S06 - Amendment 0008 - ATT 9 - 260508 - Sheet AD101-1B Data Center Phase 1B Demo Floor Plan update.pdf

PDF 476 KB Posted

Attached to
EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades
Solicitation number
36C77626R0025
Issued by

About this file

This is an architectural floor plan for a Data Center Phase 1B demolition project at a U.S. Department of Veterans Affairs facility located in Huntington. The plan, prepared by SPEES Design Build (Kent, WA) as the Architect/Engineer of Record, depicts the ground floor layout and identifies areas requiring demolition and preparation for new construction.

The project scope includes demolishing existing structures such as raised floors, stairs, walls, and roofs, as well as removing existing plantboxes and raised wooden floor decks. Critical operational requirements mandate that the existing data center remain functional during Phase 1B and Phase 2A construction, with demolition of the old data center occurring only during Phase 2B. The plan specifies stringent infection control and prevention measures, including maintaining negative pressure inside construction areas at all times, establishing ICRA (Infection Control Risk Assessment) barriers, and relocating HEPA exhaust systems to preferred locations. Two HEPA exhaust locations are identified, with Location #1 serving as a temporary location within the ante room and Location #2 as the preferred permanent location outside the ante room. The plan designates specific rooms as temporarily inaccessible during demolition and wall infill (Rooms GC108 and GC109), requires door sealing during construction phases, and specifies soil excavation to ground floor level. The document includes detailed room inventories, square footage allocations for various spaces including corridors, mechanical support areas, battery rooms, and computer facilities, with the project drawing dated 5/8/2026.

View the file

Other files

File Type Posted
S06 - 36C77626R0025 0008.pdf PDF
S06 - Amendment 0008 - ATT 7 - 02EP100B - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 11 - Burn Permit.pdf PDF
S06 - Amendment 0008 - ATT 10 - 260508 - Sheet AD103-1B Data Center Phase 1B Demo Roof update.pdf PDF
S06 - Amendment 0008 - ATT 1 - TechQuestionsVAresponses Final Set - Huntington EHRM IU.pdf PDF
S06 - Amendment 0008 - ATT 14 - Energized Electrical Work Permit.pdf PDF
S06 - Amendment 0008 - ATT 5 - ELECTRICAL 2026.04.13.pdf PDF
S06 - Amendment 0008 - ATT 6 - 01WEP100G - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 3 - Civil OSP Redesign-signed.pdf PDF
S06 - Amendment 0008 - ATT 12 - Environmental Report Huntington WV.pdf PDF
S06 - Amendment 0008 - ATT 8 - 260508 - Sheet 01S-AE452 TR Tower 4 Wall sections update.pdf PDF
S06 - Amendment 0008 - ATT 13 - Hot Tapping Permit.pdf PDF
S06 - Amendment 0008 - ATT 2 - UPDATED SHEETS.pdf PDF
S06 - Amendment 0008 - ATT 4 - Structural Set 04-21-2026.pdf PDF
S06 - 36C77626R0025 0007.pdf PDF
S06 - Amendment 0007 - ATT 1 - TechQuestionsVAresponses Partial 4 - Huntington EHRM IU.pdf PDF
S06 - Amendment 0007 - ATT 3 - Lift Planning.pdf PDF
S06 - Amendment 0007 - ATT 2 - Geotechnical Report.pdf PDF
S06 - Amendment 0007 - ATT 5 - Appendix A - PFC FPT.pdf PDF
S06 - Amendment 0007 - ATT 4 - 01 00 00 - GENERAL REQUIREMENTS_A1.pdf PDF
S06 - Amendment 0007 - ATT 6 - Crane lift Info.pdf PDF
S06 - 36C77626R0025 0006.pdf PDF
S06 - Amendment 0006 - ATT 1 - TechQuestionsVAresponses Partial 3 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0005.pdf PDF
S06 - Amendment 0004 - ATT 2 - FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
S06 - Amendment 0004 - ATT 1 - TechQuestionsVAresponses Partial 2 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0004.pdf PDF
S06 - Amendment 0003 - ATT 2 - TechQuestionsVAresponses Partial - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0003.pdf PDF
S06 - 36C77626R0025 0002.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit In-Sheet - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0001.pdf PDF
S02 - ATT 28 - 581-22-700 - FLS Compliance Letter.pdf PDF
S02 - ATT 3 - 581-22-700 - 100 Drawings Part-1 of 24.pdf PDF
S02 - ATT 15 - 581-22-700 - 100 Drawings Part-13 of 24.pdf PDF
S02 - ATT 30 - 581-22-700 - 100 Commissioning Plan.pdf PDF
S02 - ATT 20 - 581-22-700 - 100 Drawings Part-18 of 24.pdf PDF
S02 - ATT 24 - 581-22-700 - 100 Drawings Part-22 of 24.pdf PDF
S02 - ATT 1 - 581-22-700 - 100 Specifications Part-1 of 2.pdf PDF
S02 - ATT 10 - 581-22-700 - 100 Drawings Part-8 of 24.pdf PDF
S02 - ATT 12 - 581-22-700 - 100 Drawings Part-10 of 24.pdf PDF
S02 - ATT 23 - 581-22-700 - 100 Drawings Part-21 of 24.pdf PDF
S02 - ATT 31 - 581-22-700 - Topographic Survey TR Tower 3.pdf PDF
S02 - ATT 25 - 581-22-700 - 100 Drawings Part-23 of 24.pdf PDF
S02 - ATT 16 - 581-22-700 - 100 Drawings Part-14 of 24.pdf PDF
S02 - ATT 21 - 581-22-700 - 100 Drawings Part-19 of 24.pdf PDF
S02 - ATT 34 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
S02 - ATT 29 - 581-22-700 - Geotechnical Report - W24044 - VA Duct Bank 11.21.24.pdf PDF
S02 - ATT 14 - 581-22-700 - 100 Drawings Part-12 of 24.pdf PDF
S02 - ATT 27 - 581-22-700 - Asbestos locations.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

