This is an architectural floor plan for a Data Center Phase 1B demolition project at a U.S. Department of Veterans Affairs facility located in Huntington. The plan, prepared by SPEES Design Build (Kent, WA) as the Architect/Engineer of Record, depicts the ground floor layout and identifies areas requiring demolition and preparation for new construction.
The project scope includes demolishing existing structures such as raised floors, stairs, walls, and roofs, as well as removing existing plantboxes and raised wooden floor decks. Critical operational requirements mandate that the existing data center remain functional during Phase 1B and Phase 2A construction, with demolition of the old data center occurring only during Phase 2B. The plan specifies stringent infection control and prevention measures, including maintaining negative pressure inside construction areas at all times, establishing ICRA (Infection Control Risk Assessment) barriers, and relocating HEPA exhaust systems to preferred locations. Two HEPA exhaust locations are identified, with Location #1 serving as a temporary location within the ante room and Location #2 as the preferred permanent location outside the ante room. The plan designates specific rooms as temporarily inaccessible during demolition and wall infill (Rooms GC108 and GC109), requires door sealing during construction phases, and specifies soil excavation to ground floor level. The document includes detailed room inventories, square footage allocations for various spaces including corridors, mechanical support areas, battery rooms, and computer facilities, with the project drawing dated 5/8/2026.
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
UP
DN
UP
X Y Z
DEMOLISH EXISTING STRUCTURE (RAISED
FLOORS, STAIRS, WALLS, ROOFS) PREPARE
AREA FOR NEW CONSTRUCTION.
DEMOLISH EXISTING PLANTBOX AND
RAISED WOODEN FLOOR DECK.
ANTE ROOM
3' - 3"
HEPA EXHAUST LOCATION #2. MOVE EXHUAST TO THIS PREFERRED LOCATION
OUTSIDE OF THE ANTE ROOM WHEN MCR CONSTRUCTION REACHES A POINT
THAT NEGATIVE PRESSURE CAN BE MAINTAINED WITHIN THAT SPACE.
MAINTAIN NEGATIVE PRESSURE INSIDE CONSTRUCTION AREA AT ALL TIMES
ANTEROOM
ANTE ROOM
MAINTAIN NEGATIVE PRESSURE
INSIDE CONSTRUCTION AREA
AT ALL TIMES
/2
PREPARE AREA FOR NEW CONSTRUCTION.
4 5
RM GC108 & GC109 TEMPORARILY NOT
ACCESSIBLE DURING DEMOLITION AND
WALL INFILL.
EXCAVATE SOIL DOWN TO GROUND FLOOR LEVEL.
TR TOWER 1
ANTE ROOMANTE ROOM
FOR ICRA BARRIER
SEE SHEET 01SA-100G
PHASE 1B PHASE 2B PHASE 2A
EXISTING DATA CENTER SHALL REMAIN FUNCTIONAL DURING
PHASE 1B AND PHASE 2A CONSTRUCTION. DEMOLISH OLD
DATA CENTER ON PHASE 2B CONSTRUCTION.
SEAL DOOR DURING
CONSTRUCTION.
ANTE ROOM
SEAL DOOR OPENING
DURING CONSTRUCTION.
FOR ICRA BARRIER
SEE SHEET 01SA-100G
PHASE 2A & 2B
MAINTAIN NEGATIVE PRESSURE
INSIDE CONSTRUCTION AREA
AT ALL TIMES
MAINTAIN NEGATIVE PRESSURE
INSIDE CONSTRUCTION AREA
AT ALL TIMES
MAINTAIN NEGATIVE PRESSURE
INSIDE CONSTRUCTION AREA
AT ALL TIMES
AE301
HEPA EXHAUST LOCATION #1. BEGIN WITH EXHUAST IN THIS TEMPORARY
LOCATION INSIDE OF THE ANTE ROOM WHEN MCR CONSTRUCTION IS NOT YET AT
A POINT THAT NEGATIVE PRESSURE CAN BE MAINTAINED WITHIN THAT SPACE.
