About this file
This is a Design Compliance Certification Letter issued by Grey Rock Life Safety certifying that mechanical submittals for the EHRM Infrastructure Upgrades – Huntington project have been reviewed for compliance with applicable codes and standards regarding fire protection and life safety requirements. The project is located at 1540 Spring Valley Drive in Huntington, West Virginia, with Project Number 581-22-700, and the certification is for the 100% Construction Documents phase, issued on June 27, 2025.
The letter documents the review of 127 drawing sheets across multiple building structures and phases, including general notes, floor plans, mechanical piping systems, fire protection layouts, plumbing systems, HVAC duct and piping arrangements, and mechanical controls and schedules. The reviewed drawings cover numerous buildings (numbered 01S through 34, plus TR towers and data center phases) at various levels from basement through attic, with detailed specifications for demolition plans, reflective ceiling plans, and riser diagrams. Greg Kimble, PE, a Fire Protection Engineer licensed in Oregon and Colorado, certified that the design as represented in the provided sheets meets the minimum code requirements of the project. The certification notes that individual sheets remain the responsibility of registered design professionals, who are responsible for stamping individual drawings if required by the project.
View the file
Other files for this federal contract opportunity
Show all 50
EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
June 27, 2025
1 | P a g e
Design Compliance Certification Letter
This letter is to certify that the mechanical submittal for the EHRM Infrastructure upgrades - Huntington project located at 1540 Spring Valley Drive in Huntington, WV has been reviewed for compliance with applicable codes and standards regarding fire protection and life safety requirements.
Project Title: EHRM Infrastructure Upgrades – Huntington Project Number: 581-22-700 Phase: 100% Construction Documents Issue Date: 06/27/2025
Drawings and Revisions Reviewed
The following sheets and revisions have been reviewed for compliance:
SHEET
NO.
DWG NO. TITLE
1 M-001 FIRE PROTECTION, PLUMBING, AND MECHANICAL GENERAL NOTES
2 M-002 FIRE PROTECTION, PLUMBING, AND MECHANICAL GENERAL NOTES
3 M-003 FIRE PROTECTION, PLUMBING, AND MECHANICAL GENERAL NOTES
4 01-M-101 BUILDING 01S -BASEMENT -OVERALL PLAN -AREA A
5 01-M-102 BUILDING 01S -LEVEL 00 -OVERALL PLAN -AREA A
6 01-M-103 BUILDING 01S & 01W -LEVEL 00 -OVERALL PLAN -AREA B
7 01-M-104 BUILDING 01S -LEVEL 01 -OVERALL PLAN -AREA A
8 01-M-105 BUILDING 01S & 01W -LEVEL 01 -OVERALL PLAN -AREA B
9 01-M-106 BUILDING 01S -LEVEL 02 -OVERALL PLAN -AREA A
10 01-M-107 BUILDING 01S & 01W -LEVEL 02 -OVERALL PLAN -AREA B
11 01-M-108 BUILDING 01S -LEVEL 03 -OVERALL PLAN -AREA A
12 01-M-109 BUILDING 01S & 01W -LEVEL 03 -OVERALL PLAN -AREA B
13 01-M-110 BUILDING 01S -LEVEL 04 -OVERALL PLAN -AREA A
14 01-M-111 BUILDING 01S -LEVEL 04 -OVERALL PLAN -AREA B
15 01-M-112 BUILDING 01S -LEVEL 05 -OVERALL PLAN
16 01-M-113 BUILDING 01S -LEVEL 06 -OVERALL PLAN
17 01S-M-401 BASEMENT FLOOR PLAN -MECHANICAL PIPING TO TR TOWER 1
18 01S-M-402 PIPE BASEMENT FLOOR PLAN -MECHANICAL PIPING TO TR TOWER 4
19 01S-M-403 BUILDING 01S -BASEMENT -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
20 01S-M-404 BUILDING 01S -LEVEL 00 -MECHANICAL PIPING -FLOOR PLAN
21 01S-M-405 BUILDING 01S -T1 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
22 01S-M-406 BUILDING 01S -T4 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
23 01S-M-407 BUILDING 01S -LEVEL 01 -MECHANICAL PIPING -FLOOR PLAN
Standard Terms and Conditions
