S02 - ATT 28 - 581-22-700 - FLS Compliance Letter.pdf

PDF 556 KB Posted

Attached to
EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades Federal contract opportunity
Solicitation number
36C77626R0025
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This is a Design Compliance Certification Letter issued by Grey Rock Life Safety certifying that mechanical submittals for the EHRM Infrastructure Upgrades – Huntington project have been reviewed for compliance with applicable codes and standards regarding fire protection and life safety requirements. The project is located at 1540 Spring Valley Drive in Huntington, West Virginia, with Project Number 581-22-700, and the certification is for the 100% Construction Documents phase, issued on June 27, 2025.

The letter documents the review of 127 drawing sheets across multiple building structures and phases, including general notes, floor plans, mechanical piping systems, fire protection layouts, plumbing systems, HVAC duct and piping arrangements, and mechanical controls and schedules. The reviewed drawings cover numerous buildings (numbered 01S through 34, plus TR towers and data center phases) at various levels from basement through attic, with detailed specifications for demolition plans, reflective ceiling plans, and riser diagrams. Greg Kimble, PE, a Fire Protection Engineer licensed in Oregon and Colorado, certified that the design as represented in the provided sheets meets the minimum code requirements of the project. The certification notes that individual sheets remain the responsibility of registered design professionals, who are responsible for stamping individual drawings if required by the project.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades, newest first.
File Type Posted
S06 - 36C77626R0025 0008.pdf PDF
S06 - Amendment 0008 - ATT 3 - Civil OSP Redesign-signed.pdf PDF
S06 - Amendment 0008 - ATT 7 - 02EP100B - ELECTRICAL 20260413.pdf PDF
S06 - Amendment 0008 - ATT 8 - 260508 - Sheet 01S-AE452 TR Tower 4 Wall sections update.pdf PDF
S06 - Amendment 0008 - ATT 12 - Environmental Report Huntington WV.pdf PDF
S06 - Amendment 0008 - ATT 13 - Hot Tapping Permit.pdf PDF
S06 - Amendment 0008 - ATT 1 - TechQuestionsVAresponses Final Set - Huntington EHRM IU.pdf PDF
S06 - Amendment 0008 - ATT 10 - 260508 - Sheet AD103-1B Data Center Phase 1B Demo Roof update.pdf PDF
S06 - Amendment 0008 - ATT 11 - Burn Permit.pdf PDF
S06 - Amendment 0008 - ATT 14 - Energized Electrical Work Permit.pdf PDF
S06 - Amendment 0008 - ATT 4 - Structural Set 04-21-2026.pdf PDF
S06 - 36C77626R0025 0007.pdf PDF
S06 - Amendment 0007 - ATT 1 - TechQuestionsVAresponses Partial 4 - Huntington EHRM IU.pdf PDF
S06 - Amendment 0007 - ATT 5 - Appendix A - PFC FPT.pdf PDF
S06 - 36C77626R0025 0006.pdf PDF
S06 - Amendment 0006 - ATT 1 - TechQuestionsVAresponses Partial 3 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0005.pdf PDF
S06 - Amendment 0004 - ATT 2 - FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
S06 - Amendment 0004 - ATT 1 - TechQuestionsVAresponses Partial 2 - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0004.pdf PDF
S06 - Amendment 0003 - ATT 2 - TechQuestionsVAresponses Partial - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0003.pdf PDF
S06 - 36C77626R0025 0002.pdf PDF
S06 - Amendment 0001 - ATT 1 - Site Visit In-Sheet - Huntington EHRM IU.pdf PDF
S06 - 36C77626R0025 0001.pdf PDF
S02 - ATT 10 - 581-22-700 - 100 Drawings Part-8 of 24.pdf PDF
S02 - ATT 14 - 581-22-700 - 100 Drawings Part-12 of 24.pdf PDF
S02 - ATT 27 - 581-22-700 - Asbestos locations.xlsx XLSX spreadsheet
S02 - 36C77626R0025.pdf PDF
S02 - ATT 1 - 581-22-700 - 100 Specifications Part-1 of 2.pdf PDF
S02 - ATT 2 - 581-22-700 - 100 Specifications Part-2 of 2.pdf PDF
S02 - ATT 9 - 581-22-700 - 100 Drawings Part-7 of 24.pdf PDF
S02 - ATT 11 - 581-22-700 - 100 Drawings Part-9 of 24.pdf PDF
S02 - ATT 15 - 581-22-700 - 100 Drawings Part-13 of 24.pdf PDF
S02 - ATT 18 - 581-22-700 - 100 Drawings Part-16 of 24.pdf PDF
S02 - ATT 20 - 581-22-700 - 100 Drawings Part-18 of 24.pdf PDF
S02 - ATT 23 - 581-22-700 - 100 Drawings Part-21 of 24.pdf PDF
S02 - ATT 24 - 581-22-700 - 100 Drawings Part-22 of 24.pdf PDF
S02 - ATT 30 - 581-22-700 - 100 Commissioning Plan.pdf PDF
S02 - ATT 3 - 581-22-700 - 100 Drawings Part-1 of 24.pdf PDF
S02 - ATT 4 - 581-22-700 - 100 Drawings Part-2 of 24.pdf PDF
S02 - ATT 5 - 581-22-700 - 100 Drawings Part-3 of 24.pdf PDF
S02 - ATT 6 - 581-22-700 - 100 Drawings Part-4 of 24.pdf PDF
S02 - ATT 7 - 581-22-700 - 100 Drawings Part-5 of 24.pdf PDF
S02 - ATT 17 - 581-22-700 - 100 Drawings Part-15 of 24.pdf PDF
S02 - ATT 19 - 581-22-700 - 100 Drawings Part-17 of 24.pdf PDF
S02 - ATT 22 - 581-22-700 - 100 Drawings Part-20 of 24.pdf PDF
S02 - ATT 26 - 581-22-700 - 100 Drawings Part-24 of 24.pdf PDF
S02 - ATT 33 - WD - WV20260048 - 01-02-2026.pdf PDF
S02 - ATT 35 - Site Visit Information - Huntington EHRM IU.pdf PDF
Show all 50

EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

June 27, 2025

1 | P a g e

Design Compliance Certification Letter

This letter is to certify that the mechanical submittal for the EHRM Infrastructure upgrades - Huntington project located at 1540 Spring Valley Drive in Huntington, WV has been reviewed for compliance with applicable codes and standards regarding fire protection and life safety requirements.

Project Title: EHRM Infrastructure Upgrades – Huntington Project Number: 581-22-700 Phase: 100% Construction Documents Issue Date: 06/27/2025

Drawings and Revisions Reviewed

The following sheets and revisions have been reviewed for compliance:

SHEET

NO.

DWG NO. TITLE

1 M-001 FIRE PROTECTION, PLUMBING, AND MECHANICAL GENERAL NOTES

2 M-002 FIRE PROTECTION, PLUMBING, AND MECHANICAL GENERAL NOTES

3 M-003 FIRE PROTECTION, PLUMBING, AND MECHANICAL GENERAL NOTES

4 01-M-101 BUILDING 01S -BASEMENT -OVERALL PLAN -AREA A

5 01-M-102 BUILDING 01S -LEVEL 00 -OVERALL PLAN -AREA A

6 01-M-103 BUILDING 01S & 01W -LEVEL 00 -OVERALL PLAN -AREA B

7 01-M-104 BUILDING 01S -LEVEL 01 -OVERALL PLAN -AREA A

8 01-M-105 BUILDING 01S & 01W -LEVEL 01 -OVERALL PLAN -AREA B

9 01-M-106 BUILDING 01S -LEVEL 02 -OVERALL PLAN -AREA A

10 01-M-107 BUILDING 01S & 01W -LEVEL 02 -OVERALL PLAN -AREA B

11 01-M-108 BUILDING 01S -LEVEL 03 -OVERALL PLAN -AREA A

12 01-M-109 BUILDING 01S & 01W -LEVEL 03 -OVERALL PLAN -AREA B

13 01-M-110 BUILDING 01S -LEVEL 04 -OVERALL PLAN -AREA A

14 01-M-111 BUILDING 01S -LEVEL 04 -OVERALL PLAN -AREA B

15 01-M-112 BUILDING 01S -LEVEL 05 -OVERALL PLAN

16 01-M-113 BUILDING 01S -LEVEL 06 -OVERALL PLAN

17 01S-M-401 BASEMENT FLOOR PLAN -MECHANICAL PIPING TO TR TOWER 1

18 01S-M-402 PIPE BASEMENT FLOOR PLAN -MECHANICAL PIPING TO TR TOWER 4

19 01S-M-403 BUILDING 01S -BASEMENT -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS

20 01S-M-404 BUILDING 01S -LEVEL 00 -MECHANICAL PIPING -FLOOR PLAN

21 01S-M-405 BUILDING 01S -T1 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

22 01S-M-406 BUILDING 01S -T4 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

23 01S-M-407 BUILDING 01S -LEVEL 01 -MECHANICAL PIPING -FLOOR PLAN

Standard Terms and Conditions

2 | P a g e

24 01S-M-408 BUILDING 01S -T1 -LEVEL 01 -FIRE PROTECTION, PLUMBING, AND

25 01S-M-409 BUILDING 01S -T4 -LEVEL 01 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

26 01S-M-410 BUILDING 01S -T1 -LEVEL 02 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

27 01S-M-411 BUILDING 01S -T4 -LEVEL 02 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

28 01S-M-412 BUILDING 01S -T1 -LEVEL 03 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

