This document is an electrical plan for Building 01W, Level 00G, part of the EHRM Infrastructure Upgrades project at the VA Huntington facility located at 1540 Spring Valley Drive, Huntington, West Virginia. The drawing (01WEP100G) is dated 100% Construction Documents as of September 3, 2025, and was prepared by SPEES Design Build under the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management.
The electrical plan shows the ground floor layout of Building 01W with detailed depictions of power distribution systems, including A-side and B-side power sourcing (both concealed and underground/underfloor routing), transformers (XFMR-1W-TWR2A and XFMR-1W-TWR2B), enclosed circuit breakers, humidifier units, and connections to various building zones including medical offices, nursing areas, volunteer spaces, employee union areas, and telecommunications equipment rooms. Key construction requirements include: coordination with the VA regarding electrical system shutdowns and essential equipment backup power; demolition of equipment and raceways associated with removed walls; sealing of wall and ceiling penetrations to maintain fire ratings; pull box placement for feeders exceeding 250 feet or having more than 270 degrees of total bend; conduit expansion couplings at building expansion joints; bonding of tower structural steel to existing building steel with #3/0 copper conductors; and provision of updated circuit panel directories for all impacted panels. The contractor must field-verify all existing power, lighting, and associated circuitry and coordinate all work with architectural, structural, and trade drawings.
View the file
Other files for this federal contract opportunity
Show all 50
EHRM Huntington VAMC 581-22-700 Construct Infrastructure Upgrades has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PB
BB
BBBBBBBBB
B
B
B
B
B
B
B
B
BB
BB
A
A
A
A
A
A
A
A
A
A
A
A
A
A
AA
AA
BBBBBBB
BB
BB
B
B
B
BBB
B
AAAAAAA
AAAAAAA
A A
B B
A A
B B
AREA SHOWN
1W-6
1W-5
B L D
G
S E
E S
H E
E T
E
P G
B L D
G
W
REF02
01WEP400Ga
ELEC. EQUIP.
GC149
IRM
GC150
ELEC.
GC151a
HBPC
GC151
HBPC
GC152
ISO OFFICE
GC153
MID SOUTH CPAC
GC157
MID SOUTH CPAC
GC158
HAC
GC159MY HLTH VET
GC165
VOLUNTEER
GC164
VOLUNTEER
GC163A
VOLUNTEER
GC163
EMPLOYEE UNION
GC145
LRC
GC145A
LRC
GC154
MIDSOUTH CPAC
GC155
NURSING
GC156
NURSING
GC160
TELEHEALTH
GC161
TELEHEALTH
GC162
EMPLOYEE UNION
GC146
M FOSTER HM OFFICE
GC143
HBPC OFFICE
GC144
HBPC OFFICE
HBPC PHARM OFFICE
GC142
HBPC OFFICE
GC140
HBPC OFFICE
GC139
HBPC DIETICIAN OFFICE
GC138
STOR
GC135
EMPLOYEE UNION
GC141A
NURSING
GC166
STOR
GC141B
ELEV
W-1
ELEV
W-2
MECH. EQUIP
GC148
STAIR 12
GC148
STAFF RESTROOM
GC137
STAFF RESTROOM
GC136
VESTIBULE
GC167
OBVER.ROOM
GC150
SIMULATION LAB
GC169
GC128h
GC128i
GC128f
GC128g
PRIVACY
GC134
TR TOWER 2
T2-00G
T2-A
T2-B
T2-1
01W-P-10A
01W-P-11A
01W-P-02A
01WEP400Ga
EXISTING HOUSEKEEPING PAD
HOUSEKEEPING PAD
1W-LSGA
1W-CPGA SEC.1
1W-CPGA SEC.2
XFMR '1W-CPGA'
DISCONNECT
HUMIDIFIER UNIT 01W-P-01A
01WEP400Gb
01WEP400Gb
01W-P-01B
ENCLOSED CIRCUIT BREAKER
"ECB-XFMR-1W-TWR2B"
TRANSFORMER 'XFMR-1W-TWR2A'
TRANSFORMER 'XFMR-1W-TWR2B'
EXISTING
HOUSEKEEPING PAD
5 PB-1
01W-P-10B
ENCLOSED CIRCUIT BREAKER
"ECB-XFMR-1W-TWR2A"
BLDG 01
BLDG 02
BLDG 01W
BLDG 01SBLDG 23R
BLDG 23
BLDG 01A
BLDG 12
A SIDE POWER, CONCEALED WHERE POSSIBLE
B SIDE POWER, CONCEALED WHERE POSSIBLE
A SIDE POWER, UNDERGROUND / UNDERFLOOR
B SIDE POWER, UNDERGROUND / UNDERFLOOR
PROVIDED TO INDICATE 'A' AND 'B' SIDE SOURCED POWER FEEDERS.