2 | P a g e
24 01S-M-408 BUILDING 01S -T1 -LEVEL 01 -FIRE PROTECTION, PLUMBING, AND
25 01S-M-409 BUILDING 01S -T4 -LEVEL 01 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
26 01S-M-410 BUILDING 01S -T1 -LEVEL 02 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
27 01S-M-411 BUILDING 01S -T4 -LEVEL 02 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
28 01S-M-412 BUILDING 01S -T1 -LEVEL 03 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
29 01S-M-413 BUILDING 01S -T4 -LEVEL 03 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
30 01S-M-414 BUILDING 01S -T1 -LEVEL 04 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
31 01S-M-415 BUILDING 01S -T4 -LEVEL 04 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
32 01S-M-416 BUILDING 01S -T1 -LEVEL 05 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
33 01S-M-417 BUILDING 01S -T4 -LEVEL 05 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
34 01S-M-418 BUILDING 01S -LEVEL 06 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN
35 01W-M-401 BASEMENT FLOOR PLAN -MECHANICAL PIPING -MECHANICAL
PIPING TO TR TOWER 2
36 01W-M-402 BUILDING 01W -T2 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
37 01W-M-403 BUILDING 01W -T2 -LEVEL 01 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
38 01W-M-404 BUILDING 01W -T2 -LEVEL 02 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
39 01W-M-405 BUILDING 01W -T2 -LEVEL 03 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
40 M-301-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC DUCT -SECTION VIEW
41 M-302-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC DUCT & ERV -SECTION VIEW
42 MD401-1A PHASE 1A -ROOF -DATA CENTER -DEMOLITION ROOF PLAN
43 MH402-1A PHASE 1A -ROOF -DATA CENTER - ROOF PLAN
44 FD403-1B PHASE 1B -LVL 00 -DATA CENTER -FIRE PROTECTION -DEMOLITION
RCP
45 MD404-1B PHASE 1B -LVL 00 -DATA CENTER -HVAC DUCT -DEMOLITION FLOOR
PLAN
46 MD405-1B PHASE 1B -LVL 00 -DATA CENTER -DEMOLITION RCP
47 FX406-1B PHASE 1B -LVL 00 -DATA CENTER -FIRE PROTECTION -FLOOR PLAN
48 MP407-1B PHASE 1B -LVL 00 -DATA CENTER -HVAC PIPING -FLOOR PLAN
49 MH408-1B PHASE 1B -LVL 00 -DATA CENTER -HVAC DUCT -FLOOR PLAN
50 MH409-1B PHASE 1B -LVL 00 -DATA CENTER -RCP
51 MH410-1B PHASE 1B -ROOF -DATA CENTER -ROOF PLAN
3 | P a g e
52 PP411-1B PHASE 1B -LVL 00 -DATA CENTER -PLUMBING PIPING -FLOOR PLAN
53 MP412-2A PHASE 2A -LVL 00 -DATA CENTER -HVAC PIPING -FLOOR PLAN
54 MH413-2A PHASE 2A -ROOF -DATA CENTER -ROOF PLAN
55 MD414-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC PIPING -DEMOLITION
FLOOR PLAN
56 MD415-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC DUCT -DEMOLITION FLOOR
PLAN
57 MD416-2B PHASE 2B -LVL 00 -DATA CENTER -DEMOLITION RCP
58 MD417-2B PHASE 2B -LVL 00 -DATA CENTER -DEMOLITION ROOF FLOOR PLAN
59 FD418-2B PHASE 2B -LVL 00 -DATA CENTER -FIRE PROTECTION -DEMOLITION
RCP
60 FX419-2B PHASE 2B -LVL 00 -DATA CENTER -FIRE PROTECTION -FLOOR PLAN
61 MP420-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC PIPING -FLOOR PLAN
62 MH421-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC DUCT -FLOOR PLAN
63 MH422-2B PHASE 2B -LVL 00 -DATA CENTER -RCP
64 MH423-2B PHASE 2B -ROOF -DATA CENTER -ROOF PLAN
65 02-M-101 BUILDING 02 -BASEMENT -OVERALL PLAN
66 02-M-102 BUILDING 02 -LEVEL 00 -OVERALL PLAN
67 02-M-401 BASEMENT FLOOR PLAN -MECHANICAL PIPING TO TR TOWER 3
68 02-M-402 BUILDING 02 -T3 -BASEMENT -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
69 02-M-403 BUILDING 02 -T3 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
70 03-M-101 BUILDING 03 -LEVEL 01 -OVERALL PLAN
71 03-M-401 BUILDING 03 -LEVEL 01 -PLUMBING AND MECHANICAL -FLOOR
PLAN
72 04-M-101 BUILDING 04 -LEVEL 00 -OVERALL PLAN
