTING BUILDING GROUND RING EXISTS, CONTRACTOR SHALL

MATCH EXISTING CONDUCTOR SIZE AND EXTEND RING AROUND TOWER FOOTING.

File details come from the government source that posted it. Updated .