REFERENCE GENERAL SYMBOL LEGEND FOR ADDITIONAL
INFORMATION.
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 300
KENT, WA 98032
/0
/2
:4
:2 a m
B
IM
/5
-2
-7
V A
H u n t i n g to n E
H R
M /E
E
B L D
G
G R
O U
N D
F L
O O
R .r v t
01WEP100G
BLDG 01W - LEVEL 00G - ELECTRICAL PLAN
01W
DCW/NVP RTS/JNV
100% CONSTRUCTION
DOCUMENTS
09/03/2025
581-22-700EHRM INFRASTRUCTURE
UPGRADES - HUNTINGTON
VA HUNTINGTON
1540 SPRING VALLEY DRIVE, HUNTINGTON, WV 25704-9300
PROJECT
NORTH
1" = 10'-0"
BLDG 01W - LEVEL 00G - ELECTRICAL PLAN
ES101
1 8'0 16' 32'
PROJECT
NORTH
CONDUIT CONTINUES TO BUS DUCT CONNECTION BOX. BUS DUCT EXTENDS
VERTICALLY THROUGH STACKED TRS. REFERENCE SHEET 01WEP400G AND
ENLARGED ELECTRCIAL PLANS 01WEP401, 01WEP402, AND 01WEP403 FOR
ADDITIONAL INFORMATION.
PROVIDE TBB AS INDICATED; WHERE CONDUCTOR IS SUBJECT TO PHYSICAL DAMAGE,
CONDUCTOR SHALL BE ROUTED THROUGH RMC. REFERENCE TELECOMMUNICATIONS
BONDING RISER DIAGRAM ON SHEET EG602 FOR ADDITIONAL INFORMATION.
REFERENCE PHOTO DETAIL '1' ON SHEET EP501 FOR ADDITIONAL INFORMATION.
REFERENCE PHOTO DETAIL '2' ON SHEET EP501 FOR ADDITIONAL INFORMATION.
PROVIDE PULL BOX AND MOUNTING HARDWARE FOR CONDUCTOR PULLING MEANS.
LABEL PULL BOX WITH EQUIPMENT NAME IT IS SERVING. REFERENCE TYPICAL PULL
BOX SCHEDULE ON SHEET EP701 FOR ADDITIONAL INFORMATION.
GENERAL NOTES
KEY PLAN
KEY NOTES
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL
RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED
SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND, IN ALL LOCATIONS,
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
4. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING; PROVIDE CORE DRILLING AS REQUIRED. COORDINATE
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS AS REQUIRED.
5. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
7. CONTRACTOR SHALL PROVIDE PULL BOXES FOR ALL FEEDERS WHERE FEEDER RUNS
EXCEED 250FT OR HAVE MORE THAN 270 DEGREES OF TOTAL BEND. PULL BOX
PLACEMENT AND SIZING BY CONTRACTOR. COORDINATE PULL BOX LOCATIONS WITH
ALL OBSTRUCTIONS, TRADES, AND VA AS REQUIRED.
8. CONDUIT EXPANSION COUPLINGS ARE REQUIRED WHEN CONDUIT IS ROUTED
ACROSS BUILDING EXPANSION JOINTS. REFERENCE DETAIL '1' ON SHEET EP509 FOR
ADDITIONAL INFORMATION.
9. ALL RACEWAYS SHALL BE ROUTED ABOVE ACCESSIBLE CEILING, WHERE PRESENT,
UNLESS OTHERWISE NOTED.
Revisions: Date:
Addendum 1: Pre Bid RFIs 4/13/2026
PROVIDE UFER CONDUCTOR AND BONDING OF TOWER STRUCTURAL STEEL TO EXISTING
BUILDING STRUCTURAL STEEL WITH #3/0 COPPER; ALL CONNECTION POINTS SHALL BE
ACCESSIBLE. WHERE EXISTING BUILDING GROUND RING EXISTS, CONTRACTOR SHALL
MATCH EXISTING CONDUCTOR SIZE AND EXTEND RING AROUND TOWER FOOTING.