S06 - Amendment 0008 - ATT 10 - 260508 - Sheet AD103-1B Data Center Phase 1B Demo Roof update.pdf

PDF 412 KB Posted

Attached to
EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades
Solicitation number
36C77626R0025
Issued by

About this file

This is an architectural drawing for a Data Center Phase 1B Demolition and Roof Plan at a Veterans Affairs facility in Huntington, West Virginia. The drawing, prepared by SSPEES Design Build (23830 Pacific Highway S., Suite 300, Kent, WA 98032), shows the ground floor layout with detailed demolition phases and construction requirements.

The project involves demolishing and infilling select areas while maintaining functionality of the existing data center during Phase 1B construction, with complete demolition of the old data center scheduled for Phase 2. Key construction requirements include: maintaining negative pressure inside construction areas at all times; implementing ICRA (Infection Control Risk Assessment) barriers to seal construction phases; performing demolition and infill work during night shifts or after working hours in coordination with the Contracting Officer's Representative (COR); temporarily restricting access to Room 130 during demolition and wall infill activities; and securing and sealing half of a double door during construction. The drawing identifies multiple clinical spaces including prosthetics offices (1C110, 1C111), pharmacy (1C112, 1C113), nurse recruitment (1C108), electrical (1C109), chief PM&R (1B134B), and PM&R (1B134C) areas. Specific construction notes address infection control measures, temporary barriers, entry points, and coordination requirements to ensure minimal disruption to ongoing VA operations. The drawing is dated 5/8/2026 and includes a comprehensive legend identifying demolition phases, ICRA barriers, existing conditions to remain, new construction elements, and electrical details.

View the file

Other files

File Type Posted
S06 - 36C77626R0025 0008.pdf PDF
S06 - Amendment 0008 - ATT 7 - 02EP100B - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 11 - Burn Permit.pdf PDF
S06 - Amendment 0008 - ATT 9 - 260508 - Sheet AD101-1B Data Center Phase 1B Demo Floor Plan update.pdf PDF
S06 - Amendment 0008 - ATT 1 - TechQuestionsVAresponses Final Set - Huntington EHRM IU.pdf PDF
S06 - Amendment 0008 - ATT 14 - Energized Electrical Work Permit.pdf PDF
S06 - Amendment 0008 - ATT 5 - ELECTRICAL 2026.04.13.pdf PDF
S06 - Amendment 0008 - ATT 6 - 01WEP100G - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 3 - Civil OSP Redesign-signed.pdf PDF
S06 - Amendment 0008 - ATT 12 - Environmental Report Huntington WV.pdf PDF
S06 - Amendment 0008 - ATT 8 - 260508 - Sheet 01S-AE452 TR Tower 4 Wall sections update.pdf PDF
S06 - Amendment 0008 - ATT 13 - Hot Tapping Permit.pdf PDF
S06 - Amendment 0008 - ATT 2 - UPDATED SHEETS.pdf PDF
S06 - Amendment 0008 - ATT 4 - Structural Set 04-21-2026.pdf PDF
S06 - 36C77626R0025 0007.pdf PDF
S06 - Amendment 0007 - ATT 1 - TechQuestionsVAresponses Partial 4 - Huntington EHRM IU.pdf PDF
S06 - Amendment 0007 - ATT 3 - Lift Planning.pdf PDF
S06 - Amendment 0007 - ATT 2 - Geotechnical Report.pdf PDF
S06 - Amendment 0007 - ATT 5 - Appendix A - PFC FPT.pdf PDF
S06 - Amendment 0007 - ATT 4 - 01 00 00 - GENERAL REQUIREMENTS_A1.pdf PDF
S06 - Amendment 0007 - ATT 6 - Crane lift Info.pdf PDF
S06 - 36C77626R0025 0006.pdf PDF
S06 - Amendment 0006 - ATT 1 - TechQuestionsVAresponses Partial 3 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0005.pdf PDF
S06 - Amendment 0004 - ATT 2 - FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
S06 - Amendment 0004 - ATT 1 - TechQuestionsVAresponses Partial 2 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0004.pdf PDF
S06 - Amendment 0003 - ATT 2 - TechQuestionsVAresponses Partial - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0003.pdf PDF
S06 - 36C77626R0025 0002.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit In-Sheet - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0001.pdf PDF
S02 - ATT 28 - 581-22-700 - FLS Compliance Letter.pdf PDF
S02 - ATT 3 - 581-22-700 - 100 Drawings Part-1 of 24.pdf PDF
S02 - ATT 15 - 581-22-700 - 100 Drawings Part-13 of 24.pdf PDF
S02 - ATT 30 - 581-22-700 - 100 Commissioning Plan.pdf PDF
S02 - ATT 20 - 581-22-700 - 100 Drawings Part-18 of 24.pdf PDF
S02 - ATT 24 - 581-22-700 - 100 Drawings Part-22 of 24.pdf PDF
S02 - ATT 1 - 581-22-700 - 100 Specifications Part-1 of 2.pdf PDF
S02 - ATT 10 - 581-22-700 - 100 Drawings Part-8 of 24.pdf PDF
S02 - ATT 12 - 581-22-700 - 100 Drawings Part-10 of 24.pdf PDF
S02 - ATT 23 - 581-22-700 - 100 Drawings Part-21 of 24.pdf PDF
S02 - ATT 31 - 581-22-700 - Topographic Survey TR Tower 3.pdf PDF
S02 - ATT 25 - 581-22-700 - 100 Drawings Part-23 of 24.pdf PDF
S02 - ATT 16 - 581-22-700 - 100 Drawings Part-14 of 24.pdf PDF
S02 - ATT 21 - 581-22-700 - 100 Drawings Part-19 of 24.pdf PDF
S02 - ATT 34 - HEFP SEP Design Alerts 1-9 and 11-16.pdf PDF
S02 - ATT 29 - 581-22-700 - Geotechnical Report - W24044 - VA Duct Bank 11.21.24.pdf PDF
S02 - ATT 14 - 581-22-700 - 100 Drawings Part-12 of 24.pdf PDF
S02 - ATT 27 - 581-22-700 - Asbestos locations.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHOWN AREA