UP

DN

UP

X Y Z

DEMOLISH EXISTING STRUCTURE (RAISED

FLOORS, STAIRS, WALLS, ROOFS) PREPARE

AREA FOR NEW CONSTRUCTION.

DEMOLISH EXISTING PLANTBOX AND

RAISED WOODEN FLOOR DECK.

ANTE ROOM

3' - 3"

HEPA EXHAUST LOCATION #2. MOVE EXHUAST TO THIS PREFERRED LOCATION

OUTSIDE OF THE ANTE ROOM WHEN MCR CONSTRUCTION REACHES A POINT

THAT NEGATIVE PRESSURE CAN BE MAINTAINED WITHIN THAT SPACE.

MAINTAIN NEGATIVE PRESSURE INSIDE CONSTRUCTION AREA AT ALL TIMES

ANTEROOM

ANTE ROOM

MAINTAIN NEGATIVE PRESSURE

INSIDE CONSTRUCTION AREA

AT ALL TIMES

/2

PREPARE AREA FOR NEW CONSTRUCTION.

4 5

RM GC108 & GC109 TEMPORARILY NOT

ACCESSIBLE DURING DEMOLITION AND

WALL INFILL.

EXCAVATE SOIL DOWN TO GROUND FLOOR LEVEL.

TR TOWER 1

ANTE ROOMANTE ROOM

FOR ICRA BARRIER

SEE SHEET 01SA-100G

PHASE 1B PHASE 2B PHASE 2A

EXISTING DATA CENTER SHALL REMAIN FUNCTIONAL DURING

PHASE 1B AND PHASE 2A CONSTRUCTION. DEMOLISH OLD

DATA CENTER ON PHASE 2B CONSTRUCTION.

SEAL DOOR DURING

CONSTRUCTION.

ANTE ROOM

SEAL DOOR OPENING

DURING CONSTRUCTION.

FOR ICRA BARRIER

SEE SHEET 01SA-100G

PHASE 2A & 2B

MAINTAIN NEGATIVE PRESSURE

INSIDE CONSTRUCTION AREA

AT ALL TIMES

MAINTAIN NEGATIVE PRESSURE

INSIDE CONSTRUCTION AREA

AT ALL TIMES

MAINTAIN NEGATIVE PRESSURE

INSIDE CONSTRUCTION AREA

AT ALL TIMES

AE301

HEPA EXHAUST LOCATION #1. BEGIN WITH EXHUAST IN THIS TEMPORARY

LOCATION INSIDE OF THE ANTE ROOM WHEN MCR CONSTRUCTION IS NOT YET AT

A POINT THAT NEGATIVE PRESSURE CAN BE MAINTAINED WITHIN THAT SPACE.