MAINTAIN NEGATIVE PRESSURE INSIDE CONSTRUCTION AREA AT ALL TIMES
ICRA NOTE: CONTRACTOR TO UTILIZE TEMPORARY VISQUEEN
BARRIERS TO SEAL EXTERIOR OPENINGS BETWEEN DEMO AND
CONSTRUCTION PHASES TO MAINTAIN NEGATIVE AIR PRESSURE
WHENEVER POSSIBLE. CONTRACTOR TO COORDINATE WITH THE
VA PRIOR TO ANY PERIODS WHEN NEGATIVE AIR PRESSURE
CANNOT BE MAINTAINED. VA MAY RESTRICT WORKING HOURS OR
REQUIRE ADDITIONAL STEPS IF THAT ROUTE IS TAKEN. WHEN ANTE
ROOMS ARE PRESENT, SUCH AS STAIR 9 AND ROOM NUMBERS
CG103 / CG108 / CG109. THE HEPA EXHAUST MAY BE RELOCATED TO
THE ANTE ROOM TO MAINTAIN ICRA PROTECTION WITHIN THE
SPACE DURING PERIODS WHEN THE EXTERIOR WALL IS OPEN.
SHOWN AREA
PROJECT
NORTH
436 SF
IRM MECH.
SUPPORT
GC103
207 SF
STAIR 9
323 SF
IRM
GC114
130 SF
IRM
599 SF
COMPUTER
243 SF
TELE
GC118
223 SF
IRM
GC117
161 SF
BATTERY
GC119
418 SF
IRM
GC116
1071 SF
CORRIDOR
CG43
1585 SF
ENCLOSED
COURTYARD
134 SF
VAPD
WEAPON
GB177A
144 SF
VAPD CHIEF
GB176A
157 SF
STAIR 1
202 SF
LINEN
GB169
56 SF
CLOSET
1906 SF
CORRIDOR
173 SF
MEN
GC108
146 SF
WOMEN
GC109
52 SF
ELEC
GC111
1906 SF
CORRIDOR
POSITIVE ( + ) PRESSURE
CONSTRUCTION ZONE (--) PRESSURE
ANTE ROOM ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACK MAT
HEPA EQUIPED EXHAUST
TO DEMOLISH (PHASE 1B)
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
TO DEMOLISH (PHASE 1B & 2B)
2 HR FIRE RATED WALL
1 HR FIRE RATED WALL
NEW LIGHTS (SEE ELECTRICAL DETAILS)
TO DEMOLISH (PHASE 2A)
TO DEMOLISH (PHASE 2B)
TR TOWER 1
TR TOWER 2
TR TOWER 4
01W
0223R 01S
01A
TR TOWER 3
DATA CENTER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/8
/2
:1
:1
P
M
B
IM
/5
-2
-7
V
A H u n tin g to n
E H
R M
/B L
D G
G
R O
U N
D F
L O
O R
.r v t
AD101-1B
DATA CENTER - PHASE 1B - DEMO FLOOR
PLAN
GC115-1
MA RB/OB
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
3/16" = 1'-0"
DATA CENTER - PHASE 1B - DEMO FLOOR PLAN
1. DATA CENTER SHALL BE OF TYPE II - NON-RATED, NON
COMBUSTIBLE CONSTRUCTION.
2. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING
OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.
3. PATCH AND REPAIR WALLS, FLOORS AND CEILING WHERE
MECHANICAL, PLUMBING, AND ELECTRICAL ITEMS ARE
DEMOLISHED.
4. PROTECT FINISHES IN ROOMS ADJACENT TO NEW
TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED
FOR NEW WORK.
5. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS
REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED
AND REMOVED .
6. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND
DETAILS.
KEY PLAN
LEGEND
PROJECT
NORTH
ICRA CLASS IV LEGEND
3 INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER TO
SEPARATE CONSTRUCTION AREA FROM OCCUPIED SPACE.
4 INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,
SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING
AND MATCH RATING OF ICRA BARRIER, TYPICAL.
5 PLACE TACKY MATS AT ENTRANCE AND EXIT OF
CONSTRUCTION AREA, MINIMUM SIZE 24"x36", TYPICAL.
1 DEMOLISH EXISTING DOOR/FRAME.
2 DEMOLISH EXISTING WINDOW/FRAME.
ICRA KEYNOTES
Revisions: Date:
GENERAL NOTES
KEY NOTES (THIS SHEET ONLY)
BUILDING INFORMATION
BUILDING CONSTRUCTION TYPE: TYPE II - NON-COMBUSTIBLE
BUILDING OCCUPANCY TYPE: BUSINESS
| Sheets |
| AD101-1B - DATA CENTER - PHASE 1B - DEMO FLOOR PLAN |
File details come from the government source that posted it. Updated .