PROJECT

NORTH

X Y Z

TIME KEEPER

1C107

178 SF

STAIR

205 SF

TLT

31 SF

NURSE RECRUIT

1C108

100 SF

ELEC

1C109

59 SF

PROSTHETICS

1C110

228 SF

PROSTHETICS

1C111

125 SF

E-5

S-4

34 SF

CLINICAL

PHARMACY

1C112

117 SF

PHARMACY

RESIDENT

1C113

168 SF

DIETETICS

1C114

141 SF

PROSTHETICS

OFFICE

1B127

160 SF

STAIR

169 SF

CHIEF PM &R

1B134B

215 SF

PM & R

1B134C

127 SF

EXISTING DATA CENTER SHALL REMAIN FUNCTIONAL

DURING PHASE 1B CONSTRUCTION. DEMOLISH

OLD DATA CENTER ON PHASE 2 CONSTRUCTION.

2 2 2 2 2

DEMOLISH AND INFILL SHALL BE

DONE ON NIGHT SHIFTS OR AFTER

WORKING HOURS COORDINATE WITH COR.

ENTRY

POINT

RM 130 TEMPORARILY NOT ACCESSIBLE

DURING DEMOLITION AND WALL INFILL.

ENTRY

POINT

ENTRY POINT

ENTRY POINT

ENTRY POINT

ENTRY

POINT

ENTRY POINT

ENTRY

POINT

ENTRY

POINT

ENTRY POINT

SECURE AND SEAL HALF OF

DOUBLE DOOR DURING THE

COURSE OF CONSTRUCTION.

TR TOWER 1

PART OF LEVEL 01

PART OF LEVEL 02

ANTE ROOM

CORRIDOR

C2-35

1042 SF

HAC

1C111a

89 SF

PHASE 1B

PHASE 2B

FOR ICRA BARRIER

SEE SHEET 01SA-101

MAINTAIN NEGATIVE PRESSURE

INSIDE CONSTRUCTION AREA

AT ALL TIMES

PHASE 1B

ICRA NOTE: CONTRACTOR TO UTILIZE TEMPORARY VISQUEEN

BARRIERS TO SEAL EXTERIOR OPENINGS BETWEEN DEMO AND

CONSTRUCTION PHASES TO MAINTAIN NEGATIVE AIR PRESSURE

WHENEVER POSSIBLE. CONTRACTOR TO COORDINATE WITH THE

VA PRIOR TO ANY PERIODS WHEN NEGATIVE AIR PRESSURE

CANNOT BE MAINTAINED. VA MAY RESTRICT WORKING HOURS OR

REQUIRE ADDITIONAL STEPS IF THAT ROUTE IS TAKEN.