29 01S-M-413 BUILDING 01S -T4 -LEVEL 03 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

30 01S-M-414 BUILDING 01S -T1 -LEVEL 04 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

31 01S-M-415 BUILDING 01S -T4 -LEVEL 04 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

32 01S-M-416 BUILDING 01S -T1 -LEVEL 05 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

33 01S-M-417 BUILDING 01S -T4 -LEVEL 05 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

34 01S-M-418 BUILDING 01S -LEVEL 06 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN

35 01W-M-401 BASEMENT FLOOR PLAN -MECHANICAL PIPING -MECHANICAL

PIPING TO TR TOWER 2

36 01W-M-402 BUILDING 01W -T2 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

37 01W-M-403 BUILDING 01W -T2 -LEVEL 01 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

38 01W-M-404 BUILDING 01W -T2 -LEVEL 02 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

39 01W-M-405 BUILDING 01W -T2 -LEVEL 03 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

40 M-301-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC DUCT -SECTION VIEW

41 M-302-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC DUCT & ERV -SECTION VIEW

42 MD401-1A PHASE 1A -ROOF -DATA CENTER -DEMOLITION ROOF PLAN

43 MH402-1A PHASE 1A -ROOF -DATA CENTER - ROOF PLAN

44 FD403-1B PHASE 1B -LVL 00 -DATA CENTER -FIRE PROTECTION -DEMOLITION

RCP

45 MD404-1B PHASE 1B -LVL 00 -DATA CENTER -HVAC DUCT -DEMOLITION FLOOR

PLAN

46 MD405-1B PHASE 1B -LVL 00 -DATA CENTER -DEMOLITION RCP

47 FX406-1B PHASE 1B -LVL 00 -DATA CENTER -FIRE PROTECTION -FLOOR PLAN

48 MP407-1B PHASE 1B -LVL 00 -DATA CENTER -HVAC PIPING -FLOOR PLAN

49 MH408-1B PHASE 1B -LVL 00 -DATA CENTER -HVAC DUCT -FLOOR PLAN

50 MH409-1B PHASE 1B -LVL 00 -DATA CENTER -RCP

51 MH410-1B PHASE 1B -ROOF -DATA CENTER -ROOF PLAN

3 | P a g e

52 PP411-1B PHASE 1B -LVL 00 -DATA CENTER -PLUMBING PIPING -FLOOR PLAN

53 MP412-2A PHASE 2A -LVL 00 -DATA CENTER -HVAC PIPING -FLOOR PLAN

54 MH413-2A PHASE 2A -ROOF -DATA CENTER -ROOF PLAN

55 MD414-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC PIPING -DEMOLITION

FLOOR PLAN

56 MD415-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC DUCT -DEMOLITION FLOOR

PLAN

57 MD416-2B PHASE 2B -LVL 00 -DATA CENTER -DEMOLITION RCP

58 MD417-2B PHASE 2B -LVL 00 -DATA CENTER -DEMOLITION ROOF FLOOR PLAN

59 FD418-2B PHASE 2B -LVL 00 -DATA CENTER -FIRE PROTECTION -DEMOLITION

RCP

60 FX419-2B PHASE 2B -LVL 00 -DATA CENTER -FIRE PROTECTION -FLOOR PLAN

61 MP420-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC PIPING -FLOOR PLAN

62 MH421-2B PHASE 2B -LVL 00 -DATA CENTER -HVAC DUCT -FLOOR PLAN

63 MH422-2B PHASE 2B -LVL 00 -DATA CENTER -RCP

64 MH423-2B PHASE 2B -ROOF -DATA CENTER -ROOF PLAN

65 02-M-101 BUILDING 02 -BASEMENT -OVERALL PLAN

66 02-M-102 BUILDING 02 -LEVEL 00 -OVERALL PLAN

67 02-M-401 BASEMENT FLOOR PLAN -MECHANICAL PIPING TO TR TOWER 3

68 02-M-402 BUILDING 02 -T3 -BASEMENT -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

69 02-M-403 BUILDING 02 -T3 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

70 03-M-101 BUILDING 03 -LEVEL 01 -OVERALL PLAN

71 03-M-401 BUILDING 03 -LEVEL 01 -PLUMBING AND MECHANICAL -FLOOR

PLAN

72 04-M-101 BUILDING 04 -LEVEL 00 -OVERALL PLAN

73 04-M-401 BUILDING 04 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS

74 04-M-402 BUILDING 04 -LEVEL 01 -MECHANICAL PIPING -FLOOR PLAN

75 05-M-101 BUILDING 05 -LEVEL 00 -OVERALL PLAN

76 05-M-401 BUILDING 05 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS

77 05-M-402 BUILDING 05 -LEVEL 01 -MECHANICAL PIPING -FLOOR PLAN

78 06-M-101 BUILDING 06 -LEVEL 01 -OVERALL PLAN

79 06-M-401 BUILDING 06 -LEVEL 01 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS

80 06-M-402 BUILDING 06 -ROOF PLAN

81 07-M-101 BUILDING 07 -LEVEL 00 -OVERALL PLAN

82 07-M-102 BUILDING 07 -LEVEL 01 -OVERALL PLAN

83 07-M-103 BUILDING 07 -LEVEL ATTIC -OVERALL PLAN

84 07-M-401 BUILDING 07 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS

85 07-M-402 BUILDING 07 -LEVEL 01 -MECHANICAL PIPING -FLOOR PLAN

86 07-M-403 BUILDING 07 -LEVEL 02 -FLOOR PLAN

4 | P a g e

87 07-M-404 BUILDING 07 -LEVEL ATTIC -FIRE PROTECTION, PLUMBING, AND

88 08-M-101 BUILDING 08 -LEVEL 00 -OVERALL PLAN

89 08-M-102 BUILDING 08 -LEVEL ATTIC -OVERALL PLAN

90 08-M-401 BUILDING 08 -LEVEL 00 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS

91 08-M-402 BUILDING 08 -LEVEL ATTIC -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS

92 09-M-101 BUILDING 09 -LEVEL 02 -OVERALL PLAN

93 09-M-401 BUILDING 09 -LEVEL 00 -MECHANICAL PIPING -FLOOR PLAN

94 09-M-402 BUILDING 09 -LEVEL 01 -FLOOR PLAN

95 09-M-403 BUILDING 09 -LEVEL 02 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS

96 20-M-101 BUILDING 20 -LEVEL 01 -OVERALL PLAN

97 20-M-102 BUILDING 20 -LEVEL 02 -OVERALL PLAN

98 20-M-401 BUILDING 20 -LEVEL 01 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS

99 20-M-402 BUILDING 20 -LEVEL 02 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS

100 20-M-403 BUILDING 20 -ROOF PLAN

101 23R-M-101 BUILDING 23R -BASEMENT -OVERALL PLAN

102 23R-M-401 BUILDING 23R -BASEMENT -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -DEMOLITION, FLOOR PLANS & RCPS

103 25-M-101 BUILDING 25 -LEVEL 01 -OVERALL PLAN

104 25-M-401 BUILDING 25 -LEVEL 01 -FIRE PROTECTION, PLUMBING, AND

MECHANICAL -FLOOR PLAN & RCP

105 28-M-101 BUILDING 28 -LEVEL 01 -OVERALL PLAN

106 28-M-401 BUILDING 28 -LEVEL 01 -PLUMBING AND MECHANICAL -FLOOR

PLAN

107 34-M-101 BUILDING 34 -LEVEL 00 -OVERALL PLAN

108 34-M-401 BUILDING 34 -LEVEL 00 -PLUMBING AND MECHANICAL -FLOOR

PLAN

109 TR1-M-101 BUILDING TR1 -LEVEL 01 -OVERALL PLAN

110 TR1-M-401 BUILDING TR1 -LEVEL 01 -PLUMBING AND MECHANICAL -FLOOR

PLAN

111 TR3-M-101 BUILDING TR3 -LEVEL 01 -OVERALL PLAN

112 TR3-M-401 BUILDING TR3 -LEVEL 01 -MECHANICAL -FLOOR PLAN & RCP

113 TR4-M-101 BUILDING TR4 -LEVEL 01 -OVERALL PLAN

114 TR4-M-401 BUILDING TR4 -LEVEL 01 -MECHANICAL -FLOOR PLAN & RCP

115 TR5-M-101 BUILDING TR5 -LEVEL 01 -OVERALL PLAN

116 TR5-M-401 BUILDING TR5 -LEVEL 01 -MECHANICAL -FLOOR PLAN & RCP

117 M-501 MECHANICAL DETAILS I

118 M-502 MECHANICAL DETAILS II

119 M-503 MECHANICAL DETAILS III

120 M-504 TR TOWER HYDRONIC RISER DIAGRAMS

121 M-601 MECHANICAL SCHEDULES I

5 | P a g e

122 M-602 MECHANICAL SCHEDULES II

123 M-603 MECHANICAL SCHEDULES III

124 M-701 MECHANICAL CONTROLS I

125 M-702 MECHANICAL CONTROLS II

126 M-703 MECHANICAL CONTROLS III

127 M-704 MECHANICAL CONTROLS IV

Individual sheets are the responsibility of the registered design professionals. If required by the project, the registered design professional is responsible for stamping individual drawings. Grey Rock certifies the design as represented in the sheets provided to Grey Rock was reviewed to ensure meet the minimum code requirements of the project.

Sincerely, Greg Kimble, PE Fire Protection Engineer *Licensed in OR, CO