73 04-M-401 BUILDING 04 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
74 04-M-402 BUILDING 04 -LEVEL 01 -MECHANICAL PIPING -FLOOR PLAN
75 05-M-101 BUILDING 05 -LEVEL 00 -OVERALL PLAN
76 05-M-401 BUILDING 05 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
77 05-M-402 BUILDING 05 -LEVEL 01 -MECHANICAL PIPING -FLOOR PLAN
78 06-M-101 BUILDING 06 -LEVEL 01 -OVERALL PLAN
79 06-M-401 BUILDING 06 -LEVEL 01 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
80 06-M-402 BUILDING 06 -ROOF PLAN
81 07-M-101 BUILDING 07 -LEVEL 00 -OVERALL PLAN
82 07-M-102 BUILDING 07 -LEVEL 01 -OVERALL PLAN
83 07-M-103 BUILDING 07 -LEVEL ATTIC -OVERALL PLAN
84 07-M-401 BUILDING 07 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
85 07-M-402 BUILDING 07 -LEVEL 01 -MECHANICAL PIPING -FLOOR PLAN
86 07-M-403 BUILDING 07 -LEVEL 02 -FLOOR PLAN
4 | P a g e
87 07-M-404 BUILDING 07 -LEVEL ATTIC -FIRE PROTECTION, PLUMBING, AND
88 08-M-101 BUILDING 08 -LEVEL 00 -OVERALL PLAN
89 08-M-102 BUILDING 08 -LEVEL ATTIC -OVERALL PLAN
90 08-M-401 BUILDING 08 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
91 08-M-402 BUILDING 08 -LEVEL ATTIC -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
92 09-M-101 BUILDING 09 -LEVEL 02 -OVERALL PLAN
93 09-M-401 BUILDING 09 -LEVEL 00 -MECHANICAL PIPING -FLOOR PLAN
94 09-M-402 BUILDING 09 -LEVEL 01 -FLOOR PLAN
95 09-M-403 BUILDING 09 -LEVEL 02 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
96 20-M-101 BUILDING 20 -LEVEL 01 -OVERALL PLAN
97 20-M-102 BUILDING 20 -LEVEL 02 -OVERALL PLAN
98 20-M-401 BUILDING 20 -LEVEL 01 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
99 20-M-402 BUILDING 20 -LEVEL 02 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
100 20-M-403 BUILDING 20 -ROOF PLAN
101 23R-M-101 BUILDING 23R -BASEMENT -OVERALL PLAN
102 23R-M-401 BUILDING 23R -BASEMENT -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS
103 25-M-101 BUILDING 25 -LEVEL 01 -OVERALL PLAN
104 25-M-401 BUILDING 25 -LEVEL 01 -FIRE PROTECTION, PLUMBING, AND
MECHANICAL -FLOOR PLAN & RCP
105 28-M-101 BUILDING 28 -LEVEL 01 -OVERALL PLAN
106 28-M-401 BUILDING 28 -LEVEL 01 -PLUMBING AND MECHANICAL -FLOOR
PLAN
107 34-M-101 BUILDING 34 -LEVEL 00 -OVERALL PLAN
108 34-M-401 BUILDING 34 -LEVEL 00 -PLUMBING AND MECHANICAL -FLOOR
PLAN
109 TR1-M-101 BUILDING TR1 -LEVEL 01 -OVERALL PLAN
110 TR1-M-401 BUILDING TR1 -LEVEL 01 -PLUMBING AND MECHANICAL -FLOOR
PLAN
111 TR3-M-101 BUILDING TR3 -LEVEL 01 -OVERALL PLAN
112 TR3-M-401 BUILDING TR3 -LEVEL 01 -MECHANICAL -FLOOR PLAN & RCP
113 TR4-M-101 BUILDING TR4 -LEVEL 01 -OVERALL PLAN
114 TR4-M-401 BUILDING TR4 -LEVEL 01 -MECHANICAL -FLOOR PLAN & RCP
115 TR5-M-101 BUILDING TR5 -LEVEL 01 -OVERALL PLAN
116 TR5-M-401 BUILDING TR5 -LEVEL 01 -MECHANICAL -FLOOR PLAN & RCP
117 M-501 MECHANICAL DETAILS I
118 M-502 MECHANICAL DETAILS II
119 M-503 MECHANICAL DETAILS III
120 M-504 TR TOWER HYDRONIC RISER DIAGRAMS
121 M-601 MECHANICAL SCHEDULES I
5 | P a g e
122 M-602 MECHANICAL SCHEDULES II
123 M-603 MECHANICAL SCHEDULES III
124 M-701 MECHANICAL CONTROLS I
125 M-702 MECHANICAL CONTROLS II
126 M-703 MECHANICAL CONTROLS III
127 M-704 MECHANICAL CONTROLS IV
Individual sheets are the responsibility of the registered design professionals. If required by the project, the registered design professional is responsible for stamping individual drawings. Grey Rock certifies the design as represented in the sheets provided to Grey Rock was reviewed to ensure meet the minimum code requirements of the project.
Sincerely, Greg Kimble, PE Fire Protection Engineer *Licensed in OR, CO
| 2025-06-27T16:25:09-0600 | |
| Gregory Kimble | |
| I am the author of this document |
File details come from the government source that posted it. Updated .