MAINTAIN NEGATIVE PRESSURE INSIDE CONSTRUCTION AREA AT ALL TIMES

ICRA NOTE: CONTRACTOR TO UTILIZE TEMPORARY VISQUEEN

BARRIERS TO SEAL EXTERIOR OPENINGS BETWEEN DEMO AND

CONSTRUCTION PHASES TO MAINTAIN NEGATIVE AIR PRESSURE

WHENEVER POSSIBLE. CONTRACTOR TO COORDINATE WITH THE

VA PRIOR TO ANY PERIODS WHEN NEGATIVE AIR PRESSURE

CANNOT BE MAINTAINED. VA MAY RESTRICT WORKING HOURS OR

REQUIRE ADDITIONAL STEPS IF THAT ROUTE IS TAKEN. WHEN ANTE

ROOMS ARE PRESENT, SUCH AS STAIR 9 AND ROOM NUMBERS

CG103 / CG108 / CG109. THE HEPA EXHAUST MAY BE RELOCATED TO

THE ANTE ROOM TO MAINTAIN ICRA PROTECTION WITHIN THE

SPACE DURING PERIODS WHEN THE EXTERIOR WALL IS OPEN.

SHOWN AREA

PROJECT

NORTH

436 SF

IRM MECH.

SUPPORT

GC103

207 SF

STAIR 9

323 SF

IRM

GC114

130 SF

IRM

599 SF

COMPUTER

243 SF

TELE

GC118

223 SF

IRM

GC117

161 SF

BATTERY

GC119

418 SF

IRM

GC116

1071 SF

CORRIDOR

CG43

1585 SF

ENCLOSED

COURTYARD

134 SF

VAPD

WEAPON

GB177A

144 SF

VAPD CHIEF

GB176A

157 SF

STAIR 1

202 SF

LINEN

GB169

56 SF

CLOSET

1906 SF

CORRIDOR

173 SF

MEN

GC108

146 SF

WOMEN

GC109

52 SF

ELEC

GC111

1906 SF

CORRIDOR

POSITIVE ( + ) PRESSURE

CONSTRUCTION ZONE (--) PRESSURE

ANTE ROOM ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACK MAT

HEPA EQUIPED EXHAUST

TO DEMOLISH (PHASE 1B)

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

TO DEMOLISH (PHASE 1B & 2B)

2 HR FIRE RATED WALL

1 HR FIRE RATED WALL

NEW LIGHTS (SEE ELECTRICAL DETAILS)

TO DEMOLISH (PHASE 2A)

TO DEMOLISH (PHASE 2B)

TR TOWER 1

TR TOWER 2

TR TOWER 4

01W

0223R 01S

01A

TR TOWER 3

DATA CENTER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/8

/2

:1

:1

P

M

B

IM

/5

-2

-7

V

A H u n tin g to n

E H

R M

/B L

D G

G

R O

U N

D F

L O

O R

.r v t

AD101-1B

DATA CENTER - PHASE 1B - DEMO FLOOR

PLAN

GC115-1

MA RB/OB

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

3/16" = 1'-0"

DATA CENTER - PHASE 1B - DEMO FLOOR PLAN

1. DATA CENTER SHALL BE OF TYPE II - NON-RATED, NON

COMBUSTIBLE CONSTRUCTION.

2. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING

OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.

3. PATCH AND REPAIR WALLS, FLOORS AND CEILING WHERE

MECHANICAL, PLUMBING, AND ELECTRICAL ITEMS ARE

DEMOLISHED.

4. PROTECT FINISHES IN ROOMS ADJACENT TO NEW

TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED

FOR NEW WORK.

5. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS

REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED

AND REMOVED .

6. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND

DETAILS.

KEY PLAN

LEGEND

PROJECT

NORTH

ICRA CLASS IV LEGEND

3 INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER TO

SEPARATE CONSTRUCTION AREA FROM OCCUPIED SPACE.

4 INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,

SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING

AND MATCH RATING OF ICRA BARRIER, TYPICAL.

5 PLACE TACKY MATS AT ENTRANCE AND EXIT OF

CONSTRUCTION AREA, MINIMUM SIZE 24"x36", TYPICAL.

1 DEMOLISH EXISTING DOOR/FRAME.

2 DEMOLISH EXISTING WINDOW/FRAME.

ICRA KEYNOTES

Revisions: Date:

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

BUILDING INFORMATION

BUILDING CONSTRUCTION TYPE: TYPE II - NON-COMBUSTIBLE

BUILDING OCCUPANCY TYPE: BUSINESS

Sheets
AD101-1B - DATA CENTER - PHASE 1B - DEMO FLOOR PLAN

File details come from the government source that posted it. Updated .