POSITIVE ( + ) PRESSURE

CONSTRUCTION ZONE (--) PRESSURE

ANTE ROOM ( - ) PRESSURE

TEMPORARY ICRA BARRIER

TEMPORARY ICRA DOOR

CONSTRUCTION TACK MAT

HEPA EQUIPED EXHAUST

POLYETHYLENE SHEETING

HEPA EQUIPPED AIR FILTER

TO DEMOLISH (PHASE 1B)

EXISTING DOOR TO REMAIN

EXISTING DOOR TO DEMOLISH

NEW DOOR

2 HR FIRE RATED WALL

1 HR FIRE RATED WALL

NEW LIGHTS (SEE ELECTRICAL DETAILS)

TO DEMOLISH (PHASE 2A)

TO DEMOLISH (PHASE 2B)

TR TOWER 1

TR TOWER 2

TR TOWER 4

01W

0223R 01S

01A

TR TOWER 3

DATA CENTER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/8

/2

:1

:3

P

M

B

IM

/5

-2

-7

V

A H u n tin g to n

E H

R M

/B L

D G

G

R O

U N

D F

L O

O R

.r v t

AD103-1B

DATA CENTER - PHASE 1B - DEMO ROOF

GC115-1

MA RB

100% CONSTRUCTION

DOCUMENTS

09/03/2025

581-22-700EHRM INFRASTRUCTURE

UPGRADES - HUNTINGTON

VA HUNTINGTON

1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300

GENERAL NOTES

KEY PLAN

KEY NOTES (THIS SHEET ONLY)

LEGEND

PROJECT

NORTH

5 INSTALL TEMPORARY 1 HR CONSTRUCTION ICRA BARRIER TO

SEPARATE CONSTRUCTION AREA FROM OCCUPIED SPACE.

6 INSTALL FIRE RESISTANT TEMPORARY SELF-CLOSING DOOR,

SOLID CORE WOOD IN STEEL FRAME, PAINTED, AT OPENING

AND MATCH RATING OF ICRA BARRIER, TYPICAL.

7 INSTALL POLYETHYLENE SHEETING TO ISOLATE

CONSTRUCTION ZONE. TAPE AND SEAL ALONG EDGES, AND

ANY AREAS WHERE POTENTIAL DUST MAY BE EXPOSED

OUTSIDE OF CONSTRUCTION AREA.

8 PLACE TACKY MATS AT ENTRANCE AND EXIT OF

CONSTRUCTION AREA, MINIMUM SIZE 24"x36", TYPICAL.

1 DEMOLISH EXISTING ROOF/STRUCTURE.

2 DEMOLISH EXISTING WINDOW/FRAME.

3 DEMOLISH EXISTING DOOR/FRAME.

4 DEMOLISH PORTION OF EXISTING WALL. PREPARE FOR NEW

DOOR/FRAME.

3/16" = 1'-0"

DATA CENTER - PHASE 1B - DEMO ROOF

ICRA KEYNOTES

ICRA LEGEND

ICRA CLASS IV LEGEND

ICRA CLASS II LEGEND

Revisions: Date:

1. DATA CENTER SHALL BE OF TYPE II - NON-RATED, NON

COMBUSTIBLE CONSTRUCTION.

2. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING

OR ADJACENT EXISTING UNLESS OTHERWISE NOTED.

3. PATCH AND REPAIR WALLS, FLOORS AND CEILING WHERE

MECHANICAL, PLUMBING, AND ELECTRICAL ITEMS ARE

DEMOLISHED.

4. PROTECT FINISHES IN ROOMS ADJACENT TO NEW

TELECOMMUNICATION ROOMS AND AREAS NOT SCHEDULED

FOR NEW WORK.

5. PATCH AND REPAIR CEILING, WALLS AND FLOORS AS

REQUIRED WHERE ICRA BARRIERS WILL BE CONSTRUCTED

AND REMOVED .

6. REFER TO SHEET AS101 FOR ICRA REQUIREMENTS AND

DETAILS.

BUILDING INFORMATION

BUILDING CONSTRUCTION TYPE: TYPE II - NON-COMBUSTIBLE

BUILDING OCCUPANCY TYPE: BUSINESS

Sheets
AD103-1B - DATA CENTER - PHASE 1B - DEMO ROOF

File details come from the government source that posted it. Updated .